CN109752492A - A kind of flue gas analysis device of the boiler for Chemical Manufacture - Google Patents
A kind of flue gas analysis device of the boiler for Chemical Manufacture Download PDFInfo
- Publication number
- CN109752492A CN109752492A CN201910170289.4A CN201910170289A CN109752492A CN 109752492 A CN109752492 A CN 109752492A CN 201910170289 A CN201910170289 A CN 201910170289A CN 109752492 A CN109752492 A CN 109752492A
- Authority
- CN
- China
- Prior art keywords
- chamber
- flue gas
- fixedly installed
- cooling chamber
- boiler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
The present invention relates to flue gas analysis engineering device technique fields, and disclose a kind of flue gas analysis device of boiler for Chemical Manufacture, including cooling chamber, the right side of the cooling chamber is fixedly installed with filter chamber, the filter chamber is internally provided with filter screen, the right side of the filter chamber is fixedly installed with mixing chamber, the right side of the mixing chamber is fixedly installed with analysis room, cooling chamber is internally provided with snorkel, the right end of snorkel, which runs through cooling chamber and extends to the outside on cooling chamber top and fix, is communicated with the first aspiration pump, filter chamber is fixedly installed with draft hood at the top of inner cavity, the top fixation of draft hood is communicated with the second aspiration pump, the other end of second aspiration pump is connected to mixing chamber fixation.This is used for the flue gas analysis device of the boiler of Chemical Manufacture, by the way that cooling chamber is arranged, is cooled down using the water inside cooling chamber to the flue gas inside snorkel, to prevent the service life of high temperature impact analysis device.
Description
Technical field
The present invention relates to flue gas analysis engineering device technique field, the flue gas analysis of specially a kind of boiler for Chemical Manufacture
Device.
Background technique
The main reason for flue gas is the mixture of gas and flue dust, is pollution residential block atmosphere, therefore flue gas is to environment
Pollution is the combined pollution of a variety of poisonous substances, and flue gas is related to the harmfulness of human body and the size of particle, generates harm to human body
It is mostly the floating dust that diameter is less than 10um, it is especially maximum with the floating dust harmfulness of 1-2.5um.
The flue gas generated using flue gas analysis device to boiler is needed to analyze in chemical production process, thus according to dividing
It analyses result and specific aim processing is carried out to flue gas, since a large amount of heat can be carried when flue gas in boiler by being discharged, and existing flue gas
Analytical equipment lacks the processing unit to heat, these heats can damage analytical equipment, thus impact analysis device
Service life, and existing analytical equipment lacks the processing equipment to dust in flue gas, and these dusts will affect analysis result
Accuracy.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of flue gas analysis device of boiler for Chemical Manufacture,
Have the advantages of heat treatment and dust are handled, solves existing flue gas analysis device and lack processing unit to heat, this
A little heats can damage analytical equipment, thus the service life of impact analysis device, and existing analytical equipment lacks
To the processing equipment of dust in flue gas, these dusts will affect the problem of analyzing result accuracy.
The invention provides the following technical scheme: a kind of flue gas analysis device of the boiler for Chemical Manufacture, including cooling
Room, the right side of the cooling chamber are fixedly installed with filter chamber, and the filter chamber is internally provided with filter screen, the filter chamber
Right side be fixedly installed with mixing chamber, the right side of the mixing chamber is fixedly installed with analysis room, the inside of the cooling chamber
It is provided with snorkel, the right end of the snorkel is through cooling chamber and extends to the outside on cooling chamber top and fixed is communicated with the
One aspiration pump, draft hood is fixedly installed at the top of the filter chamber inner cavity, and the top fixation of the draft hood is communicated with second
The other end of aspiration pump, second aspiration pump is connected to mixing chamber fixation, is fixedly installed with liquid storage at the top of the cooling chamber
Pipe, the right side of the liquid storage pipe is fixed to be communicated with water pump, and the other end of the water pump is connected to mixing chamber fixation, the mixing
The fixed mateiral pump being communicated with inside analysis room in the right side of room, the bottom of the analysis room inner cavity is fixedly installed with support
Frame, is fixedly installed with analyzer at the top of support frame as described above, and the bottom of the cooling chamber and analysis room is fixedly installed with support
Column.
Preferably, the right end of first aspiration pump is extended to the over the bottom of filter chamber inner cavity.
Preferably, the front of the filter chamber is provided with protective door, and the junction of the protective door and filter chamber is equipped with close
Seal.
Preferably, the front of the analysis room is provided with protective cover, is provided with transparent window in the middle part of the protective cover.
Preferably, the quantity of the support column is four, and four support columns are equally divided into two groups, and two groups of support columns
It is located at the bottom of cooling chamber and analysis room.
Preferably, the top of the liquid storage pipe is fixed is communicated with inlet tube, the left side of the cooling chamber be fixed with into
Water pipe, the bottom of the cooling chamber is fixed to be communicated with drainpipe, and the bottom fixation of the mixing chamber is communicated with drain pipe.
Be compared with the prior art, the present invention have it is following the utility model has the advantages that
1, the flue gas analysis device of the boiler for being used for Chemical Manufacture, by the way that cooling chamber is arranged, inside cooling chamber
Water cools down to the flue gas inside snorkel, to prevent the service life of high temperature impact analysis device.
2, the flue gas analysis device of the boiler for being used for Chemical Manufacture, by the way that filter screen is arranged, using filter screen to flue gas
In dust be filtered, to prevent the accuracy of dust impact analysis result.
3, the flue gas analysis device of the boiler for being used for Chemical Manufacture can be square using protective door by the way that protective door is arranged
Just staff clears up filter screen, increases the practicability of the flue gas analysis device.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is surface structure schematic diagram of the invention;
Fig. 3 is enlarged structure schematic diagram at A of the present invention.
In figure: 1, cooling chamber;2, liquid storage pipe;3, filter chamber;4, analysis room;5, snorkel;6, the first aspiration pump;7, it is evacuated
Cover;8, the second aspiration pump;9, mixing chamber;10, filter screen;11, water pump;12, mateiral pump;13, support frame;14, analyzer;15,
Support column;16, protective door;17, protective cover.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-3, a kind of flue gas analysis device of the boiler for Chemical Manufacture, including cooling chamber 1, cooling chamber 1
Right side be fixedly installed with filter chamber 3, the front of filter chamber 3 is provided with protective door 16, the connection of protective door 16 and filter chamber 3
Place is equipped with sealing ring, and filter chamber 3 is internally provided with filter screen 10, and the right side of filter chamber 3 is fixedly installed with mixing chamber 9, mixes
The right side for closing room 9 is fixedly installed with analysis room 4, and the front of analysis room 4 is provided with protective cover 17, the middle part setting of protective cover 17
There is transparent window, cooling chamber 1 is internally provided with snorkel 5, and the right end of snorkel 5 through cooling chamber 1 and extends to cooling chamber 1
The outside on top and fixation is communicated with the first aspiration pump 6, the first aspiration pump 6 and the model applicatory of the second aspiration pump 8 are
TXF-150P, the right end of the first aspiration pump 6 are extended to the over the bottom of 3 inner cavity of filter chamber, and filter chamber is fixedly installed at the top of 3 inner cavity
Draft hood 7, the top of draft hood 7 is fixed to be communicated with the second aspiration pump 8, and the other end and mixing chamber 9 of the second aspiration pump 8 are fixed to be connected
Logical, the top of cooling chamber 1 is fixedly installed with liquid storage pipe 2, and the top fixation of liquid storage pipe 2 is communicated with inlet tube, the left side of cooling chamber 1
Face is fixed with water inlet pipe, and the bottom of cooling chamber 1 is fixed to be communicated with drainpipe, and the bottom fixation of mixing chamber 9 is communicated with drain pipe,
The right side of liquid storage pipe 2 is fixed to be communicated with water pump 11, the model FL-43 applicatory of water pump 11, the other end of water pump 11 and mixed
The fixed connection in room 9, the fixed mateiral pump 12 being communicated with inside analysis room 4 in the right side of mixing chamber 9 are closed, mateiral pump 12 can fit
Model TDA-50, the bottom of 4 inner cavity of analysis room are fixedly installed with support frame 13, and the top of support frame 13 is fixedly installed with
The bottom of analyzer 14, the model MQY-200 applicatory of analyzer 14, cooling chamber 1 and analysis room 4 is fixedly installed with support
Column 15, the quantity of support column 15 are four, and four support columns 15 are equally divided into two groups, and two groups of support columns 15 are located at cooling
The bottom of room 1 and analysis room 4.
When work, start the first aspiration pump 6, the second aspiration pump 8 and water pump 11 first, then by flue gas by snorkel 5
Left end is passed through in snorkel 5, and when the flue gas containing heat passes through cooling chamber 1, the water inside cooling chamber 1 cools away the heat in flue gas
Amount, the flue gas in snorkel 5 is pumped into the bottom of filter chamber 3 by the first aspiration pump 6 at this time, and then the second aspiration pump 8 is by filter chamber 3
Internal flue gas is pumped into mixing chamber 9, when flue gas passes through filter screen 10, filters out dust therein, water pump 11 will be in liquid storage pipe 2
The mixed liquor in portion is pumped into mixing chamber 9, and flue gas, into mixing, is then pumped into analyzer 14 by mateiral pump 12, is passed through with mixed liquor
Analyzer 14 analyzes it, and then the data of display screen can judge the nocuousness contained in flue gas on observation analysis instrument 14
Substance.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of flue gas analysis device of the boiler for Chemical Manufacture, including cooling chamber (1), it is characterised in that: the cooling
The right side of room (1) is fixedly installed with filter chamber (3), and the filter chamber (3) is internally provided with filter screen (10), the filtering
The right side of room (3) is fixedly installed with mixing chamber (9), and the right side of the mixing chamber (9) is fixedly installed with analysis room (4), institute
Being internally provided with snorkel (5) for cooling chamber (1) is stated, the right end of the snorkel (5) through cooling chamber (1) and extends to cooling
The outside on room (1) top and fixation is communicated with the first aspiration pump (6), is fixedly installed with pumping at the top of filter chamber (3) inner cavity
The top fixation of gas hood (7), the draft hood (7) is communicated with the second aspiration pump (8), the other end of second aspiration pump (8)
It is connected to, is fixedly installed with liquid storage pipe (2) at the top of the cooling chamber (1), the right side of the liquid storage pipe (2) with mixing chamber (9) fixation
Side fixation is communicated with water pump (11), and the other end of the water pump (11) is connected to mixing chamber (9) fixation, the mixing chamber (9)
Right side fixed be communicated with the mateiral pump (12) internal positioned at analysis room (4), the fixed peace in the bottom of analysis room (4) inner cavity
It equipped with support frame (13), is fixedly installed at the top of support frame as described above (13) analyzer (14), the cooling chamber (1) and analysis room
(4) bottom is fixedly installed with support column (15).
2. a kind of flue gas analysis device of boiler for Chemical Manufacture according to claim 1, it is characterised in that: described
The right end of first aspiration pump (6) is extended to the over the bottom of filter chamber (3) inner cavity.
3. a kind of flue gas analysis device of boiler for Chemical Manufacture according to claim 1, it is characterised in that: described
The front of filter chamber (3) is provided with protective door (16), and the junction of the protective door (16) and filter chamber (3) is equipped with sealing ring.
4. a kind of flue gas analysis device of boiler for Chemical Manufacture according to claim 1, it is characterised in that: described
The front of analysis room (4) is provided with protective cover (17), is provided with transparent window in the middle part of the protective cover (17).
5. a kind of flue gas analysis device of boiler for Chemical Manufacture according to claim 1, it is characterised in that: described
The quantity of support column (15) is four, and four support columns (15) are equally divided into two groups, and two groups of support columns (15) difference positions
In the bottom of cooling chamber (1) and analysis room (4).
6. a kind of flue gas analysis device of boiler for Chemical Manufacture according to claim 1, it is characterised in that: described
The top fixation of liquid storage pipe (2) is communicated with inlet tube, and the left side of the cooling chamber (1) is fixed with water inlet pipe, the cooling
The bottom of room (1) is fixed to be communicated with drainpipe, and the bottom fixation of the mixing chamber (9) is communicated with drain pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910170289.4A CN109752492A (en) | 2019-03-07 | 2019-03-07 | A kind of flue gas analysis device of the boiler for Chemical Manufacture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910170289.4A CN109752492A (en) | 2019-03-07 | 2019-03-07 | A kind of flue gas analysis device of the boiler for Chemical Manufacture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109752492A true CN109752492A (en) | 2019-05-14 |
Family
ID=66406891
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910170289.4A Pending CN109752492A (en) | 2019-03-07 | 2019-03-07 | A kind of flue gas analysis device of the boiler for Chemical Manufacture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109752492A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111457403A (en) * | 2020-04-22 | 2020-07-28 | 陈辉辉 | A purification unit for organic waste gas |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104048937A (en) * | 2014-06-20 | 2014-09-17 | 王毓芳 | Flue gas detection and analysis device for high-temperature flue |
CN205720137U (en) * | 2016-03-24 | 2016-11-23 | 黑龙江省聚拢乾坤农业技术开发有限公司 | A kind of boiler flue gas content detection instrument |
CN106248445A (en) * | 2016-08-30 | 2016-12-21 | 中煤科工集团重庆研究院有限公司 | Extraction method high-temperature flue gas discharge on-line analysis system in situ |
CN205982236U (en) * | 2016-08-28 | 2017-02-22 | 云南蓝硕环境信息咨询有限公司 | Smoke online detection system |
CN205991970U (en) * | 2016-08-02 | 2017-03-01 | 华电电力科学研究院 | A kind of online sulfur trioxide apparatus for measuring concentration based on liquid absorption method |
CN107831275A (en) * | 2017-11-07 | 2018-03-23 | 无锡艾科瑞思产品设计与研究有限公司 | A kind of boiler smoke detection means |
CN107884255A (en) * | 2017-12-27 | 2018-04-06 | 贵州大学 | It is a kind of can dust-proof temp-lowering smoke gas analysis equipment |
CN207996503U (en) * | 2017-12-21 | 2018-10-23 | 贵溪正发铜业有限公司 | A kind of copper smelting by pyrometallurgy smoke absorption self-cleaning device |
CN208275196U (en) * | 2018-04-26 | 2018-12-25 | 南京优佰达科技有限公司 | A kind of novel environment friendly smoke dust-removing equipment |
CN208612177U (en) * | 2018-05-15 | 2019-03-19 | 越研环境工程盐城有限公司 | A kind of baking oven organic waste gas treatment device |
-
2019
- 2019-03-07 CN CN201910170289.4A patent/CN109752492A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104048937A (en) * | 2014-06-20 | 2014-09-17 | 王毓芳 | Flue gas detection and analysis device for high-temperature flue |
CN205720137U (en) * | 2016-03-24 | 2016-11-23 | 黑龙江省聚拢乾坤农业技术开发有限公司 | A kind of boiler flue gas content detection instrument |
CN205991970U (en) * | 2016-08-02 | 2017-03-01 | 华电电力科学研究院 | A kind of online sulfur trioxide apparatus for measuring concentration based on liquid absorption method |
CN205982236U (en) * | 2016-08-28 | 2017-02-22 | 云南蓝硕环境信息咨询有限公司 | Smoke online detection system |
CN106248445A (en) * | 2016-08-30 | 2016-12-21 | 中煤科工集团重庆研究院有限公司 | Extraction method high-temperature flue gas discharge on-line analysis system in situ |
CN107831275A (en) * | 2017-11-07 | 2018-03-23 | 无锡艾科瑞思产品设计与研究有限公司 | A kind of boiler smoke detection means |
CN207996503U (en) * | 2017-12-21 | 2018-10-23 | 贵溪正发铜业有限公司 | A kind of copper smelting by pyrometallurgy smoke absorption self-cleaning device |
CN107884255A (en) * | 2017-12-27 | 2018-04-06 | 贵州大学 | It is a kind of can dust-proof temp-lowering smoke gas analysis equipment |
CN208275196U (en) * | 2018-04-26 | 2018-12-25 | 南京优佰达科技有限公司 | A kind of novel environment friendly smoke dust-removing equipment |
CN208612177U (en) * | 2018-05-15 | 2019-03-19 | 越研环境工程盐城有限公司 | A kind of baking oven organic waste gas treatment device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111457403A (en) * | 2020-04-22 | 2020-07-28 | 陈辉辉 | A purification unit for organic waste gas |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104964891B (en) | The detection method and sampling apparatus and sample devices of particle concentration free of cleaning | |
CN207689323U (en) | A kind of gas particles object sampling area air curtain protection system | |
CN104568686A (en) | System and method for testing deposition coefficient of sub-micron particles in box body and average coagulation coefficient | |
CN101644643A (en) | Sample air pretreatment device for coke furnace inorganization emission source and method thereof | |
CN108871870A (en) | A kind of portable surface seawater sampling apparatus | |
CN109752492A (en) | A kind of flue gas analysis device of the boiler for Chemical Manufacture | |
CN209992248U (en) | Soil gas stratified sampling device | |
CN204718913U (en) | The sampling apparatus of No clean particle concentration and sample devices | |
KR101523658B1 (en) | Particles Transmitting Capacity Evaluation Method and Apparatus for Filter using Fluorescent Aerosol | |
CN206362593U (en) | The stripping air lift harvester of volatile organic matter in a kind of water | |
US8518166B2 (en) | Air filtering system capable of enhancing inspection convenience | |
CN112683604B (en) | Constant-speed sampling device for pressure measurement method | |
CN104237465B (en) | Air pollutants source resolution sampling system and method | |
CN207263718U (en) | A kind of printing and dyeing industry exhaust gas intelligent measurement processing unit | |
CN206684102U (en) | Clean type automatic sampling apparatus | |
CN201596427U (en) | High-temperature resistant filter film particle catcher | |
CN212119172U (en) | Pollution detection device for black and odorous water pollution treatment | |
CN211799872U (en) | Waste gas collecting device of semi-blind flow plate-and-frame filter press | |
CN209264381U (en) | A kind of waste gas collection device | |
CN215493501U (en) | Sulfur-containing pollutant measuring equipment in quantitative waste gas | |
CN214952462U (en) | Novel gas sample collecting device | |
CN218687542U (en) | Exhaust treatment device for environmental detection | |
CN220671055U (en) | Gas sampling device for exhaust gas detection | |
CN210907323U (en) | Biological safety exhaust system | |
CN219376446U (en) | Environment-friendly soil grinding ventilation equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190514 |