CN109763613A - The solid wood handrail and installation method of balustrade with glass panel - Google Patents

The solid wood handrail and installation method of balustrade with glass panel Download PDF

Info

Publication number
CN109763613A
CN109763613A CN201910087394.1A CN201910087394A CN109763613A CN 109763613 A CN109763613 A CN 109763613A CN 201910087394 A CN201910087394 A CN 201910087394A CN 109763613 A CN109763613 A CN 109763613A
Authority
CN
China
Prior art keywords
handrail
balustrade
glass panel
section
handrail section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910087394.1A
Other languages
Chinese (zh)
Other versions
CN109763613B (en
Inventor
林瑶
董子新
张朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Is Still Building Decoration Design Engineering Co Ltd
Original Assignee
Shenzhen Is Still Building Decoration Design Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Is Still Building Decoration Design Engineering Co Ltd filed Critical Shenzhen Is Still Building Decoration Design Engineering Co Ltd
Priority to CN201910087394.1A priority Critical patent/CN109763613B/en
Publication of CN109763613A publication Critical patent/CN109763613A/en
Application granted granted Critical
Publication of CN109763613B publication Critical patent/CN109763613B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)
  • Escalators And Moving Walkways (AREA)

Abstract

The present invention relates to the technical fields of breast board armrest, more particularly, to the solid wood handrail and installation method of a kind of balustrade with glass panel.A kind of solid wood handrail of balustrade with glass panel, it is advantageous that more easily reacing smooth fairing ace structure.A kind of solid wood handrail of balustrade with glass panel, including multistage handrail section, the lower end surface of every section of handrail section are provided with the arc groove in the middle part of handrail section with handrail section identical radian measure, and the depth of arc groove is greater than the design insertion depth of balustrade with glass panel.Multistage handrail section is set and balustrade with glass panel cooperates, since the arc groove depth of processing is greater than the design insertion depth of balustrade with glass panel, therefore there is certain reserved space for being adjusted to handrail section when the splicing of handrail section, therefore be also easier to reach smooth fairing ace structure.

Description

The solid wood handrail and installation method of balustrade with glass panel
Technical field
The present invention relates to the technical fields of breast board armrest, solid wood handrail and installation more particularly, to a kind of balustrade with glass panel Method.
Background technique
Solid wood handrail uses full solid wood material, current domestic most common solid wood handrail material have beech, oak, Hua Li, Teak, husky Billy, pinus sylvestris var. mongolica etc..Solid wood handrail feel is thick and heavy reliable, is gentle exquisiteness, feels very comfortable.
Existing Authorization Notice No. discloses one kind for the patent of invention of CN103603468B and exempts from support steel structure spiral shape Stair.Program indsole stair are aesthetic feeling of the spiral Curve Design structure to increase moulding.
Above-mentioned prior art, which has the following deficiencies:, uses solid wood handrail as its handrail in use, solid wood is helped Hand processes the mode that curvilinear structure needs to be designed to multistage splicing, has a little error during processing every section of handrail section When, the solid wood handrail being spliced just is unable to reach smooth fairing ace.
Summary of the invention
One of purpose of the invention is to provide a kind of solid wood handrail of balustrade with glass panel, it is advantageous that more easily reacing Smooth fairing ace structure.
Foregoing invention purpose of the invention has the technical scheme that a kind of solid wood of balustrade with glass panel is helped Hand, including multistage handrail section, the lower end surface of every section of handrail section are provided with the arc in the middle part of handrail section with handrail section identical radian measure Slot, the depth of arc groove are greater than the design insertion depth of balustrade with glass panel.
By using above-mentioned technical proposal, multistage handrail section is set and balustrade with glass panel cooperates, due to the arc groove depth of processing Degree is greater than the design insertion depth of balustrade with glass panel, therefore has certain reserved space for handrail when the splicing of handrail section Section is adjusted, therefore is also easier to reach smooth fairing ace structure.
The present invention is further arranged to: the width of the arc groove be greater than balustrade with glass panel thickness, the two of the arc groove Diaphragm seal abuts sealing with balustrade with glass panel when side inner wall is stained with diaphragm seal, balustrade with glass panel and arc groove grafting.
It is a further object to provide a kind of installation methods of above-mentioned solid wood handrail.
Foregoing invention purpose of the invention has the technical scheme that a kind of peace of above-mentioned solid wood handrail Dress method, comprising:
Step 1: drawing auxiliary line;
Step 2: installation auxiliary positioning component;
Step 3: installation first segment handrail section;
It is fixed Step 4: beating glass cement;
Step 5: adjusting auxiliary positioning module position;
Step 6: installation handrail section;
It is fixed Step 7: beating glass cement;
Repeat the above steps five to step 7 complete handrail section installation form complete solid wood handrail.
By using above-mentioned technical proposal, one to seven the installation to the solid wood handrail is completed through the above steps.
The present invention is further arranged to: in step 2, auxiliary positioning component includes locating piece, the both ends of locating piece the same side If there are two the suckers of cooperation absorption balustrade with glass panel;After locating piece and auxiliary line alignment, pass through the sucker of auxiliary positioning component It is attracted and installs with balustrade with glass panel.
By using above-mentioned technical proposal, cooperates absorption that locating piece is fixedly mounted by sucker, resisted and helped by locating piece The position of handrail section is fixed in the lower end surface of means.It helps due to not needing manpower and carries out subsequent the step of beating glass cement, The positioning of handrail section is more accurate, and installation accuracy is also just higher.
The present invention is further arranged to: the both ends of described locating piece the same side are fixedly connected with close to the position of top half There is the fixed link perpendicular to locating piece side, sucker is fixedly arranged on remotely located piece of every fixed link one end.
By using above-mentioned technical proposal, the suction of sucker is influenced in order to avoid the curved-surface structure of balustrade with glass panel resists locating piece It is attached, sucker is arranged in fixed link, when such sucker suction, also there are biggish spacing between locating piece and balustrade with glass panel, It will not hinder the absorption of sucker.
The present invention is further arranged to: being located at the position below two fixed links on the locating piece and is respectively threaded with one Root adjusts bolt, and the screw portion for adjusting bolt is pierced by from the side that locating piece is fixed with fixed link, and is pierced by adjusting bolt One end be fixed with Rubber end.
By using above-mentioned technical proposal, after fixed link is set, when sucker suction, locating piece can under the action of self-weight to Lower inclination, therefore the Rubber end by adjusting bolt end and balustrade with glass panel abut to adjust the angle change of locating piece, change The height of itself and handrail section cooperation position.Rubber end avoids adjusting bolt from wearing balustrade with glass panel as buffering simultaneously.
The present invention is further arranged to: in step 3, by the lowest part of the arc groove of first segment handrail section and balustrade with glass panel Grafting after alignment, and the lower end surface of handrail section and locating piece are abutted, the position of handrail section is fixed.
By using above-mentioned technical proposal, positioning handrail section is cooperated by locating piece, so that the position of handrail section installation is quasi- Really.
The present invention is further arranged to: in step 4, being cooperated in the arc groove of first segment handrail section with balustrade with glass panel Both glass glue bonds are stamped in position, in first segment handrail section compared with filling sealing at downside arc groove, balustrade with glass panel fit clearance Plug.
By using above-mentioned technical proposal, by glass glue connection handrail section and balustrade with glass panel, sealing-plug clogs handrail section Arc groove lower port, avoid influence solid wood handrail overall aesthetic degree.
The present invention is further arranged to: in step 6, the arc groove of handrail section being aligned rear grafting, handrail with balustrade with glass panel The lower end surface of section is abutted with locating piece, and the relatively downside side of handrail section is abutted with the upper side side for having installed handrail section, is passed through Rotation adjusts bolt and adjusts the height of locating piece and handrail section abutted position, so that not installing handrail Duan Yuyi installation handrail section Upper surface is concordant.
By using above-mentioned technical proposal, after first segment handrail section is fixed, subsequent handrail section is also noted that when installing It is aligned with the end face for having installed handrail section, can realize the fine tuning of fine height gap by adjusting bolt, reach high-precision The purpose of installation.
The present invention is further arranged to: in step 7, being beaten in the arc groove of handrail section with the position of balustrade with glass panel cooperation Both upper glass glue bonds.
By using above-mentioned technical proposal, pass through the subsequent handrail section of glass glue bond and balustrade with glass panel.
In conclusion advantageous effects of the invention are as follows:
1. multistage handrail section is arranged and balustrade with glass panel cooperates, since the design that the arc groove depth of processing is greater than balustrade with glass panel is inserted into Depth, therefore have certain reserved space for being adjusted to handrail section when the splicing of handrail section, therefore also just more hold Easily reach smooth fairing ace structure;
2. cooperating absorption that locating piece is fixedly mounted by sucker, the lower end surface of handrail section is resisted by locating piece to fix handrail section Position, help due to not needing manpower and carry out subsequent the step of beating glass cement, handrail section positions more accurate, installation accuracy Also just higher.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment;
Fig. 2 is the enlarged drawing in Fig. 1 at A;
Fig. 3 is the structural schematic diagram of auxiliary positioning component in embodiment.
Appended drawing reference: 1, handrail section;2, arc groove;3, diaphragm seal;4, locating piece;5, fixed link;6, sucker;7, spiral shell is adjusted Bolt;8, Rubber end;9, balustrade with glass panel.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
As shown, a kind of solid wood handrail of balustrade with glass panel 9, including multistage handrail section 1, the lower end surface of every section of handrail section 1 is provided with Arc groove 2 positioned at 1 middle part and 1 identical radian measure of handrail section of handrail section.The width of arc groove 2 is slightly larger than the thickness of balustrade with glass panel 9, The depth of arc groove 2 is greater than the design insertion depth of balustrade with glass panel 9.The two sides inner wall of arc groove 2 is stained with to be bonded with balustrade with glass panel 9 The diaphragm seal 3 of sealing.
Embodiment two:
A kind of installation method of above-mentioned solid wood handrail, comprising:
Step 1: drawing auxiliary line;
The depth that arc groove 2 is embedded in when installing according to solid wood handrail uses the pigment pen easily wiped in the lateral surface of balustrade with glass panel 9 Picture auxiliary line, auxiliary line and 9 highest point of balustrade with glass panel are equidistant.
Step 2: installation auxiliary positioning component;
Auxiliary positioning component includes the locating piece 4 of strip, and the both ends of 4 the same side of locating piece are solid close to the position of top half Surely it is connected with the fixed link 5 perpendicular to 4 side of locating piece, every 5 remotely located pieces 4 of fixed link one end is mounted on sucker 6. It is attracted by sucker 6 with balustrade with glass panel 9 and fixes auxiliary positioning component.It is located at the position of two fixed links, 5 lower section on locating piece 4 It is respectively threaded with an adjusting bolt 7, the screw portion for adjusting bolt 7 is worn from the side that locating piece 4 is fixed with fixed link 5 Out, and in the screw rod end for adjusting bolt 7 Rubber end 8 is fixed with as buffering, adjusting bolt 7 is avoided to wear balustrade with glass panel 9.
After locating piece 4 and auxiliary line alignment, installation is attracted by the sucker 6 and balustrade with glass panel 9 of auxiliary positioning component.It Adjusting bolt 7 by rotation afterwards abuts Rubber end 8 and balustrade with glass panel 9, adjusts fixed link 5 until horizontality.
Step 3: installation first segment handrail section 1;
The arc groove 2 of first segment handrail section 1 is aligned rear grafting with the lowest part of balustrade with glass panel 9, and makes the lower end of handrail section 1 Face and locating piece 4 abut, and the position of handrail section 1 is fixed.
It is fixed Step 4: beating glass cement;
In the arc groove 2 of first segment handrail section 1 and both glass glue bonds are stamped in the position of the cooperation of balustrade with glass panel 9.And One section of handrail section 1 is compared with filling sealing-plug at downside arc groove 2,9 fit clearance of balustrade with glass panel.
Step 5: adjusting auxiliary positioning module position;
After handrail section 1 is fixed, auxiliary positioning component is removed, auxiliary positioning component is installed and is aligned to slightly higher place with auxiliary line Position.
Step 6: installation handrail section 1;
The arc groove 2 of handrail section 1 is aligned rear grafting with balustrade with glass panel 9, the lower end surface of handrail section 1 is abutted with locating piece 4, handrail The relatively downside side of section 1 is abutted with the upper side side for having installed handrail section 1.By rotation adjust bolt 7 adjust locating piece 4 with The height of 1 abutted position of handrail section, so that it is concordant with the upper surface for having installed handrail section 1 not install handrail section 1.
It is fixed Step 7: beating glass cement;
In the arc groove 2 of handrail section 1 and both glass glue bonds are stamped in the position of the cooperation of balustrade with glass panel 9.
Repeat the above steps five to step 7 complete handrail section 1 installation form complete solid wood handrail.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (10)

1. a kind of solid wood handrail of balustrade with glass panel (9), it is characterized in that: including multistage handrail section (1), under every section of handrail section (1) End face is provided with the arc groove (2) in the middle part of handrail section (1) with handrail section (1) identical radian measure, and the depth of arc groove (2) is greater than glass The design insertion depth of glass breast board (9).
2. the solid wood handrail of balustrade with glass panel (9) according to claim 1, it is characterized in that: the width of the arc groove (2) is big The two sides inner wall of thickness in balustrade with glass panel (9), the arc groove (2) is stained with diaphragm seal (3), balustrade with glass panel (9) and arc groove (2) diaphragm seal (3) with balustrade with glass panel (9) abuts sealing when grafting.
3. a kind of installation method of solid wood handrail of any of claims 1 or 2, characterized in that include:
Step 1: drawing auxiliary line;
Step 2: installation auxiliary positioning component;
Step 3: installation first segment handrail section (1);
It is fixed Step 4: beating glass cement;
Step 5: adjusting auxiliary positioning module position;
Step 6: installation handrail section (1);
It is fixed Step 7: beating glass cement;
Repeat the above steps five to step 7 complete handrail section (1) installation form complete solid wood handrail.
4. the installation method of solid wood handrail according to claim 3, it is characterized in that: in step 2, auxiliary positioning component packet Include locating piece (4), the both ends of locating piece (4) the same side set there are two cooperation absorption balustrade with glass panel (9) sucker (6);It will positioning After block (4) and auxiliary line alignment, installation is attracted by the sucker (6) and balustrade with glass panel (9) of auxiliary positioning component.
5. the installation method of solid wood handrail according to claim 4, it is characterized in that: the two of the locating piece (4) the same side The position close to top half is held to be fixedly connected to the fixed link (5) perpendicular to locating piece (4) side, sucker (6) is fixedly arranged on One end of every fixed link (5) remotely located piece (4).
6. the installation method of solid wood handrail according to claim 5, it is characterized in that: being located at two on the locating piece (4) Position below fixed link (5) is respectively threaded with an adjusting bolt (7), adjusts the screw portion of bolt (7) from locating piece (4) side for being fixed with fixed link (5) is pierced by, and is fixed with Rubber end (8) adjusting one end that bolt (7) are pierced by.
7. the installation method of solid wood handrail according to claim 6, it is characterized in that: in step 3, by first segment handrail section (1) grafting after arc groove (2) is aligned with the lowest part of balustrade with glass panel (9), and make lower end surface and the locating piece of handrail section (1) (4) it abuts, the position of handrail section (1) is fixed.
8. the installation method of solid wood handrail according to claim 7, it is characterized in that: in step 4, in first segment handrail section (1) both glass glue bonds are stamped in arc groove (2) and the position of balustrade with glass panel (9) cooperation, first segment handrail section (1) compared with Sealing-plug is inserted at downside arc groove (2), balustrade with glass panel (9) fit clearance.
9. the installation method of solid wood handrail according to claim 8, it is characterized in that: in step 6, by the arc of handrail section (1) The lower end surface of grafting after shape slot (2) is aligned with balustrade with glass panel (9), handrail section (1) is abutted with locating piece (4), handrail section (1) compared with Downside side is abutted with the upper side side for having installed handrail section (1), by rotation adjust bolt (7) adjust locating piece (4) with The height of handrail section (1) abutted position, so that it is concordant with the upper surface for having installed handrail section (1) not install handrail section (1).
10. the installation method of solid wood handrail according to claim 9, it is characterized in that: in step 7, in handrail section (1) Stamp both glass glue bonds in arc groove (2) and the position of balustrade with glass panel (9) cooperation.
CN201910087394.1A 2019-01-29 2019-01-29 Solid wood handrail of glass breast board and mounting method Active CN109763613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910087394.1A CN109763613B (en) 2019-01-29 2019-01-29 Solid wood handrail of glass breast board and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910087394.1A CN109763613B (en) 2019-01-29 2019-01-29 Solid wood handrail of glass breast board and mounting method

Publications (2)

Publication Number Publication Date
CN109763613A true CN109763613A (en) 2019-05-17
CN109763613B CN109763613B (en) 2021-01-12

Family

ID=66455608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910087394.1A Active CN109763613B (en) 2019-01-29 2019-01-29 Solid wood handrail of glass breast board and mounting method

Country Status (1)

Country Link
CN (1) CN109763613B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704695A (en) * 2012-06-12 2012-10-03 中国建筑第八工程局有限公司 Construction method of arc-shaped full glass balustrade
CN206542601U (en) * 2017-02-28 2017-10-03 深圳市中盈建科控股有限公司 A kind of acoustic control lights fence
CN206702884U (en) * 2017-04-19 2017-12-05 安徽安凯汽车股份有限公司 A kind of positioning tool of Vehicle side power window glass

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704695A (en) * 2012-06-12 2012-10-03 中国建筑第八工程局有限公司 Construction method of arc-shaped full glass balustrade
CN206542601U (en) * 2017-02-28 2017-10-03 深圳市中盈建科控股有限公司 A kind of acoustic control lights fence
CN206702884U (en) * 2017-04-19 2017-12-05 安徽安凯汽车股份有限公司 A kind of positioning tool of Vehicle side power window glass

Also Published As

Publication number Publication date
CN109763613B (en) 2021-01-12

Similar Documents

Publication Publication Date Title
EP2447151B1 (en) Aircraft panel comprising an opening equipped with a surround
CN109763613A (en) The solid wood handrail and installation method of balustrade with glass panel
CN203891280U (en) Connecting structure capable of adjusting installation angle of cross beam and stand column of glass curtain wall
CN208126785U (en) A kind of instrument flight one liquid crystal display
CN103743110A (en) Decoration panel mounting structure and water heater
CN206941939U (en) Top surface decoration panel installs interface arrangment
CN105178784B (en) A kind of hidden frame glass fitting structure of high safety
CN206445543U (en) A kind of grip device for turbine blade root bottom surface Milling Process
CN203752051U (en) Assistant tool for glass mounting
CN114197710A (en) Large-plate open-type embossed plate GRC curtain wall and high-precision construction method
CN108592882B (en) Adjustable water alignment bubble seat subassembly
CN208588369U (en) A kind of adjustable air level holder assembly
CN208588357U (en) A kind of horizontal ruler
CN214062172U (en) Glass handrail that stability is high
CN208491403U (en) A kind of inner frame of function sofa
CN205930999U (en) A aligning gear for engine installation support
CN205589340U (en) Tank power transmission central line rectifier
CN108994579A (en) A kind of automobile push button bottom plate and body holding adjust fixed mechanism with button bottom plate
CN208733987U (en) A kind of buckle structure
CN205442152U (en) Sensing device rectifies
CN109059861A (en) A kind of horizontal ruler
CN220658807U (en) Correction device for inlaid angle
CN205078091U (en) Safe pleasing to eye novel latent frame glass mounting structure
CN208863848U (en) A kind of furniture apex angle connection decoration structure part
CN208613555U (en) A kind of automotive trim panel recliner brackets tooling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant