CN109763665A - A kind of rail mounted safety rope hanging component for high-altitude construction - Google Patents

A kind of rail mounted safety rope hanging component for high-altitude construction Download PDF

Info

Publication number
CN109763665A
CN109763665A CN201910171817.8A CN201910171817A CN109763665A CN 109763665 A CN109763665 A CN 109763665A CN 201910171817 A CN201910171817 A CN 201910171817A CN 109763665 A CN109763665 A CN 109763665A
Authority
CN
China
Prior art keywords
track
moving
riser
fastener
safety rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910171817.8A
Other languages
Chinese (zh)
Inventor
周洪文
李恒
易鼎鼎
董译萱
马家昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Institute of Technology
Original Assignee
Shanghai Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Institute of Technology filed Critical Shanghai Institute of Technology
Priority to CN201910171817.8A priority Critical patent/CN109763665A/en
Publication of CN109763665A publication Critical patent/CN109763665A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of rail mounted safety ropes for high-altitude construction to hang component.Wherein, the first side of moving track is equipped with opening along its length, is equipped with guide groove in the two sides of opening in the inner cavity of moving track.The first end of moving assembly is moving portion, is set in guide groove.The second end of moving assembly is connected with external security rope.The first end of connector is connected with moving track.The second end of connector is connected with steel pipe.Steel pipe and outside scaffolding steel pipe mutually overlap fixation.By the way that moving track, moving assembly is arranged, moving track is embedded track, the moving portion of moving assembly protrudes into the inner cavity of moving track and is moved, safety rope is connected with the other end of moving assembly, in such a way that moving assembly is wrapped in inside by this moving track, the risk that moving assembly falls off is reduced, the safety of high-altitude construction operation is improved.

Description

A kind of rail mounted safety rope hanging component for high-altitude construction
Technical field
The present invention relates to a kind of safe corollary apparatus of high altitude operation more particularly to a kind of rail mounteds for high-altitude construction Safety rope hangs component.
Background technique
Safety in production is all placed on the top priority of every management by either central or place now.Current some buildings Engineering high altitude operation, there are also the high altitude operation of other field, some takes safety rope hanging to hang, but cannot prolong working face shifting Dynamic, worker can only ceaselessly dismantle safety rope, make to construct extremely inconvenient, and there are great security risks.Such as in bridge construction Beam engineering has quite a few quantity using concreting guardrail, and according to engineering characteristic, operation side is narrow and long, and It is all the construction of high-altitude edge, needing to take worker is to hang the safeguard measures such as safety rope, but to be protected along pouring by construction personnel Column direction is mobile, and lacks to be reliably fixed and a little hang safety rope to hang, and has great security risk.Two existing safety rope dresses It sets middle moving parts and is coated at track, so that the safety of high-altitude construction operation is not high.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of rail mounted safety ropes for high-altitude construction to hang component, with Improve the safety of high-altitude construction operation.
To solve the above problems, the technical solution of the present invention is as follows:
A kind of rail mounted safety rope for high-altitude construction of the invention hangs component, comprising: moving track, mobile group Part;Wherein,
The first side of the moving track is equipped with opening along its length, in institute in the inner cavity of the moving track The two sides for stating opening are equipped with guide groove;
The first end of the moving assembly is moving portion, and wears the opening of the moving track and be set to the guide groove It is interior;
The second end of the moving assembly is connected with external security rope.
The rail mounted safety rope for high-altitude construction of the invention hangs component, the moving track include starting stave, Second riser, third riser, the 4th riser, the first transverse slat, the second transverse slat and third transverse slat;Wherein,
The first end of first transverse slat is vertical with the first end of the starting stave to be connect;
The second end of first transverse slat is vertical with the first end of second riser to be connect;
The second end of the starting stave is vertical with the first end of second transverse slat to be connect;
The second end of second riser is vertical with the first end of the third transverse slat to be connect;
The second end of second transverse slat is vertical with the first end of the third riser to be connect and the third riser is located at Between the starting stave and the second riser;
The second end of the third transverse slat is vertical with the first end of the 4th riser to be connect and the 4th riser is located at Between the starting stave and the second riser.
Rail mounted safety rope for high-altitude construction of the invention hangs component, and the moving assembly further includes vertical pivot, hangs Ring;Wherein,
The first end of the vertical pivot is vertically connected at the moving portion;
The second end of the vertical pivot is connected with the hanging ring.
The rail mounted safety rope for high-altitude construction of the invention hangs component, and the moving portion includes the first runner, the Two runners, wheel shaft;Wherein,
First runner is set to the first end of the wheel shaft;
Second runner is set to the second end of the wheel shaft;
The first end of the wheel shaft is equipped with the first locating part;
The second end of the wheel shaft is equipped with the second locating part;
The starting stave is equipped with the first limit card slot corresponding with first locating part;
Second riser is equipped with the second limit card slot corresponding with second locating part.
Rail mounted safety rope for high-altitude construction of the invention hangs component, and first runner is first motor driving Wheel;
Second runner is the second motor driving wheel;
It further include controller and infrared distance measurement alarm;
The controller is set on the vertical pivot, for receiving external control signal and the control first motor driving Wheel and second motor driving wheel;
The infrared distance measurement alarm is set on the vertical pivot.
Rail mounted safety rope for high-altitude construction of the invention hangs component, further includes connector, steel pipe;
The first end of the connector is connected with the moving track;
The second end of the connector is connected with the steel pipe;
The steel pipe and outside scaffolding steel pipe mutually overlap fixation.
Rail mounted safety rope for high-altitude construction of the invention hangs component, and the connector includes the first track end button Part, the second orbital segment fastener and several rail superior portion fasteners;Wherein,
The first end of the first track end fastener is connected with the first end of the moving track;
The second end of the first track end fastener is connected with the first end of the steel pipe;
The first end of the second track end fastener is connected with the second end of the moving track;
The second end of the second track end fastener is connected with the second end of the steel pipe;
The first end of several rail superior portion fasteners is connected with the moving track, several rail superior portion fasteners Second end is connected with the steel pipe, and several rail superior portion fasteners are distributed in the first track end fastener and described second Between track end fastener.
Rail mounted safety rope for high-altitude construction of the invention hangs component, and the first end of the rail superior portion fastener is set There are several bolts hole, the rail superior portion fastener is connected by the bolt hole and bolt with the moving track.
The present invention due to using the technology described above, makes it have the following advantages that and actively imitate compared with prior art Fruit:
For one embodiment of the invention by setting moving track, moving assembly, moving track is embedded track, moving assembly Moving portion protrude into the inner cavity of moving track and moved, safety rope is connected with the other end of moving assembly, passes through this shifting Moving assembly is wrapped in internal mode by dynamic rail road, is reduced the risk that moving assembly falls off, is improved high-altitude construction operation Safety.
Detailed description of the invention
Fig. 1 is the schematic diagram that the rail mounted safety rope for high-altitude construction of the invention hangs component;
Fig. 2 is the schematic diagram for the moving track that the rail mounted safety rope for high-altitude construction of the invention hangs component;
Fig. 3 is the schematic diagram for the moving assembly that the rail mounted safety rope for high-altitude construction of the invention hangs component;
Fig. 4 is the sectional view that the rail mounted safety rope for high-altitude construction of the invention hangs component;
Fig. 5 is the schematic diagram for the track end fastener that the rail mounted safety rope for high-altitude construction of the invention hangs component;
Fig. 6 is the signal for the rail superior portion fastener that the rail mounted safety rope for high-altitude construction of the invention hangs component Figure;
Description of symbols: 1: moving track;101: the first limit card slots;102: the second limit card slots;2: moving portion; 201: wheel shaft;202: the first runners;203: the second runners;204: the first locating parts;205: the second locating parts;3: hanging ring;4: the Two track end fasteners;5: rail superior portion fastener;501: bolt hole;6: steel pipe;7: bolt;8: infrared distance measurement alarm;9: control Device;10: the first track end fasteners.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to a kind of rail mounted safety rope for high-altitude construction proposed by the present invention Hanging component is described in further detail.According to following explanation and claims, advantages and features of the invention will be become apparent from.
Referring to Fig. 1 and Fig. 4, in one embodiment, a kind of rail mounted safety rope hanging component for high-altitude construction, packet It includes: moving track 1, moving assembly, connector, steel pipe 6.Wherein, the first side of moving track 1 is equipped with along its length It is open, is equipped with guide groove in the two sides of opening in the inner cavity of moving track.The first end of moving assembly is moving portion, and is worn The opening of moving track 1 is simultaneously set in guide groove.The second end of moving assembly is connected with external security rope.The first end of connector It is connected with moving track 1.The second end of connector is connected with steel pipe 6.Steel pipe 6 and the mutually overlap joint of outside scaffolding steel pipe 6 are fixed. By the way that moving track 1, moving assembly, connector, steel pipe 6 is arranged, moving track 1 is embedded track, the movement of moving assembly Portion 2 protrudes into the inner cavity of moving track 1 and is moved, and steel pipe 6 is connected with outside scaffolding, leads between moving track 1 and steel pipe 6 It crosses connector to be connected, safety rope is connected with the other end of moving assembly, is wrapped in moving assembly by this moving track 1 interior The mode in portion reduces the risk that moving assembly falls off, improves the safety of high-altitude construction operation.Track of the invention simultaneously Formula safety rope hanging component removal facilitates structure simple, applied widely, substantially increases safety and practicability.
Further, referring to Fig. 2, moving track 1 includes starting stave, the second riser, third riser, the 4th riser, the One transverse slat, the second transverse slat and third transverse slat.Wherein, the first end of the first transverse slat and first end of starting stave is vertical connects.The The second end of one transverse slat is vertical with the first end of the second riser to be connect.The second end of starting stave and the first end of the second transverse slat are hung down It is direct-connected to connect.The second end of second riser is vertical with the first end of third transverse slat to be connect.The second end and third riser of second transverse slat First end vertically connect and third riser is between starting stave and the second riser.The second end of third transverse slat is perpendicular with the 4th The first end of plate vertically connects and the 4th riser is between starting stave and the second riser.Starting stave, the second riser, third Riser, the 4th riser, the first transverse slat, the second transverse slat and third transverse slat are stainless-steel sheet, and the connection type between it is Welding.The first end of moving track 1 be opening and be equipped with dismountable block plate, second end be it is closed, moving portion 2 can be from opening End is put into and is closed by dismountable block plate, to prevent moving portion 2 from skidding off.
Further, referring to Fig. 3, moving assembly further includes vertical pivot, hanging ring 3.Wherein, the first end of vertical pivot is vertically connected at Moving portion 2.The second end of vertical pivot is connected with hanging ring 3.Vertical pivot and moving portion 2 and the connection type of hanging ring 3 are welding.
Preferably, moving portion 2 includes the first runner 202, the second runner 203, wheel shaft 201.Wherein, the first runner 202 is set In the first end of wheel shaft 201.Second runner 203 is set to the second end of wheel shaft 201.The first end of wheel shaft 201 is equipped with the first limit Part 204.The second end of wheel shaft 201 is equipped with the second locating part 205.Starting stave is equipped with corresponding with the first locating part 204 the One limit card slot 101.Second riser is equipped with second limit card slot 102 corresponding with the second locating part 205.First limit card slot 101 are welded on for two steel bars and constitute on the inner sidewall of starting stave, and the second limit card slot 102 is that two steel bars are welded on the It is constituted on the inner sidewall of two risers, there is certain bearing capacity.
Preferably, the first runner 202 is first motor driving wheel.Second runner 203 is the second motor driving wheel.Further include Controller 9 and infrared distance measurement alarm 8.Controller 9 is set on vertical pivot, for receiving the first electricity of external control signal and control Machine driving wheel and the second motor driving wheel.Infrared distance measurement alarm 8 is set on vertical pivot.
Further, referring to Fig. 5 and Fig. 6, connector includes the first track end fastener 10, the second orbital segment fastener and several Rail superior portion fastener 5.Wherein, the first end of the first track end fastener 10 is connected with the first end of moving track 1.First track end The second end of fastener 10 is connected with the first end of steel pipe 6.The first end of second track end fastener 4 and the second end of moving track 1 It is connected.The second end of second track end fastener 4 is connected with the second end of steel pipe 6.The first end and shifting of several rail superior portion fasteners 5 Dynamic rail road 1 is connected, and the second end of several rail superior portion fasteners 5 is connected with steel pipe 6, and several rail superior portion fasteners 5 are distributed in the Between one track end fastener 10 and the second track end fastener 4.The first end of first track end fastener 10 and the second track end fastener 4 Opposite by two zigzag shape steel and be formed by connecting by bolt 7, the inner wall formed can be bonded moving track 1.
Preferably, if the first end of rail superior portion fastener 5 is equipped with 7 hole 501 of bolt stem, rail superior portion fastener 5 passes through bolt 7 Hole 501 and bolt 7 are connected with moving track 1.The second end of rail superior portion fastener 5 is opposite by two semicircle steel and by spiral shell Bolt 7 is formed by connecting, and the inner wall formed can be bonded steel pipe 6.
Further, 6 specification of steel pipe and the sectional dimension of moving track 1 are plurality of specifications, since Construction of Civil Engineering has Many high altitude operation, so steel pipe 6 is identical with 6 specification of scaffolding steel pipe, bracket is fixed by the mutually overlap joint of scaffolding steel pipe 6 , it can be overlapped according to the Construction Condition at scene, this device can be there are many specification, different, the selection of can be according to demand the case where The device of different specification size.When people using safety rope hanging on hanging ring 3 be set the safety of infrared distance measurement alarm 8 away from From, when people exceed safe distance when, infrared distance measurement alarm 8 will automatic alarm, controller 9 will control motor driving wheel fortune It is dynamic, inside controller 9 equipped with mobile phone device interconnected, mobile phone can be passed through control controller 9 and control motor drive Driving wheel movement, mobile phone can navigate to the position of controller 9, be needed in someone in use, can will be empty by using mobile phone Nearest pulley blocks move to oneself at one's side, it is then stand-by to fix safety rope.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Mode.Even if to the present invention, various changes can be made, if these variations belong to the model of the claims in the present invention and its equivalent technologies Within enclosing, then still fall within the protection scope of the present invention.

Claims (8)

1. a kind of rail mounted safety rope for high-altitude construction hangs component characterized by comprising moving track, mobile group Part;Wherein,
The first side of the moving track is equipped with opening along its length, opens in the inner cavity of the moving track described The two sides of mouth are equipped with guide groove;
The first end of the moving assembly is moving portion, and wears the opening of the moving track and be set in the guide groove;
The second end of the moving assembly is connected with external security rope.
2. the rail mounted safety rope described in accordance with the claim 1 for high-altitude construction hangs component, which is characterized in that the shifting Dynamic rail road includes starting stave, the second riser, third riser, the 4th riser, the first transverse slat, the second transverse slat and third transverse slat;Its In,
The first end of first transverse slat is vertical with the first end of the starting stave to be connect;
The second end of first transverse slat is vertical with the first end of second riser to be connect;
The second end of the starting stave is vertical with the first end of second transverse slat to be connect;
The second end of second riser is vertical with the first end of the third transverse slat to be connect;
The second end of second transverse slat is vertical with the first end of the third riser connect and the third riser be located at it is described Between starting stave and the second riser;
The second end of the third transverse slat is vertical with the first end of the 4th riser connect and the 4th riser be located at it is described Between starting stave and the second riser.
3. the rail mounted safety rope for high-altitude construction hangs component according to claim 2, which is characterized in that the shifting Dynamic component further includes vertical pivot, hanging ring;Wherein,
The first end of the vertical pivot is vertically connected at the moving portion;
The second end of the vertical pivot is connected with the hanging ring.
4. the rail mounted safety rope described in accordance with the claim 3 for high-altitude construction hangs component, which is characterized in that the shifting Dynamic portion includes the first runner, the second runner, wheel shaft;Wherein,
First runner is set to the first end of the wheel shaft;
Second runner is set to the second end of the wheel shaft;
The first end of the wheel shaft is equipped with the first locating part;
The second end of the wheel shaft is equipped with the second locating part;
The starting stave is equipped with the first limit card slot corresponding with first locating part;
Second riser is equipped with the second limit card slot corresponding with second locating part.
5. the rail mounted safety rope described in accordance with the claim 3 for high-altitude construction hangs component, which is characterized in that described the One runner is first motor driving wheel;
Second runner is the second motor driving wheel;
It further include controller and infrared distance measurement alarm;
The controller is set on the vertical pivot, for receive external control signal and the control first motor driving wheel and Second motor driving wheel;
The infrared distance measurement alarm is set on the vertical pivot.
6. the rail mounted safety rope described in accordance with the claim 1 for high-altitude construction hangs component, which is characterized in that further include Connector, steel pipe;
The first end of the connector is connected with the moving track;
The second end of the connector is connected with the steel pipe;
The steel pipe and outside scaffolding steel pipe mutually overlap fixation.
7. the rail mounted safety rope for high-altitude construction hangs component according to claim 6, which is characterized in that the company Fitting includes the first track end fastener, the second orbital segment fastener and several rail superior portion fasteners;Wherein,
The first end of the first track end fastener is connected with the first end of the moving track;
The second end of the first track end fastener is connected with the first end of the steel pipe;
The first end of the second track end fastener is connected with the second end of the moving track;
The second end of the second track end fastener is connected with the second end of the steel pipe;
The first end of several rail superior portion fasteners is connected with the moving track, and the second of several rail superior portion fasteners End is connected with the steel pipe, and several rail superior portion fasteners are distributed in the first track end fastener and second track It holds between fastener.
8. the rail mounted safety rope for high-altitude construction hangs component according to claim 7, which is characterized in that the rail The first end of road top fastener is equipped with several bolts hole, and the rail superior portion fastener passes through the bolt hole and bolt and the shifting Dynamic rail road is connected.
CN201910171817.8A 2019-03-07 2019-03-07 A kind of rail mounted safety rope hanging component for high-altitude construction Pending CN109763665A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910171817.8A CN109763665A (en) 2019-03-07 2019-03-07 A kind of rail mounted safety rope hanging component for high-altitude construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910171817.8A CN109763665A (en) 2019-03-07 2019-03-07 A kind of rail mounted safety rope hanging component for high-altitude construction

Publications (1)

Publication Number Publication Date
CN109763665A true CN109763665A (en) 2019-05-17

Family

ID=66456810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910171817.8A Pending CN109763665A (en) 2019-03-07 2019-03-07 A kind of rail mounted safety rope hanging component for high-altitude construction

Country Status (1)

Country Link
CN (1) CN109763665A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109722996A (en) * 2019-03-05 2019-05-07 代营伟 For reinforcing the suspension apparatus of highway bridge and the building method of the suspension apparatus

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102219106A (en) * 2011-05-11 2011-10-19 李超 Hanging pulley and rail
CN203514837U (en) * 2013-09-18 2014-04-02 河南城建建设集团有限公司 Safety device for building safety construction
CN203568358U (en) * 2013-11-14 2014-04-30 无锡市福曼科技有限公司 Suspending and sliding structure
CN106193639A (en) * 2016-07-08 2016-12-07 中建三局集团有限公司 Assembled rail safety rope hangar system
CN205945501U (en) * 2016-08-23 2017-02-08 北华大学 Frequency converter having detachable inverter module
CN107237223A (en) * 2016-03-28 2017-10-10 令狐启 The transport channel that a kind of hanging type electric power is pushed
CN206782672U (en) * 2017-01-19 2017-12-22 河北百慕防腐材料有限公司 Spinned suspension arrangement by formula

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102219106A (en) * 2011-05-11 2011-10-19 李超 Hanging pulley and rail
CN203514837U (en) * 2013-09-18 2014-04-02 河南城建建设集团有限公司 Safety device for building safety construction
CN203568358U (en) * 2013-11-14 2014-04-30 无锡市福曼科技有限公司 Suspending and sliding structure
CN107237223A (en) * 2016-03-28 2017-10-10 令狐启 The transport channel that a kind of hanging type electric power is pushed
CN106193639A (en) * 2016-07-08 2016-12-07 中建三局集团有限公司 Assembled rail safety rope hangar system
CN205945501U (en) * 2016-08-23 2017-02-08 北华大学 Frequency converter having detachable inverter module
CN206782672U (en) * 2017-01-19 2017-12-22 河北百慕防腐材料有限公司 Spinned suspension arrangement by formula

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109722996A (en) * 2019-03-05 2019-05-07 代营伟 For reinforcing the suspension apparatus of highway bridge and the building method of the suspension apparatus

Similar Documents

Publication Publication Date Title
CN104790294B (en) Unilateral separation traveling is crossed pier formula box beam and is checked car
CN109763665A (en) A kind of rail mounted safety rope hanging component for high-altitude construction
CN106006488B (en) aerial work platform
CN207726612U (en) A kind of combined type suspending device being fixed on inspection shaft well head
CN205928543U (en) Pole overhauls platform
CN205527391U (en) Bridge type shaft hoist
CN204326493U (en) Unidirectional rising catching device
CN206266121U (en) A kind of new tower crane
CN208077377U (en) A kind of gas warning system
CN208150862U (en) A kind of lifting platform for the construction of large-scale deep shaft
CN208054764U (en) Construction material is vertical and horizontal transporter
CN207918313U (en) The crane of the mobile repair cape of installation revolves arm
CN206152133U (en) Building constructor safety arrangement
CN113697658B (en) Integral hoisting construction process for large-span steel frame structure of assembled factory building
CN108046183A (en) A kind of safe construction platform
CN208749208U (en) Communicate shaft tower
CN113323367A (en) Chain transmission lifting control system for attached scaffold
CN106081947A (en) Possess safety and enter the derrick crane of passage
CN109650235A (en) A kind of mine cage climbs wall method with saving oneself to climb wall device and save oneself
CN207627756U (en) A kind of escaping from high building on fire intelligent apparatus
CN206591845U (en) Suitable for the safety belt suspension device of scaffold
CN208964483U (en) A kind of collapsible pressure inclined tube inside trolley
CN215937191U (en) Steady-state four-point crane ship
CN216811080U (en) Construction protection device and anti-collision guardrail protection system
CN217600244U (en) Truss vehicle capable of quickly hanging objects

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhou Hongwen

Inventor after: Li Heng

Inventor after: Zhao Zhigang

Inventor after: Song Guorui

Inventor after: Yi Dingding

Inventor after: Dong Yixuan

Inventor after: Ma Jiaxin

Inventor before: Zhou Hongwen

Inventor before: Li Heng

Inventor before: Yi Dingding

Inventor before: Dong Yixuan

Inventor before: Ma Jiaxin

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190517

RJ01 Rejection of invention patent application after publication