CN109753123A - A kind of charge nurse's leading capacity promotion control apparatus and system based on big data - Google Patents

A kind of charge nurse's leading capacity promotion control apparatus and system based on big data Download PDF

Info

Publication number
CN109753123A
CN109753123A CN201910036191.XA CN201910036191A CN109753123A CN 109753123 A CN109753123 A CN 109753123A CN 201910036191 A CN201910036191 A CN 201910036191A CN 109753123 A CN109753123 A CN 109753123A
Authority
CN
China
Prior art keywords
module
big data
information storage
data
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910036191.XA
Other languages
Chinese (zh)
Inventor
梁海英
周明建
孟平
梁静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangquan Coal Industry (group) Co Ltd General Hospital
Original Assignee
Yangquan Coal Industry (group) Co Ltd General Hospital
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangquan Coal Industry (group) Co Ltd General Hospital filed Critical Yangquan Coal Industry (group) Co Ltd General Hospital
Priority to CN201910036191.XA priority Critical patent/CN109753123A/en
Publication of CN109753123A publication Critical patent/CN109753123A/en
Pending legal-status Critical Current

Links

Landscapes

  • Medical Treatment And Welfare Office Work (AREA)
  • Accommodation For Nursing Or Treatment Tables (AREA)

Abstract

Charge nurse's leading capacity based on big data that the invention discloses a kind of promotes control apparatus and system, including display, MIM message input module, pull rod, adjustable spring, positioning plate, sucking disk outer-shell, sucker liner, information communication module, information storage module, aggregation of data analysis module, operate keyboard and control cabinet, the display is mounted on the outer wall top side of control cabinet, the invention, the person works' state large database concept and analysis of setting up its positive coal group internal nursing plate obtain the index and variation tendency of working condition, oneself sample and basic database are provided for the construction of national healthcare big data, achievement early period is provided to be included in national medical big data system in the future, these big datas will provide strong data basis for decision of the hospital management layer to nursing plate, ensure the science and timeliness of decision of the senior level, these are big Data will increase patient satisfaction and provide reference, and have extensive social benefit to improve doctor-patient relationship.

Description

A kind of charge nurse's leading capacity promotion control apparatus and system based on big data
Technical field
The present invention relates to the management and control devices technical field based on big data, specially a kind of charge nurse's neck based on big data It leads power and promotes control apparatus and system.
Background technique
With the development of internet and information technology, big data has penetrated into the every aspect of the whole society, nursery work No exception, in big data era, how nursery work complies with era development, seizes the opportunity, and promotes nursing discipline level, and The problem of being worth domestic nursing colleague thinking, the whole world is in exploratory stage, domestic scholars to nursing big data research at present Some discussions have been delivered, but have generally speaking belonged to introductory research greatly, have really been goed deep into inside big data, collected, arrange, divide It analyses, using the also seldom of big data, so designing a kind of charge nurse's leading capacity promotion control apparatus and system based on big data It is necessary.
Summary of the invention
Charge nurse's leading capacity based on big data that the purpose of the present invention is to provide a kind of promotes control apparatus and system, with Solve the problems mentioned above in the background art.
In order to solve the above technical problem, the present invention provides following technical solutions: a kind of charge nurse's neck based on big data It leads power and promotes control apparatus and system, including display, fixing bearing, rotating nuts, cored screw, fixed frame, information input Module, pull rod, adjustable spring, positioning plate, sucking disk outer-shell, sucker liner, information communication module, information storage module, data are comprehensive It closes analysis module, consult module, idler wheel, control main body, loop bar, reserve battery, operation keyboard and control cabinet, the display It is mounted on the outer wall top side of control cabinet, the operation keyboard is mounted on the outer wall top side of control cabinet, and is located at display Front side, the positioning plate are mounted on the sidewall bottom of control cabinet, and the inside of positioning plate, the suction are run through in the bottom end of the loop bar Disk casing is mounted on the bottom end of loop bar, and the sucker liner is mounted on the inside of sucking disk outer-shell, and the top of the loop bar is equipped with Fixed frame, and the outer wall side of control cabinet is arranged in by buckle for fixed frame, the adjustable spring is socketed in the top of loop bar, The bottom end of the adjustable spring is fixed on the top side of positioning plate, and the top of adjustable spring is fixed on the bottom end of fixed frame, described The inside of adjustable spring is run through in the bottom end of pull rod vertically, and is fixed with the top side of sucker liner by viscose, the cored screw It is fixed on the top of fixed frame, the top of the pull rod is hung inside the top of fixed frame, and runs through the inside of cored screw, The rotating nuts are socketed in the outside of cored screw, and the top of pull rod is fixed on the inner wall of rotating nuts by fixing bearing Top side, the idler wheel are mounted on the bottom side of control cabinet, and the reserve battery is fixed on the inner wall top side of control cabinet, the control Main body processed is fixed on the inside of control cabinet, and the control main body includes MIM message input module, information communication module, information storage Module, aggregation of data analysis module and consult module, the information communication module and MIM message input module, information storage module, Aggregation of data analysis module passes through signal with access module respectively and connects, and the MIM message input module and information storage module pass through Signal connection, the information storage module are connect with aggregation of data analysis module by signal, and the access module and information are stored up Storing module is connected by signal.
A kind of charge nurse's leading capacity promotion managing and control system based on big data,
1) it selects, translate, the related scale of revision nurse job state, patient satisfaction correlation scale divides according to time sequencing It is fitted on every month;
2) selected scale is compiled into electric questionnaire in questionnaire star system;
3) the questionnaire star system compiled is previously implanted control device, information storage module is arrived in storage;
4) questionnaire is periodically monthly pushed by information communication module, acquires data, data are returned to letter by information communication module Cease storage module;
5) May and September are tested twice, and 300 nurses is invited to participate in daily data acquisition, continuous 2 weeks each, with every number of days According to as the supplement to monthly data;
6) monthly report is by an aggregation of data analysis module data analysis result of progress, for instructing the nursing work of next month Make;
7) data analysis result, Paper Writing 2-3 submissions are based on.
According to the above technical scheme, the bottom end inner wall of the avris of the sucker liner and sucking disk outer-shell is sealed solid by viscose It is fixed.
According to the above technical scheme, the side of control cabinet is arranged in the fixed frame under the cooperation of buckle, described solid Determining frame is to slide up and down structure in buckle.
According to the above technical scheme, the unlatching front end of the information storage module sets close system to be multinomial, and being can not be more Change system.
According to the above technical scheme, the control main body is connect with display by signal wire, and the display desktop is set Set quick questionnaire star APP.
Compared with prior art, the beneficial effects obtained by the present invention are as follows being: the invention, it is established that its positive coal group internal shield The person works' state large database concept and analysis of managing plate obtain the index and variation tendency of working condition, are the big number of national healthcare Oneself sample and basic database are provided according to construction, provides achievement early period to be included in national medical big data system future;This A little big datas will provide strong data basis for decision of the hospital management layer to nursing plate, it is ensured that the science of decision of the senior level And timeliness;These big datas will increase patient satisfaction and provide reference, and have extensive society's effect to improve doctor-patient relationship Benefit;As the basic large database concept of a hospital, exploratory sample can be provided for the work gone together in this respect, summarize warp It tests, pushes the whole city, the whole province, the whole nation or even International Medical colleague to, there is extensive and far-reaching practice and theoretical value.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is location structure schematic diagram of the invention;
Fig. 3 is managing and control system schematic diagram of the invention;
In figure: 1, display;2, fixing bearing;3, rotating nuts;4, cored screw;5, fixed frame;6, MIM message input module;7, Pull rod;8, adjustable spring;9, positioning plate;10, sucking disk outer-shell;11, sucker liner;12, information communication module;13, information stores Module;14, aggregation of data analysis module;15, module is consulted;16, idler wheel;17, main body is controlled;18, loop bar;19, reserve battery; 20, keyboard is operated;21, cabinet is managed.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-3 is please referred to, the present invention provides a kind of technical solution: a kind of charge nurse's leading capacity riser based on big data Control device, including display 1, fixing bearing 2, rotating nuts 3, cored screw 4, fixed frame 5, MIM message input module 6, pull rod 7, Adjustable spring 8, positioning plate 9, sucking disk outer-shell 10, sucker liner 11, information communication module 12, information storage module 13, data are comprehensive It closes analysis module 14, consult module 15, idler wheel 16, control main body 17, loop bar 18, reserve battery 19, operation keyboard 20 and control Cabinet 21, display 1 are mounted on the outer wall top side of control cabinet 21, and operation keyboard 20 is mounted on the outer wall top of control cabinet 21 Side, and it is located at the front side of display 1, positioning plate 9 is mounted on the sidewall bottom of control cabinet 21, and the bottom end of loop bar 18 is through positioning The inside of plate 9, sucking disk outer-shell 10 are mounted on the bottom end of loop bar 18, and sucker liner 11 is mounted on the inside of sucking disk outer-shell 10, sucker The avris of liner 11 and the bottom end inner wall of sucking disk outer-shell 10 are sealed by viscose and are fixed, and the top of loop bar 18 is equipped with fixed frame 5, And the outer wall side of control cabinet 21 is arranged in by buckle for fixed frame 5, adjustable spring 8 is socketed in the top of loop bar 18, stretches The bottom end of spring 8 is fixed on the top side of positioning plate 9, and the top of adjustable spring 8 is fixed on the bottom end of fixed frame 5, the bottom of pull rod 7 The inside of adjustable spring 8 is run through at end vertically, and is fixed with the top side of sucker liner 11 by viscose, and cored screw 4 is fixed on solid Determine the top of frame 5, the top of pull rod 7 is hung inside the top of fixed frame 5, and runs through the inside of cored screw 4, rotating nuts 3 are socketed in the outside of cored screw 4, and the top of pull rod 7 is fixed on the inner wall top side of rotating nuts 3, rolling by fixing bearing 2 Wheel 16 is mounted on the bottom side of control cabinet 21, and reserve battery 19 is fixed on the inner wall top side of control cabinet 21, and control main body 17 is solid It is scheduled on the inside of control cabinet 21, the side of control cabinet 21 is arranged in fixed frame 5 under the cooperation of buckle, and fixed frame 5 is in card To slide up and down structure in button, control main body 17 include MIM message input module 6, information communication module 12, information storage module 13, Aggregation of data analysis module 14 and consult module 15, information communication module 12 and MIM message input module 6, information storage module 13, Aggregation of data analysis module 14 is connected by signal respectively with module 15 is consulted, MIM message input module 6 and information storage module 13 It is connected by signal, the unlatching front end of information storage module 13 sets close system to be multinomial, and for that can not change system, information storage Module 13 is connect with aggregation of data analysis module 14 by signal, is consulted module 15 and information storage module 13 and is connected by signal It connects, control main body 17 is connect with display 1 by signal wire, and quick questionnaire star APP is arranged in 1 desktop of display.
2. a kind of charge nurse's leading capacity based on big data promotes managing and control system,
1) it selects, translate, the related scale of revision nurse job state, patient satisfaction correlation scale divides according to time sequencing It is fitted on every month;
2) selected scale is compiled into electric questionnaire in questionnaire star system;
3) the questionnaire star system compiled is previously implanted control device, information storage module 13 is arrived in storage;
4) questionnaire is periodically monthly pushed by information communication module 12, acquires data, data pass through 12 foldback of information communication module To information storage module 13;
5) May and September are tested twice, and 300 nurses is invited to participate in daily data acquisition, continuous 2 weeks each, with every number of days According to as the supplement to monthly data;
6) monthly report is by the data analysis result of progress of aggregation of data analysis module 14, for instructing the nursing of next month Work;
7) data analysis result, Paper Writing 2-3 submissions are based on.
Based on above-mentioned, it is an advantage of the current invention that control cabinet 21 is moved down in the cooperation of idler wheel 16 when being managed It moves to fixed position, then operator steps down in the top of loop bar 18 with foot, sucking disk outer-shell 10 is snapped on the bottom plate of hospital, Then rotating nuts 3 are rotated, under being threadedly engaged of cored screw 4, while passing through the cooperation of fixing bearing 2, pull rod 7 is drawn It rises, realizes the stretching of sucker liner 11, reduce the space pressure of sucking disk outer-shell 10, realize the absorption of sucking disk outer-shell 10, thus real The fixation of cabinet 21 is now managed, display 1 is then controlled by operation keyboard 20, will be stored in inside information storage module 13 Questionnaire is transported in the mobile device of each staff by information communication module 12, after making a report on, passes through information communication Module 12 receives information, or is input in information storage module 13 by MIM message input module 6, then passes through aggregation of data Analysis module 14 is analyzed, and obtains data, then can carry out inquiry reading by consulting module 15 at any time.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (6)

1. a kind of charge nurse's leading capacity based on big data promotes control device, including display (1), fixing bearing (2), rotation Nut (3), cored screw (4), fixed frame (5), MIM message input module (6), pull rod (7), adjustable spring (8), positioning plate (9), Sucking disk outer-shell (10), sucker liner (11), information communication module (12), information storage module (13), aggregation of data analysis module (14), consult module (15), idler wheel (16), control main body (17), loop bar (18), reserve battery (19), operation keyboard (20) and It manages cabinet (21), it is characterised in that: the display (1) is mounted on the outer wall top side of control cabinet (21), the operation key Disk (20) is mounted on the outer wall top side of control cabinet (21), and is located at the front side of display (1), and the positioning plate (9) is mounted on The sidewall bottom of cabinet (21) is managed, the inside of positioning plate (9), the sucking disk outer-shell (10) are run through in the bottom end of the loop bar (18) It is mounted on the bottom end of loop bar (18), the sucker liner (11) is mounted on the inside of sucking disk outer-shell (10), the loop bar (18) Top is equipped with fixed frame (5), and fixed frame (5) is by buckling the outer wall side being arranged managing cabinet (21), described flexible Spring (8) is socketed in the top of loop bar (18), and the bottom end of the adjustable spring (8) is fixed on the top side of positioning plate (9), and flexible The top of spring (8) is fixed on the bottom end of fixed frame (5), and the interior of adjustable spring (8) is run through in the bottom end of the pull rod (7) vertically Portion, and fixed with the top side of sucker liner (11) by viscose, the cored screw (4) is fixed on the top of fixed frame (5), institute The top for stating pull rod (7) is hung inside the top of fixed frame (5), and runs through the inside of cored screw (4), the rotating nuts (3) it is socketed in the outside of cored screw (4), and the top of pull rod (7) is fixed on rotating nuts (3) by fixing bearing (2) Inner wall top side, the idler wheel (16) are mounted on the bottom side of control cabinet (21), and the reserve battery (19) is fixed on control cabinet (21) inner wall top side, control main body (17) are fixed on the inside of control cabinet (21), and the control main body (17) includes MIM message input module (6), information communication module (12), information storage module (13), aggregation of data analysis module (14) and access Module (15), the information communication module (12) and MIM message input module (6), information storage module (13), aggregation of data are analyzed Module (14) is connected by signal respectively with module (15) are consulted, the MIM message input module (6) and information storage module (13) It is connected by signal, the information storage module (13) is connect with aggregation of data analysis module (14) by signal, the access Module (15) is connect with information storage module (13) by signal.
2. a kind of charge nurse's leading capacity based on big data promotes managing and control system, it is characterised in that:
1) it selects, translate, the related scale of revision nurse job state, patient satisfaction correlation scale divides according to time sequencing It is fitted on every month;
2) selected scale is compiled into electric questionnaire in questionnaire star system;
3) the questionnaire star system compiled is previously implanted control device, information storage module (13) are arrived in storage;
4) questionnaire periodically monthly is pushed by information communication module (12), acquires data, data pass through information communication module (12) It is returned to information storage module (13);
5) May and September are tested twice, and 300 nurses is invited to participate in daily data acquisition, continuous 2 weeks each, with every number of days According to as the supplement to monthly data;
6) monthly report is by data analysis result of aggregation of data analysis module (14) progress, for instructing the shield of next month Science and engineering is made;
7) data analysis result, Paper Writing 2-3 submissions are based on.
3. a kind of charge nurse's leading capacity based on big data according to claim 1 promotes control device, it is characterised in that: The avris of the sucker liner (11) and the bottom end inner wall of sucking disk outer-shell (10) are sealed by viscose and are fixed.
4. a kind of charge nurse's leading capacity based on big data according to claim 1 promotes control device, it is characterised in that: The fixed frame (5) is arranged in the side of control cabinet (21) under the cooperation of buckle, and the fixed frame (5) is upper in buckle Lower slider structure.
5. a kind of charge nurse's leading capacity based on big data according to claim 2 promotes managing and control system, it is characterised in that: The unlatching front end of the information storage module (13) sets close system to be multinomial, and for that can not change system.
6. a kind of charge nurse's leading capacity based on big data according to claim 1 promotes control apparatus and system, special Sign is: the control main body (17) is connect with display (1) by signal wire, and display (1) the desktop setting is fast asked Roll up star APP.
CN201910036191.XA 2019-01-15 2019-01-15 A kind of charge nurse's leading capacity promotion control apparatus and system based on big data Pending CN109753123A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910036191.XA CN109753123A (en) 2019-01-15 2019-01-15 A kind of charge nurse's leading capacity promotion control apparatus and system based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910036191.XA CN109753123A (en) 2019-01-15 2019-01-15 A kind of charge nurse's leading capacity promotion control apparatus and system based on big data

Publications (1)

Publication Number Publication Date
CN109753123A true CN109753123A (en) 2019-05-14

Family

ID=66405602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910036191.XA Pending CN109753123A (en) 2019-01-15 2019-01-15 A kind of charge nurse's leading capacity promotion control apparatus and system based on big data

Country Status (1)

Country Link
CN (1) CN109753123A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110825166A (en) * 2019-10-22 2020-02-21 重庆信易源智能科技有限公司 Information acquisition system for supermarket member purchase preference big data analysis

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104240008A (en) * 2014-07-25 2014-12-24 周峰 Hospital quality improving system for patient satisfaction investigation and analysis on basis of cloud platform
CN105005869A (en) * 2015-08-03 2015-10-28 中国福利会国际和平妇幼保健院 Nursing quality control management system
WO2016108772A1 (en) * 2014-12-29 2016-07-07 Terzioglu Fusun Nursing information management system
CN107479661A (en) * 2017-09-25 2017-12-15 深圳市蓝豆芽科技有限公司 A kind of good computer host box mounting seat of stabilization
CN107495926A (en) * 2017-08-25 2017-12-22 苏州曼陀菲科智能科技有限公司 A kind of system for healthy comprehensive assessment
CN208093120U (en) * 2018-05-09 2018-11-13 湖北大学 A kind of international trade statistics data variation bulletining device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104240008A (en) * 2014-07-25 2014-12-24 周峰 Hospital quality improving system for patient satisfaction investigation and analysis on basis of cloud platform
WO2016108772A1 (en) * 2014-12-29 2016-07-07 Terzioglu Fusun Nursing information management system
CN105005869A (en) * 2015-08-03 2015-10-28 中国福利会国际和平妇幼保健院 Nursing quality control management system
CN107495926A (en) * 2017-08-25 2017-12-22 苏州曼陀菲科智能科技有限公司 A kind of system for healthy comprehensive assessment
CN107479661A (en) * 2017-09-25 2017-12-15 深圳市蓝豆芽科技有限公司 A kind of good computer host box mounting seat of stabilization
CN208093120U (en) * 2018-05-09 2018-11-13 湖北大学 A kind of international trade statistics data variation bulletining device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110825166A (en) * 2019-10-22 2020-02-21 重庆信易源智能科技有限公司 Information acquisition system for supermarket member purchase preference big data analysis
CN110825166B (en) * 2019-10-22 2021-04-20 上海平意信息科技有限公司 Information acquisition system for supermarket member purchase preference big data analysis

Similar Documents

Publication Publication Date Title
Raghupathi et al. An overview of health analytics
US8131472B2 (en) Methods for hierarchical organization of data associated with medical events in databases
CN103942432A (en) Intelligent health management system
US11501858B1 (en) Visual charting method for creating electronic medical documents
WO2009011736A1 (en) Analytical methods and software product for automated health care information systems
US11328815B2 (en) Physical measurement of empirical indicators of patient-related outcome value using time and motion sensor results
CN101986333A (en) Auxiliary decision supporting system of hospital
US20150294088A1 (en) Patient Summary Generation
Meystre et al. Randomized controlled trial of an automated problem list with improved sensitivity
CN114121295A (en) Construction method of knowledge graph driven liver cancer diagnosis and treatment scheme recommendation system
Laccetti et al. Increase in cancer center staff effort related to electronic patient portal use
Tsumoto et al. Information reuse in hospital information systems: A data mining approach
CN109753123A (en) A kind of charge nurse's leading capacity promotion control apparatus and system based on big data
CN101930497A (en) Independent and interactive health management system
US20140288387A1 (en) Integrated patient health tracking system
JP2009031900A (en) Medical checkup data processor
CN117251443A (en) Clinical data management platform
CN102323995A (en) Osteoporosis remote community health management system
US20140047384A1 (en) Integrated data capture with item group key
CN116030931A (en) Medication recommendation method, device, electronic equipment and storage medium
WO2023107595A1 (en) Human resource management ai-optimization systems and methods
CN111145007B (en) Result-oriented type medical improvement promotion loan project dynamic monitoring method and system
CN110570917A (en) Medical data processing system with classification function
Blum et al. A clinical information display system
Siddiqi et al. Use of information and mobile computing technologies in healthcare facilities of Saudi Arabia

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination