CN109743587A - Live streaming connection monitoring method, terminal device and storage medium - Google Patents

Live streaming connection monitoring method, terminal device and storage medium Download PDF

Info

Publication number
CN109743587A
CN109743587A CN201910004885.5A CN201910004885A CN109743587A CN 109743587 A CN109743587 A CN 109743587A CN 201910004885 A CN201910004885 A CN 201910004885A CN 109743587 A CN109743587 A CN 109743587A
Authority
CN
China
Prior art keywords
data
live streaming
target
attended operation
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910004885.5A
Other languages
Chinese (zh)
Other versions
CN109743587B (en
Inventor
叶乾升
曾文舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Huya Information Technology Co Ltd
Original Assignee
Guangzhou Huya Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Huya Information Technology Co Ltd filed Critical Guangzhou Huya Information Technology Co Ltd
Priority to CN201910004885.5A priority Critical patent/CN109743587B/en
Publication of CN109743587A publication Critical patent/CN109743587A/en
Application granted granted Critical
Publication of CN109743587B publication Critical patent/CN109743587B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Two-Way Televisions, Distribution Of Moving Picture Or The Like (AREA)
  • Testing, Inspecting, Measuring Of Stereoscopic Televisions And Televisions (AREA)

Abstract

The embodiment of the present application discloses a kind of live streaming connection monitoring method, terminal device and storage medium, this method comprises: obtaining the operation monitoring data of target live streaming attended operation, wherein, the target live streaming attended operation is the operation that at least two main broadcaster users establish live streaming connection;Power and success rate relation factor data are connected into according to operation monitoring data determination;Using power and the success rate relation factor data of connecting into as display data progress visualization display.Power will be connected into through the above technical solution and success rate relation factor data carry out visualization display, difference can intuitively be embodied and connect into power and corresponding success rate relation factor data, when there is the case where connection failure, what administrative staff can check visualization display connects into power and success rate relation factor come the reason of searching this connection failure, the problem of connection failure can be more quickly determined out, may further solve the problems, such as early as possible.

Description

Live streaming connection monitoring method, terminal device and storage medium
Technical field
The invention relates to computer technology more particularly to a kind of live streaming connection monitoring method, terminal device and deposit Storage media.
Background technique
Live streaming is generally referred to as the broadcast mode that the generation of media file carries out simultaneously with broadcast, and it is straight that live streaming is included in network The network direct broadcasting played on platform is broadcast, the user of network direct broadcasting includes main broadcaster and spectators.As the temperature of live streaming platform gradually rises The type of height, live streaming is also more and more, in addition to the mode that the corresponding main broadcaster of a traditional direct broadcasting room is broadcast live, further includes Multi-user's live-mode, i.e. multiple main broadcasters are broadcast live respectively in a direct broadcasting room.
But multi-user's live-mode needs to establish the connection relationship between multiple main broadcaster ends, during this if there is The problem of connection failure, then needs the leaf through respectively journal file at multiple main broadcaster ends of research staff to go to search reason, this side Formula efficiency is lower, can not solve the problems, such as connection failure in time.
Summary of the invention
The embodiment of the present application provides a kind of live streaming connection monitoring method, terminal device and storage medium, can quickly search To the problem of connection failure.
In a first aspect, the embodiment of the present application provides a kind of live streaming connection monitoring method, comprising:
Obtain the operation monitoring data of target live streaming attended operation, wherein the target live streaming attended operation is at least two A main broadcaster user establishes the operation of live streaming connection;
Power and success rate relation factor data are connected into according to operation monitoring data determination;
Using power and the success rate relation factor data of connecting into as display data progress visualization display.
Further, the operation monitoring data for obtaining target live streaming attended operation includes:
Obtain the operation monitoring data of multiple targets live streaming attended operation in historical time section, wherein the operation prison Controlling data includes connection result and attended operation data.
Further, determine that connecting into power includes: according to the operation monitoring data
It is determined in preset period of time according to the connection result that attended operation is broadcast live in the multiple target when each presetting Between section connect into power, wherein include at least one preset period of time, each preset time in the historical time section Period includes at least one preset time section;
Determine that success rate relation factor data include: according to the operation monitoring data
For each preset time section, the target data in historical time section in attended operation data is obtained;Wherein, institute It is associated with connection result to state target data;
The target data is determined as to the success rate relation factor data in the preset time section.
Further, the target data is determined as to the success rate relation factor data in the preset time section, is wrapped It includes:
For each preset time section, the target data in the historical time section in the attended operation data is determined Quantity;
The target data is associated with the success rate that the quantity of the target data is determined as the preset time section Factor data.
Further, further includes:
When detecting target live streaming attended operation starting, the association main broadcaster end of the target live streaming attended operation is determined;
Obtain the attended operation data at association main broadcaster end, wherein the attended operation data are that the association main broadcaster end is held The data generated when row attended operation;
At the end of detecting the target live streaming attended operation, connection result is determined;
The connection result and all attended operation data got are determined as the target live streaming attended operation Operate monitoring data.
Further, described at the end of detecting the target live streaming attended operation, determine connection result, comprising:
If detecting live streaming flow data corresponding with target live streaming attended operation within the default Connection Time, really The fixed target live streaming attended operation terminates, and is determined as successful connection;
If live streaming flow data corresponding with target live streaming attended operation is not detected within the default Connection Time, It determines that the live streaming attended operation terminates, and is determined as connection failure.
Further, the attended operation includes establishing operation, invitation operations, inquiry operation, inviting response operation, live streaming At least one of push operation and Rendering operations;
The attended operation data include operation code, operation answer code, mode of operation code, operating result and customized number At least one of according to.
Further, using it is described connect into power and success rate relation factor data as display data and carry out visualization it is aobvious After showing, further includes:
It receives and the associated reparation patch file of target live streaming attended operation or target installation file;
Optimization operation is executed according to the reparation patch file or target installation file.
Second aspect the embodiment of the present application also provides a kind of terminal device, including memory, processor and is stored in On reservoir and the computer program that can run on a processor, the processor realize that the application is arbitrarily real when executing described program Apply the connection monitoring method of live streaming described in example.
The third aspect, the embodiment of the present application also provides a kind of computer readable storage mediums, are stored thereon with computer Program, the program realize that live streaming described in the application any embodiment connects monitoring method when being executed by processor.
The embodiment of the present application discloses a kind of live streaming connection scheme, and the operation that attended operation is broadcast live by obtaining target monitors Data, wherein the target live streaming attended operation is the operation that at least two main broadcaster users establish live streaming connection;According to the behaviour Make monitoring data determination and connects into power and success rate relation factor data;Power and success rate relation factor are connected by described Data carry out visualization display as display data.Power and success rate relation factor number will be connected into through the above technical solution According to visualization display is carried out, it can intuitively embody difference and connect into power and corresponding success rate relation factor data, go out When the case where existing connection failure, what administrative staff can check visualization display connects into power and success rate relation factor to look into The reason of looking for this connection failure, may further solve the problems, such as the problem of can more quickly determining out connection failure as early as possible.
Detailed description of the invention
Fig. 1 is a kind of flow chart for live streaming connection monitoring method that the embodiment of the present application one provides;
Fig. 2 is a kind of flow chart for live streaming connection monitoring method that the embodiment of the present application two provides;
Fig. 3 is the flow chart for another live streaming connection monitoring method that the embodiment of the present application two provides;
Fig. 4 is the flow chart for another live streaming connection monitoring method that the embodiment of the present application two provides;
Fig. 5 is a kind of flow chart for live streaming connection monitoring method that the embodiment of the present application three provides;
Fig. 6 is a kind of flow chart for live streaming connection monitoring method that the embodiment of the present application four provides;
Fig. 7 is the structural schematic diagram of the live streaming attachment device in the embodiment of the present application five;
Fig. 8 is the hardware structural diagram of one of the embodiment of the present application seven terminal device.
Specific embodiment
The application is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched The specific embodiment stated is used only for explaining the application, rather than the restriction to the application.It also should be noted that in order to just Part relevant to the application is illustrated only in description, attached drawing rather than entire infrastructure.
Embodiment one
Fig. 1 is the flow chart for the live streaming connection monitoring method that the embodiment of the present application one provides, and this method can be connected by live streaming Connection device executes, wherein the device can generally can integrate on a hardware platform, specifically by software and or hardware realization Include the following steps:
S110, the operation monitoring data for obtaining target live streaming attended operation, wherein the target live streaming attended operation is extremely Few two main broadcaster users establish the operation of live streaming connection.
Wherein, the live streaming is connected as the connection relationship established between the main broadcaster user for participating in live streaming based on direct broadcasting room, It can be broadcast live and interact in the same direct broadcasting room so as to participate in the main broadcaster user of live streaming when subsequent, the application institute For the operation that mutually establishes a connection between at least two main broadcaster users of target live streaming attended operation, can be two Main broadcaster user is also possible to establish a connection between multiple main broadcaster users.
Target live streaming attended operation can be attended operation and start to all behaviour included by the section that attended operation terminates Make, may include operation performed by any one main broadcaster user foundation live streaming connection in at least two main broadcaster user.Institute State the number that operation monitoring data is generated, sent or received by the operation in the implementation procedure of target live streaming attended operation According to.Main broadcaster user establishes target live streaming attended operation generally by live streaming platform, and it is flat that live streaming platform can be the live streaming of webpage version Platform can also be live streaming application program.
It can be the operation monitoring data for obtaining the live streaming attended operation of multiple targets in historical time section.
S111, power and success rate relation factor data are connected into according to operation monitoring data determination.
The power that connects into is that multiple targets are broadcast live attended operation and connect into power, can be broadcast live according to each target What the connection result of attended operation determined the live streaming attended operations of multiple targets connects into power.Success rate relation factor data are shadow The data of connection result, the multiple operations for including in target live streaming attended operation are rung, and each operation has correspondence generate, send out The data sent or received, some of them data influence whether connection result, it will the data for influencing connection result extract As success rate relation factor data.
S112, using it is described connect into power and success rate relation factor data as display data carry out visualization display.
Wherein it is possible to be by it is described connect into power and success rate relation factor data carried out by visualization tool it is visual Change display.Illustratively, the visualization tool can be Grafana, and Grafana is a visualization tool, be applied to number According to monitoring aspect, the data monitored can be subjected to visualization display by UI (User Interface, user interface).It can It can be depending on change display and be shown data by way of chart, so as to which data are more intuitively presented, figure The form of table may include curve graph, histogram, cake chart, bar chart, area-graph, XY scatter plot, surface chart and radar map etc. Deng.
Visualization display, Ke Yizhi are carried out by the way that power and success rate relation factor data will be connected into as display data It sees ground embodiment difference and connects into power and corresponding success rate relation factor data, when there is the case where connection failure, management What personnel can check visualization display connects into power and success rate relation factor come the reason of searching this connection failure, can The problem of to more quickly determine out connection failure, may further solve the problems, such as early as possible.
Embodiment two
Fig. 2 is the flow chart for the live streaming connection monitoring method that the embodiment of the present application two provides, and this method can be connected by live streaming Connection device executes, wherein the device can generally can integrate on a hardware platform, specifically by software and or hardware realization Include the following steps:
S120, the operation monitoring data that attended operation is broadcast live in multiple targets in historical time section is obtained, wherein the behaviour It include connection result and attended operation data as monitoring data, the target live streaming attended operation is that at least two main broadcaster users build The operation of vertical live streaming connection.
Wherein, the period that the historical time section can be systemic presupposition illustratively can be history one month It is interior, in one week of history etc..The operation that multiple at least two main broadcaster establishes live streaming connection has occurred in historical time section, respectively Obtain the operation monitoring data of multiple target live streaming attended operations.Wherein, the multiple target live streaming attended operation may include The operation of live streaming connection is established between different main broadcaster users respectively, as long as the target live streaming in historical time section occurs Attended operation.
The live streaming attended operation of each target has a connection result, may include successful connection or connection failure.Even Connecing operation data is that any one main broadcaster user before judging connection result, in at least two main broadcaster user establishes directly Broadcast the operation data of the performed any operation of connection.
S121, power and success rate relation factor data are connected into according to operation monitoring data determination.
S122, using it is described connect into power and success rate relation factor data as display data carry out visualization display.
The specific embodiment of aforesaid operations can refer to associated description above, and details are not described herein.
Optionally, as shown in figure 3, connecting into power and success rate relation factor number according to operation monitoring data determination According to can be implemented in the following way:
S1210, it each of is determined in preset period of time according to the connection result that attended operation is broadcast live in the multiple target Preset time section connects into power, wherein and it include at least one preset period of time in the historical time section, it is each pre- If the time cycle includes at least one preset time section.
The operation monitoring data for obtaining multiple targets live streaming attended operation in historical time section, can supervise multiple operations It is for statistical analysis to control data.Main broadcaster user, which establishes live streaming connection, will have certain relationship with the specific time, for example, in morning Period, the operation that main broadcaster user establishes live streaming connection can be relatively fewer, and in 21 points to 23 points of period, main broadcaster user is established The operation of live streaming connection can be relatively more, so section establishes target live streaming attended operation, suffered influence in different times It is different.
Preset period of time is a unit interval in historical time section, i.e., includes at least one in historical time section Preset period of time;And preset time section is a unit interval in preset period of time, i.e., in preset period of time Including at least one preset time section.
Historical time section is divided according to preset time section each in each preset period of time, and is counted respectively Each preset time section in preset period of time connects into power.The company in different preset time sections can be respectively seen It is connected into the data of influence suffered by power and connection result.
Illustratively, historical time Duan Weiyi months, the preset period of time was one day, and preset period of time is one Hour, i.e., it, will be more with daily each hour according to the operation monitoring data of multiple targets live streaming attended operation in one month A operation monitoring data is divided, and then the operation monitoring data further according to each of daily hour calculates every in one month It 0 point to 1 point connect into power, it is daily 1 point to 2 points connect into power ..., daily 23 points to 0 point connect into Power.In this way, it is available daily each of hour connect into power.
S1211, it is directed to each preset time section, obtains the target data in historical time section in attended operation data; Wherein, the target data is associated with connection result.
Correspondingly, historical time section is divided according to each preset time section in each preset period of time, And the attended operation data in each preset time section of each preset period of time are obtained respectively, divide from attended operation data The target data in each preset time section of each preset period of time is not determined.
Target data and connection result are associated, i.e. connection result is if it is failure, probably due to being target live streaming connection The some step operations of certain for including in operation occur caused by situation, can will will affect connection knot from attended operation data The data of fruit are determined as target data.Target data can be including a variety of data, include that target is broadcast live in attended operation data Different step in attended operation operates corresponding operation data, wherein may have multiple operation datas all can influence connection knot Fruit.The selection of specific target data can be presetting for research staff, can also be set according to practical application scene It sets.
Illustratively, if target data be target be broadcast live the mode of operation code that the first operation is corresponding in attended operation and The second operation corresponding response time, then by the mode of operation in daily 10 points to 11 points in one month of attended operation data Code and response time extract, i.e., by the behaviour of target live streaming attended operation all in daily 10 points to 11 points in one month Make status code and the response time extracts, as target data.
S1212, the success rate relation factor data that the target data is determined as to the preset time section.
Target data conduct for each preset time section, in the historical time section that will acquire in attended operation data Success rate relation factor data.
Power is connected by determine each preset time section in each preset period of time respectively, can gone out When existing connection failure, administrative staff can be determined in conjunction with the current time corresponding preset time section connect into power and Corresponding success rate relation factor data more intuitive can more accurately be seen and targetedly connect into power and corresponding success Rate relation factor data can faster and more accurately determine the problem of connection failure.
Optionally, as shown in figure 4, the target data to be determined as to the success rate relation factor in the preset time section Data can be implemented in the following way:
S1213, it is directed to each preset time section, determines the mesh in the historical time section in the attended operation data Mark the quantity of data.
S1214, the success that the quantity of the target data and the target data is determined as to the preset time section Rate relation factor data.
Wherein, the quantity of the target data in each preset time section in the statistical history period respectively, and by target Data quantity corresponding with its is determined as success rate relation factor data.After the quantity of target data has been determined, by target Data quantity corresponding with its carries out visualization display as display data, can further make success rate relation factor data more Intuitively, the problem of administrative staff can be helped quickly to determine connection failure.
Embodiment three
Fig. 5 is the flow chart for the live streaming connection monitoring method that the embodiment of the present application three provides, and this method can be connected by live streaming Connection device executes, wherein the device can generally can integrate on a hardware platform, specifically by software and or hardware realization Include the following steps:
S130, when detecting target live streaming attended operation starting, determine the association master of target live streaming attended operation Broadcast end.
Wherein it is possible to be receive association main broadcaster end have sent enabled instruction when, determine target live streaming attended operation open It is dynamic.Illustratively, it if association main broadcaster end needs to create a direct broadcasting room, and is established in this direct broadcasting room and other main broadcaster users When live streaming connection, association main broadcaster end can send a newly-built direct broadcasting room and be broadcast live the instruction of connection to server, create directly It between broadcasting and is broadcast live the instruction i.e. enabled instruction of connection, is detecting newly-built direct broadcasting room that association main broadcaster end is sent and carrying out straight When broadcasting the instruction of connection, that is, determine target live streaming attended operation starting.For another example, if association main broadcaster end is intended to be added to one The direct broadcasting room having built up, and when establishing live streaming connection with other main broadcaster users in this direct broadcasting room, association main broadcaster end can be with It sends an addition direct broadcasting room and is broadcast live the instruction of connection to server, direct broadcasting room is added and is broadcast live the instruction of connection That is enabled instruction determines mesh when detecting the addition direct broadcasting room of association main broadcaster end transmission and being broadcast live the instruction of connection Mark live streaming attended operation starting.
Main broadcaster's user terminal involved in live streaming connection, example are established in the association main broadcaster end of the target live streaming attended operation Property, live streaming connection, association master are established if necessary to a newly-built direct broadcasting room and in newly-built direct broadcasting room and other main broadcaster users Broadcast end include establish the initiation main broadcaster user of direct broadcasting room, and be invited into live streaming connection be invited to main broadcaster user;If When being incorporated into the direct broadcasting room having built up, and establishing live streaming connection with other main broadcaster users in this direct broadcasting room, close Connection main broadcaster end includes the main broadcaster user that direct broadcasting room is added, and straight in main broadcaster user's foundation that direct broadcasting room needs and is newly added Broadcast the main broadcaster user of connection.
S131, the attended operation data for obtaining association main broadcaster end, wherein the attended operation data are the association main broadcaster End executes the data generated when attended operation.
Main broadcaster end is associated with when being broadcast live connection, needs to be implemented corresponding attended operation.One target live streaming connection behaviour Make to complete to include at least two multiple attended operations for being associated with the execution of main broadcaster ends.
Optionally, the attended operation includes establishing operation, invitation operations, inquiry operation, response operation, live streaming being invited to push away Send at least one of operation and Rendering operations.
Wherein, establishing operation is initiation main broadcaster user's sending for establishing the operation of direct broadcasting room, and invitation operations are to initiate For main broadcaster user for inviting other main broadcaster users to be added to direct broadcasting room and being broadcast live the operation of connection, inquiry operation is to initiate master Broadcasting user inquires the operation of other main broadcaster users, and inviting response operation is the behaviour of the response of the main broadcaster user that is invited to for invitation Make, live streaming push operation is the operation for being associated with main broadcaster end and direct broadcasting room being pushed or recommended, and Rendering operations are association main broadcaster end Carrying out the Rendering operations in target live streaming attended operation.
The attended operation data include operation code, operation answer code, mode of operation code, operating result and customized number At least one of according to.
Wherein, operation data, i.e. life in an attended operation implementation procedure are correspondingly connected with for each attended operation At, the data that receive and transmit.The operation code be the corresponding number code of each attended operation, for from different companies Operation is connect to correspond;The operation answer code is the code of obtained response message after each attended operation executes, operation Answer code is used to record the specific implementation response of each attended operation, and the mode of operation code is for embodying each attended operation tool The code for the state that body is implemented;The operating result is the specific result of implementation of each attended operation;Self-defining data can be Administrative staff's data information according to added by practical application request, can be administrative staff addition operating result the reason of Deng.
S132, at the end of detecting target live streaming attended operation, determine connection result.
It can be by detecting whether that receiving live streaming flow data is broadcast live whether attended operation terminates to judge the target, institute After stating target live streaming attended operation, if successful connection, being associated with main broadcaster end can be normally broadcast live;And if Connection failure is then associated with main broadcaster end and does not establish direct broadcasting room or be not added in the direct broadcasting room having built up.I.e. if inspection Live streaming flow data is measured, then is associated with main broadcaster end and comes into normal live streaming, target live streaming attended operation is over.Otherwise such as Live streaming flow data is persistently not detected in fruit, then can determine that target live streaming attended operation is over, and determine connection failure, Such case association main broadcaster end needs to establish target live streaming attended operation again to reconnect.
Optionally, if detecting live streaming fluxion corresponding with target live streaming attended operation within the default Connection Time According to, it is determined that the target live streaming attended operation terminates, and is determined as successful connection;
If live streaming flow data corresponding with target live streaming attended operation is not detected within the default Connection Time, It determines that the live streaming attended operation terminates, and is determined as connection failure.
Wherein, the default Connection Time can be the time of systemic presupposition, for live streaming fluxion to be persistently not detected According to when cutting target attended operation is broadcast live, avoid the live streaming attended operation of target from persistently occupying resource.Illustratively, described pre- If the Connection Time can be 3 minutes, i.e., start timing when detecting target live streaming attended operation starting, if examined in 3 minutes Measuring live streaming flow data corresponding with target live streaming attended operation, it is determined that the target live streaming attended operation terminates, with And it is determined as successful connection;If live streaming flow data corresponding with target live streaming attended operation was also not detected by 3 minutes, It then determines that the live streaming attended operation terminates, and is determined as connection failure.
S133, the connection result and all attended operation data got are determined as the target live streaming connection behaviour The operation monitoring data of work.
The operation monitoring data of the attended operation of target live streaming each time includes the company of connection result and all attended operations Connect operation data.It can be and report interface by one data of realization, be stored in the interface as component in the library maven, So as to call data to report interface from the library maven.When detecting target live streaming attended operation starting, target is broadcast live The operation monitoring data of attended operation reports interface to upload in background data base by data, ordinal number when back-end data can be According to library (tsdb, Time Series Database).
Optionally, it can also be the attended operation for obtaining local cache from the association main broadcaster end according to data obtaining time Data.I.e. association main broadcaster end can be obtained by the attended operation data in target live streaming attended operation in local cache in data When the time being taken to reach, interface can be reported to upload to the attended operation data of local cache in background data base by data. It avoids supporting due to multiple association main broadcasters continuing and uploads data into time series database and lead to load excessive in background data base, it can be with Alleviate the pressure of background data base.
S134, the operation monitoring data for obtaining target live streaming attended operation, wherein the target live streaming attended operation is extremely Few two main broadcaster users establish the operation of live streaming connection.
S135, power and success rate relation factor data are connected into according to operation monitoring data determination.
S136, using it is described connect into power and success rate relation factor data as display data carry out visualization display.
The specific embodiment of aforesaid operations can refer to associated description above, and details are not described herein.
It should be noted that the execution sequence of operation S130 is not limited to as shown in figure 5, operating S130 can also operate It is executed after S134, as long as there is target live streaming attended operation that can execute operation S130 to S133 is operated, to determine target The operation monitoring data of attended operation is broadcast live and is stored.
The embodiment of the present application is by when detecting that attended operation starting is broadcast live in target, determining the target live streaming connection behaviour The association main broadcaster end of work;Obtain the attended operation data at association main broadcaster end;Detecting that target live streaming attended operation terminates When, determine connection result;The connection result and all attended operation data got are determined as the target live streaming to connect Connect the operation monitoring data of operation.The available operation monitoring data in target live streaming attended operation, so as to therefrom Determination connect into power and success rate relation factor data, and then will connect into power and success rate relation factor data progress can It is shown depending on changing.
Example IV
Fig. 6 is the flow chart for the live streaming connection monitoring method that the embodiment of the present application four provides, and this method can be connected by live streaming Connection device executes, wherein the device can generally can integrate on a hardware platform, specifically by software and or hardware realization Include the following steps:
S140, the operation monitoring data for obtaining target live streaming attended operation, wherein the target live streaming attended operation is extremely Few two main broadcaster users establish the operation of live streaming connection.
S141, power and success rate relation factor data are connected into according to operation monitoring data determination.
S142, using it is described connect into power and success rate relation factor data as display data carry out visualization display.
The specific embodiment of aforesaid operations can refer to associated description above, and details are not described herein.
S143, reception and the associated reparation patch file of target live streaming attended operation or target installation file.
Administrative staff can connect out according to connect into power and the success rate relation factor data search of visualization display The reason of failure, and the patch file for repairing connection failure is determined according to the success rate relation factor data counted, or Release the installation kit of new edition.The patch file of repairing is the heat that the connection failure reason of attended operation is broadcast live for repairing target Patch file, the target installation file are the installation kit of the connection failure reason of repaired mark live streaming attended operation of looking over so as to check.
S144, optimization operation is executed according to the reparation patch file or target installation file.
Patch file is repaired based on the received, optimization operation is executed to live streaming application program, so that application program is broadcast live rear Same connection failure will not occur again in continuous process.Target installation file executes optimization operation based on the received, i.e., according to mesh The reason of mark installation file is reinstalled application program is broadcast live, and the live streaming application program of new edition has repaired connection failure, Will not occur same connection failure when use again.
In addition, detect can not extreme case by repairing patch file or target installation file when, can pass through Test code carrys out the problem of automatization simulation is to determine connection failure, and solves connection failure by third-party testing tool Problem.
The associated reparation patch file of attended operation or target installation file is broadcast live with target by receiving in the application, and The reason of executing optimization operation according to the reparation patch file or target installation file, connection failure can be repaired, the company of reduction It connects and is unsuccessfully in the presence of, improve the success rate of live streaming connection.
Embodiment five
Fig. 7 is the structural schematic diagram of live streaming attachment device that the embodiment of the present application five provides, the device can by software with/ Or hardware realization, it generally can integrate on a hardware platform.As shown in fig. 7, the live streaming attachment device includes:
Data acquisition module 210, for obtaining the operation monitoring data of target live streaming attended operation, wherein the target It is the operation that at least two main broadcaster users establish live streaming connection that attended operation, which is broadcast live,;
Data determining module 211, for determined according to the operation monitoring data connect into power be associated with success rate because Prime number evidence;
Visualization model 212, for using it is described connect into power and success rate relation factor data as display data into Row visualization display.
The embodiment of the present application discloses a kind of live streaming attachment device, and the operation that attended operation is broadcast live by obtaining target monitors Data, wherein the target live streaming attended operation is the operation that at least two main broadcaster users establish live streaming connection;According to the behaviour Make monitoring data determination and connects into power and success rate relation factor data;Power and success rate relation factor are connected by described Data carry out visualization display as display data.Power and success rate relation factor number will be connected into through the above technical solution According to visualization display is carried out, it can intuitively embody difference and connect into power and corresponding success rate relation factor data, go out When the case where existing connection failure, what administrative staff can check visualization display connects into power and success rate relation factor to look into The reason of looking for this connection failure, may further solve the problems, such as the problem of can more quickly determining out connection failure as early as possible.
Optionally, data acquisition module is specifically used for:
Obtain the operation monitoring data of multiple targets live streaming attended operation in historical time section, wherein the operation prison Controlling data includes connection result and attended operation data.
Optionally, data determining module specifically includes:
Success rate determining module, the connection result for attended operation to be broadcast live according to the multiple target determine preset time Each preset time section in period connects into power, wherein when presetting in the historical time section including at least one Between the period, each preset period of time includes at least one preset time section;
Target data determining module obtains attended operation number in historical time section for being directed to each preset time section Target data in;Wherein, the target data is associated with connection result;
Relation factor module, for the target data to be determined as to the success rate relation factor in the preset time section Data.
Optionally, relation factor module is specifically used for:
For each preset time section, the target data in the historical time section in the attended operation data is determined Quantity;
The target data is associated with the success rate that the quantity of the target data is determined as the preset time section Factor data.
Optionally, further includes:
Main broadcaster end determining module, for determining that the target live streaming connects when detecting target live streaming attended operation starting Connect the association main broadcaster end of operation;
Operation data obtains module, for obtaining the attended operation data at association main broadcaster end, wherein the attended operation number The data generated when attended operation are executed according to for the association main broadcaster end;
As a result determining module, for determining connection result at the end of detecting the target live streaming attended operation;
Monitoring data determining module, for the connection result and all attended operation data got to be determined as institute State the operation monitoring data of target live streaming attended operation.
Optionally, as a result determining module is specifically used for:
If detecting live streaming flow data corresponding with target live streaming attended operation within the default Connection Time, really The fixed target live streaming attended operation terminates, and is determined as successful connection;
If live streaming flow data corresponding with target live streaming attended operation is not detected within the default Connection Time, It determines that the live streaming attended operation terminates, and is determined as connection failure.
Optionally, the attended operation includes establishing operation, invitation operations, inquiry operation, response operation, live streaming being invited to push away Send at least one of operation and Rendering operations;
The attended operation data include operation code, operation answer code, mode of operation code, operating result and customized number At least one of according to.
Optionally, further includes:
File reception module, for using it is described connect into power and success rate relation factor data as display data into After row visualization display, receive and the associated reparation patch file of target live streaming attended operation or target installation file;
Optimization module, for executing optimization operation according to the reparation patch file or target installation file.
Embodiment six
The embodiment of the present application also provides a kind of storage medium comprising computer executable instructions, and the computer is executable Instruction connects monitoring method for executing live streaming when being executed by computer processor, this method comprises:
Obtain the operation monitoring data of target live streaming attended operation, wherein the target live streaming attended operation is at least two A main broadcaster user establishes the operation of live streaming connection;
Power and success rate relation factor data are connected into according to operation monitoring data determination;
Using power and the success rate relation factor data of connecting into as display data progress visualization display.
Optionally, which can be also used for executing the application times when being executed by computer processor Live streaming connection monitoring method provided by embodiment of anticipating.
By the description above with respect to embodiment, it is apparent to those skilled in the art that, the application It can be realized by software and required common hardware, naturally it is also possible to which by hardware realization, but in many cases, the former is more Good embodiment.Based on this understanding, the technical solution of the application substantially in other words contributes to the prior art Part can be embodied in the form of software products, which can store in computer readable storage medium In, floppy disk, read-only memory (Read-Only Memory, ROM), random access memory (Random such as computer Access Memory, RAM), flash memory (FLASH), hard disk or CD etc., including some instructions are with so that a computer is set Standby (can be personal computer, server or the network equipment etc.) executes method described in each embodiment of the application.
Embodiment seven
As shown in figure 8, a kind of hardware structural diagram of the terminal device provided for the embodiment of the present application seven, such as Fig. 7 institute Show, which includes:
One or more processors 410, in Fig. 8 by taking a processor 410 as an example;
Memory 420;
The terminal device can also include: input unit 430 and output device 440.
Processor 410, memory 420, input unit 430 and output device 440 in the terminal device can pass through Bus or other modes connect, in Fig. 7 for being connected by bus.
Memory 420 be used as a kind of non-transient computer readable storage medium, can be used for storing software program, computer can Program and module are executed, as the corresponding program instruction/module (example of connection monitoring method is broadcast live in one of the embodiment of the present application Such as, data acquisition module 210 shown in Fig. 7, data determining module 211 and visualization model 212).Processor 410 passes through operation Software program, instruction and the module being stored in memory 420, thereby executing the various function application and number of terminal device Monitoring method is connected according to a kind of live streaming of processing, i.e. realization above method embodiment.
Memory 420 may include storing program area and storage data area, wherein storing program area can store operation system Application program required for system, at least one function;Storage data area, which can be stored, uses created number according to terminal device According to etc..In addition, memory 420 may include high-speed random access memory, it can also include non-transitory memory, such as extremely A few disk memory, flush memory device or other non-transitory solid-state memories.In some embodiments, memory 420 it is optional include the memory remotely located relative to processor 410, these remote memories can pass through network connection to end End equipment.The example of above-mentioned network includes but is not limited to internet, intranet, local area network, mobile radio communication and combinations thereof.
Input unit 430 can be used for receiving the number or character information of input, and generates and set with the user of terminal device It sets and the related key signals of function control inputs.Output device 440 may include that display screen etc. shows equipment.
Note that above are only the preferred embodiment and institute's application technology principle of the application.It will be appreciated by those skilled in the art that The application is not limited to specific embodiment described here, be able to carry out for a person skilled in the art it is various it is apparent variation, The protection scope readjusted and substituted without departing from the application.Therefore, although being carried out by above embodiments to the application It is described in further detail, but the application is not limited only to above embodiments, in the case where not departing from the application design, also It may include more other equivalent embodiments, and scope of the present application is determined by the scope of the appended claims.

Claims (10)

1. a kind of live streaming connects monitoring method characterized by comprising
Obtain the operation monitoring data of target live streaming attended operation, wherein the target live streaming attended operation is at least two main Broadcasting user establishes the operation of live streaming connection;
Power and success rate relation factor data are connected into according to operation monitoring data determination;
Using power and the success rate relation factor data of connecting into as display data progress visualization display.
2. the method according to claim 1, wherein obtaining the operation supervision packet of target live streaming attended operation It includes:
Obtain the operation monitoring data of multiple targets live streaming attended operation in historical time section, wherein the operation monitors number According to including connection result and attended operation data.
3. according to the method described in claim 2, it is characterized in that, connecting into power packet according to operation monitoring data determination It includes:
Each preset time area in preset period of time is determined according to the connection result that attended operation is broadcast live in the multiple target Between connect into power, wherein include at least one preset period of time, each preset period of time in the historical time section Including at least one preset time section;
Determine that success rate relation factor data include: according to the operation monitoring data
For each preset time section, the target data in historical time section in attended operation data is obtained;Wherein, the mesh It is associated with connection result to mark data;
The target data is determined as to the success rate relation factor data in the preset time section.
4. according to the method described in claim 3, it is characterized in that, the target data is determined as the preset time section Success rate relation factor data, comprising:
For each preset time section, the number of the target data in the historical time section in the attended operation data is determined Amount;
The quantity of the target data and the target data is determined as to the success rate relation factor in the preset time section Data.
5. method according to any one of claims 1 to 4, which is characterized in that further include:
When detecting target live streaming attended operation starting, the association main broadcaster end of the target live streaming attended operation is determined;
Obtain the attended operation data at association main broadcaster end, wherein the attended operation data are that the association main broadcaster end executes company Connect the data generated when operation;
At the end of detecting the target live streaming attended operation, connection result is determined;
The connection result and all attended operation data got are determined as to the operation of the target live streaming attended operation Monitoring data.
6. according to the method described in claim 5, it is characterized in that, described detecting that target live streaming attended operation terminates When, determine connection result, comprising:
If detecting live streaming flow data corresponding with target live streaming attended operation within the default Connection Time, it is determined that institute Stating target live streaming attended operation terminates, and is determined as successful connection;
If live streaming flow data corresponding with target live streaming attended operation is not detected within the default Connection Time, it is determined that The live streaming attended operation terminates, and is determined as connection failure.
7. according to the method described in claim 5, it is characterized in that, the attended operation includes establishing operation, invitation operations, looking into It askes operation, invite response operation, live streaming at least one of push operation and Rendering operations;
The attended operation data include in operation code, operation answer code, mode of operation code, operating result and self-defining data At least one.
8. wanting 1 to 4 described in any item methods according to right, which is characterized in that connect into power by described and be associated with success rate Factor data is carried out as display data after visualization display, further includes:
It receives and the associated reparation patch file of target live streaming attended operation or target installation file;
Optimization operation is executed according to the reparation patch file or target installation file.
9. a kind of terminal device including memory, processor and stores the calculating that can be run on a memory and on a processor Machine program, which is characterized in that the processor realizes live streaming connection monitoring according to claims 1-8 when executing described program Method.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is by processor Live streaming connection monitoring method according to claims 1-8 is realized when execution.
CN201910004885.5A 2019-01-03 2019-01-03 Live broadcast connection monitoring method, terminal equipment and storage medium Active CN109743587B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910004885.5A CN109743587B (en) 2019-01-03 2019-01-03 Live broadcast connection monitoring method, terminal equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910004885.5A CN109743587B (en) 2019-01-03 2019-01-03 Live broadcast connection monitoring method, terminal equipment and storage medium

Publications (2)

Publication Number Publication Date
CN109743587A true CN109743587A (en) 2019-05-10
CN109743587B CN109743587B (en) 2021-09-17

Family

ID=66363218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910004885.5A Active CN109743587B (en) 2019-01-03 2019-01-03 Live broadcast connection monitoring method, terminal equipment and storage medium

Country Status (1)

Country Link
CN (1) CN109743587B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016197864A1 (en) * 2015-06-11 2016-12-15 阿里巴巴集团控股有限公司 Connection-status detection method and apparatus, and smart television system
CN106992974A (en) * 2017-03-17 2017-07-28 腾讯科技(深圳)有限公司 A kind of live video information monitoring method, device and equipment
CN107995187A (en) * 2017-11-30 2018-05-04 上海哔哩哔哩科技有限公司 Video main broadcaster, live broadcasting method, terminal and system based on HTML5 browsers
CN108174293A (en) * 2017-12-01 2018-06-15 咪咕视讯科技有限公司 Information processing method and device, server and storage medium
CN108184140A (en) * 2018-01-10 2018-06-19 武汉斗鱼网络科技有限公司 A kind of live streaming connects wheat method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016197864A1 (en) * 2015-06-11 2016-12-15 阿里巴巴集团控股有限公司 Connection-status detection method and apparatus, and smart television system
CN106992974A (en) * 2017-03-17 2017-07-28 腾讯科技(深圳)有限公司 A kind of live video information monitoring method, device and equipment
CN107995187A (en) * 2017-11-30 2018-05-04 上海哔哩哔哩科技有限公司 Video main broadcaster, live broadcasting method, terminal and system based on HTML5 browsers
CN108174293A (en) * 2017-12-01 2018-06-15 咪咕视讯科技有限公司 Information processing method and device, server and storage medium
CN108184140A (en) * 2018-01-10 2018-06-19 武汉斗鱼网络科技有限公司 A kind of live streaming connects wheat method and device

Also Published As

Publication number Publication date
CN109743587B (en) 2021-09-17

Similar Documents

Publication Publication Date Title
CN107480015B (en) Load testing method, device and system, storage medium and pressure testing server
CN110460676A (en) Request amount control method, device, storage medium and computer equipment
CN104866632A (en) Failure data acquisition method, device and terminal of electric household appliance
CN109462490B (en) Video monitoring system and fault analysis method
CN110784929B (en) Access resource allocation method, device, equipment and system
CN108989463B (en) Data processing method and device
CN111885136A (en) Edge computing gateway cluster operation method and system based on edge cloud cooperation
CN105306318A (en) Intelligent scene configuration method and device and server
CN104410163A (en) Safety production and energy saving method based on power energy management system
CN112765035A (en) Distributed pressure test system, method, device, electronic equipment and storage medium
CN104717670B (en) A kind of measure of the quality of service method, apparatus and system
CN108536570A (en) The method, apparatus and system that data direct broadcasting room gray scale pressure is surveyed
CN110519121B (en) Method and device for detecting regional tasks
CN107094306B (en) Terminal performance evaluation method and device
CN108282384B (en) Automatic test system for communication stability of MMS server based on IEC61850
CN109743587A (en) Live streaming connection monitoring method, terminal device and storage medium
CN105335266B (en) Method for determining the failure of tested equipment
CN109032320A (en) Battery back unit test method and relevant device
CN111008209B (en) Data reconciliation method, device and system, storage medium and electronic device
CN109040075B (en) Management method, server and system for nodes in wireless mobile sensor network
CN110825466A (en) Program jamming processing method and jamming processing device
CN104486139A (en) System communication detection method and device
CN107480032A (en) A kind of method for monitoring self-help tax service terminal switch on condition
CN116150195A (en) System and method for online monitoring safety low-carbon electricity consumption of users in multiple types of parks
CN112650815A (en) Method and device for synchronizing environmental data, storage medium and electronic device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant