CN109742784A - A kind of bulk power grid large capacity fast electric air braking system control method - Google Patents

A kind of bulk power grid large capacity fast electric air braking system control method Download PDF

Info

Publication number
CN109742784A
CN109742784A CN201811547455.XA CN201811547455A CN109742784A CN 109742784 A CN109742784 A CN 109742784A CN 201811547455 A CN201811547455 A CN 201811547455A CN 109742784 A CN109742784 A CN 109742784A
Authority
CN
China
Prior art keywords
braking
power
power grid
control method
large capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811547455.XA
Other languages
Chinese (zh)
Other versions
CN109742784B (en
Inventor
葛景
汤凡
刘柏私
赖民昊
陈向宜
张宇栋
韩连山
王新宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
NR Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
NR Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, NR Engineering Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811547455.XA priority Critical patent/CN109742784B/en
Publication of CN109742784A publication Critical patent/CN109742784A/en
Application granted granted Critical
Publication of CN109742784B publication Critical patent/CN109742784B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/60Arrangements for transfer of electric power between AC networks or generators via a high voltage DC link [HVCD]

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

The present invention discloses a kind of bulk power grid large capacity fast electric air braking system control method, it is mainly used for extensive power supply and sends out occasion, if high power DC occurs in extra-high voltage alternating current-direct current power grid occurs commutation failure or the failures such as direct current locking or the interruption of important communication channel, generator rotor angle is caused substantially to vibrate, cause voltage to frequency problem, resistance or reactance are then put into rapidly by thyristor switch, carry out active or idle braking, the control method includes following step: (1) identifying system failure, including DC Line Fault is mainly to exchange service channel failure;(2) combining braking system temperature, perhaps residual flow state, installation point real-time voltage information are quickly thrown using thyristor and move back resistance or inductance;(3) combination failure information delay exits braking system.The method moves back high-power active or load or burden without work by quickly throwing, and reduces system transient modelling overvoltage, inhibits the fluctuation of system generator rotor angle, increases system voltage, power-angle stability.

Description

A kind of bulk power grid large capacity fast electric air braking system control method
Technical field
The invention belongs to field of power system, in particular to a kind of bulk power grid large capacity fast electric air braking system controlling party Method.
Background technique
There is generation of electricity by new energy (wind-power electricity generation, photovoltaic power generation) concentrated area and power load central areas in China apart Farther out the problem of, a kind of mode of solution are to realize point-to-point high-power conveying, this electricity by more times D.C. high voltage transmissions The variation of source structure and the formation of AC-DC hybrid power grid pattern make the written main lance for influencing power grid security of stability problem Shield is mainly reflected in: when short trouble occurs for power grid, since commutation failure can occur for single time or more times D.C. high voltage transmissions Even locking or important communication channel failure and other reasons, the appearance of direct current transmission active power is substantially fallen in short-term, to alternating current Net causes active impact, and AC network generator rotor angle occurs substantial power fluctuation, causes system voltage fluctuation occur, may lead The a large amount of off-grids of new energy are sent out, further deteriorates system generator rotor angle, Voltage-stabilizing Problems, eventually leads to power grid unstability.Additionally, due to sending End is sent out power and is greatly reduced, and sending end mains frequency may be reduced quickly, may further cause low-frequency load shedding movement.
For grid stability problem caused by bulk power grid power rush, traditional method is that cooperation is cut machine and arranged in electric system It applies, but there are drawbacks for this method, system is weakened the control ability of voltage after a large amount of unit excision, the stabilization of power grid Property problem may be protruded more;In addition, sending end power grid will appear low-and high-frequency Alternate Phenomenon after direct current locking restores.
Summary of the invention
The purpose of the present invention is to propose a kind of bulk power grid large capacity fast electric air braking system control method, main to use Occasion is sent out in extensive power supply, commutation failure occurs for high power DC or direct current closes if occurred in extra-high voltage alternating current-direct current power grid The failures such as lock or the interruption of important communication channel, inhibit system generator rotor angle and voltage fluctuation, increase system stability.
In order to achieve the above objectives, solution of the invention is:
A kind of bulk power grid large capacity fast electric air braking system control method is mainly used for extensive power supply and sends out occasion, If high power DC occurs in extra-high voltage alternating current-direct current power grid to occur in commutation failure or direct current locking or important communication channel The failures such as disconnected, cause generator rotor angle substantially to vibrate, cause voltage to frequency problem, then put into resistance or electricity rapidly by thyristor switch It is anti-, carry out active or idle braking, the control method include following step: (1) identifying system failure, including DC Line Fault with Main exchange service channel failure;(2) braking system temperature or residual flow state, installation point real-time voltage information are combined, is used Thyristor is quickly thrown and moves back resistance or inductance;(3) combination failure information delay exits braking system.Specifically:
(1) converter station exchange side power information and fault message are obtained, direct current is calculated or important communication channel is active Power variation Δ P (absolute value of decrement), judges following two condition while meeting, then sequentially carries out step (3) to (4): A) when Δ P is greater than power and variable threshold value Δ Pset;B) respective action signal is received;
(2) converter station exchange side power information and fault message are obtained, is calculated converter station Δ Q (absolute value of increment), Judge following two condition while meeting, then sequentially carry out step (5): a) when Δ Q is greater than power and variable threshold value Δ Qset;B) it connects It receives steady control or action signal is protected in direct current control;
(3) time interval Δ T1, detection resistance temperature t1, as Δ T1 of the detection from one action moment of last time to current time Greater than delay definite value T1set and resistance temperature t1 is less than temperature and sets definite value t1set, triggers valve group, puts into braking resistor, carries out Active braking;
(4) start timing after active braking investment, if making time Tin1 is greater than Tinset1, exit active braking;
(5) idle braking system residual flow Ir is detected, if Ir is less than residual flow and sets definite value Irset, triggers valve group, investment braking Reactance carries out idle braking;
(6) real-time monitoring installation point voltage exits idle braking if installation point voltage U is less than Uset.
In above scheme, if occurred in extra-high voltage alternating current-direct current power grid, commutation failure occurs for high power DC or direct current closes The failures such as lock or the interruption of important exchange service channel, cause generator rotor angle substantially to vibrate, cause voltage to frequency problem, then pass through valve Perhaps reactance carries out active or idle fast braking to investment resistance to group rapidly;
In above scheme, the active braking system chief component includes valve group, resistance, using grouping or is concentrated Formula design;The active braking system chief component includes valve group, and reactance is designed using block form;
In above scheme, in the step (1), direct current refers to extra-high voltage, high power DC;Important communication channel refers to water Electricity sends out other communication channels for exchanging service channel between channel, province and constraining power supply submitting ability;
In above scheme, in the step (1), receives respective action signal and refer to from protection, steady control or direct current control Guarantor receives action signal;
In above scheme, in the step (1), (2), P, Q are calculated using the voltage and current directly acquired, and calculation method is adopted With dq change instantaneous power calculation method, Δ P, Δ Q calculation method be current instantaneous power subtract device start before power;
In above scheme, in the step (3), time delay condition and temperature condition be with relationship, if temperature acquisition data Wrong or collector failure is checked, then temperature condition meets always;
In above scheme, in the step (6), after idle braking investment, the unique conditional exited is installation point voltage, is moved back It is exited one by one when out according to grouping;
When there is DC Line Fault or important communication channel failure with system where the large capacity electric braking, cause Active reactive significantlys change, and electric braking control system is closed valve group, and resistance or reactance are connected with the system, leads to It crosses resistance or reactance and quickly inhibits system generator rotor angle or voltage change;
When above-mentioned steps (4), (6) condition meet, valve group is disconnected, load impedance is separated with system.
After adopting the above scheme, D.C. high voltage transmission can be consumed since commutation failure or locking or important exchange are logical The transient state energy that road failure generates inhibits power grid generator rotor angle and transient overvoltage problem occur.
The present invention compared to the prior art, have following technological merit and the utility model has the advantages that
1) present invention uses thyristor switch scheme, in extra-high voltage alternating current-direct current system commutation failure or locking, Huo Zhechong When wanting communication channel failure, quick control is independently decoupled for active and reactive problem respectively;
2) current solution is mainly completed by cutting machine, and the program can reduce the machine of cutting or even not cut machine, increases system Stability.
Detailed description of the invention
Fig. 1 is large capacity electric braking system schematic;
Wherein: 1. mechanical switch;2. valve group;3. resistance;4. reactance;5. installing bus;
Fig. 2 is to throw active brake logic schematic diagram;
Fig. 3 is to move back active brake logic schematic diagram;
Fig. 4 is to throw idle brake logic schematic diagram;
Fig. 5 is to move back idle brake logic schematic diagram;
Fig. 6 is flow chart of the invention.
Specific embodiment
Below with reference to attached drawing, technical solution of the present invention is described in detail.
The present invention provides a kind of bulk power grid large capacity fast electric air braking system control method, is mainly used for extensive power supply Send out occasion, if in extra-high voltage alternating current-direct current power grid occur high power DC occur commutation failure or direct current locking or it is important The failures such as communication channel interruption, cause generator rotor angle substantially to vibrate, cause voltage to frequency problem, then are put into rapidly by thyristor switch Perhaps reactance carries out active or idle braking to resistance.Fig. 1 is large capacity fast electric air braking system structure chart, wherein valve group 2 one end connects installation bus 5 through mechanical switch 1, and the other end of valve group 2 is grounded through resistance 3 or reactance 4, and valve group 2 is by thyristor Switch is constituted;Fig. 2 is active braking investment logical schematic;Fig. 3 is that logical schematic is exited in active braking;Fig. 4 is idle system It is dynamic to exit logical schematic;Fig. 5 is that logical schematic is exited in idle braking.Cooperate shown in Fig. 6, which includes following steps It is rapid:
(1) converter station exchange side power information and fault message are obtained, direct current is calculated or important communication channel is active Power variation Δ P (absolute value of decrement), judges following two condition while meeting, then sequentially carries out step (3) to (4): A) when Δ P is greater than power and variable threshold value Δ Pset;B) respective action signal is received;
(2) converter station exchange side power information and fault message are obtained, is calculated converter station Δ Q (absolute value of increment), Judge following two condition while meeting, then sequentially carry out step (5): a) when Δ Q is greater than power and variable threshold value Δ Qset;B) it connects It receives steady control or action signal is protected in direct current control;
(3) time interval Δ T1, detection resistance temperature t1, as Δ T1 of the detection from one action moment of last time to current time Greater than delay definite value T1set and resistance temperature t1 is less than temperature and sets definite value t1set, triggers electronic power switch, investment braking Resistance carries out active braking;It can refer to shown in Fig. 2;
(4) start timing after active braking investment, if making time Tin1 is greater than Tinset1, exit active braking, it can Cooperate shown in Fig. 3.
(5) idle braking system residual flow Ir is detected, if Ir is less than residual flow and sets definite value Irset, thyristor switch is triggered, throws Enter to brake reactance, carries out idle braking;It can cooperate shown in Fig. 4;
(6) real-time monitoring installation point voltage exits idle braking, can cooperate Fig. 5 if installation point voltage U is less than Uset It is shown.
Wherein, if in extra-high voltage alternating current-direct current power grid occur high power DC occur commutation failure or direct current locking or The failures such as important exchange service channel interruption, cause generator rotor angle substantially to vibrate, cause voltage to frequency problem, then pass through thyristor switch Perhaps reactance carries out active or idle fast braking to investment resistance rapidly;
Wherein, the active braking system chief component includes thyristor switch, resistance, using grouping or is concentrated Formula design;The active braking system chief component includes thyristor switch, and reactance is designed using block form;
Wherein, in the step (1), direct current refers to extra-high voltage, high power DC;Important communication channel refers to that water power is sent out Service channel is exchanged between channel, province and constrains other communication channels that power supply sends out ability;
Wherein, it in the step (1), receives respective action signal and refers to and received from protection, steady control or direct current control guarantor Action signal;
Wherein, the step (1), in (2), P, Q are calculated using the voltage and current directly acquired, and calculation method is using dq change Change instantaneous power calculation method, Δ P, Δ Q calculation method be current instantaneous power subtract device start before power;
Wherein, in the step (3), time delay condition and temperature condition be with relationship, if temperature acquisition data check has Mistake or collector failure, then temperature condition meets always;
Wherein, in the step (6), after idle braking investment, the unique conditional exited is installation point voltage, when exiting by It is exited one by one according to grouping;
When there is DC Line Fault or important communication channel failure with system where the large capacity electric braking, cause Active reactive significantlys change, and electric braking control system is closed thyristor switch, by resistance or reactance and the system It is connected, system generator rotor angle or voltage change is quickly inhibited by resistance or reactance;
When above-mentioned steps (4), (6) condition meet, thyristor switch is disconnected, load impedance is separated with system.
After adopting the above scheme, D.C. high voltage transmission can be consumed since commutation failure or locking or important exchange are logical The transient state energy that road failure generates inhibits power grid generator rotor angle and transient overvoltage problem occur.
The above examples only illustrate the technical idea of the present invention, and this does not limit the scope of protection of the present invention, all According to the technical idea provided by the invention, any changes made on the basis of the technical scheme each falls within the scope of the present invention Within.

Claims (8)

1. a kind of bulk power grid large capacity fast electric air braking system control method, it is characterised in that:
Comprising realizing real power control and idle control, realize that real power control includes the following steps:
Step a1 obtains converter station exchange side power information and fault message, calculates direct current or important communication channel is active Power variation Δ P, and a2 is gone to step when judging following two condition while meeting: condition 1, Δ P are greater than power and variable threshold It is worth Δ Pset;Condition 2 receives respective action signal;
Step a2 detects time interval Δ T1, detection resistance temperature t1, as Δ T1 from one action moment of last time to current time Greater than delay definite value T1set and resistance temperature t1 is less than temperature and sets definite value t1set, puts into braking resistor, carries out active braking;
Step a3, active braking start timing after putting into, if making time Tin1 is greater than Tinset1, exit active braking;
Realize that idle control includes the following steps:
Step b1 obtains converter station exchange side power information and fault message, calculates converter station reactive power variation delta Q, And go to step b2 when judging following two condition while meeting: condition 1, Δ Q are greater than power and variable threshold value Δ Qset;Condition 2, It receives steady control or action signal is protected in direct current control;
Step b2 detects idle braking system residual flow Ir, if Ir is less than residual flow and sets definite value Irset, investment braking reactance is carried out Idle braking;
Step b3, real-time monitoring installation point voltage exit idle braking if installation point voltage U is less than Uset.
2. a kind of bulk power grid large capacity fast electric air braking system control method as described in claim 1, it is characterised in that: institute It states in step a2, the system for carrying out active braking includes mechanical switch, valve group and braking resistor, wherein one end of valve group is through machine Tool switch connection installation bus, the other end of valve group are grounded through braking resistor;When need to put into braking resistor, valve group closure.
3. a kind of bulk power grid large capacity fast electric air braking system control method as described in claim 1, it is characterised in that: institute It states in step b2, the system for carrying out idle braking includes mechanical switch, valve group and braking reactance, wherein one end of valve group is through machine Tool switch connection installation bus, the other end of valve group is through braking reactance grounded;When need to put into braking reactance, valve group closure.
4. a kind of bulk power grid large capacity fast electric air braking system control method as described in claim 1, it is characterised in that: institute It states in step a1, direct current refers to extra-high voltage, high power DC, and important communication channel refers to that water power is sent out and exchanges connection between channel, province Network channel and constraint power supply send out the communication channel of ability.
5. a kind of bulk power grid large capacity fast electric air braking system control method as described in claim 1, it is characterised in that: institute It states in step a1, receives respective action signal and refer to from protection, steady control or direct current control guarantor and receive action signal.
6. a kind of bulk power grid large capacity fast electric air braking system control method as described in claim 1, it is characterised in that: institute State in step a1, b1, Δ P, Δ Q calculation method be current instantaneous power subtract device start before power.
7. a kind of bulk power grid large capacity fast electric air braking system control method as described in claim 1, it is characterised in that: institute It states in step a2, if temperature acquisition data checks wrong or collector failure, then it is assumed that resistance temperature t1 is set less than temperature Definite value t1set.
8. a kind of bulk power grid large capacity fast electric air braking system control method as described in claim 1, it is characterised in that: institute It states in step b3, after idle braking investment, the unique conditional exited is installation point voltage, is exited one by one when exiting according to grouping.
CN201811547455.XA 2018-12-18 2018-12-18 Large-power-grid high-capacity rapid electric braking system control method Active CN109742784B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811547455.XA CN109742784B (en) 2018-12-18 2018-12-18 Large-power-grid high-capacity rapid electric braking system control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811547455.XA CN109742784B (en) 2018-12-18 2018-12-18 Large-power-grid high-capacity rapid electric braking system control method

Publications (2)

Publication Number Publication Date
CN109742784A true CN109742784A (en) 2019-05-10
CN109742784B CN109742784B (en) 2020-10-16

Family

ID=66360295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811547455.XA Active CN109742784B (en) 2018-12-18 2018-12-18 Large-power-grid high-capacity rapid electric braking system control method

Country Status (1)

Country Link
CN (1) CN109742784B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116937654A (en) * 2023-09-14 2023-10-24 四川大学 Feedback power coordination control method for hybrid multi-feed direct current transmission system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103346541A (en) * 2013-06-20 2013-10-09 国家电网公司 Convertor station direct current filter differential protection method and device
US20130334887A1 (en) * 2010-06-30 2013-12-19 Abb Technology Ag Multi-terminal dc transmission system and method and means for control there-of
CN107134755A (en) * 2017-07-03 2017-09-05 南京南瑞继保电气有限公司 A kind of direct current transportation DC filter high-voltage capacitor earth-fault protection method
CN107181276A (en) * 2017-06-26 2017-09-19 南方电网科学研究院有限责任公司 Method and device for recovering commutation failure of hybrid direct-current power transmission system
CN108666995A (en) * 2018-04-03 2018-10-16 国家电网有限公司 Dynamic is let out can device, equipment and DC transmission system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130334887A1 (en) * 2010-06-30 2013-12-19 Abb Technology Ag Multi-terminal dc transmission system and method and means for control there-of
CN103346541A (en) * 2013-06-20 2013-10-09 国家电网公司 Convertor station direct current filter differential protection method and device
CN107181276A (en) * 2017-06-26 2017-09-19 南方电网科学研究院有限责任公司 Method and device for recovering commutation failure of hybrid direct-current power transmission system
CN107134755A (en) * 2017-07-03 2017-09-05 南京南瑞继保电气有限公司 A kind of direct current transportation DC filter high-voltage capacitor earth-fault protection method
CN108666995A (en) * 2018-04-03 2018-10-16 国家电网有限公司 Dynamic is let out can device, equipment and DC transmission system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郑超等: "柔直异步互联后送端区域电网动态特性变化及稳定控制", 《全球能源互联网》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116937654A (en) * 2023-09-14 2023-10-24 四川大学 Feedback power coordination control method for hybrid multi-feed direct current transmission system
CN116937654B (en) * 2023-09-14 2023-11-28 四川大学 Feedback power coordination control method for hybrid multi-feed direct current transmission system

Also Published As

Publication number Publication date
CN109742784B (en) 2020-10-16

Similar Documents

Publication Publication Date Title
CN103124068B (en) A kind of anti-island protect system of distributed power generation grid-connected system and guard method thereof
CN201601609U (en) Megawatt-level permanent magnetic direct-drive wind power generation current transformer
WO2014044007A1 (en) Wind farm automatic dynamic voltage control system
CN102545379B (en) Method for casting and canceling 10kV backup automatic switching adaptive up-grade safe and automatic device under unit connection
CN109256756B (en) The MMC-HVDC to power to passive network exchanges adaptive reclosing method
CN204144918U (en) The DC circuit breaker that a kind of high frequency switch power supply system uses
CN105553361B (en) A kind of centralized current-sharing control method of exciting power cabinet
CN104934971A (en) Dynamic section control method based on power flow transfer ratio
CN210041339U (en) Frequency stabilization control device of electric power system
CN112993950B (en) Flexible direct current converter valve alternating current connecting line single-phase earth fault protection system and method
CN106571620B (en) Fault determination method for direct-current line grounding short circuit of double-end flexible direct-current power transmission system
CN111611133B (en) Data center energy consumption management method based on intelligent monitoring
CN107834588A (en) A kind of transverter energy-dissipating device control method and system
CN107271786A (en) Island detection method based on harmonic impedance dq components
CN106849147B (en) A kind of control method reducing direct current transportation commutation failure probability
CN109742784A (en) A kind of bulk power grid large capacity fast electric air braking system control method
CN104836252A (en) Urban rail transit medium-voltage inverter type renewable energy utilization device
CN110190740A (en) Fault-tolerant protection method and circuit of PFC circuit and air conditioner
CN204597623U (en) A kind of solid converting switch
CN108469557B (en) High voltage direct current transmission device Fault Locating Method based on inverter differential protection
CN103762612A (en) Method for electrified access to multi-terminal flexible direct-current transmission system by using isolating switch
CN110943470B (en) Control method for transient energy dissipation system of extra-high voltage alternating current and direct current power grid
CN107834586A (en) A kind of more direct current locking policy optimization methods of sending end for considering system frequency and being subjected to ability
CN115102217B (en) Method for determining stable operation domain of MMC at receiving end of LCC-MMC hybrid cascaded direct-current power grid
Swathika et al. Communication assisted overcurrent protection of microgrid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant