CN109743120A - Sequential control circuit, sequential control method and terminal - Google Patents

Sequential control circuit, sequential control method and terminal Download PDF

Info

Publication number
CN109743120A
CN109743120A CN201910133833.8A CN201910133833A CN109743120A CN 109743120 A CN109743120 A CN 109743120A CN 201910133833 A CN201910133833 A CN 201910133833A CN 109743120 A CN109743120 A CN 109743120A
Authority
CN
China
Prior art keywords
power
switch
time
baseband chip
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910133833.8A
Other languages
Chinese (zh)
Other versions
CN109743120B (en
Inventor
林鉴杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vivo Mobile Communication Co Ltd
Original Assignee
Vivo Mobile Communication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vivo Mobile Communication Co Ltd filed Critical Vivo Mobile Communication Co Ltd
Priority to CN201910133833.8A priority Critical patent/CN109743120B/en
Publication of CN109743120A publication Critical patent/CN109743120A/en
Application granted granted Critical
Publication of CN109743120B publication Critical patent/CN109743120B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention provides a kind of sequential control circuit, sequential control method and terminal, wherein sequential control circuit includes baseband chip, signal projector, switch, power coupler and antenna, and the signal projector, the switch, the power coupler and the antenna are sequentially connected electrically;The baseband chip is electrically connected by first control circuit with the signal projector;The baseband chip is electrically connected by second control circuit with the switch;The baseband chip is electrically connected by third control circuit with the power coupler;At the time point that the baseband chip is coupled to forward power by detecting the power coupler, the first time sequence parameter of the switch is adjusted;Wherein, the forward power is the power from the switch to the power coupler.In the present invention, by the way that sequential control circuit is arranged, to realize the purpose of switching sequence dynamic adjustment.As it can be seen that sequential control method of the invention has preferable timing control effect.

Description

Sequential control circuit, sequential control method and terminal
Technical field
The present invention relates to technical field of circuit control more particularly to a kind of sequential control circuits, sequential control method and end End.
Background technique
As the requirement to network throughput is higher and higher, the quantity of the antenna in terminal such as mobile phone, computer is more and more, with The quantity of the matched duplexer of antenna is also more and more, the timing control of switch is required also higher and higher.Currently, terminal The control of middle switching sequence is generally realized before terminal factory by manual debugging, needs to spend biggish energy, low efficiency Under.Also, with the use of terminal, device can generate different degrees of aging, and the consistency of device can also generate more or less Influence, switching sequence for having debugged is unable to satisfy actual demand before this makes.As it can be seen that the timing control side of existing terminal Method has that timing control effect is poor.
Summary of the invention
The embodiment of the present invention provides a kind of sequential control circuit, sequential control method and terminal, to solve existing terminal Sequential control method has that timing control effect is poor.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
In a first aspect, the embodiment of the invention provides a kind of sequential control circuit, including baseband chip, signal projector, Switch, power coupler and antenna, the signal projector, the switch, the power coupler and the antenna are successively electric Connection;
The baseband chip is electrically connected by first control circuit with the signal projector;
The baseband chip is electrically connected by second control circuit with the switch;
The baseband chip is electrically connected by third control circuit with the power coupler;
The time point that the baseband chip is coupled to forward power by detecting the power coupler, to the switch First time sequence parameter is adjusted;
Wherein, the forward power is the power from the switch to the power coupler.
Second aspect, the embodiment of the invention provides a kind of terminals, including the timing in first aspect of the embodiment of the present invention Control circuit.
The third aspect, the embodiment of the invention provides a kind of sequential control methods, are applied to first party of the embodiment of the present invention Sequential control circuit in face, the sequential control circuit include baseband chip, signal projector, switch, power coupler and Antenna, the signal projector, the switch, the power coupler and the antenna are sequentially connected electrically;
The described method includes:
The baseband chip controls the switch and opens;
It is described switch on the time more than or equal to the first preset time in the case where, the baseband chip controls institute It states signal projector and emits the first signal;
The baseband chip is coupled to time point of forward power as reference instant using the power coupler, adjusts institute State the first time sequence parameter of switch;
Wherein, the forward power is the power from the switch to the power coupler.
Fourth aspect, the embodiment of the invention provides a kind of terminals, including the timing in first aspect of the embodiment of the present invention Control circuit, the sequential control circuit include baseband chip, signal projector, switch, power coupler and antenna, the letter Number transmitter, the switch, the power coupler and the antenna are sequentially connected electrically;
The baseband chip includes:
First control unit is opened for controlling the switch;
Second control unit, for it is described switch on the time more than or equal to the first preset time in the case where, It controls the signal projector and emits the first signal;
Processing unit, the time point for being coupled to forward power using the power coupler adjust as reference instant First time sequence parameter of the switch;
Wherein, the forward power is the power from the switch to the power coupler.
5th aspect the embodiment of the invention provides a kind of terminal, including processor, memory and is stored in the storage On device and the program that can run on the processor, the embodiment of the present invention the is realized when described program is executed by the processor Three aspect in sequential control method the step of.
6th aspect, the embodiment of the present invention provide a kind of computer readable storage medium, the computer-readable storage medium It is stored with computer program in matter, is realized in the third aspect of the embodiment of the present invention when computer program is executed by processor The step of sequential control method.
In the embodiment of the present invention, by the way that sequential control circuit is arranged, to realize the purpose of switching sequence dynamic adjustment.This hair The sequential control method of bright embodiment can both carry out before terminal factory, to realize the automatic debugging of switching sequence;The party Method can periodically or non-periodically carry out in terminal use process again, to realize the dynamic calibration of switching sequence.As it can be seen that this The sequential control method of inventive embodiments has preferable timing control effect.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of sequential control circuit provided in an embodiment of the present invention;
Fig. 2 is a kind of flow diagram of sequential control method provided in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of another sequential control circuit provided in an embodiment of the present invention;
Fig. 4 is the flow diagram of another sequential control method provided in an embodiment of the present invention;
Fig. 5 is a kind of structural schematic diagram of baseband chip provided in an embodiment of the present invention;
Fig. 6 is the structural schematic diagram of another baseband chip provided in an embodiment of the present invention;
Fig. 7 is the structural schematic diagram of terminal provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair Embodiment in bright, those of ordinary skill in the art's acquired every other implementation without creative efforts Example, shall fall within the protection scope of the present invention.
As shown in Figure 1, the embodiment of the present invention provides a kind of sequential control circuit, including baseband chip 1, signal projector 2, Switch 3, power coupler 4 and antenna 5, signal projector 2, switch 3, power coupler 4, antenna 5 are sequentially connected electrically;
Baseband chip 1 is electrically connected by first control circuit 6 with signal projector 2;
Baseband chip 1 is electrically connected by second control circuit 7 with switch 3;
Baseband chip 1 is electrically connected by third control circuit 8 with power coupler 4;
The time point that baseband chip 1 is coupled to forward power by detecting power coupler 4, to the first timing of switch 3 Parameter is adjusted;
Wherein, above-mentioned forward power is from switch 3 to the power of power coupler 4.
Sequential control circuit provided in an embodiment of the present invention can be used for controlling the timing switched in radio frequency path, Baseband chip 1 can be radio frequency baseband chip, and signal projector 2 can be RF signal transmitter, for example, power amplifier (Power Amplifier, abbreviation PA).
Above-mentioned power coupler 4 is bidirectional power coupler, that is to say, that the power coupler 4 can be coupled from signal The power (i.e. forward power) that transmitter 2 emits signal and transmits through switch 3, can also couple and set from antenna 5 from network side Standby (such as base station) receives power (i.e. backward power) corresponding to signal.In general, signal projector 2 emits the function of signal Rate receives the power of signal much larger than antenna 5, therefore, controls the switching sequence under the positive transmission of radio frequency path compared to control Switching sequence under the reverse transfer of radio frequency path is even more important.
For the ease of distinguishing, the time sequence parameter of the switch under the positive transmission of radio frequency path is referred to as by the embodiment of the present invention First time sequence parameter of switch.The time sequence parameter of switch under the reverse transfer of radio frequency path is referred to as out by the embodiment of the present invention The second time sequence parameter closed.
As the center of entire timing control, baseband chip 1 can control signal projector 2 by first control circuit 6 Emit the time of signal (such as radiofrequency signal);Baseband chip 1 can also detect power coupler 4 by third control circuit 8 Whether it is coupled to forward power, and is coupled to the time of forward power;Baseband chip 1 can also be coupled with power coupler 4 To forward power time point as reference time point, pass through the control of second control circuit 7, adjustment switch 3 and reference time point Interval, achieve the purpose that the first time sequence parameter of control switch 3.
Correspondingly, as shown in Fig. 2, the embodiment of the present invention provides a kind of sequential control method, applied to timing shown in FIG. 1 Control circuit, this method comprises:
Step 201: baseband chip control switch is opened;
Step 202: in the case where switching on the time more than or equal to the first preset time, baseband chip control letter Number transmitter emits the first signal;
Step 203: baseband chip is coupled to time point of forward power as reference instant using power coupler, and adjustment is opened The first time sequence parameter closed.
Switch has certain starting time, wakeup time and stable time etc., therefore in order to ensure signal is normally sent out It penetrates and transmits, need to switch a period of time unlatching in advance before signal transmitting, and when delaying one section after signal has emitted Between close.If there are problems for switching sequence, for example, switch is opened not in time, switch is not fully opened, switch closing etc. in advance Deng, it will the phenomenon that leading to signal transmission abnormality, or even burning switch generation.In view of the foregoing, the embodiment of the present invention provides The method that a kind of pair of switching sequence carries out dynamic control.
Due to GSM (Global System For Mobile Communications, global system for mobile communications), LTE (Long Term Evolution, long term evolution), WCDMA (Wide band Code Division Multiple Access, Wideband code division multiple access), CDMA (Code Division Multiple Access, CDMA), TDSCDMA (Time Division-Synchronous Code Division Multiple Access, Time Division-Synchronous Code Division Multiple Access), WIFI (Wireless Fidelity, Wireless Fidelity) either 5G signal, it is necessary to follow 3GPP (3rd Generation Partnership Project, third generation partner program) as defined in timing requirements, for transmitting signal and receive signal There is fixed frame structure, therefore baseband chip can accurately control and be arranged the timing for switching on and closing, that is, switch Time sequence parameter.
In step 201, baseband chip can first open switch, specifically, baseband chip can pass through second control circuit Control switch is opened.
In step 202, in the case where switching on the time more than or equal to the first preset time, in other words, to After switch reaches stable open state or fully open state, baseband chip can control signal projector to emit the first signal, Specifically, baseband chip, which controls signal projector by first control circuit, emits the first signal.
So far, since switch has fully opened, the first signal of signal projector transmitting can be by switching normal transmission To power coupler.
In step 203, baseband chip can detecte the time point that power coupler is coupled to forward power, and by power Coupler is coupled to the time point of forward power as reference instant, adjusts the first time sequence parameter of switch.
Specifically, can preset, switch shifts to an earlier date opening time amount x and/or switch delays shut-in time amount y and is given to base Microarray strip, baseband chip moment on the basis of the time point that power coupler is coupled to forward power pass through GPIO (General Purpose Input Output, universal input/output) interface or MIPI (Mobile Industry Processor Interface, mobile industry processor interface) control switch the first time sequence parameter.
So far, the time sequence parameter of switch is completed by baseband chip dynamic adjustment, and in the course of subsequent work, switch is It can be opened or closed according to the time sequence parameter adjusted, until baseband chip is again adjusted switching sequence.
Wherein, above-mentioned time sequence parameter may include at least one in opening time, the shut-in time of delaying and stable time in advance ?.
In the embodiment of the present invention, by the way that sequential control circuit is arranged, to realize the purpose of switching sequence dynamic adjustment.This hair The sequential control method of bright embodiment can both carry out before terminal factory, to realize the automatic debugging of switching sequence;The party Method can periodically or non-periodically carry out in terminal use process again, to realize the dynamic calibration of switching sequence.As it can be seen that this The sequential control method of inventive embodiments has preferable timing control effect.
As shown in figure 3, the embodiment of the present invention provides another sequential control circuit, including baseband chip 1, signal projector 2, switch 3, power coupler 4, antenna tuner 9 and antenna 5, signal projector 2, switch 3, power coupler 4, antenna tuning Device 9 and antenna 5 are sequentially connected electrically;
Baseband chip 1 is electrically connected by first control circuit 6 with signal projector 2;
Baseband chip 1 is electrically connected by second control circuit 7 with switch 3;
Baseband chip 1 is electrically connected by third control circuit 8 with power coupler 4;
Baseband chip 1 is electrically connected by the 4th control circuit 10 with antenna tuner 9;
The time point that baseband chip 1 is coupled to forward power by detecting power coupler 4, to the first timing of switch 3 First time sequence parameter of parameter and antenna tuner 9 is adjusted.
Currently, being further typically provided with antenna tuner 9 in radio frequency path, identical as switch 3, antenna tuner 9 also has one Fixed starting time, wakeup time and stable time etc., therefore in order to ensure signal normal transmission and transmit, need antenna tune Humorous device 9 before signal transmitting open in advance by a period of time, and delays a period of time after signal has emitted and close.In view of upper Reason is stated, the embodiment of the present invention is other than the timing to switch controls, it is also necessary to carry out to the timing of antenna tuner Control.
As the center of entire timing control, baseband chip 1 can control signal projector 2 by first control circuit 6 Emit the time of signal (such as radiofrequency signal);Baseband chip 1 can also detect power coupler 4 by third control circuit 8 Whether it is coupled to forward power, and is coupled to the time of forward power;Baseband chip 1 can also be coupled with power coupler 4 To forward power time point as reference time point, by between 7 control switch 3 of second control circuit and reference time point Every achieving the purpose that 3 timing of control switch, and control antenna tuner 9 and reference time point by the 4th control circuit 10 Interval achievees the purpose that control 9 timing of antenna tuner.
Correspondingly, as shown in figure 4, the embodiment of the present invention provides another sequential control method, when being applied to shown in Fig. 2 Sequence control circuit, this method comprises:
Step 401: baseband chip control switch and antenna tuner are opened;
Step 402: in the case where switching on the time more than or equal to the first preset time, and antenna tuner In the case that opening time is greater than or equal to the second preset time, baseband chip controls signal projector and emits the first signal;
Step 403: the time point that baseband chip is coupled to forward power using power coupler as reference instant, adjusts respectively First time sequence parameter of whole switch and the first time sequence parameter of antenna tuner.
In step 401, baseband chip can first open switch and antenna tuner, specifically, baseband chip can pass through Second control circuit control switch is opened, and baseband chip can control antenna tuner by the 4th control circuit and open.
In step 402, in the case where switching on the time more than or equal to the first preset time, and antenna tuning In the case that the opening time of device is greater than or equal to the second preset time, in other words, reach stable open state or complete wait switch Full open state, and after antenna tuner reaches stable open state or fully open state, baseband chip can control signal Transmitter emits the first signal, specifically, baseband chip, which controls signal projector by first control circuit, emits the first signal.
So far, since switch and antenna tuner have fully opened, the first signal of signal projector transmitting can pass through Normal transmission is switched to power coupler, and passes through antenna tuner normal transmission to antenna.
In step 402, baseband chip can detecte the time point that power coupler is coupled to forward power, and by power Coupler is coupled to the time point of forward power as reference instant, adjusts separately the first time sequence parameter and antenna tuning of switch First time sequence parameter of device.
Specifically, can preset, switch shifts to an earlier date opening time amount x and/or switch delays shut-in time amount y and is given to base Microarray strip, can also preset antenna tuner shift to an earlier date the opening time amount z and/or antenna tuner delay the shut-in time amount h, Baseband chip moment on the basis of the time point that power coupler is coupled to forward power passes through GPIO (General Purpose Input Output, universal input/output) interface or MIPI (Mobile Industry Processor Interface, Mobile industry processor interface) the first time sequence parameter of control switch and the first time sequence parameter of antenna tuner.
For example, baseband chip is coupled to time point of forward power with power coupler for 0 moment, baseband chip can be with By-x the moment as switching on the time, i.e., switch is advanced by the x time compared with 0 moment and opens.Baseband chip can make the y moment For the shut-in time of switch, i.e. switch is delayed the y time compared with 0 moment and is closed.
It should be noted that the shut-in time of switch can also be with power coupler from there is transmission power to no transmitting function The time point m of rate is benchmark time point, and baseband chip can be using the m+y moment as the shut-in time of switch, i.e., switch is compared with the m moment The y time is delayed to close.
So far, the first time sequence parameter of the first time sequence parameter of switch and antenna tuner is adjusted by baseband chip dynamic It completes, in the course of subsequent work, switch and antenna tuner can be opened or be closed according to the time sequence parameter adjusted It closes, until baseband chip is again adjusted the timing of switch and antenna tuner.
Optionally, the method also includes:
The time point that the baseband chip is coupled to backward power using the power coupler as reference instant, adjusts respectively Second time sequence parameter of the whole switch and the second time sequence parameter of the antenna tuner;
Wherein, the backward power is from the antenna tuner to the power of the power coupler.
As previously mentioned, the timing under the positive transmission of control radio frequency path is compared under the reverse transfer for controlling radio frequency path Timing it is even more important, but the embodiment of the present invention can also realize the timing control under radio frequency path reverse transfer.Due to timing control Principle processed is identical, and to avoid repeating, the embodiment of the present invention does not repeat this.
Sequential control method provided in an embodiment of the present invention can be applied to before terminal factory, also can be applied to terminal In use process, periodically or non-periodically carry out.In addition to this, sequential control method provided in an embodiment of the present invention can also be It is carried out in the case where detecting radio frequency path there are sequence problem.The following are specific embodiments.
Optionally, the baseband chip controls the step of switch is opened, i.e., step 201 includes:
In the third preset time after the signal projector emits second signal, if the non-coupling of the power coupler Forward power is closed, the baseband chip controls the switch and opens;
Alternatively,
In the 4th preset time after the signal projector emits third signal, if the power coupler couples The forward power arrived is less than or equal to the presupposition multiple of the corresponding power of the third signal, opens described in the baseband chip control It closes and opens;Wherein, the presupposition multiple less than 1 and is greater than 0.
In the embodiment, if in the third preset time after signal projector emits second signal, power coupling Device is not coupled to forward power, then shows that switch is not opened on schedule, there are sequence problems so as to show radio frequency path.? Signal projector emit third signal after the 4th preset time in, if the forward power that power coupler is coupled to be less than or The presupposition multiple of power corresponding equal to third signal then shows that switch may not fully opened on schedule, thus also being capable of table There are sequence problems for bright radio frequency path.
When any of the above-described condition meets, in order to avoid leading to the property of radio frequency path because radio frequency path is there are sequence problem Can index be deteriorated, and in order to avoid leading to switch or showing of being burned out of signal projector because radio frequency path is there are sequence problem As occurring, step 201 can be performed to step 203, to realize the adjustment to switching sequence.
Likewise, the step of baseband chip control switch and the antenna tuner are opened, i.e., step 401 is wrapped It includes:
In the third preset time after the signal projector emits second signal, if the non-coupling of the power coupler Forward power is closed, the baseband chip control switch and the antenna tuner are opened;
Alternatively,
In the 4th preset time after the signal projector emits third signal, if the power coupler couples The forward power arrived is less than or equal to the presupposition multiple of the corresponding power of the third signal, opens described in the baseband chip control It closes and the antenna tuner is opened;Wherein, the presupposition multiple less than 1 and is greater than 0.
In the embodiment, if power coupler is not in the 4th preset time after signal projector emits signal It is coupled to forward power, then shows that switch is not opened on schedule, there are sequence problems so as to show radio frequency path.If power The forward power that coupler is coupled to is less than or equal to the presupposition multiple of the corresponding power of signal of signal projector transmitting, then table Bright switch may not fully opened on schedule, to also can show that radio frequency path, there are sequence problems.
In addition, the baseband chip controls the step of antenna tuner is opened, it may include:
In the 5th preset time after the signal projector emits fourth signal, if the power coupler couples To forward power and backward power, the baseband chip controls the antenna tuner and opens.
In the embodiment, if in the 5th preset time after signal projector emits fourth signal, power coupling Device is coupled to forward power and backward power, though then show that switch is opened on schedule, antenna tuner is not opened on schedule, is made The power that antenna tuner must be reached reflexes to power coupler again, and so as to show radio frequency path, there are sequence problems.
When any of the above-described condition meets, in order to avoid leading to the property of radio frequency path because radio frequency path is there are sequence problem Energy index is deteriorated, and in order to avoid leading to switch, antenna tuner or signal transmitting because radio frequency path is there are sequence problem The phenomenon that device is burned out, can be performed step 401 to step 403, to realize to switching sequence and antenna tuner timing Adjustment.
The embodiment of the present invention also provides a kind of terminal, including the sequential control circuit in foregoing invention embodiment.Terminal Specific embodiment is referred to above description, and can reach identical technical effect, to avoid repeating, does not go to live in the household of one's in-laws on getting married to this It states.
The embodiment of the present invention also provides another terminal, which includes sequential control circuit as shown in Figure 1, when described Sequence control circuit includes baseband chip, signal projector, switch, power coupler and antenna, and the signal projector described is opened It closes, the power coupler and the antenna are sequentially connected electrically;
As shown in figure 5, baseband chip 500 includes:
First control unit 501 is opened for controlling the switch;
Second control unit 502, in described the case where switching on the time more than or equal to the first preset time Under, it controls the signal projector and emits the first signal;
Processing unit 503, the time point for being coupled to forward power using the power coupler adjust as reference instant First time sequence parameter of the whole switch;
Wherein, the forward power is the power from the switch to the power coupler.
Optionally, which includes sequential control circuit as shown in Figure 3, and the sequential control circuit includes base band core Piece, signal projector, switch, power coupler, antenna tuner and antenna, the signal projector, the switch, the function Rate coupler, the antenna tuner and the antenna are sequentially connected electrically;
As shown in fig. 6, baseband chip 500 further include:
Third control unit 504 is opened for controlling the antenna tuner;
Second control unit 502 is specifically used for:
The time is switched on more than or equal to the first preset time described, and the opening time of the antenna tuner In the case where more than or equal to the second preset time, controls the signal projector and emit the first signal;
Processing unit 503 is also used to:
The time point for being coupled to forward power using the power coupler as reference instant, adjusts the antenna tuner The first time sequence parameter.
Optionally, processing unit 503 is also used to:
The time point for being coupled to backward power using the power coupler as reference instant, adjusts separately the switch Second time sequence parameter of the second time sequence parameter and the antenna tuner;
Wherein, the backward power is from the antenna tuner to the power of the power coupler.
Optionally, first control unit 501 is specifically used for:
In the third preset time after the signal projector emits second signal, if the non-coupling of the power coupler Forward power is closed, the switch is controlled and opens;
Alternatively,
In the 4th preset time after the signal projector emits third signal, if the power coupler couples The forward power arrived is less than or equal to the presupposition multiple of the corresponding power of the third signal, controls the switch and opens;It is described Presupposition multiple is less than 1 and is greater than 0.
Optionally, third control unit 504 is specifically used for:
In the 5th preset time after the signal projector emits fourth signal, if the power coupler couples To forward power and backward power, controls the antenna tuner and open.
Optionally, the time sequence parameter includes at least one in opening time, the shut-in time of delaying and stable time in advance ?.
It should be noted that above-mentioned baseband chip 500 can be in embodiment of the method and arbitrarily implement in the embodiment of the present invention The baseband chip of mode, any embodiment of baseband chip can be by above-mentioned in the embodiment of the present invention in embodiment of the method Baseband chip 500 is realized, and reaches identical beneficial effect, and to avoid repeating, details are not described herein again.
As shown in fig. 7, Fig. 7 is a kind of hardware structural diagram of terminal provided in an embodiment of the present invention, the terminal 700 packet It includes but is not limited to: radio frequency unit 701, network module 702, audio output unit 703, input unit 704, sensor 705, display The components such as unit 706, user input unit 707, interface unit 708, memory 709, processor 710 and power supply 711.This Field technical staff is appreciated that the restriction of the not structure paired terminal of terminal structure shown in Fig. 7, and terminal may include than figure Show more or fewer components, perhaps combines certain components or different component layouts.In embodiments of the present invention, terminal Including but not limited to mobile phone, tablet computer, laptop, palm PC, car-mounted terminal, wearable device and pedometer Deng.
It should be understood that the embodiment of the present invention in, radio frequency unit 701 can be used for receiving and sending messages or communication process in, signal Send and receive, specifically, by from base station downlink data receive after, to processor 710 handle;In addition, by uplink Data are sent to base station.In general, radio frequency unit 701 includes but is not limited to baseband chip, signal projector, switch, power coupling Device, antenna tuner and antenna etc..In addition, radio frequency unit 701 can also system and network and other equipment by wireless communication Communication.
Wherein, the sequential control method of the embodiment of the present invention realizes that radio frequency unit 701 is used for by radio frequency unit 701:
Baseband chip controls the switch and opens;
It is described switch on the time more than or equal to the first preset time in the case where, the baseband chip controls institute It states signal projector and emits the first signal;
The baseband chip is coupled to time point of forward power as reference instant using the power coupler, adjusts institute State the first time sequence parameter of switch;
Wherein, the forward power is the power from the switch to the power coupler.
Optionally, radio frequency unit 701 is also used to:
The baseband chip controls the antenna tuner and opens;
Radio frequency unit 701 is described in described the case where switching on the time more than or equal to the first preset time in execution Under, when the baseband chip controls the step of the first signal of the signal projector transmitting, it is used for:
The time is switched on more than or equal to the first preset time described, and the opening time of the antenna tuner In the case where more than or equal to the second preset time, the baseband chip controls the signal projector and emits the first signal;
Radio frequency unit 701 is also used to:
The baseband chip is coupled to time point of forward power as reference instant using the power coupler, adjusts institute State the first time sequence parameter of antenna tuner.
Optionally, radio frequency unit 701 is also used to:
The time point that the baseband chip is coupled to backward power using the power coupler as reference instant, adjusts respectively Second time sequence parameter of the whole switch and the second time sequence parameter of the antenna tuner;
Wherein, the backward power is from the antenna tuner to the power of the power coupler.
Optionally, radio frequency unit 701 is used for when the execution baseband chip controls the step that the switch is opened:
In the third preset time after the signal projector emits second signal, if the non-coupling of the power coupler Forward power is closed, the baseband chip controls the switch and opens;
Alternatively,
In the 4th preset time after the signal projector emits third signal, if the power coupler couples The forward power arrived is less than or equal to the presupposition multiple of the corresponding power of the third signal, opens described in the baseband chip control It closes and opens;Wherein, the presupposition multiple less than 1 and is greater than 0.
Optionally, radio frequency unit 701 is used when the execution baseband chip controls the step that the antenna tuner is opened In:
In the 5th preset time after the signal projector emits fourth signal, if the power coupler couples To forward power and backward power, the baseband chip controls the antenna tuner and opens.
Optionally, the time sequence parameter includes at least one in opening time, the shut-in time of delaying and stable time in advance ?.
Terminal provides wireless broadband internet by network module 702 for user and accesses, and such as user is helped to receive and dispatch electricity Sub- mail, browsing webpage and access streaming video etc..
Audio output unit 703 can be received by radio frequency unit 701 or network module 702 or in memory 709 The audio data of storage is converted into audio signal and exports to be sound.Moreover, audio output unit 703 can also provide and end The relevant audio output of specific function (for example, call signal receives sound, message sink sound etc.) that end 700 executes.Sound Frequency output unit 703 includes loudspeaker, buzzer and receiver etc..
Input unit 704 is for receiving audio or video signal.Input unit 704 may include graphics processor (Graphics Processing Unit, GPU) 7041 and microphone 7042, graphics processor 7041 is in video acquisition mode Or the image data of the static images or video obtained in image capture mode by image capture apparatus (such as camera) carries out Reason.Treated, and picture frame may be displayed on display unit 706.Through graphics processor 7041, treated that picture frame can be deposited Storage is sent in memory 709 (or other storage mediums) or via radio frequency unit 701 or network module 702.Mike Wind 7042 can receive sound, and can be audio data by such acoustic processing.Treated audio data can be The format output that mobile communication base station can be sent to via radio frequency unit 701 is converted in the case where telephone calling model.
Terminal 700 further includes at least one sensor 705, such as optical sensor, motion sensor and other sensors. Specifically, optical sensor includes ambient light sensor and proximity sensor, wherein ambient light sensor can be according to ambient light Light and shade adjusts the brightness of display panel 7061, and proximity sensor can close display panel when terminal 700 is moved in one's ear 7061 and backlight.As a kind of motion sensor, accelerometer sensor can detect in all directions (generally three axis) and add The size of speed can detect that size and the direction of gravity when static, can be used to identify terminal posture (such as horizontal/vertical screen switching, Dependent game, magnetometer pose calibrating), Vibration identification correlation function (such as pedometer, tap) etc.;Sensor 705 can be with Including fingerprint sensor, pressure sensor, iris sensor, molecule sensor, gyroscope, barometer, hygrometer, thermometer, Infrared sensor etc., details are not described herein.
Display unit 706 is for showing information input by user or being supplied to the information of user.Display unit 706 can wrap Display panel 7061 is included, liquid crystal display (Liquid Crystal Display, LCD), Organic Light Emitting Diode can be used Forms such as (Organic Light-Emitting Diode, OLED) configure display panel 7061.
User input unit 707 can be used for receiving the number or character information of input, and generates and set with the user of terminal It sets and the related key signals of function control inputs.Specifically, user input unit 707 include touch panel 7071 and other Input equipment 7072.Touch panel 7071, also referred to as touch screen, collect user on it or nearby touch operation (such as User is using any suitable objects or attachment such as finger, stylus on touch panel 7071 or near touch panel 7071 Operation).Touch panel 7071 may include both touch detecting apparatus and touch controller.Wherein, touch detecting apparatus is examined The touch orientation of user is surveyed, and detects touch operation bring signal, transmits a signal to touch controller;Touch controller from Touch information is received on touch detecting apparatus, and is converted into contact coordinate, then gives processor 710, receives processor 710 The order sent simultaneously is executed.Furthermore, it is possible to using multiple types such as resistance-type, condenser type, infrared ray and surface acoustic waves Realize touch panel 7071.In addition to touch panel 7071, user input unit 707 can also include other input equipments 7072. Specifically, other input equipments 7072 can include but is not limited to physical keyboard, function key (such as volume control button, switch Key etc.), trace ball, mouse, operating stick, details are not described herein.
Further, touch panel 7071 can be covered on display panel 7071, when touch panel 7071 is detected at it On or near touch operation after, send processor 710 to determine the type of touch event, be followed by subsequent processing device 710 according to touching The type for touching event provides corresponding visual output on display panel 7061.Although in Fig. 7, touch panel 7071 and display Panel 7061 is the function that outputs and inputs of realizing terminal as two independent components, but in certain embodiments, it can The function that outputs and inputs of terminal is realized so that touch panel 7071 and display panel 7061 is integrated, is not limited herein specifically It is fixed.
Interface unit 708 is the interface that external device (ED) is connect with terminal 700.For example, external device (ED) may include it is wired or Wireless head-band earphone port, external power supply (or battery charger) port, wired or wireless data port, memory card port, For connecting port, the port audio input/output (I/O), video i/o port, ear port of the device with identification module Etc..Interface unit 708 can be used for receiving the input (for example, data information, electric power etc.) from external device (ED) and will One or more elements that the input received is transferred in terminal 700 or can be used for terminal 700 and external device (ED) it Between transmit data.
Memory 709 can be used for storing software program and various data.Memory 709 can mainly include storing program area The storage data area and, wherein storing program area can (such as the sound of application program needed for storage program area, at least one function Sound playing function, image player function etc.) etc.;Storage data area can store according to mobile phone use created data (such as Audio data, phone directory etc.) etc..In addition, memory 709 may include high-speed random access memory, it can also include non-easy The property lost memory, a for example, at least disk memory, flush memory device or other volatile solid-state parts.
Processor 710 is the control centre of terminal, using the various pieces of various interfaces and the entire terminal of connection, is led to It crosses operation or executes the software program and module being stored in memory 709, and call the number being stored in memory 709 According to, execute terminal various functions and processing data, thus to terminal carry out integral monitoring.Processor 710 may include one or Multiple processing units;Preferably, processor 710 can integrate application processor and modem processor, wherein application processor Main processing operation system, user interface and application program etc., modem processor mainly handles wireless communication.It is understood that , above-mentioned modem processor can not also be integrated into processor 710.
Terminal 700 can also include the power supply 711 (such as battery) powered to all parts, it is preferred that power supply 711 can be with It is logically contiguous by power-supply management system and processor 710, thus by power-supply management system realize management charging, electric discharge, with And the functions such as power managed.
In addition, terminal 700 includes some unshowned functional modules, details are not described herein.
Preferably, the embodiment of the present invention also provides a kind of terminal, including processor 710, and memory 709 is stored in storage It is real when which is executed by processor 710 on device 709 and the computer program that can be run on the processor 710 Each process of existing above-mentioned sequential control method embodiment, and identical technical effect can be reached, to avoid repeating, here no longer It repeats.
The embodiment of the present invention also provides a kind of computer readable storage medium, and meter is stored on computer readable storage medium Calculation machine program, the computer program are realized above-mentioned corresponding to the detection of the transfer resource of terminal or network side when being executed by processor Each process of embodiment of the method, and identical technical effect can be reached, to avoid repeating, which is not described herein again.Wherein, described Computer readable storage medium, such as read-only memory (Read-Only Memory, abbreviation ROM), random access memory (Random Access Memory, abbreviation RAM), magnetic or disk etc..
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, method of element, article or device.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art The part contributed out can be embodied in the form of software products, which is stored in a storage medium In (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal (can be mobile phone, computer, service Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be subject to the protection scope in claims.

Claims (19)

1. a kind of sequential control circuit, which is characterized in that including baseband chip, signal projector, switch, power coupler and day Line, the signal projector, the switch, the power coupler and the antenna are sequentially connected electrically;
The baseband chip is electrically connected by first control circuit with the signal projector;
The baseband chip is electrically connected by second control circuit with the switch;
The baseband chip is electrically connected by third control circuit with the power coupler;
The time point that the baseband chip is coupled to forward power by detecting the power coupler, to the first of the switch Time sequence parameter is adjusted;
Wherein, the forward power is the power from the switch to the power coupler.
2. circuit according to claim 1, which is characterized in that it further include antenna tuner, it is the signal projector, described Switch, the power coupler, the antenna tuner and the antenna are sequentially connected electrically;
The baseband chip is electrically connected by the 4th control circuit with the antenna tuner;
The time point that the baseband chip is coupled to forward power by detecting the power coupler, to the first of the switch First time sequence parameter of time sequence parameter and the antenna tuner is adjusted.
3. circuit according to claim 2, which is characterized in that the baseband chip is by detecting the power coupler coupling The time point for closing backward power, the second time sequence parameter of the second time sequence parameter and the antenna tuner to the switch into Row adjustment;
Wherein, the backward power is from the antenna tuner to the power of the power coupler.
4. circuit according to any one of claim 1 to 3, which is characterized in that the signal projector is power amplification Device.
5. circuit according to any one of claim 1 to 3, which is characterized in that the time sequence parameter includes opening in advance At least one of in time, the shut-in time of delaying and stable time.
6. a kind of terminal, which is characterized in that including sequential control circuit described in any one of claims 1 to 5.
7. a kind of sequential control method, which is characterized in that applied to the electricity of timing control described in any one of claims 1 to 5 Road, the sequential control circuit include baseband chip, signal projector, switch, power coupler and antenna, the signal transmitting Device, the switch, the power coupler and the antenna are sequentially connected electrically;
The described method includes:
The baseband chip controls the switch and opens;
It is described switch on the time more than or equal to the first preset time in the case where, the baseband chip controls the letter Number transmitter emits the first signal;
The baseband chip is coupled to time point of forward power as reference instant using the power coupler, opens described in adjustment The first time sequence parameter closed;
Wherein, the forward power is the power from the switch to the power coupler.
8. the method according to the description of claim 7 is characterized in that the sequential control circuit further includes antenna tuner, institute Signal projector, the switch, the power coupler, the antenna tuner and the antenna is stated to be sequentially connected electrically;
Before the step of baseband chip controls the signal projector transmitting signal, the method also includes:
The baseband chip controls the antenna tuner and opens;
It is described it is described switch on the time more than or equal to the first preset time in the case where, the baseband chip controls institute State the step of signal projector emits the first signal, comprising:
The time is switched on more than or equal to the first preset time described, and the opening time of the antenna tuner is greater than Or in the case where being equal to the second preset time, the baseband chip controls the signal projector and emits the first signal;
After the baseband chip controls the step of signal projector emits the first signal, the method also includes:
The time point that the baseband chip is coupled to forward power using the power coupler as reference instant, adjusts the day First time sequence parameter of line tuner.
9. according to the method described in claim 8, it is characterized in that, controlling the signal projector transmitting in the baseband chip After the step of first signal, the method also includes:
The time point that the baseband chip is coupled to backward power using the power coupler as reference instant, adjusts separately institute State the second time sequence parameter of switch and the second time sequence parameter of the antenna tuner;
Wherein, the backward power is from the antenna tuner to the power of the power coupler.
10. method according to any one of claims 7 to 9, which is characterized in that the baseband chip controls the switch The step of unlatching, comprising:
In the third preset time after the signal projector emits second signal, if the power coupler is not coupled to Forward power, the baseband chip control the switch and open;
Alternatively,
In the 4th preset time after the signal projector emits third signal, if what the power coupler was coupled to Forward power is less than or equal to the presupposition multiple of the corresponding power of the third signal, and the baseband chip control is described to open It opens;Wherein, the presupposition multiple less than 1 and is greater than 0.
11. method according to claim 8 or claim 9, which is characterized in that the baseband chip controls the antenna tuner and opens The step of opening, comprising:
In the 5th preset time after the signal projector emits fourth signal, if the power coupler is coupled to just To power and backward power, the baseband chip controls the antenna tuner and opens.
12. method according to any one of claims 7 to 9, which is characterized in that the time sequence parameter includes opening in advance At least one of in time, the shut-in time of delaying and stable time.
13. a kind of terminal, which is characterized in that including sequential control circuit described in any one of claims 1 to 5, when described Sequence control circuit includes baseband chip, signal projector, switch, power coupler and antenna, and the signal projector described is opened It closes, the power coupler and the antenna are sequentially connected electrically;
The baseband chip includes:
First control unit is opened for controlling the switch;
Second control unit, for it is described switch on the time more than or equal to the first preset time in the case where, control The signal projector emits the first signal;
Processing unit, for being coupled to time point of forward power using the power coupler as reference instant, described in adjustment First time sequence parameter of switch;
Wherein, the forward power is the power from the switch to the power coupler.
14. terminal according to claim 13, which is characterized in that the sequential control circuit further includes antenna tuner, The signal projector, the switch, the power coupler, the antenna tuner and the antenna are sequentially connected electrically;
The baseband chip further include:
Third control unit is opened for controlling the antenna tuner;
Second control unit is specifically used for:
The time is switched on more than or equal to the first preset time described, and the opening time of the antenna tuner is greater than Or in the case where being equal to the second preset time, controls the signal projector and emit the first signal;
The processing unit is also used to:
The time point for being coupled to forward power using the power coupler as reference instant, adjusts the of the antenna tuner One time sequence parameter.
15. terminal according to claim 14, which is characterized in that the processing unit is also used to:
The time point for being coupled to backward power using the power coupler as reference instant, adjusts separately the second of the switch Second time sequence parameter of time sequence parameter and the antenna tuner;
Wherein, the backward power is from the antenna tuner to the power of the power coupler.
16. terminal described in any one of 3 to 15 according to claim 1, which is characterized in that the first control unit is specifically used In:
In the third preset time after the signal projector emits second signal, if the power coupler is not coupled to Forward power controls the switch and opens;
Alternatively,
In the 4th preset time after the signal projector emits third signal, if what the power coupler was coupled to Forward power is less than or equal to the presupposition multiple of the corresponding power of the third signal, controls the switch and opens;It is described default Multiple is less than 1 and is greater than 0.
17. terminal according to claim 14 or 15, which is characterized in that the third control unit is specifically used for:
In the 5th preset time after the signal projector emits fourth signal, if the power coupler is coupled to just To power and backward power, controls the antenna tuner and open.
18. terminal described in any one of 3 to 15 according to claim 1, which is characterized in that the time sequence parameter includes opening in advance It opens time, the shut-in time of delaying and stablizes at least one in the time.
19. a kind of terminal, which is characterized in that including processor, memory and be stored on the memory and can be at the place The program run on reason device, is realized as described in any one of claim 7 to 12 when described program is executed by the processor The step of sequential control method.
CN201910133833.8A 2019-02-22 2019-02-22 Timing control circuit, timing control method and terminal Active CN109743120B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910133833.8A CN109743120B (en) 2019-02-22 2019-02-22 Timing control circuit, timing control method and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910133833.8A CN109743120B (en) 2019-02-22 2019-02-22 Timing control circuit, timing control method and terminal

Publications (2)

Publication Number Publication Date
CN109743120A true CN109743120A (en) 2019-05-10
CN109743120B CN109743120B (en) 2021-06-04

Family

ID=66368165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910133833.8A Active CN109743120B (en) 2019-02-22 2019-02-22 Timing control circuit, timing control method and terminal

Country Status (1)

Country Link
CN (1) CN109743120B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030038618A1 (en) * 2001-08-23 2003-02-27 Gumm Linley F. Network analyzer using time sequenced measurements
CN202949416U (en) * 2012-11-14 2013-05-22 青岛海信移动通信技术股份有限公司 Circuit structure and mobile terminal supporting wireless fidelity (WIFI) and bluetooth communication
CN103297065A (en) * 2012-02-23 2013-09-11 中兴通讯股份有限公司 Emulation device and method for adjusting time sequence of radio frequency transceiving thereof
WO2014201688A1 (en) * 2013-06-21 2014-12-24 Telefonaktiebolaget L M Ericsson (Publ) Method and device for performing automatic gain control
CN105916194A (en) * 2016-05-26 2016-08-31 努比亚技术有限公司 Radio-frequency signal transmitting method, radio-frequency signal transmitting device and terminal

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030038618A1 (en) * 2001-08-23 2003-02-27 Gumm Linley F. Network analyzer using time sequenced measurements
CN103297065A (en) * 2012-02-23 2013-09-11 中兴通讯股份有限公司 Emulation device and method for adjusting time sequence of radio frequency transceiving thereof
CN202949416U (en) * 2012-11-14 2013-05-22 青岛海信移动通信技术股份有限公司 Circuit structure and mobile terminal supporting wireless fidelity (WIFI) and bluetooth communication
WO2014201688A1 (en) * 2013-06-21 2014-12-24 Telefonaktiebolaget L M Ericsson (Publ) Method and device for performing automatic gain control
CN105916194A (en) * 2016-05-26 2016-08-31 努比亚技术有限公司 Radio-frequency signal transmitting method, radio-frequency signal transmitting device and terminal

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
余海生: "一种开关电源的时序控制电路设计", 《微电子学》 *

Also Published As

Publication number Publication date
CN109743120B (en) 2021-06-04

Similar Documents

Publication Publication Date Title
CN110198550A (en) A kind of secondary cell group maintenance method, terminal device and network node
CN110198545A (en) A kind of secondary cell group adding method, terminal device and host node
CN110366212A (en) A kind of detection method and terminal of condition switching result
CN109768810A (en) A kind of signal processing circuit, terminal device and signal processing method
CN110034876A (en) PUCCH resource instruction, processing method, network side equipment, user terminal
CN110212877A (en) A kind of circuit control method, electronic equipment and radio circuit
CN109284078A (en) A kind of control method and mobile terminal of double-sided screen
CN109981009A (en) A kind of control method and mobile terminal of stepper motor
CN109819450A (en) A kind of received method, apparatus of signal and terminal
CN110198553A (en) A kind of secondary cell group delet method, terminal device and network node
CN110289885A (en) A kind of antenna tuning method and terminal
CN109981157A (en) A kind of radio frequency link control method and terminal
CN110149663A (en) Condition handover cancelling method and communication equipment
CN110505638A (en) Measure control method, terminal and network side equipment
CN110266323A (en) A kind of signal control circuit, terminal device and signal control method
CN109413726A (en) Power consumption control method and mobile terminal
CN110351040A (en) Sounding reference signal transmission enhancement, configuration method, user equipment and network side equipment
CN108900695A (en) A kind of display processing method and terminal device
CN110035505A (en) Semi-static SRS resource instruction, processing method, network side equipment, user terminal
CN107948919A (en) A kind of shared method for processing information and mobile terminal
CN109558046A (en) A kind of information display method and terminal device
CN110336623A (en) Power detecting method, device and mobile terminal
CN107949021B (en) Switch the method and terminal device of receives link in terminal device
CN109739300A (en) A kind of method of controlling antenna and terminal
CN109284186A (en) Mobile terminal and its method and apparatus for detecting frame rate adjustment mobile terminal performance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant