CN109753337A - A kind of mirror image construction method, device and server - Google Patents

A kind of mirror image construction method, device and server Download PDF

Info

Publication number
CN109753337A
CN109753337A CN201711064359.5A CN201711064359A CN109753337A CN 109753337 A CN109753337 A CN 109753337A CN 201711064359 A CN201711064359 A CN 201711064359A CN 109753337 A CN109753337 A CN 109753337A
Authority
CN
China
Prior art keywords
event
building
mirror image
processing
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711064359.5A
Other languages
Chinese (zh)
Other versions
CN109753337B (en
Inventor
罗晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alibaba Group Holding Ltd
Original Assignee
Alibaba Group Holding Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alibaba Group Holding Ltd filed Critical Alibaba Group Holding Ltd
Priority to CN201711064359.5A priority Critical patent/CN109753337B/en
Publication of CN109753337A publication Critical patent/CN109753337A/en
Application granted granted Critical
Publication of CN109753337B publication Critical patent/CN109753337B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This application involves the communications field, a kind of mirror image construction method, device and server are disclosed, to solve the technical issues of mirror image constructing plan in the prior art will lead to the covering of mirror image mistake.This method comprises: Component- Based Development event structure table, handles at least one first mirror construction event of first layer;After the completion of the processing for confirming at least one first mirror construction event, the processing at least one second mirror image building event of the second layer is triggered;Wherein, in the building event structure table, mirror image building event building of the mirror image building event building of the second layer dependent on the first layer.It can prevent because the building of some building event fails in this at least one building event, the mistake covering of caused mirror image has reached the technical effect for improving the accuracy rate of mirror image building.

Description

A kind of mirror image construction method, device and server
Technical field
This application involves internet area more particularly to a kind of mirror image construction methods, device and server.
Background technique
Mirror image building is a kind of a kind of mode for being packaged delivery together by application and using the environment relied on.Mirror image building Input is the building context directory that a description file and this file rely on.The process of mirror image building is, by the defeated of building Enter to download to a performing environment (a usually physical machine, virtual machine or container), then according to the finger in description file Order goes to execute building process, comprising: downloading foundation image, downloading need software package to be mounted, execute installation etc..
In mirror image building process, the building process of each building event may be to be mutually related, with Docker mirror image For building, as shown in Figure 1, the Docker mirror image includes building event A, B, C, D, E, F, G, when the mirror image structure of building event A After building up function, the mirror image building of webhook hook notice building event B, C, D can use, when building event B, C, D have been constructed Cheng Hou, then trigger the building of building event E, F, G.
Scheme in the prior art, the prior art has at least the following problems: after the building event of a certain layer constructs failure, still The building of next layer of building event can be triggered, so as to cause the mistake that there can be mirror image.
Summary of the invention
The application provides a kind of mirror image construction method, device and server, to solve mirror image building side in the prior art Case will lead to the technical issues of mirror image mistake covering.
In a first aspect, the embodiment of the present application provides a kind of mirror image construction method, comprising:
Component- Based Development event structure table handles at least one first mirror construction event of first layer;
After the completion of the processing for confirming at least one first mirror construction event, trigger to the second layer at least one the The processing of two mirror images building event;
Wherein, in the building event structure table, the building event building of the mirror image of the second layer is dependent on described the One layer of mirror image building event building.
Second aspect, a kind of mirror image construction device of the embodiment of the present application, comprising:
First processing module is used for Component- Based Development event structure table, at least one first mirror construction thing of first layer Part is handled;
Judgment module, for confirming whether the processing of at least one first mirror construction event is completed;
Second processing module confirms that the processing of at least one first mirror construction event is complete for the judgment module Cheng Hou triggers the processing at least one second mirror image building event of the second layer;
Wherein, in the building event structure table, the building event building of the mirror image of the second layer is dependent on described the One layer of mirror image building event building.
The third aspect, the embodiment of the present application provide a kind of server, comprising:
Processor;
Memory, for storing a kind of program of mirror image construction method, described program is reading execution by the processor When, it performs the following operations:
Component- Based Development event structure table handles at least one first mirror construction event of first layer;
After the completion of the processing for confirming at least one first mirror construction event, trigger to the second layer at least one the The processing of two mirror images building event;
Wherein, in the building event structure table, the building event building of the mirror image of the second layer is dependent on described the One layer of mirror image building event building.
Fourth aspect, the embodiment of the present application provide a kind of computer readable storage medium, are stored thereon with computer program, Following operation is realized when the program is executed by processor:
Component- Based Development event structure table handles at least one first mirror construction event of first layer;
After the completion of the processing for confirming at least one first mirror construction event, trigger to the second layer at least one the The processing of two mirror images building event;
Wherein, in the building event structure table, the building event building of the mirror image of the second layer is dependent on described the One layer of mirror image building event building.
The application has the beneficial effect that:
Due in the embodiment of the present application, when building is comprising at least mirror image of two layer building events, in a certain building thing After part (such as: the first mirror image construct event) is completed, directly the first mirror image of triggering constructs next layer of building of event The building of event, but first determine to be located on the same floor in at least two layer building events with first mirror image building event At least one building event, and determine this at least one building event building finish part at later, just trigger next layer Building event building, so as to prevent because this at least one building event in some building event building failure, The mistake covering of caused mirror image, has reached the technical effect for improving the accuracy rate of mirror image building.
Detailed description of the invention
Fig. 1 is the schematic diagram of each building object of mirror image in the prior art;
The schematic diagram of the tree-like table of each building object of mirror image and chain table in Fig. 2 the embodiment of the present application;
Fig. 3 is the flow chart of the mirror image construction method of the application first aspect;
Fig. 4 is the structure chart of the mirror image construction device of the application second aspect;
Fig. 5 is the structure chart of the server of the application third aspect.
Specific embodiment
The application provides a kind of mirror image construction method, device and server, to solve mirror image building side in the prior art Case will lead to the technical issues of mirror image mistake covering.
In order to solve the above technical problems, general thought is as follows for technical solution in the embodiment of the present application:
When building is comprising at least mirror image of two layer building events, a certain building event (such as: the first mirror image constructs thing Part) complete after, directly the first mirror image of triggering construct event next layer of building event building, but first determine At least one the building event being located on the same floor in at least two layer building events with first mirror image building event, and Determine this at least one building event building finish part at the building event for later, just triggering next layer building, so as to It enough prevents because the building of some building event fails in this at least one building event, the mistake covering of caused mirror image reaches The technical effect for improving the accuracy rate of mirror image building is arrived.
In order to better understand the above technical scheme, below by attached drawing and specific embodiment to technical scheme It is described in detail, it should be understood that the specific features in the embodiment of the present application and embodiment are to the detailed of technical scheme Thin explanation, rather than the restriction to technical scheme, in the absence of conflict, the embodiment of the present application and embodiment In technical characteristic can be combined with each other.
In a first aspect, the embodiment of the present application provides a kind of mirror image construction method, the mirror image includes at least two layer building things Part, the mirror image of the building is for example are as follows: Docker mirror image, rkt mirror image etc..As shown in Fig. 2, seven structures for including by a mirror image The hierarchical relationship schematic diagram of event A, B, C, D, E, F, G are built, wherein including the tree-like table of building event, is indicated between building event Upstream-downstream relationship also includes building event shape of face table, is connected with building event chain table is passed through between the building event of level, Middle building event A is in the first level, and building event B, C, D are in the second level, and building event E, F, G are in third level, It is connected between building event B, C, D by building event chain table, listened building event chain table phase between building event E, F, G Even etc..Certainly, mirror image can also include the building event of other quantity, and the embodiment of the present application is with no restriction.
Referring to FIG. 3, the mirror image construction method includes:
Step S301: Component- Based Development event structure table, at least one first mirror construction event of first layer Reason;
Step S302: it after the completion of the processing for confirming at least one the first mirror construction event, triggers to the second layer at least The processing of one the second mirror image building event;
Wherein, in the building event structure table, the building event building of the mirror image of the second layer is dependent on described the One layer of mirror image building event building.
First mirror image building event can arbitrarily construct event for mirror image, for shown in Fig. 2, it is assumed that the building of the first mirror image Event is building event B, after building event B terminates, can be determined by building event chain table shown in Fig. 2 and structure The event B of building is located on the same floor at least one building event of grade, such as: building event C, building event D, wherein can determine All building events of grade are located on the same floor with the first mirror image building event out as at least one subsequent used building thing Part, so as to prevent all building events from being covered by mistake;Event can also be determined to construct with the first mirror image positioned at same The part building event of level can then prevent this part from constructing event quilt as at least one subsequent used building event Mistake covering.
As a kind of optional embodiment, after determining that the building event building of the first mirror image is completed, the method is also wrapped It includes: the building completion status of first mirror image building event being informed into building control centre, by controlling the building Center is managed the building state of first mirror image building event.
For example, building control centre can store the building state of each building event, and building state is for example wrapped Include: not yet construct, construct in, building complete etc..First mirror image building event (such as: building event B) in building completion Afterwards, can to building control centre send building completion status, building control centre determine the first mirror image building event be in Construct completion status after, then can by the first mirror image construct event building state be set as building complete, thus it is subsequent its He constructs event (such as: building event C, building event D etc.) can inquire the first mirror image building thing to building control centre The building state of part can also be comprising such as after constructing building state of the control centre in addition to may include each building event Building event chain table shown in table 2 and the building tree-like table of event, so that certain building event can pass through after building is completed Building event shape of face table determines the building event being located on the same floor with it, if it is determined that the building event being located on the same floor with it All in building completion status, then its next layer building event can be determined by the tree-like table of building event.
After determining at least one building event, so that it may judge whether at least one described building event has constructed At.
In the specific implementation process, it can judge whether each framework event at least one building event constructs one by one It completes.Wherein, after determining that constructing event with the first mirror image is located on the same floor the building event of grade, then it can pass through building The building state of each building event is inquired by control centre, to judge at least one by the building state of each building event Whether a building event constructs completion, due to being directly to judge each structure so can be improved by the inquiry of building control centre Build the efficiency whether event is in building state.
After judging whether at least one described building event constructs completion, so that it may execute: if described at least one A building event building is completed, and next layer of building event of the first mirror image building event is constructed.
In the specific implementation process, if having at least one building event part building event and unstructured completion In the case of, if just carrying out next layer of the building of building event, then any building at least one subsequent building event In the case where event building failure, next layer of building event will lead to the covering of mistake if covering to it, It constructs and fails so as to cause mirror image, such as: if building object C building failure, but trigger the structure to building object F It builds, then after building object F building is completed, building object C can be covered, however because building object C is failure, thus The covering that will lead to building object F is also mistake, therefore, in the embodiment of the present application, at least one building event building After success, the building of next layer of building event is just carried out, can prevent the building event to building failure from covering, from And improve the success rate of building mirror image.
When constructing next layer of building event of the first mirror image building event, next layer of maximum node can be first constructed Corresponding building event is then first to construct to building event E, to next layer of building event for shown in Fig. 2 When being constructed, it can first judge whether the code of the second mirror image building event to be built changes, if the second mirror image If change occurs in the code of building event, then the building to the second mirror image building event is triggered;If the second mirror image constructs thing If change does not occur in the code of part, then event will not be constructed to the second mirror image and constructed, and will construct control centre The building state of second mirror image building event is set as success, so as to prevent from repeating constructing, avoids the waste of building resource.
As a kind of optional embodiment, if it is determined that being determined after whether at least one building event constructs completion Third building event at least one building event is not yet completed, then suspends next layer of the structure to the first mirror image building event Build the building of event.
For shown in Fig. 2, third constructs event for example are as follows: building event C, building event D etc., if third constructs Event not yet constructs completion, then it is likely to be at following two state: 2. state that the state 1. not yet constructed is constructing, Under this state, all it cannot be guaranteed that subsequent third building event can construct completion, event is constructed to third so needing to suspend Building, with prevent third building event building failure, cause it is subsequent occur mirror image mistake covering.
In the specific implementation process, being in different building states for third building event, then subsequent processing is also different, Such as: 1. if third building event is in the state that not yet constructs, the third building event is constructed, wherein can be with Determine whether to carry out subsequent builds based on the building result of third building event, such as: if third building event building Success, then can continue whether other building events that judgement is located on the same floor with third building event construct completion, if structure If building completion, then the building of next layer building event is carried out, if being constructed without completion, can be constructed according to third The processing mode of event continues to handle the building event for completion building.If third constructs event building failure, Stop the building of mirror image.2. waiting prefixed time interval if third building event is in the state constructed;If After the prefixed time interval, the third building event not yet constructs success, then stops the building of the mirror image.This is default Time interval be usually duration is estimated constructed by building event, such as are as follows: 1min, 2min etc., the embodiment of the present application is not It is restricted.If third building event not yet constructs completions after prefixed time interval, then illustrate third to construct event pole that have can Failure can be constructed, in this case, then the mistake covering of mirror image in order to prevent, then can stop the structure of third building event It builds.
Second aspect, based on the same inventive concept, the embodiment of the present application provide a kind of mirror image construction device, referring to FIG. 4, Include:
First processing module 401 is used for Component- Based Development event structure table, at least one first mirror construction of first layer Event is handled;
Judgment module 402, for confirming whether the processing of at least one first mirror construction event is completed;
Second processing module 403 confirms the place of at least one first mirror construction event for the judgment module After the completion of reason, the processing at least one second mirror image building event of the second layer is triggered;
Wherein, in the building event structure table, the building event building of the mirror image of the second layer is dependent on described the One layer of mirror image building event building.
In an optional implementation, the judgment module 402 is specifically used for:
The processing status that first mirror image constructs event is inquired by constructing control centre, the building control centre uses In the processing status for each mirror image building event for managing the mirror image;
Judge that corresponding first mirror image constructs whether event has been handled by the processing status that each first mirror image constructs event At.
In an optional implementation, the Second processing module 403 is specifically used for:
Judge whether the code of the second mirror image building event of the second layer changes;
If the code changes, the processing to second mirror image building event is triggered.
In an optional implementation, described device further include:
Reporting modules 404, for the processing completion status of first mirror image building event to be informed building control centre, To be managed by the building state for constructing event to first mirror image to the building control centre.
In an optional implementation, described device further include:
Suspend module 405, for suspending to described the when not yet handle completion there are first mirror image building event The processing of two layers of the second mirror image building event.
In an optional implementation, described device further include:
First state determining module 406, the processing shape of the first mirror image building event for determining not yet to handle completion State;
First state processing module 407, if be in still for the first mirror image building event for not yet constructing completion Untreated state, then the first mirror image building event for not yet handling this completion are handled;If described not yet handled At the state that is handling of the first mirror image building event, then wait prefixed time interval;If the prefixed time interval Later, the first mirror image building event for not yet handling completion not yet handles success, then stops the processing of the mirror image.
The third aspect, based on the same inventive concept, the embodiment of the present application provide a kind of server, referring to FIG. 5, including:
Processor 50;
Memory 51, for storing a kind of program of mirror image construction method, described program is read by the processor 50 When execution, perform the following operations:
Component- Based Development event structure table handles at least one first mirror construction event of first layer;
After the completion of the processing for confirming at least one first mirror construction event, trigger to the second layer at least one the The processing of two mirror images building event;
Wherein, in the building event structure table, the building event building of the mirror image of the second layer is dependent on described the One layer of mirror image building event building.
For example, which can be Cloud Server, such as: data center, virtual machine etc..
Fourth aspect, based on the same inventive concept, the embodiment of the present application provide a kind of computer readable storage medium, thereon It is stored with computer program, when which is executed by processor, is performed the following operations:
Component- Based Development event structure table handles at least one first mirror construction event of first layer;
After the completion of the processing for confirming at least one first mirror construction event, trigger to the second layer at least one the The processing of two mirror images building event;
Wherein, in the building event structure table, the building event building of the mirror image of the second layer is dependent on described the One layer of mirror image building event building.
The application one or more embodiment, at least has the advantages that
Due in the embodiment of the present application, when building is comprising at least mirror image of two layer building events, in a certain building thing After part (such as: the first mirror image construct event) is completed, directly the first mirror image of triggering constructs next layer of building of event The building of event, but first determine to be located on the same floor in at least two layer building events with first mirror image building event At least one building event, and determine this at least one building event building finish part at later, just trigger next layer Building event building, so as to prevent because this at least one building event in some building event building failure, The mistake covering of caused mirror image, has reached the technical effect for improving the accuracy rate of mirror image building.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The equipment for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of equipment, the commander equipment realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Although the preferred embodiment of the application has been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the application range.
Obviously, those skilled in the art can carry out various modification and variations without departing from the essence of the application to the application Mind and range.In this way, if these modifications and variations of the application belong to the range of the claim of this application and its equivalent technologies Within, then the application is also intended to include these modifications and variations.

Claims (14)

1. a kind of mirror image construction method characterized by comprising
Component- Based Development event structure table handles at least one first mirror construction event of first layer;
After the completion of the processing for confirming at least one first mirror construction event, at least one second mirror to the second layer is triggered As the processing of building event;
Wherein, in the building event structure table, the mirror image building event building of the second layer depends on the first layer Mirror image building event building.
2. the method as described in claim 1, which is characterized in that at least one the first mirror construction event described in the confirmation Processing is completed, comprising:
The processing status that first mirror image constructs event is inquired by constructing control centre, the building control centre is for managing Manage the processing status of each mirror image building event of the mirror image;
Judge that corresponding first mirror image constructs whether event handles completion by the processing status that each first mirror image constructs event.
3. the method as described in claim 1, which is characterized in that the triggering constructs at least one second mirror image of the second layer The first mirror image of processing of event constructs event, comprising:
Judge whether the code of the second mirror image building event of the second layer changes;
If the code changes, the processing to second mirror image building event is triggered.
4. method a method according to any one of claims 1-3, which is characterized in that in each first mirror construction thing of confirmation first layer After part handles the first mirror image building event of completing, the method also includes:
The processing completion status of first mirror image building event is informed into building control centre, by controlling the building Center is managed the building state of first mirror image building event.
5. method a method according to any one of claims 1-3, which is characterized in that in each first mirror image structure of the confirmation first layer Before part event handles completion, the method also includes:
Completion is not yet handled if there is first mirror image building event, pause constructs the event second layer to first mirror image The second mirror image building event processing.
6. method as claimed in claim 5, which is characterized in that construct thing in second mirror image of the pause to the second layer The first mirror image constructs event after the processing of part, the method also includes:
Determine the processing status for the first mirror image building event for not yet handling completion;
If the first mirror image building event for not yet constructing completion is in still untreated state, this has not yet been handled At the first mirror image building event handled;
If the state that is handling of the first mirror image building event for not yet handling completion, wait between preset time Every;If after the prefixed time interval, the first mirror image building event for not yet handling completion not yet handles success, then stop The only processing of the mirror image.
7. a kind of mirror image construction device characterized by comprising
First processing module is used for Component- Based Development event structure table, at least one first mirror construction event of first layer into Row processing;
Judgment module, for confirming whether the processing of at least one first mirror construction event is completed;
Second processing module confirms that the processing of at least one first mirror construction event is completed for the judgment module Afterwards, the processing at least one second mirror image building event of the second layer is triggered;
Wherein, in the building event structure table, the mirror image building event building of the second layer depends on the first layer Mirror image building event building.
8. device as claimed in claim 7, which is characterized in that the judgment module is specifically used for:
The processing status that first mirror image constructs event is inquired by constructing control centre, the building control centre is for managing Manage the processing status of each mirror image building event of the mirror image;
Judge that corresponding first mirror image constructs whether event handles completion by the processing status that each first mirror image constructs event.
9. device as claimed in claim 7, which is characterized in that the Second processing module is specifically used for:
Judge whether the code of the second mirror image building event of the second layer changes;
If the code changes, the processing to second mirror image building event is triggered.
10. the device as described in claim 7-9 is any, which is characterized in that described device further include:
Reporting modules, for the processing completion status of first mirror image building event to be informed building control centre, to pass through Building state of the building control centre to first mirror image building event is managed.
11. the device as described in claim 7-9 is any, which is characterized in that described device further include:
Suspend module, for suspending to the second layer when not yet handling completion there are first mirror image building event The processing of second mirror image building event.
12. device as claimed in claim 11, which is characterized in that described device further include:
First state determining module, the processing status of the first mirror image building event for determining not yet to handle completion;
First state processing module, if being in still untreated for the first mirror image building event for not yet constructing completion State, then the first mirror image building event for not yet handling this completion are handled;If described not yet handle the first of completion The state that mirror image building event is being handled, then wait prefixed time interval;If described after the prefixed time interval The the first mirror image building event for not yet handling completion not yet handles success, then stops the processing of the mirror image.
13. a kind of server characterized by comprising
Processor;
Memory, for storing a kind of program of mirror image construction method, described program is held when reading execution by the processor The following operation of row:
Component- Based Development event structure table handles at least one first mirror construction event of first layer;
After the completion of the processing for confirming at least one first mirror construction event, at least one second mirror to the second layer is triggered As the processing of building event;
Wherein, in the building event structure table, the mirror image building event building of the second layer depends on the first layer Mirror image building event building.
14. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is by processor Following operation is realized when execution:
Component- Based Development event structure table handles at least one first mirror construction event of first layer;
After the completion of the processing for confirming at least one first mirror construction event, at least one second mirror to the second layer is triggered As the processing of building event;
Wherein, in the building event structure table, the mirror image building event building of the second layer depends on the first layer Mirror image building event building.
CN201711064359.5A 2017-11-02 2017-11-02 Mirror image construction method and device and server Active CN109753337B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711064359.5A CN109753337B (en) 2017-11-02 2017-11-02 Mirror image construction method and device and server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711064359.5A CN109753337B (en) 2017-11-02 2017-11-02 Mirror image construction method and device and server

Publications (2)

Publication Number Publication Date
CN109753337A true CN109753337A (en) 2019-05-14
CN109753337B CN109753337B (en) 2023-03-28

Family

ID=66397906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711064359.5A Active CN109753337B (en) 2017-11-02 2017-11-02 Mirror image construction method and device and server

Country Status (1)

Country Link
CN (1) CN109753337B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7804767B1 (en) * 1999-10-25 2010-09-28 Tellabs Operations, Inc. Protection/restoration of MPLS networks
CN104021040A (en) * 2014-06-04 2014-09-03 河海大学 Cloud computing associated task scheduling method and device based on time constraint
CN106815071A (en) * 2017-01-12 2017-06-09 上海轻维软件有限公司 Big data job scheduling system based on directed acyclic graph
CN107168776A (en) * 2017-05-16 2017-09-15 广州视源电子科技股份有限公司 A kind of event stochastic method, device, equipment and storage medium
CN107301063A (en) * 2017-05-10 2017-10-27 北京奇艺世纪科技有限公司 A kind of mirror image management method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7804767B1 (en) * 1999-10-25 2010-09-28 Tellabs Operations, Inc. Protection/restoration of MPLS networks
CN104021040A (en) * 2014-06-04 2014-09-03 河海大学 Cloud computing associated task scheduling method and device based on time constraint
CN106815071A (en) * 2017-01-12 2017-06-09 上海轻维软件有限公司 Big data job scheduling system based on directed acyclic graph
CN107301063A (en) * 2017-05-10 2017-10-27 北京奇艺世纪科技有限公司 A kind of mirror image management method and device
CN107168776A (en) * 2017-05-16 2017-09-15 广州视源电子科技股份有限公司 A kind of event stochastic method, device, equipment and storage medium

Also Published As

Publication number Publication date
CN109753337B (en) 2023-03-28

Similar Documents

Publication Publication Date Title
CN110383795B (en) Server-free cloud management platform based on service graph
CN109194538B (en) Testing method, device, server and storage medium based on distributed coordination
CN104144073B (en) Master-slave device environment deployment method and master-slave device environment deployment system
CN106134141B (en) A kind of method and device updating network service describing device NSD
CN102147746B (en) Dynamic thread pool management system and method
CN108205442A (en) Edge calculations platform
CN104331375B (en) Shared virtual resource management method under shared virtualization resource pool environment and device
CN106941516B (en) Heterogeneous field device control management system based on industrial internet operating system
US20160127418A1 (en) Policy-guided fulfillment of a cloud service
CN105635051B (en) Data interaction method, device and system
CN111201754A (en) Apparatus for providing a collection of cryptographically protected and filtered and sorted transaction data sets of links of a blockchain
EP3298757A1 (en) Custom communication channels for application deployment
CN108959972A (en) The rule-based safety of cooperation
CN104683303B (en) APP management methods
RU2605918C2 (en) Method for providing functions in industrial automation system and industrial automation system
CN108322325A (en) A kind of virtual machine management method and device
CN106034112B (en) Access control, strategy acquisition, attribute acquisition methods and relevant apparatus
US20140280799A1 (en) Managing virtual computing services
CA3032515A1 (en) Flow engine for building automated flows within a cloud based developmental platform
CN105357045A (en) Cloud platform service establishment method and cloud platform service establishment device
CN104917794A (en) Data sharing method, device and system
CN107408179A (en) dynamic security module server device and its driving method
CN109714407A (en) Server resource adjusting method and device, electronic equipment and storage medium
CN106569874B (en) Store the operating method and physical server of equipment
US10241842B2 (en) Cloud container resource binding and tasking using keys

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant