CN109747783A - Rush window pipeline method for arranging - Google Patents

Rush window pipeline method for arranging Download PDF

Info

Publication number
CN109747783A
CN109747783A CN201811597380.6A CN201811597380A CN109747783A CN 109747783 A CN109747783 A CN 109747783A CN 201811597380 A CN201811597380 A CN 201811597380A CN 109747783 A CN109747783 A CN 109747783A
Authority
CN
China
Prior art keywords
window
nozzle
arranging
cutting ferrule
pipeline method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811597380.6A
Other languages
Chinese (zh)
Inventor
金振楠
郝宝彦
王树山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cosco Shipping Heavy Industry Dalian Co Ltd
Original Assignee
Cosco Shipping Heavy Industry Dalian Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cosco Shipping Heavy Industry Dalian Co Ltd filed Critical Cosco Shipping Heavy Industry Dalian Co Ltd
Priority to CN201811597380.6A priority Critical patent/CN109747783A/en
Publication of CN109747783A publication Critical patent/CN109747783A/en
Pending legal-status Critical Current

Links

Abstract

Window pipeline method for arranging is rushed the invention discloses a kind of, the following steps are included: A, in window moving back the careful stage, the model of communication cabin component, position dimension are marked out to come on window drawing, the screw type of communication cabin component is determined according to the screw thread specification of nozzle, the specification of cutting ferrule is determined according to the size of water supplying pipe, it calculates nozzle coverage area and determines position of the crossing cabin part on window, move back to examine and give window producer, make as required;B, after window arrival is installed, cutting ferrule is carried out indoors and connects water supplying pipe, in outdoor mounted nozzle;C, nozzle angle is adjusted after water supply, guarantees to cover window.The present invention rushes window pipeline method for arranging, designs simple and practical, saving design working hour;Nozzle crossing cabin part working procedure shifts to an earlier date;Reduce site operation workload, improves working efficiency;Peripheral pipe is reduced, constructing, it is succinct, beautiful to see in appearance after the completion, and the window visual field is blocked in reduction.

Description

Rush window pipeline method for arranging
Technical field
Window pipeline method for arranging is rushed the present invention relates to a kind of.
Background technique
Driver's cabin window flushing pipeline, there are two types of conventional arrangements, first is that main line will be rinsed through outdoor, along window Structure line style arrangement, uniformly distributed according to window, the shortcomings that bearing each branch pipe connection nozzle rinse, being arranged so is exactly to rinse to lead Pipeline is easy and windshield wiper collision, and branch pipe is easy to carry nozzle impingement with windshield wiper, or rinses coverage area and be blocked, most In the operational test stage, requiring the redjustment and modification of worker scene can just meet the requirements ship;Second is that will rinse main line cloth It sets in driver's cabin room, is arranged indoors along the structure line style of window, each branch pipe is pierced by outdoor, connection nozzle punching respectively The shortcomings that washing window, being arranged so is exactly that communication cabin component quantity is more, how many nozzle is according to the how many a communication cabin components of needs, site welding Amount is big, needs working hour relatively more;Both the above pipeline arrangement has respective limitation, if it is special line type structure Ship, such as certain type ocean engineering operation ship, the working region visual field is required it is high, window design be all often according to visual angle most Greatly, the visual field most open consideration, and there are many window quantity, structure line style is special, if according to above two method arrangement, First is that main line difficult arrangement, blocks sight, second is that the circle of driver's cabin one is all window, there are many nozzle quantity, if independent crossing cabin If raw branch pipe, workload is very big, and unsightly.
Summary of the invention
The object of the present invention is to provide a kind of energy simple-arrangeds to improve construction efficiency and beauty to field obscuration minimum Rush window pipeline method for arranging.
Present invention technical solution used for the above purpose is: a kind of to rush window pipeline method for arranging including following Step:
A, the careful stage is moved back in window, the model of communication cabin component, position dimension is marked out to come on window drawing, according to the spiral shell of nozzle Line specification determines the screw type of communication cabin component, and the specification of cutting ferrule is determined according to the size of water supplying pipe, and it is true to calculate nozzle coverage area Determine position of the crossing cabin part on window, moves back to examine and give window producer, make as required;
B, after window arrival is installed, cutting ferrule is carried out indoors and connects water supplying pipe, in outdoor mounted nozzle;
C, nozzle angle is adjusted after water supply, guarantees to cover window.
The present invention is a kind of to rush window pipeline method for arranging, designs simple and practical, saving design working hour;Nozzle crossing cabin part construction work Sequence shifts to an earlier date;Reduce site operation workload, improves working efficiency;Peripheral pipe is reduced, is seen in appearance after the completion of construction succinct, beautiful It sees, the window visual field is blocked in reduction.
Detailed description of the invention
Fig. 1 be the present invention it is a kind of rush window pipeline method for arranging rush scheme of installation of the window pipe crossing cabin part on window.
Fig. 2 is that a kind of engineer operation ship driver's cabin for rushing window pipeline method for arranging of the present invention rushes window pipeline cut-away view.
Specific embodiment
As depicted in figs. 1 and 2, window pipeline method for arranging is rushed, the specific steps are A, as shown in Figure 1, move back the careful stage in window, The model of communication cabin component 1, position dimension are marked out to come on window drawing, wherein determining logical cabin according to the screw thread specification of nozzle 4 The screw type of part determines the specification of cutting ferrule 3 according to the size of water supplying pipe 2, calculates 4 coverage area of nozzle and determines crossing cabin part in window Technical requirements as above are moved back to examine and give window producer, made as required by the position on family;B, after window arrival is installed, shipyard 6 cutting ferrule connection water supplying pipe is carried out indoors, nozzle is installed in outdoor 5;C, nozzle angle is adjusted after water supply, guarantees to cover window Family.

Claims (1)

1. a kind of rush window pipeline method for arranging, which comprises the following steps:
A, the careful stage is moved back in window, the model of communication cabin component, position dimension is marked out to come on window drawing, according to the spiral shell of nozzle Line specification determines the screw type of communication cabin component, and the specification of cutting ferrule is determined according to the size of water supplying pipe, and it is true to calculate nozzle coverage area Determine position of the crossing cabin part on window, moves back to examine and give window producer, make as required;
B, after window arrival is installed, cutting ferrule is carried out indoors and connects water supplying pipe, in outdoor mounted nozzle;
C, nozzle angle is adjusted after water supply, guarantees to cover window.
CN201811597380.6A 2018-12-26 2018-12-26 Rush window pipeline method for arranging Pending CN109747783A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811597380.6A CN109747783A (en) 2018-12-26 2018-12-26 Rush window pipeline method for arranging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811597380.6A CN109747783A (en) 2018-12-26 2018-12-26 Rush window pipeline method for arranging

Publications (1)

Publication Number Publication Date
CN109747783A true CN109747783A (en) 2019-05-14

Family

ID=66404046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811597380.6A Pending CN109747783A (en) 2018-12-26 2018-12-26 Rush window pipeline method for arranging

Country Status (1)

Country Link
CN (1) CN109747783A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110025471A (en) * 2009-09-04 2011-03-10 삼성중공업 주식회사 Window of a wheel house
KR20120022138A (en) * 2010-09-01 2012-03-12 삼성중공업 주식회사 Wind shield cleaner for vessel including photocatalysis
KR20120064918A (en) * 2010-12-10 2012-06-20 삼성중공업 주식회사 Apparatus for cleaning window of vessel
CN203306211U (en) * 2013-05-29 2013-11-27 广东江龙船舶制造有限公司 Windscreen wiper water spraying device
KR20140004831A (en) * 2012-07-02 2014-01-14 현대중공업 주식회사 Wheelhouse window cleaning apparatus of ship
KR20150093456A (en) * 2014-02-07 2015-08-18 삼성중공업 주식회사 Apparatus and method for cleaning window
CN206856937U (en) * 2017-05-17 2018-01-09 大连船舶工程技术研究中心有限公司 Cleanable sanitary sewage cabin observation window peculiar to vessel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110025471A (en) * 2009-09-04 2011-03-10 삼성중공업 주식회사 Window of a wheel house
KR20120022138A (en) * 2010-09-01 2012-03-12 삼성중공업 주식회사 Wind shield cleaner for vessel including photocatalysis
KR20120064918A (en) * 2010-12-10 2012-06-20 삼성중공업 주식회사 Apparatus for cleaning window of vessel
KR20140004831A (en) * 2012-07-02 2014-01-14 현대중공업 주식회사 Wheelhouse window cleaning apparatus of ship
CN203306211U (en) * 2013-05-29 2013-11-27 广东江龙船舶制造有限公司 Windscreen wiper water spraying device
KR20150093456A (en) * 2014-02-07 2015-08-18 삼성중공업 주식회사 Apparatus and method for cleaning window
CN206856937U (en) * 2017-05-17 2018-01-09 大连船舶工程技术研究中心有限公司 Cleanable sanitary sewage cabin observation window peculiar to vessel

Similar Documents

Publication Publication Date Title
CN102582784B (en) Process for sectionally putting up ship berths or docks
CN105756359A (en) Automatic spraying maintenance system for concrete vertical member employing circulating water supply
CN102637233A (en) Parameterization modeling method for turbine blade root extension segment profile
CN109747783A (en) Rush window pipeline method for arranging
CN110390145A (en) A kind of house type graphic design method based on BIM
CN110991997A (en) BIM technology-based comprehensive pipeline design construction method
CN206538969U (en) Assembled wall decoration structure
CN204420308U (en) Knockdown enter wall tap
CN110377987A (en) A kind of office tower frame-core tube design method based on BIM
CN113158378B (en) Method for drawing up body type of crescent rib steel bifurcated pipe
CN204152041U (en) A kind of cornice stone material and aluminium alloy decorative structure
CN105499041A (en) Anchor chain spray nozzle
CN203176427U (en) Secondary faucet with multiple sprayers
CN103065004B (en) The method of a kind of ship surface sectional construction dynamic dispatching
CN203620821U (en) Flow channel wall surface stress balance optimization-based high-pressure irrigation spray head
CN210152263U (en) Assembly type water supply contact box and assembly structure thereof
Akkoyunlu Parametric BIM façade module development for diagrid twisted structures
CN208235845U (en) Fiberglas reinforced plaster tablet, Fiberglas reinforced plaster tablet moulding
CN202464113U (en) Mounting structure for watertight top rudder carrier of rudder system of ship
CN106695443B (en) A kind of small-sized row's knife precision machine tool scrap flushing device and its rush bits method
CN205857814U (en) A kind of assembled toilet
CN208586823U (en) A kind of novel flashing member
CN213684364U (en) Narrow welded turbine runner of runner
CN204212297U (en) Energy-saving heat-insulating curtain wall postposition fixed structure
CN205189218U (en) Cold and hot air cycle building module of porous way

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190514

RJ01 Rejection of invention patent application after publication