CN109754225A - A kind of design method and device of the monitoring system of the formulation of generation schedule a few days ago process - Google Patents
A kind of design method and device of the monitoring system of the formulation of generation schedule a few days ago process Download PDFInfo
- Publication number
- CN109754225A CN109754225A CN201811652870.1A CN201811652870A CN109754225A CN 109754225 A CN109754225 A CN 109754225A CN 201811652870 A CN201811652870 A CN 201811652870A CN 109754225 A CN109754225 A CN 109754225A
- Authority
- CN
- China
- Prior art keywords
- generation schedule
- few days
- days ago
- event
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses design methods and device that a kind of generation schedule a few days ago formulates the monitoring system of process, which comprises obtains the formulation process of the generation schedule a few days ago of monitored object;The formulation process includes main flow unit, judging unit, output unit;According to the logical relation that the main flow unit and the judging unit are run, event-order serie control function is designed, executes sequence for provide event;It according to the function of the judging unit, designs event and triggers driving function, for when the result for not meeting index occurs in some event, triggering driving to execute another event;Backstage writing function is designed, for recording the data type and content of each functional unit in the formulation process.The present invention can be for the monitoring system for promoting electricity market standardization operation to propose science, effective generation schedule a few days ago, it is ensured that each step movement in generation schedule process is completed timely, accurate, high-qualityly a few days ago.
Description
Technical field
The present invention relates to big data digging technology fields, more particularly to a kind of generation schedule a few days ago to formulate the monitoring system of process
The design method and device of system.
Background technique
With the continuous construction of China's power spot market, the generation schedule a few days ago of electricity market becomes construction spot market
An important ring.After the foundation of generation schedule process a few days ago, setting up monitoring system also to it is particularly important.Although in state
The outer operating mechanism for having the mature process of generation schedule a few days ago, but how to ensure that the process is normally and efficiently run, there has been no
Specific scheme.
It is sent out a few days ago currently, having the right directly to dock in third party's monitor control mechanism of China's electricity market and higher level supervision department
The monitoring system of electricity plan directly acquires data and monitors the implementation procedure of generation schedule a few days ago, this is also third party's monitoring equipment
The main means that structure and higher level supervision department are monitored Electricity Market Operation mechanism by monitoring system.But above-mentioned hand
Section can not ensure that generation schedule formulates normal, efficient, the accurate operation of process and its monitoring system, therefore can not also promote electricity
Power market specifications operation.
Summary of the invention
Technical problem to be solved by the present invention lies in provide a kind of monitoring system of the formulation of generation schedule a few days ago process
Design method and device, can be for the prison for promoting electricity market standardization operation to propose science, effective generation schedule a few days ago
Control system, it is ensured that each step movement in generation schedule process is completed timely, accurate, high-qualityly a few days ago.
In order to solve the above-mentioned technical problem, the monitoring system of process is formulated the invention proposes a kind of generation schedule a few days ago
Design method, comprising:
Obtain the formulation process of the generation schedule a few days ago of monitored object;The formulation process includes main flow unit, judgement
Unit, output unit;
According to the logical relation that the main flow unit and the judging unit are run, event-order serie control function is designed,
Sequence is executed for provide event;
It according to the function of the judging unit, designs event and triggers driving function, for not met when some event
When the result of index, triggering driving executes another event;
Backstage writing function is designed, for recording the data type of each functional unit in the formulation process and interior
Hold.
Further, the formulation process of the generation schedule a few days ago, comprising:
The main flow unit, for basic data importing, data plausibility check, generation schedule calculating a few days ago, safety
Check and quantum chemical method evaluation index;
The judging unit, for judging whether data plausibility check is reasonable, Security Checking whether passes through and index
Whether meet the requirements;
The output unit, for exporting Unit Commitment plan a few days ago and generation schedule.
Further, the event-order serie control function, is specifically used for:
The plausibility check just can be performed after the basic data imports backstage;
The planning just can be performed after the basic data is by plausibility check;
The Security Checking just can be performed after generation schedule is worked out a few days ago described;
It is described complete establishment after generation schedule is by Security Checking a few days ago just can quantum chemical method assess its index;
The just exportable and publication generation schedule a few days ago after the index meets the requirements.
Further, the event triggers driving function, is specifically used for:
When the appearance basic data does not pass through the event of plausibility check, automatic trigger data correction request mechanism;
When occur it is described generation schedule does not pass through the event of Security Checking a few days ago when, automatic trigger adds generation schedule correction
Tied mechanism;
When the undesirable event of the appearance index, automatic trigger adds generation schedule and corrects tied mechanism.
Further, the backstage writing function, is specifically used for:
Record the type of the data for needing to record in output unit described in the main flow unit, the judging unit and interior
Hold, and adds time tag and person liable's label to recorded data.
The invention also provides a kind of generation schedules a few days ago to formulate the device of the monitoring system of process, comprising:
Process obtains module, the formulation process of the generation schedule a few days ago for obtaining monitored object;The formulation process mould
Block includes main flow unit, judging unit, output unit;
Event-order serie control module, the logical relation for being run according to the main flow unit and the judging unit,
Regulation event executes sequence;
Event triggers drive module, for when the result for not meeting index occurs in some event, triggering driving to execute another
One event;
Backstage logging modle, for recording the data type of each functional unit in the formulation process module and interior
Hold.
Further, the process obtains module, comprising:
The main flow unit, for basic data importing, data plausibility check, generation schedule calculating a few days ago, safety
Check and quantum chemical method evaluation index;
The judging unit, for judging whether data plausibility check is reasonable, Security Checking whether passes through and index
Whether meet the requirements;
The output unit, for exporting Unit Commitment plan a few days ago and generation schedule.
Further, the event-order serie control module, is specifically used for:
The plausibility check just can be performed after the basic data imports backstage;
The planning just can be performed after the basic data is by plausibility check;
The Security Checking just can be performed after generation schedule is worked out a few days ago described;
It is described complete establishment after generation schedule is by Security Checking a few days ago just can quantum chemical method assess its index;
The just exportable and publication generation schedule a few days ago after the index meets the requirements.
Further, the event triggers drive module, is specifically used for:
When the appearance basic data does not pass through the event of plausibility check, automatic trigger data correction request mechanism;
When occur it is described generation schedule does not pass through the event of Security Checking a few days ago when, automatic trigger adds generation schedule correction
Tied mechanism;
When the undesirable event of the appearance evaluation index, automatic trigger adds generation schedule and corrects constraint machine
System.
Further, the backstage logging modle, is specifically used for:
Record the type of the data for needing to record in output unit described in the main flow unit, the judging unit and interior
Hold, and adds time tag and person liable's label to recorded data.
Implement the embodiment of the present invention, can for promote electricity market standardization operation propose science, it is effective a few days ago
The monitoring system of generation schedule, it is ensured that each step movement in generation schedule process is completed timely, accurate, high-qualityly a few days ago.
Detailed description of the invention
Fig. 1 is that the process of the design method for the monitoring system that a kind of generation schedule a few days ago provided by the invention formulates process is shown
It is intended to;
Fig. 2 is a kind of reality of the design method for the monitoring system that a kind of generation schedule a few days ago provided by the invention formulates process
Apply the flow diagram of example;
Fig. 3 is the structural representation of the device for the monitoring system that a kind of generation schedule a few days ago provided by the invention formulates process
Figure.
Specific embodiment
Below in conjunction with the attached drawing in the present invention, the technical solution in the present invention is clearly and completely described, is shown
So, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the reality in the present invention
Example is applied, every other embodiment obtained by those of ordinary skill in the art without making creative efforts all belongs to
In the scope of protection of the invention.
First aspect.
A kind of generation schedule a few days ago provided in this embodiment formulates the design side of the monitoring system of process referring to FIG. 1-2,
Method can be executed by relevant server, and hereafter using server as executing subject for be illustrated.
The generation schedule a few days ago formulates the design method of the monitoring system of process, at least includes the following steps S1~S4.
S1, obtain monitored object generation schedule a few days ago formulation process.The formulation process includes main flow unit, sentences
Disconnected unit, output unit.
The main flow unit, for basic data importing, data plausibility check, generation schedule calculating a few days ago, safety
Check and quantum chemical method evaluation index.
The judging unit, for judging whether data plausibility check is reasonable, Security Checking whether passes through and index
Whether meet the requirements.
The output unit, for exporting Unit Commitment plan a few days ago and generation schedule.
It can explain, the formulation process of the generation schedule a few days ago specifically has:
Plausibility check is carried out to the basic data of importing and unreasonable data are modified.Pass through data reasonability school
After testing, planning is carried out to the generation schedule a few days ago, Security Checking is then carried out to it and to not by Security Checking
Generation schedule is corrected constraint a few days ago.Then quantum chemical method assesses the index of the generation schedule a few days ago for completing establishment.Most
After export and issue the satisfactory generation schedule a few days ago of index.
Since specific Electricity Market Operation mechanism is not exactly the same, the formulation process of generation schedule should be according to electricity a few days ago
The characteristic of the power market business chooses the generation schedule a few days ago that suitable fundamental formulates reflection own characteristic and needs.
Therefore, for the business feature of China's electricity market, in specific embodiment, to the maintenance plan of importing, negative
The basic datas such as lotus prediction, unit parameter and network topology carry out bad data detection identification, rationality checking identification and model and close
A series of plausibility checks such as rationality inspection.Route or cross-section limitation control are used to the generation schedule a few days ago for not passing through Security Checking
The means such as system are corrected constraint.And the index includes at least safety, economy, energy saving and fairness.
The formulation process of generation schedule has most direct operation instruction meaning a few days ago.To the formulation stream of generation schedule a few days ago
Journey corrects with working out and standardize with being standardized, and may advantageously facilitate electricity market standardization operation, ensures in electricity market
Control Mechanism for Building.
S2, the logical relation run according to the main flow unit and the judging unit, design event-order serie control function
Can, sequence is executed for provide event.
The event-order serie control function, it is described reasonable specifically for just can be performed after the basic data imports backstage
Property verification, in the basic data by the way that the planning just can be performed after plausibility check;In the generation schedule a few days ago
The Security Checking just can be performed after working out;Just may be used after the generation schedule a few days ago for completing establishment is by Security Checking
Quantum chemical method assesses its index;The just exportable and publication generation schedule a few days ago after the index meets the requirements.
To guarantee that for generation schedule by defined correct process execution, the execution sequence of each event should be with unified standard a few days ago
For partitioning standards, divided such as sequencing temporally.
In specific embodiment, the logical relation and sequence run according to the main flow unit, the judging unit,
The timing control link of design focal point monitor event, guarantee have only executed previous event, and next event just can be performed.
For example, only having input the data plausibility check that basic data can just perform the next step, no since program
Previous event can be skipped, to guarantee that generation schedule is by defined correct process execution a few days ago.The event-order serie control function
Other concrete applications and this explanation similarly, details are not described herein.
S3, according to the function of the judging unit, design event and trigger driving function, for not being inconsistent when some event
When closing the result of index, triggering driving executes another event.
The event triggers driving function, specifically for not passing through the event of plausibility check when the appearance basic data
When, automatic trigger data correction request mechanism;When occur it is described generation schedule does not pass through the event of Security Checking a few days ago when, automatically
Triggering addition generation schedule corrects tied mechanism;When the undesirable event of the appearance index, automatic trigger addition hair
Electricity plan correction tied mechanism.
The determination of generation schedule a few days ago is a system job, and it is undesirable to need to modify correction repeatedly in operation
Event result triggers driving function with event, can accurately and timely improve the operational issue or skill in generation schedule a few days ago
Art transformation.
In specific embodiment, event is designed according to the judging unit and triggers driving function, when some event occurs
When undesirable result, triggering driving executes some event, to guarantee important section in plan process a few days ago
Point, critical event execute, and the normal operation and output normal outcome to program play supervisory function bit.
For example, can enter next program during plausibility check when data pass through plausibility check and run, but
When result is negative, then event triggering driving function is opened, and log-on data is corrected request mechanism, after data modification is complete again
Corresponding process is executed, until passing through data plausibility check.Other concrete applications of event triggering driving function with
Similarly, details are not described herein for this explanation.
S4, design backstage writing function, for record it is described formulation process in each functional unit data type and
Content.
The backstage writing function, specifically for recording output unit described in the main flow unit, the judging unit
The type and content of the middle data for needing to record, and time tag and person liable's label are added to recorded data.
In specific embodiment, each link real-time recorded data and corresponding result that executed to generation schedule a few days ago with
Just it consults at any time.For example, wanting logging program to be in the presence of, iterative process, Yi Jixiu when event triggering driving occurs in program
Positive process, to refer to later.Time tag and person liable's label are added to recorded data, main function is that record is comprehensive
Information by reference, meanwhile, carry out job rating and responsibility on this basis and prosecute.
A kind of generation schedule a few days ago that the present embodiment proposes formulates the design method of the monitoring system of process, by designing thing
Part timing control function executes sequence for provide event, to ensure that generation schedule is executed by defined correct process a few days ago;
Driving function is triggered by design event, some does not meet the event of index for modification correction, to ensure generation schedule before the execution day
The important node and critical event in process are formulated, so that the normal operation and output correct result to program play monitoring and make
With;By designing backstage writing function, for recording the data type and content of each functional unit in the formulation process,
To there is comprehensive information that can consult reference at any time later, it is also possible to which this is to prosecute according to progress job rating and responsibility.
By implementing the present embodiment, science can be proposed for promotion electricity market standardization operation, effectively sent out a few days ago
The monitoring system of electricity plan, it is ensured that each step movement in generation schedule process is completed timely, accurate, high-qualityly a few days ago.
Second aspect.
Please refer to Fig. 3.The present embodiment also proposed a kind of device of the monitoring system of the formulation of generation schedule a few days ago process,
It is characterized in that, comprising:
Process obtains module 21, the formulation process of the generation schedule a few days ago for obtaining monitored object.The formulation process
Module includes main flow unit 211, judging unit 212, output unit 213.
By taking the present embodiment as an example.
The main flow unit, for basic data importing, data plausibility check, generation schedule calculating a few days ago, safety
Check and quantum chemical method evaluation index.
The judging unit, for judging whether data plausibility check is reasonable, Security Checking whether passes through and index
Whether meet the requirements.
The output unit, for exporting Unit Commitment plan a few days ago and generation schedule.
Event-order serie control module 22, for being closed according to the logic of the main flow unit and judging unit operation
System is, it is specified that event executes sequence.
The event-order serie control module, is specifically used for: the conjunction just can be performed after the basic data imports backstage
Rationality verification;The planning just can be performed after the basic data is by plausibility check;In the power generation meter a few days ago
Drawing just can be performed the Security Checking after working out;After the generation schedule a few days ago for completing establishment is by Security Checking
Can quantum chemical method assess its index;The just exportable and publication generation schedule a few days ago after the index meets the requirements.
Event triggers drive module 23, for when the result for not meeting index occurs in some event, triggering driving to be executed
Another event.
The event triggers drive module, specifically for not passing through the event of plausibility check when the appearance basic data
When, automatic trigger data correction request mechanism;When occur it is described generation schedule does not pass through the event of Security Checking a few days ago when, automatically
Triggering addition generation schedule corrects tied mechanism;When the undesirable event of the appearance index, automatic trigger addition hair
Electricity plan correction tied mechanism.
Backstage logging modle 24, for recording the data type of each functional unit in the formulation process module and interior
Hold.
The backstage logging modle, specifically for recording output unit described in the main flow unit, the judging unit
The type and content of the middle data for needing to record, and time tag and person liable's label are added to recorded data.
A kind of generation schedule a few days ago that the present embodiment proposes formulates the device of the monitoring system of process, when by design event
Sequence control module executes sequence for provide event, to ensure that generation schedule is executed by defined correct process a few days ago;Pass through
Design event triggers drive module, some does not meet the event of index for modification correction, to ensure that generation schedule is formulated before the execution day
Important node and critical event in process, so that the normal operation and output correct result to program play supervisory function bit;
By designing backstage logging modle, for recording the data type and content of each functional unit in the formulation process, with
Just there is comprehensive information that can consult reference at any time after, it is also possible to which this is to prosecute according to progress job rating and responsibility.
By implementing the present embodiment, science can be proposed for promotion electricity market standardization operation, effectively sent out a few days ago
The monitoring system of electricity plan, it is ensured that each step movement in generation schedule process is completed timely, accurate, high-qualityly a few days ago.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art
For, without departing from the principle of the present invention, several improvement and deformations can also be made, these improvement and deformations are also considered as
Protection scope of the present invention.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with
Relevant hardware is instructed to complete by computer program, the program can be stored in a computer-readable storage medium
In, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, the storage medium can be magnetic
Dish, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random Access
Memory, RAM) etc..
Claims (10)
1. the design method that a kind of generation schedule a few days ago formulates the monitoring system of process characterized by comprising
Obtain the formulation process of the generation schedule a few days ago of monitored object;The formulation process include main flow unit, judging unit,
Output unit;
According to the logical relation that the main flow unit and the judging unit are run, event-order serie control function is designed, is used for
Regulation event executes sequence;
It according to the function of the judging unit, designs event and triggers driving function, for occurring not meeting index when some event
Result when, triggering driving execute another event;
Backstage writing function is designed, for recording the data type and content of each functional unit in the formulation process.
2. the design method that generation schedule a few days ago according to claim 1 formulates the monitoring system of process, which is characterized in that
The formulation process of the generation schedule a few days ago, comprising:
The main flow unit is used for basic data importing, data plausibility check, generation schedule calculating a few days ago, Security Checking,
And quantum chemical method evaluation index;
The judging unit, for judging whether data plausibility check is reasonable, Security Checking whether passes through and whether is index
It meets the requirements;
The output unit, for exporting Unit Commitment plan a few days ago and generation schedule.
3. the design method that generation schedule a few days ago according to claim 1 formulates the monitoring system of process, which is characterized in that
The event-order serie control function, is specifically used for:
The plausibility check just can be performed after the basic data imports backstage;
The planning just can be performed after the basic data is by plausibility check;
The Security Checking just can be performed after generation schedule is worked out a few days ago described;
It is described complete establishment after generation schedule is by Security Checking a few days ago just can quantum chemical method assess its index;
The just exportable and publication generation schedule a few days ago after the index meets the requirements.
4. the design method that generation schedule a few days ago according to claim 1 formulates the monitoring system of process, which is characterized in that
The event triggers driving function, is specifically used for:
When the appearance basic data does not pass through the event of plausibility check, automatic trigger data correction request mechanism;
When occur it is described generation schedule does not pass through the event of Security Checking a few days ago when, automatic trigger adds generation schedule correction constraint
Mechanism;
When the undesirable event of the appearance index, automatic trigger adds generation schedule and corrects tied mechanism.
5. the design method that generation schedule a few days ago according to claim 1 formulates the monitoring system of process, which is characterized in that
The backstage writing function, is specifically used for:
The type and content of the data for needing to record in output unit described in the main flow unit, the judging unit are recorded,
And time tag and person liable's label are added to recorded data.
6. the device that a kind of generation schedule a few days ago formulates the monitoring system of process characterized by comprising
Process obtains module, the formulation process of the generation schedule a few days ago for obtaining monitored object;The formulation process module packet
Include main flow unit, judging unit, output unit;
Event-order serie control module, for according to the main flow unit and the judging unit operation logical relation, it is specified that
Event executes sequence;
Event triggers drive module, for when the result for not meeting index occurs in some event, triggering driving to execute another
Event;
Backstage logging modle, for recording the data type and content of each functional unit in the formulation process module.
7. the device that generation schedule a few days ago according to claim 6 formulates the monitoring system of process, which is characterized in that described
Process obtains module, comprising:
The main flow unit is used for basic data importing, data plausibility check, generation schedule calculating a few days ago, Security Checking,
And quantum chemical method evaluation index;
The judging unit, for judging whether data plausibility check is reasonable, Security Checking whether passes through and whether is index
It meets the requirements;
The output unit, for exporting Unit Commitment plan a few days ago and generation schedule.
8. the device that generation schedule a few days ago according to claim 6 formulates the monitoring system of process, which is characterized in that described
Event-order serie control module, is specifically used for:
The plausibility check just can be performed after the basic data imports backstage;
The planning just can be performed after the basic data is by plausibility check;
The Security Checking just can be performed after generation schedule is worked out a few days ago described;
It is described complete establishment after generation schedule is by Security Checking a few days ago just can quantum chemical method assess its index;
The just exportable and publication generation schedule a few days ago after the index meets the requirements.
9. the device that generation schedule a few days ago according to claim 6 formulates the monitoring system of process, which is characterized in that described
Event triggers drive module, is specifically used for:
When the appearance basic data does not pass through the event of plausibility check, automatic trigger data correction request mechanism;
When occur it is described generation schedule does not pass through the event of Security Checking a few days ago when, automatic trigger adds generation schedule correction constraint
Mechanism;
When the undesirable event of the appearance evaluation index, automatic trigger adds generation schedule and corrects tied mechanism.
10. the device that generation schedule a few days ago according to claim 6 formulates the monitoring system of process, which is characterized in that institute
Backstage logging modle is stated, is specifically used for:
The type and content of the data for needing to record in output unit described in the main flow unit, the judging unit are recorded,
And time tag and person liable's label are added to recorded data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811652870.1A CN109754225B (en) | 2018-12-29 | 2018-12-29 | Design method and device of monitoring system for daily power generation planning process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811652870.1A CN109754225B (en) | 2018-12-29 | 2018-12-29 | Design method and device of monitoring system for daily power generation planning process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109754225A true CN109754225A (en) | 2019-05-14 |
CN109754225B CN109754225B (en) | 2023-08-29 |
Family
ID=66404981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811652870.1A Active CN109754225B (en) | 2018-12-29 | 2018-12-29 | Design method and device of monitoring system for daily power generation planning process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109754225B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112101581A (en) * | 2020-07-30 | 2020-12-18 | 广东电网有限责任公司广州供电局 | Power supply system maintenance method, device and equipment |
CN112149947A (en) * | 2020-07-30 | 2020-12-29 | 中国南方电网有限责任公司 | Intelligent maintenance plan arranging method, device and equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100106342A1 (en) * | 2008-10-28 | 2010-04-29 | Korea Electric Power Corporation | Day-ahead load reduction system based on customer baseline load |
CN103187730A (en) * | 2012-01-10 | 2013-07-03 | 浙江省电力公司 | Advanced control method related to automatic generation control |
CN103199538A (en) * | 2012-01-10 | 2013-07-10 | 浙江省电力公司 | Day-ahead planed multi-scale imminent generation scheduling closed-loop control method |
CN103473604A (en) * | 2013-08-22 | 2013-12-25 | 国家电网公司 | Method for evaluating comprehensive property of day-ahead power generation plan |
US20150263522A1 (en) * | 2014-03-17 | 2015-09-17 | Alstom Grid Inc. | Powergrid operation and supervision system |
-
2018
- 2018-12-29 CN CN201811652870.1A patent/CN109754225B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100106342A1 (en) * | 2008-10-28 | 2010-04-29 | Korea Electric Power Corporation | Day-ahead load reduction system based on customer baseline load |
CN103187730A (en) * | 2012-01-10 | 2013-07-03 | 浙江省电力公司 | Advanced control method related to automatic generation control |
CN103199538A (en) * | 2012-01-10 | 2013-07-10 | 浙江省电力公司 | Day-ahead planed multi-scale imminent generation scheduling closed-loop control method |
CN103473604A (en) * | 2013-08-22 | 2013-12-25 | 国家电网公司 | Method for evaluating comprehensive property of day-ahead power generation plan |
US20150263522A1 (en) * | 2014-03-17 | 2015-09-17 | Alstom Grid Inc. | Powergrid operation and supervision system |
Non-Patent Citations (9)
Title |
---|
BO LIU等: "An Optimal Approach for Coordinating Scheduling Day-Ahead and Real-Time Energy Market with Risks", 2006 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY * |
丁恰等: "智能电网日前发电计划系统设计与关键技术", 《电网与清洁能源》 * |
丁恰等: "智能电网日前发电计划系统设计与关键技术", 《电网与清洁能源》, no. 09, 25 September 2013 (2013-09-25), pages 1 * |
李亚杰等: "可重构流程模型驱动和组件化的MES流程进化", 《计算机集成制造系统》 * |
李亚杰等: "可重构流程模型驱动和组件化的MES流程进化", 《计算机集成制造系统》, no. 04, 15 April 2013 (2013-04-15), pages 2 * |
王铁强等: "考虑交流潮流校正的日内滚动发电计划模型与方法", 《中国电力》 * |
王铁强等: "考虑交流潮流校正的日内滚动发电计划模型与方法", 《中国电力》, no. 04, 5 April 2016 (2016-04-05) * |
雷建等: "流程工业生产调度与控制集成系统研究", 《计算机应用》 * |
雷建等: "流程工业生产调度与控制集成系统研究", 《计算机应用》, no. 05, 10 May 2006 (2006-05-10) * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112101581A (en) * | 2020-07-30 | 2020-12-18 | 广东电网有限责任公司广州供电局 | Power supply system maintenance method, device and equipment |
CN112149947A (en) * | 2020-07-30 | 2020-12-29 | 中国南方电网有限责任公司 | Intelligent maintenance plan arranging method, device and equipment |
Also Published As
Publication number | Publication date |
---|---|
CN109754225B (en) | 2023-08-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Madhavji | Environment evolution: The Prism model of changes | |
Zhou et al. | A slim integrated with empirical study and network analysis for human error assessment in the railway driving process | |
Larson et al. | Managing design processes: A risk assessment approach | |
CN103578039B (en) | A kind of power networks risk prewarning analysis system | |
Jiang et al. | Development and Optimization of a Condition‐Based Maintenance Policy with Sustainability Requirements for Production System | |
CN109754225A (en) | A kind of design method and device of the monitoring system of the formulation of generation schedule a few days ago process | |
Lagerström | Analyzing system maintainability using enterprise architecture models | |
Dui et al. | Analysis of variable system cost and maintenance strategy in life cycle considering different failure modes | |
Gu et al. | Investigation on the quality assurance procedure and evaluation methodology of machine learning building energy model systems | |
CN116976839A (en) | Lead storage battery production control method based on network collaborative manufacturing | |
Peng et al. | Modeling and simulation of offshore wind farm installation with multi-leveled cgspn approach | |
Li | Research on Financial Management Algorithm Based on Machine Learning in Big Data Era | |
Yaxiong et al. | A research on BPM system based on process knowledge | |
Llamas et al. | Experience reuse to improve agility in knowledge-driven industrial processes | |
Liang et al. | Identification of Human Operation Deviation Using a Conformance Checking Technique | |
CN117952634B (en) | Power industry source end carbon data credible rating method and system | |
Sangani et al. | Commercial Viability Assessment and Planning of Safety-Critical Embedded SW of Electrified Road Vehicles | |
CN118472947B (en) | Load control method, system, equipment and storage medium of power equipment | |
Chen et al. | An AIOps Approach to Data Cloud Based on Large Language Models | |
Opiyo et al. | Reference scheme for deriving aspects and criteria for forecasting functional performance and cost implications of cyber-physical products | |
Jarus et al. | Facilitating model–based design and evaluation for sustainability | |
Zeng et al. | Construction of Digital Evaluation Model for Distribution Network Business Based on GIM 3D Design Results | |
Azhar et al. | A Model-Driven Framework for Water Supply Management System (MWS) | |
Lisboa et al. | A Malleable Model Development for Critical Systems Supervision Integration | |
Xu et al. | Research on Optimization of Anomaly Detection System of Electric Power Marketing Data Based on Ant Colony Algorithm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |