CN109764635A - The control system and refrigerator of refrigerator - Google Patents

The control system and refrigerator of refrigerator Download PDF

Info

Publication number
CN109764635A
CN109764635A CN201811557419.1A CN201811557419A CN109764635A CN 109764635 A CN109764635 A CN 109764635A CN 201811557419 A CN201811557419 A CN 201811557419A CN 109764635 A CN109764635 A CN 109764635A
Authority
CN
China
Prior art keywords
compartment
heat exchanger
control system
compressor
refrigerator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811557419.1A
Other languages
Chinese (zh)
Inventor
秦道洋
张国帅
白正超
袁琨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Co Ltd
Original Assignee
Qingdao Haier Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Co Ltd filed Critical Qingdao Haier Co Ltd
Priority to CN201811557419.1A priority Critical patent/CN109764635A/en
Publication of CN109764635A publication Critical patent/CN109764635A/en
Pending legal-status Critical Current

Links

Abstract

Present invention discloses a kind of control system of refrigerator and refrigerators, the refrigerator includes the second compartment that the first compartment and space are less than first compartment, the control system includes the First Heat Exchanger that heat exchange is carried out with first compartment, the second heat exchanger of heat exchange is carried out with the second compartment, the throttling set being connected between the First Heat Exchanger and the second heat exchanger, compressor, the reversal valve being connected with the compressor, the First Heat Exchanger and the second heat exchanger are connected with compressor and reversal valve, the reversal valve has the first working condition and the second working condition, when first working condition, the First Heat Exchanger freezes to the first compartment, second heat exchanger carries out heating and thermal insulation to second compartment simultaneously, when second working condition, the First Heat Exchanger carries out heating guarantor to the first compartment Temperature, while second heat exchanger freezes to second compartment.The invention enables better user experiences, and can effective use of energy sources.

Description

The control system and refrigerator of refrigerator
Technical field
The present invention relates to a kind of control system of refrigerator and refrigerators.
Background technique
Currently, general refrigerator refrigeration system only utilizes refrigeration for refrigerator, and it is incomplete to the heat of the condensation heat dissipation of refrigerator Application, or increase condensation heat dissipation moist closet etc. is collected to be utilized.But due to the influence of refrigeration compartment refrigeration demand, make to keep the temperature Room cannot reach good heat insulation effect, for experiencing difference.Refrigeration and heating cannot be effectively utilized simultaneously.It is usually adopted at present Technical solution has: the simple refrigeration compartment with incubator, no compartment handoff functionality, therefore can not effectively keep the temperature system It is cold, or the compensation such as heater strip are needed to improve heat insulation effect.
Such as a kind of refrigerator compartment and tool are disclosed in the Chinese patent application CN105241153A that on January 13rd, 2016 announces There is its refrigerator, heating device is set in refrigerator compartment, so as to directly turn between Heat preservation function and refrigerating function Change refrigerator compartment.But in addition setting heating device is needed, higher cost, and when from refrigerating function to Heat preservation power and energy, It is then turned on heating device, takes a long time could to allow and reaches Heat preservation state in refrigerator compartment.Equally from Heat preservation function It when can convert to refrigerating function, need to turn off heating device, it is also desirable to which the long period, which could allow in refrigerator compartment, reaches refrigeration State.Therefore user experience is poor, and waste of energy.
Summary of the invention
The purpose of the present invention is to provide a kind of control system of refrigerator and refrigerator, so that better user experience, and can have Effect utilizes the energy.
One of for achieving the above object, an embodiment of the present invention provides a kind of control system of refrigerator, the ice Case includes the second compartment that the first compartment and space are less than first compartment, in which:
The control system include with first compartment carry out heat exchange First Heat Exchanger, with the second compartment into Second heat exchanger of row heat exchange, the throttling set being connected between the First Heat Exchanger and the second heat exchanger, compressor, with The reversal valve that the compressor is connected, the First Heat Exchanger and the second heat exchanger are connected with compressor and reversal valve, And the reversal valve has the first working condition and the second working condition, when first working condition, the First Heat Exchanger Freeze to the first compartment, while second heat exchanger carries out heating and thermal insulation, second working condition to second compartment When, the First Heat Exchanger carries out heating and thermal insulation to the first compartment, while second heat exchanger freezes to second compartment.
As the further improvement of an embodiment of the present invention, when the first working condition, the system that is discharged from the compressor The sequence of flow of cryogen is followed successively by second heat exchanger, the throttling set, the First Heat Exchanger, finally returns described Compressor, when the second working condition, the sequence of flow for the refrigerant being discharged from the compressor be followed successively by the First Heat Exchanger, The throttling set, second heat exchanger, finally return the compressor.
As the further improvement of an embodiment of the present invention, the throttling set is capillary, and the compressor has Suction side and outlet side, are equipped with muffler between the reversal valve and the suction side, the capillary and the muffler weld It is connected to together.
As the further improvement of an embodiment of the present invention, the compressor has suction side and an outlet side, and described the One compartment and at least one of periphery of second compartment are equipped with dew removing tube, and the dew removing tube is set to the reversal valve and the row Between outlet.
As the further improvement of an embodiment of the present invention, the dew removing tube coiling is between first compartment and second The entire periphery of room.
As the further improvement of an embodiment of the present invention, the control system further includes being set to the First Heat Exchanger The first two-way device for drying and filtering between throttling set.
As the further improvement of an embodiment of the present invention, the control system further includes being set to second heat exchanger The second two-way device for drying and filtering between throttling set.
As the further improvement of an embodiment of the present invention, the refrigerator further includes connection first compartment and first First air duct of heat exchanger, the first blower set on first air duct.
As the further improvement of an embodiment of the present invention, the First Heat Exchanger is located at the side wall of first compartment Directly to carry out heat exchange with the first compartment.
One of for achieving the above object, the present invention is another, and embodiment further provides a kind of refrigerator, the refrigerator packets It includes the first compartment and space is less than the second compartment of first compartment, in which:
The refrigerator further includes the control system controlled the first compartment and second compartment, and the control system includes The First Heat Exchanger of heat exchange and the second heat exchanger of second compartment progress heat exchange are carried out with first compartment, are connected Pass through the throttling set between the First Heat Exchanger and the second heat exchanger, compressor, the commutation being connected with the compressor Valve, the First Heat Exchanger and the second heat exchanger are connected with compressor and reversal valve, and the reversal valve has the first work Make state and the second working condition, when first working condition, the First Heat Exchanger freezes to the first compartment, simultaneously Second heat exchanger carries out heating and thermal insulation to second compartment, and when second working condition, the First Heat Exchanger is to first Compartment carries out heating and thermal insulation, while second heat exchanger freezes to second compartment.
Compared with prior art, the beneficial effects of the present invention are: only need for reversal valve to be placed in the first working condition or Second working condition can make the first compartment, the refrigeration of second compartment and heating and thermal insulation mode be converted mutually.In this way when When winter, biggish first compartment is as freezing chamber, and lesser second compartment is as heating and thermal insulation room.Temperature is required by freezing chamber Spend relatively low, the first compartment compares that ambassador's cooling system time is long, so as to improve the heating effect of heat preservation compartment.And When summer, biggish first compartment is as heating and thermal insulation room, and lesser second compartment is as freezing chamber, and temperature compares when because of summer Height, moist closet do not need too many heat, and second compartment lesser in this way keeps the cooling system time shorter as freezing chamber, and first The heat that heat exchanger generates is smaller, so that it may the first compartment be made to realize heating and thermal insulation.Therefore, the present invention can be specific according to Summer and winter Temperature it is different, refrigeration and heating mode to the first compartment and second compartment are converted mutually so that better user experience, And energy effective use of energy sources, avoid the problem of Winter protection effect difference and cooling in summer effect difference.
Detailed description of the invention
Fig. 1 is the first compartment of refrigerator in the specific embodiment of the invention and the schematic diagram of second compartment;
Fig. 2 is the schematic diagram of the control system of refrigerator in the specific embodiment of the invention, and reversal valve is in the first work at this time Make state;
Fig. 3 is the schematic diagram of the control system of refrigerator in the specific embodiment of the invention, and reversal valve is in the second work at this time Make state.
Specific embodiment
Below with reference to specific embodiment shown in the drawings, the present invention will be described in detail.But these embodiments are simultaneously The present invention is not limited, structure that those skilled in the art are made according to these embodiments, method or functionally Transformation is included within the scope of protection of the present invention.
In each diagram of the application, for the ease of illustration, structure or partial certain sizes can be relative to other knots Structure or part are exaggerated, and therefore, are only used for the basic structure of the theme of diagram the application.
In addition, the term of the representation space relative position used herein such as "upper", " top ", "lower", " lower section " is A unit as shown in the drawings or feature are described for the purpose convenient for explanation relative to another unit or feature Relationship.The term of relative space position can be intended to include equipment in use or work other than orientation as shown in the figure not Same orientation.For example, being described as being located at other units or feature " below " or " under " if the equipment in figure overturn Unit will be located at other units or feature " top ".Therefore, exemplary term " lower section " can include above and below both Orientation.Equipment can otherwise be directed (be rotated by 90 ° or other directions), and be interpreted accordingly it is used herein with it is empty Between relevant description language.
Preferred embodiment provided by the invention discloses a kind of refrigerator, and refrigerator includes cabinet, as shown in Figure 1, cabinet defines First compartment 10 and second compartment 12, wherein less than the first compartment 10, refrigerator further includes for beating in the space of second compartment 12 Open or close the door body (not shown) of closed box body.
Referring further to Figure 2 and Fig. 3, refrigerator further include the control system controlled the first compartment 10 and second compartment 12 System, control system include that the First Heat Exchanger 14 that heat exchange is carried out with the first compartment 10 and second compartment 12 carry out heat exchange Second heat exchanger 16, the throttling set 18 being connected between First Heat Exchanger 14 and the second heat exchanger 16, compressor 20 and compression The reversal valve 22 that machine 20 is connected, First Heat Exchanger 14 and the second heat exchanger 16 are connected with compressor 20 and reversal valve 22, And reversal valve 22 has the first working condition and the second working condition.Wherein, when reversal valve 22 is in the first working condition, the One heat exchanger 14 freezes to the first compartment 10, while the second heat exchanger 16 carries out heating and thermal insulation to second compartment 12, when changing When being in the second working condition to valve 22, First Heat Exchanger 14 carries out heating and thermal insulation, while the second heat exchanger to the first compartment 10 16 pairs of second compartments 12 are freezed.
In this preferred embodiment, it is only necessary to reversal valve 22 are placed in the first working condition or the second working condition, can be made The first compartment 10, the refrigeration of second compartment 12 and heating and thermal insulation mode is obtained to be converted mutually.In this way when winter, biggish One compartment 10 is used as freezing chamber, and lesser second compartment 12 is used as heating and thermal insulation room.Require temperature relatively low by freezing chamber, the One compartment 10 is bigger, so that the cooling system time is long, so as to improve the heating effect of heat preservation compartment.And summer When, biggish first compartment 10 is used as heating and thermal insulation room, and lesser second compartment 12 is used as freezing chamber, and temperature compares when because of summer Height, moist closet do not need too many heat, and second compartment 12 lesser in this way keeps the cooling system time shorter as freezing chamber, the The heat that one heat exchanger 14 generates is smaller, so that it may the first compartment 10 be made to realize heating and thermal insulation.Therefore, this preferred embodiment provides Refrigerator and control system can be different according to the specific temperature of Summer and winter, refrigeration to the first compartment 10 and second compartment 12 and add Heat pattern is converted mutually, so that better user experience, and energy effective use of energy sources, avoid Winter protection effect difference and summer The problem of season poor refrigerating efficiency.
Wherein, the arrow in Fig. 2 and Fig. 3 illustrates the flow direction of refrigerant.When the first working condition, from compressor 20 The sequence of flow of the refrigerant of discharge is followed successively by the second heat exchanger 16, throttling set 18, First Heat Exchanger 14, finally returns pressure Contracting machine 20.Specifically, compressor 20 sucks refrigerant, become the gaseous refrigerant of high temperature and pressure, the gaseous refrigerant of high temperature and pressure Agent enters the second heat exchanger 16 by reversal valve 22, and the second heat exchanger 16 is used as condenser at this time, and refrigerant is in the second heat exchange Heat release in device 16 carries out heating and thermal insulation to second compartment 12, second compartment 12 is made to become heating and thermal insulation room, and then refrigerant condenses After enter throttling set 18, become the liquid refrigerant of low-temp low-pressure by the refrigerant that 18 expenditure and pressure of throttling set is crossed, The liquid refrigerant of low-temp low-pressure enters after First Heat Exchanger 14 evaporation that can rapidly absorb heat, thus to the first compartment 10 into Row refrigeration, First Heat Exchanger 14 is evaporator at this time.Final refrigerant becomes the gaseous refrigerant of isothermal and isobaric, later gaseous state system Cryogen can be sucked by compressor 20 again to be compressed, and continues to recycle.To sum up, which freezes to the first compartment 10 same When, the heat that the second heat exchanger 16 distributes is used effectively, to carry out heating and thermal insulation to second compartment 12.
As shown in figure 3, when reversal valve 22 is in the second working condition, the refrigerant being discharged from compressor 20 first passes through the One heat exchanger 14, using the second heat exchanger 16.Specifically, the sequence of flow for the refrigerant being discharged from compressor 20 is followed successively by the One heat exchanger 14, throttling set 18, the second heat exchanger 16, finally return compressor 20.Its specific work process are as follows: compressor 20 sucking refrigerants, become the gaseous refrigerant of high temperature and pressure, and the gaseous refrigerant of high temperature and pressure is entered by reversal valve 22 First Heat Exchanger 14, First Heat Exchanger 14 is used as condenser, refrigerant heat release in First Heat Exchanger 14, to the first compartment at this time 10 carry out heating and thermal insulation, and the first compartment 10 is made to become heating and thermal insulation room, then enter throttling set 18 after refrigerant condensation, pass through Cross the liquid refrigerant that the refrigerant that 18 expenditure and pressure of throttling set is crossed becomes low-temp low-pressure, the liquid refrigerant of low-temp low-pressure into Can rapidly absorb heat evaporation after entering to the second heat exchanger 16, to freeze to second compartment 12, the second heat exchanger at this time 16 be evaporator.Final refrigerant becomes the gaseous refrigerant of isothermal and isobaric, and gaseous refrigerant can be again by compressor 20 later Sucking compression, continues to recycle.To sum up, while which freezes to second compartment 12, First Heat Exchanger 14 is distributed Heat be used effectively, with to the first compartment 10 carry out heating and thermal insulation.Therefore, the shape of reversal valve 22 can be converted as needed State, thus the mutual conversion for making the first compartment 10 and second compartment 12 be freezed and be heated, to meet different phase and difference The different of user need.
Further, throttling set 18 is capillary, and compressor 20 has suction side and outlet side, reversal valve 22 and sucking Muffler 24 is equipped between end, in general, capillary is welded together with muffler 24.Certainly, capillary and muffler 24 can also To be not welded to together, but independently it is arranged.
In addition, the first compartment 10 and at least one of periphery of second compartment 12 are equipped with dew removing tube 26, dew removing tube 26 is set Between reversal valve 22 and outlet side.Preferably, dew removing tube 26 is steel pipe.Certainly, dew removing tube 26 can also use other materials. Dew removing tube 26 can prevent the first compartment 10 or second compartment 12 as refrigeration compartment from generating condensation and improving as heating Keep the temperature the second compartment 12 of compartment or the heat insulation effect of the first compartment 10.
Preferably, the coiling of dew removing tube 26 is in the entire periphery of the first compartment 10 and second compartment 12.And part dew removing tube 26 It is also located between the first compartment 10 and second compartment 12.
Control system further includes set on the first two-way device for drying and filtering 28 between First Heat Exchanger 14 and throttling set 18. Further, control system further includes set on the second two-way device for drying and filtering between the second heat exchanger 16 and throttling set 18 30。
In addition, the refrigerator of this preferred embodiment can be used air-cooled, can also be used direct-cooled.When using air-cooled, refrigerator is also wrapped Include connection the first compartment 10 and First Heat Exchanger 14 the first air duct (not shown), and set on the first air duct the first blower (not Diagram).Refrigerator may also include the second air duct (not shown) of connection second compartment 12 and the second heat exchanger 16, and be set to the second wind Second blower (not shown) in road.And when using it is direct-cooled when, First Heat Exchanger 14 be located at the side wall of the first compartment 10 with directly with First compartment 10 carries out heat exchange.Equally, the second heat exchanger 16 also is located at the side wall of second compartment 12 with direct and second compartment 12 carry out heat exchange.In addition, can be configured as the first compartment 10 using air-cooled, second compartment 12 is using direct-cooled.Opposite, it can also It is direct-cooled to be arranged to the use of the first compartment 10, and second compartment 12 is using air-cooled.
It should be appreciated that although this specification is described in terms of embodiments, but not each embodiment only includes one A independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should will say As a whole, the technical solution in each embodiment may also be suitably combined to form those skilled in the art can for bright book With the other embodiments of understanding.
The series of detailed descriptions listed above only for feasible embodiment of the invention specifically Protection scope bright, that they are not intended to limit the invention, it is all without departing from equivalent implementations made by technical spirit of the present invention Or change should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of control system of refrigerator, the refrigerator includes that the first compartment and space are less than between the second of first compartment Room, it is characterised in that:
The control system includes that the First Heat Exchanger that heat exchange is carried out with first compartment and the second compartment carry out heat Exchange the second heat exchanger, be connected between the First Heat Exchanger and the second heat exchanger throttling set, compressor, with it is described The reversal valve that compressor is connected, the First Heat Exchanger and the second heat exchanger are connected with compressor and reversal valve, and institute Reversal valve is stated with the first working condition and the second working condition, when first working condition, the First Heat Exchanger is to the One compartment freezes, while second heat exchanger carries out heating and thermal insulation, when second working condition, institute to second compartment It states First Heat Exchanger and heating and thermal insulation is carried out to the first compartment, while second heat exchanger freezes to second compartment.
2. the control system of refrigerator according to claim 1, which is characterized in that when the first working condition, from the compression The sequence of flow of the refrigerant of machine discharge is followed successively by second heat exchanger, the throttling set, the First Heat Exchanger, finally Return the compressor, when the second working condition, the sequence of flow for the refrigerant being discharged from the compressor is followed successively by described First Heat Exchanger, the throttling set, second heat exchanger, finally return the compressor.
3. the control system of refrigerator according to claim 1, which is characterized in that the throttling set is capillary, described Compressor has suction side and outlet side, and muffler, the capillary and institute are equipped between the reversal valve and the suction side Muffler is stated to be welded together.
4. the control system of refrigerator according to claim 1, which is characterized in that the compressor has suction side and discharge End, first compartment and at least one of periphery of second compartment are equipped with dew removing tube, and the dew removing tube is set to the commutation Between valve and the outlet side.
5. the control system of refrigerator according to claim 4, which is characterized in that the dew removing tube coiling is between described first The entire periphery of room and second compartment.
6. the control system of refrigerator according to claim 1, which is characterized in that the control system further includes set on described The first two-way device for drying and filtering between First Heat Exchanger and throttling set.
7. the control system of refrigerator according to claim 1, which is characterized in that the control system further includes set on described The second two-way device for drying and filtering between second heat exchanger and throttling set.
8. the control system of refrigerator according to claim 1, which is characterized in that the refrigerator further includes connection described first First air duct of compartment and First Heat Exchanger, the first blower set on first air duct.
9. the control system of refrigerator according to claim 1, which is characterized in that the First Heat Exchanger is located at described first The side wall of compartment is directly to carry out heat exchange with the first compartment.
10. a kind of refrigerator, the refrigerator includes the second compartment that the first compartment and space are less than first compartment, and feature exists In:
The refrigerator further includes the control system controlled the first compartment and second compartment, and the control system includes and institute The first compartment is stated to carry out the First Heat Exchanger of heat exchange, carry out the second heat exchanger of heat exchange with the second compartment, be connected to Throttling set, compressor between the First Heat Exchanger and the second heat exchanger, the reversal valve being connected with the compressor, institute It states First Heat Exchanger and the second heat exchanger is connected with compressor and reversal valve, and the reversal valve has the first working condition With the second working condition, when first working condition, the First Heat Exchanger freezes to the first compartment, while described Two heat exchangers carry out heating and thermal insulation to second compartment, when second working condition, the First Heat Exchanger to the first compartment into Row heating and thermal insulation, while second heat exchanger freezes to second compartment.
CN201811557419.1A 2018-12-19 2018-12-19 The control system and refrigerator of refrigerator Pending CN109764635A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811557419.1A CN109764635A (en) 2018-12-19 2018-12-19 The control system and refrigerator of refrigerator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811557419.1A CN109764635A (en) 2018-12-19 2018-12-19 The control system and refrigerator of refrigerator

Publications (1)

Publication Number Publication Date
CN109764635A true CN109764635A (en) 2019-05-17

Family

ID=66451379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811557419.1A Pending CN109764635A (en) 2018-12-19 2018-12-19 The control system and refrigerator of refrigerator

Country Status (1)

Country Link
CN (1) CN109764635A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005265229A (en) * 2004-03-17 2005-09-29 Kubota Corp Heating-cooling device for vending machine
CN106225371A (en) * 2016-08-05 2016-12-14 青岛海尔股份有限公司 Refrigerator compartment and control system thereof
CN206410382U (en) * 2017-01-05 2017-08-15 合肥华凌股份有限公司 Return-air heat exchanger tube, refrigeration system and refrigeration plant
CN108278829A (en) * 2018-02-07 2018-07-13 青岛海尔股份有限公司 A kind of refrigerator
CN207831732U (en) * 2017-05-23 2018-09-07 中山市尊品电器有限公司 Independent control multi-temp-region Intelligent refrigeration thermostatic equipment
CN108981246A (en) * 2018-09-18 2018-12-11 长虹美菱股份有限公司 A kind of refrigeration system and its control method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005265229A (en) * 2004-03-17 2005-09-29 Kubota Corp Heating-cooling device for vending machine
CN106225371A (en) * 2016-08-05 2016-12-14 青岛海尔股份有限公司 Refrigerator compartment and control system thereof
CN206410382U (en) * 2017-01-05 2017-08-15 合肥华凌股份有限公司 Return-air heat exchanger tube, refrigeration system and refrigeration plant
CN207831732U (en) * 2017-05-23 2018-09-07 中山市尊品电器有限公司 Independent control multi-temp-region Intelligent refrigeration thermostatic equipment
CN108278829A (en) * 2018-02-07 2018-07-13 青岛海尔股份有限公司 A kind of refrigerator
CN108981246A (en) * 2018-09-18 2018-12-11 长虹美菱股份有限公司 A kind of refrigeration system and its control method

Similar Documents

Publication Publication Date Title
CN102395840B (en) Freezer-refrigerator
KR100785116B1 (en) Refrigerator
EP1924810A1 (en) Air conditioning system for communication equipment and controlling method thereof
CN107178924A (en) A kind of accumulation of heat is not shut down except defrosting system and air-conditioning
CN106225358A (en) Cold storage hot gas defrosting refrigeration system and heat accumulating type steam defrosting heat pump system
CN109269189A (en) A kind of dual-purpose refrigerator
CN202813592U (en) Air-conditioning device
JP2003004321A (en) Refrigerating air conditioner
US6915658B2 (en) Accumulator and air conditioning system using the same
CN100552327C (en) The compressor discharge pressure control device of heat pump and heat pump
JP2001296068A (en) Regenerative refrigerating device
KR20100005734U (en) Heat pump storage system
CN103335439A (en) Refrigeration system
CN207635638U (en) A kind of refrigeration system and refrigerator
CN105928290A (en) Adsorbing and frost restraining technology based refrigerating system of air-cooled refrigerator
KR20200084238A (en) A cooling system without an outdoor unit combining a freezer and an air conditioner
CN216114369U (en) Air conditioner system
CN109764635A (en) The control system and refrigerator of refrigerator
KR20100005735U (en) storage system
CN212253305U (en) Refrigerator with a door
CN202382340U (en) Gravitational convection radiation air conditioner
CN109724286B (en) Air conditioning system and air conditioner
KR20100097827A (en) Heat pump type cooling and heating apparatus
CN109827355A (en) Freezer is freezed with hot fluorine defrosting type air injection enthalpy-increasing and two alliance machine set system of hot water
CN214841905U (en) Refrigerator with cold and warm dual-purpose function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 266101 Haier Industrial Park, No. 1, Haier Road, hi tech park, Laoshan District, Shandong, China

Applicant after: Haier Zhijia Co.,Ltd.

Address before: 266101 Haier Industrial Park, Haier Road, Laoshan District, Shandong, Qingdao, China

Applicant before: Qingdao Haier Joint Stock Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190517