CN109740855A - Meter and the load restoration ability estimation on line method of key sections limit constraint - Google Patents

Meter and the load restoration ability estimation on line method of key sections limit constraint Download PDF

Info

Publication number
CN109740855A
CN109740855A CN201811492000.2A CN201811492000A CN109740855A CN 109740855 A CN109740855 A CN 109740855A CN 201811492000 A CN201811492000 A CN 201811492000A CN 109740855 A CN109740855 A CN 109740855A
Authority
CN
China
Prior art keywords
load
measure
restored
regulation
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811492000.2A
Other languages
Chinese (zh)
Other versions
CN109740855B (en
Inventor
李刚
张金龙
仇晨光
鲍颜红
刘韶峰
程锦闽
任先成
杨君军
周海锋
徐伟
袁震
许晓彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jiangsu Electric Power Co Ltd, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical State Grid Jiangsu Electric Power Co Ltd
Priority to CN201811492000.2A priority Critical patent/CN109740855B/en
Publication of CN109740855A publication Critical patent/CN109740855A/en
Application granted granted Critical
Publication of CN109740855B publication Critical patent/CN109740855B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses meter and the load restoration ability estimation on line methods of key sections limit constraint, generate load aggregation to be restored based on system protection, source net G system cutting load action message and are ranked up according to load priority and load restoration performance indicator;Restore the online regulation measure spaces of generations such as plan, new energy predictive information based on the current method of operation of power grid and direct current, and is ranked up according to measure priority and measure performance of control index;It is generated based on the current method of operation of power grid and recovery scheme and envisions mode after restoring and carry out Load flow calculation, key sections are out-of-limit if it exists, comprehensively consider trend sensitivity under priority and anticipation mode and resequence to load restoration set and regulation measure space, be then based on ranking results select measure eliminate it is out-of-limit, and according to aid decision result update load restoration ability.The present invention counts and the load restoration ability rapid evaluation of key sections limit constraint, and period regulation personnel are to load restoration capability analysis calculating speed and accuracy requirement under real time operation mode after meeting the disposition of extra-high voltage direct-current failure.

Description

Meter and the load restoration ability estimation on line method of key sections limit constraint
Technical field
The invention belongs to power system automation technology fields, and specifically the present invention relates to meter and key sections limits about The load restoration ability estimation on line method of beam.
Background technique
To cope with the greater impact caused by receiving end power grid of extra-high voltage direct-current failure, Jiangsu Power Grid proposes construction " big rule The thinking of mould source net lotus close friend interaction systems ", the system take the load control system measure of two kinds of different time spans, realize that two is big main Function.First is that system protection fast cut back function, implements the control of the first time limit.For frequency urgent control requirement, setting Soviet Union South, northern Suzhou cutting load control centre station, interconnect, quick cut-out can with the urgent coordinated control system of East China Power Grid frequency Interruptible load.Second is that friendly interact accurate cutting load function, implement the control of the second time limit.For Power System Steady-state problem, implementation can The accurate real-time control of interruptible load.
So, the later period is disposed in extra-high voltage direct-current failure, a large number of users load cut off using accurate load control system means, How these loads quickly and effectively restore to lack effective intelligent supporting method.The conventionally employed method manually determined is come true Determine whether current system has the problems such as load restoration ability, can restore how many, how to restore, it is difficult to meet quick load recovery Requirement, or even there are the risks that new failure is induced derived from load restoration process.
Summary of the invention
Object of the present invention is to: it is born to meet period regulation personnel after the disposition of extra-high voltage direct-current failure under real time operation mode Lotus recovery capability is accurate, rapid evaluation requirement, and the load restoration ability for providing meter and the constraint of key sections limit is estimated online Calculation method, the present invention carry out the load restoration ability rapid evaluation of key sections limit constraint, meet at extra-high voltage direct-current failure Period regulation personnel are postponed to load restoration capability analysis calculating speed and accuracy requirement under real time operation mode, effectively support is special High voltage direct current failure disposes the control decision of later period load restoration.
To achieve the above object, the technical solution adopted by the present invention, specific as follows:
Meter and the load restoration ability estimation on line method of key sections limit constraint, comprising the following steps:
1) the cutting load action message of the system protection based on acquisition, source net G system generates load aggregation L to be restored0, If load aggregation L to be restored0It is not sky, enters step 2), otherwise, exit load restoration ability estimation on line;
2) model parameter based on power grid and current operating status generate basic method of operation F0, based on basic operation side Formula F0, preassigned regulation measure, direct current recovery plan, tie line plan and new energy predictive information generate online regulation and arrange Apply space C0
3) based on basic method of operation F0Under load aggregation L to be restored0In each load it is sensitive to the trend of each key sections Degree calculates the restorability index of each load, considers that the restorability index of load priority and each load generates to be restored bear Lotus ordered set L1
4) based on basic method of operation F0Online regulation measure space C down0In each measure it is sensitive to the trend of each key sections Degree and measure response time calculate the performance of control index of each measure, consider the performance of control index of measure priority and measure Generate regulation measure Sorting space C1
5) basic method of operation F is calculated based on frequency estimation0Generated energy P needed for frequency retrievalf, according to load to be restored Ordered set L1In load total amount to be restored, regulation measure Sorting space C1In can with power generation total amount and frequency retrieval needed for hair Electricity Pf, and consider that system losses and spinning reserve determine that load can restore total amount and matched regulation power generation total amount, to extensive Multiple load ordered set L1, regulation measure Sorting space C1It is middle that load can be restored into total amount and matched regulation power generation total amount respectively Share in order to each load to be restored and each regulation measure;
6) based on basic method of operation F0, load ordered set L to be restored1, regulation measure Sorting space C1It generates after restoring Anticipation mode F1, Load flow calculation is carried out, and judge whether key sections are out-of-limit, and key sections are got over if it exists according to cross-section limitation 7) limit, enters step, otherwise enters step 8);
7) based on anticipation mode F after restoring1Under load ordered set L to be restored1In restored load to each out-of-limit section Trend sensitivity calculates the aid decision performance indicator of each load, comprehensively considers load priority and load aid decision performance Index is to load ordered set L to be restored1Rearrangement;Based on anticipation mode F after recovery1Down regulation sequence for measures space C1In Can trend sensitivity with measure to each out-of-limit section, calculate the aid decision performance indicator of each regulation measure, consider that measure is excellent First grade and measure aid decision performance indicator are to regulation sequence for measures space C1Rearrangement;According to regulation measure Sorting space C1 Rearrangement successively select ancillary measure solve cross section limit, terminate if it can not solve, otherwise according to aid decision result Update load ordered set L to be restored1, regulation measure Sorting space C1In load can restore power and regulation measure control amount;
8) load ordered set L to be restored is counted1Middle recovery load total amount be load currently can recovery capability, regulation measure Sorting space C1It is middle that measure is used to need the mating regulation measure taken, regulation measure Sorting space C for load restoration1In all adopt Being with the maximum regulation time of measure currently can recovery capability be corresponding estimates time-consuming.
Load aggregation L to be restored is generated in step 1)0, specifically includes the following steps:
There is N in power gridLA load to be restored,For i-th of load to be restored, then NLA load to be restored is constituted to extensive Multiple load aggregation L0:
Step 2) generates online regulation measure space C0, specifically includes the following steps:
There is N in power gridCA controllable measure, j-th of regulation measureCurrent power beMaximum power isMeasure available flag is(0 is no, and 1 is), then NCA regulation measure forms online regulation measure space C0:
The regulation measure type of regulation measure includes internal routine or the adjustment of new energy unit output, unit booting, contact Line Plan rescheduling and DC power modulation.
The step 3) specifically includes the following steps:
3-1) based on basic method of operation F0Under load aggregation L to be restored0In each load it is sensitive to the trend of each key sections Degree calculates the restorability index of each load
Wherein,For the restorability index of i-th of load to be restored,For F0The nargin of lower k-th of section,For F0The active power of lower k-th of section,For the stability limitation of k-th of section,For F0It is i-th lower Load to be restored to the active po wer sensitivity of k-th of key sections,For F0Lower i-th of load to be restored is taken the photograph Dynamic variable quantity and k-th of section active power variable quantity, N because caused by perturbing load0,INTFor F0Lower section narginIt is less than Specified threshold value ε0,INTKey sections number,WithRespectively F0Lower i-th of load to be restored is to each key sections Synthesis active po wer sensitivity and corresponding per unit value,It indicatesIt takes absolute value;
3-2) according to each load priorityFrom small to large to L0It is ranked up, obtains load to be restored and tentatively sort collection Close L0';Restorability index according to each loadFrom big to small to L0' middle consistent measure the progress of load priority is internal Second level sequence, obtains load ordered set L to be restored1:
Wherein,For set L1In i-th of load to be restored,WithRespectively set L1In i-th it is to be restored The restorability index and load priority of load, if it is in L0In be ordered as i0, then
Regulation measure Sorting space C is generated in the step 4)1, specifically includes the following steps:
4-1) it is based on F0Lower C0In each measure each measure is calculated to the trend sensitivity of each key sections and measure response time Performance of control index
Wherein,For the performance of control index of j-th of regulation measure,K-th is closed for j-th of regulation measure The active po wer sensitivity of key section,WithRespectively F0The perturbation variable quantity of lower j-th of regulation measure and k-th Section active power variable quantity because caused by perturbing measure power,For for F0The nargin of lower k-th of section,WithRespectively j-th of regulation measure to the synthesis active po wer sensitivity and corresponding per unit value of each key sections,WithThe climbing rate of respectively j-th regulation measure and corresponding per unit value,WithRespectively j-th of regulation measure Available delay time and corresponding per unit value,It indicatesIt takes absolute value,It indicatesIt takes absolute value;
4-2) according to each regulation measure priorityFrom small to large to C0It is ranked up, is regulated sequence for measures space C0';According to each regulation measure load restoration performance indicatorFrom big to small to C0' in the consistent measure of measure priority carry out Internal secondary sequence, is regulated sequence for measures space C1:
Wherein,For set C1In j-th of regulation measure,WithRespectively C1In j-th of regulation measure load restoration performance indicator, measure priority, current power, maximum power and measure can with mark Will.
The step 5) specifically includes the following steps:
5-1)F0Lower power grid current frequency is f0, rated frequency fr, then generated energy P needed for frequency retrievalfCalculation method Are as follows:
Wherein, PLFor F0Lower load is the sum of active, KLFor the active static frequency characteristic coefficient of load of power grid, KSFor power grid Network Loss Rate,WithRespectively C1In j-th of regulation measure current power, maximum power;
5-2)F0The lower current spare capacity of power grid is Pb,0, spare capacity requirement is Pb,r, by C1Sequence passes sequentially through following formula meter Calculate the spare capacity surplus after j-th of regulation measure usesUntilOr it all calculates and completes:
Wherein,WithRespectively C1The spinning reserve unit mark of k-th of regulation measure Will (0 no 1 is), measure available flag, maximum power and current power;
If it existsThen enable the available regulation measure number N after considering spinning reserveC,b=j and by subsequent all categories It is set to 0 in the measure available flag of spinning reserve unit, and modifies the maximum power of j-th of regulation measure;Otherwise N is enabledC,b= NC
L 5-3) is calculated by formula (5-3-1)-(5-3-3)1In load total amount PL to be restored1,h, C1In can with power generation total amount PC1,h, it is contemplated that load total amount PH can be restored1:
PH1=min (PL1,h,(PC1,h-Pf)×(1-KS))(5-3-3)
Wherein,For L1In i-th of load to be restored active power,WithRespectively C1In Measure available flag, current power and the maximum power of j-th of regulation measure, KSFor the Network Loss Rate of power grid, PfFor frequency retrieval institute The generated energy needed;
5-4) press L1What sequence passed sequentially through that formula (5-4-1) calculate i-th load restores powerUntilOr it all calculates and completes:
If it existsSubsequent all loads to be restored then can be restored into powerIt is set to 0:
5-5) press C1Sequence passes sequentially through formula (5-5) and calculates the control amount that j-th of regulation measure matched load is restored UntilOr it all calculates and completes:
If it existsThen by the control amount of subsequent regulation measureIt is set to 0:
The step 7) specifically includes the following steps:
7-1) it is based on F1Lower L1In restored load to the aid decision of each load of trend Calculation of Sensitivity of each out-of-limit section Performance indicatorBased on F1Lower C1In can be with measure to the auxiliary of each regulation measure of trend Calculation of Sensitivity of each out-of-limit section Help decision performance indicator
Wherein,For F1The nargin of lower k-th of section,For F1The active power of lower k-th of section, For the stability limitation of k-th of section,For F0Lower i-th of load to be restored to the active po wer sensitivity of k-th of key sections,For F1The perturbation variable quantity and k-th of section of lower i-th of load to be restored are because caused by perturbing load Active power variable quantity, N1,INTFor F1Lower section narginKey sections number less than 0,WithRespectively F1Lower the I loads to be restored to the synthesis active po wer sensitivity and corresponding per unit value of each key sections,For j-th of regulation measure To the active po wer sensitivity of k-th of key sections,WithRespectively F1The perturbation variable quantity of lower j-th of regulation measure With k-th of section because measure power perturbation caused by active power variable quantity,WithRespectively j-th of regulation measure To the synthesis active po wer sensitivity and corresponding per unit value of each key sections,It indicatesIt takes absolute value,It indicates It takes absolute value;
7-2) according to each load priorityFrom big to small to L1It resequences, and according further to each load Aid decision performance indicatorFrom big to small to L1The middle consistent measure of load priority carries out internal secondary sequence;Foundation Each regulation measure priority(it is higher to be worth smaller priority) is from big to small to C1It resequences, and according further to each The aid decision performance indicator of regulation measureFrom big to small to C1The middle consistent measure of measure priority carries out internal secondary Sequence;
7-3) initialization control step-lengthWith control precision ε step;
7-4) enable the control step-length of the m times iterationAccording to L1And C1Sequence is selected by ancillary measure Rule successively selects ancillary measure and makes the control amount to beJudge whether cross section limit can solve based on sensitivity, if out-of-limit It solves then to enter 7-5);If it is unresolved but still have measure it is available if enable m=m+1 enter 7-4);Otherwise out-of-limit to eliminate, enter 7-5);
If 7-5) out-of-limit solution, according to cross section limit aid decision measure, restoring power, regulating and controlling to arrange for load is updated The control amount applied;It need not be updated if out-of-limit do not solve;
Wherein,For L1In i-th of load aid decision amount,For C1In j-th of regulation measure auxiliary Decision content.
Ancillary measure picking rule the following steps are included:
A) by wattful power after the matched control for sending receiving end control amount and each section of each step-length need of formula (7-4-1) calculating Rate;
Wherein, Pr is that receiving end controls surplus, and Ps is that sending end controls surplus,It is active after control for k-th of section Power, KSFor the Network Loss Rate of power grid,For F1The active power of lower k-th of section,For the control step of the m times iteration It is long, m >=0;
B) sending end control considers regulation measure drop power output: pressing C1Positive sequence is successively handled, if measure available flagAndAnd Ps > 0, then:
Wherein, εsFor active po wer sensitivity threshold value,Active spirit for j-th of regulation measure to k-th of key sections Sensitivity,For the aid decision amount of j-th of regulation measure,WithRespectively j-th of regulation measure Current power, the control amount restored of minimum power and matched load, the present embodiment εsTake 0.1;
C) regulation measure increasing power output is paid the utmost attention in receiving end control: by C1Inverted order is successively handled, if measure available flagAndAnd Pr > 0, then:
If d) receiving end regulation measure increases power output insufficient space, consider that receiving end has restored load and reduced amount of recovery: by L1Just Sequence is successively handled, ifAndAnd Pr > 0, then:
If e) all sections all meetThen out-of-limit elimination, it is otherwise out-of-limit not eliminate.
Step 8) the load currently can recovery capability be formula (8-1):
Currently can corresponding estimate time-consuming of recovery capability be formula (8-2):
Wherein, PL1,h,realFor L1Reality can restore load total amount i.e. load currently can recovery capability,For L1In I-th load restores power, T1For currently can recovery capability estimate time-consuming,With Respectively C1In j-th of regulation measure measure available flag, can with delay time, matched load restore control amount and climbing Rate.
Model parameter includes the static parameter of generator, load, exchange line segment, transformer, direct current line segment and capacitive reactance device.
Beneficial effect of the present invention includes:
The invention proposes meter and the load restoration ability estimation on line methods of key sections limit constraint, are protected based on system Shield, source net G system cutting load action message generate load aggregation to be restored and refer to according to load priority and load restoration performance Mark is ranked up;Regulate and control to arrange online based on the generations such as the current method of operation of power grid and direct current recovery plan, new energy predictive information Space is applied, and is ranked up according to measure priority and measure performance of control index;It is to be restored according to load based on ranking results Total amount, regulatable power generation total amount, and consider that system losses, spinning reserve, frequency character of load determine load restoration ability, extensive Compound case;It is generated based on the current method of operation of power grid and recovery scheme and envisions mode after restoring and carry out Load flow calculation, if it exists Key sections are out-of-limit, and it is empty to load restoration set and regulation measure to comprehensively consider trend sensitivity under priority and anticipation mode Between resequence, be then based on ranking results select measure eliminate it is out-of-limit, and according to aid decision result update load restoration energy Power.
Invention considers the influence of load priority and load to safety and stability and is ranked up to load to be restored, is guaranteeing It is preferential to restore to reduce the influence to safety and stability while important ratio higher load user;It is extensive that regulation measure considers direct current The information such as multiple plan, new energy prediction, ensure that the accuracy and exploitativeness of regulation measure boundary condition;To regulation measure The calculating of Control performance standard comprehensively considers response speed and the impact factor to safety and stability, preferentially more using response speed Fastly, smaller measure is influenced on safety and stability so that load restoration faster, it is safer;To the key under anticipation mode after recovery Cross section limit problem is quickly estimated based on the sensitivity information under anticipation mode and solves out-of-limit required control amount and modified load Recovery capability improves computational efficiency.The load restoration ability of meter and the constraint of key sections limit can be carried out using the present invention Rapid evaluation, period regulation personnel are to load restoration capability analysis meter under real time operation mode after meeting the disposition of extra-high voltage direct-current failure Speed and accuracy requirement is calculated, effectively extra-high voltage direct-current failure is supported to dispose the control decision of later period load restoration.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples;
Fig. 1 is the flow chart of the load restoration ability estimation on line method of present invention meter and the constraint of key sections limit.
Specific embodiment
The invention will be further described with reference to the accompanying drawing and by specific embodiment, and following embodiment is descriptive , it is not restrictive, this does not limit the scope of protection of the present invention.
In order to make technological means of the invention, creation characteristic, workflow, application method reach purpose and effect, and it is It is easy to understand the evaluation method with reference to specific embodiments the present invention is further explained.
The invention will be further described with reference to the accompanying drawings and in conjunction with example.
As shown in Figure 1, meter and the load restoration ability estimation on line method of key sections limit constraint, including following step It is rapid:
1) the cutting load action message of the system protection based on acquisition, source net G system generates load aggregation L to be restored0, If load aggregation L to be restored0It is not sky, enters step 2), otherwise, exit load restoration ability estimation on line;
2) model parameter based on power grid and current operating status generate basic method of operation F0, based on basic operation side Formula F0, preassigned regulation measure, direct current recovery plan, tie line plan and new energy predictive information generate online regulation and arrange Apply space C0
Model parameter includes the static parameter (packet of generator, load, exchange line segment, transformer, direct current line segment and capacitive reactance device Include equipment limit value, resistance and reactance).
3) based on basic method of operation F0Under load aggregation L to be restored0In each load it is sensitive to the trend of each key sections Degree calculates the restorability index of each load, considers that the restorability index of load priority and each load generates to be restored bear Lotus ordered set L1
4) based on basic method of operation F0Online regulation measure space C down0In each measure it is sensitive to the trend of each key sections Degree and measure response time calculate the performance of control index of each measure, consider the performance of control index of measure priority and measure Generate regulation measure Sorting space C1
5) basic method of operation F is calculated based on frequency estimation0Generated energy P needed for frequency retrievalf, according to load to be restored Ordered set L1In load total amount to be restored, regulation measure Sorting space C1In can with power generation total amount and frequency retrieval needed for hair Electricity Pf, and consider that system losses and spinning reserve determine that load can restore total amount and matched regulation power generation total amount, to extensive Multiple load ordered set L1, regulation measure Sorting space C1It is middle that load can be restored into total amount and matched regulation power generation total amount respectively Share in order to each load to be restored and each regulation measure;
6) based on basic method of operation F0, load ordered set L to be restored1, regulation measure Sorting space C1It generates after restoring Anticipation mode F1, Load flow calculation is carried out, the present embodiment envisions mode F1's by PQ+ Niu Lafa Load flow calculation, after being restored Trend distribution, and judge whether key sections are out-of-limit, and key sections are out-of-limit if it exists according to cross-section limitation, it enters step 7), it is no It then enters step 8);Step 6) carries out Load flow calculation, and judges whether key sections are out-of-limit according to cross-section limitation and belong to this field Common technology means, the present embodiment are no longer described in detail.
7) based on anticipation mode F after restoring1Under load ordered set L to be restored1In restored load to each out-of-limit section Trend sensitivity calculates the aid decision performance indicator of each load, comprehensively considers load priority and load aid decision performance Index is to load ordered set L to be restored1Rearrangement;Based on anticipation mode F after recovery1Down regulation sequence for measures space C1In Can trend sensitivity with measure to each out-of-limit section, calculate the aid decision performance indicator of each regulation measure, consider that measure is excellent First grade and measure aid decision performance indicator are to regulation sequence for measures space C1Rearrangement;According to regulation measure Sorting space C1 Rearrangement successively select ancillary measure solve cross section limit, terminate if it can not solve, otherwise according to aid decision result Update load ordered set L to be restored1, regulation measure Sorting space C1In load can restore power and regulation measure control amount, It enters step 8);
8) load ordered set L to be restored is counted1Middle recovery load total amount be load currently can recovery capability, regulation measure Sorting space C1It is middle that measure is used to need the mating regulation measure taken, regulation measure Sorting space C for load restoration1In all adopt Being with the maximum regulation time of measure currently can recovery capability be corresponding estimates time-consuming.
Load aggregation L to be restored is generated in step 1)0, specifically includes the following steps:
There is N in power gridLA load to be restored,For i-th of load to be restored, then NLA load to be restored is constituted to extensive Multiple load aggregation L0:
Step 2) generates online regulation measure space C0, specifically includes the following steps:
There is N in power gridCA controllable measure, j-th of regulation measureCurrent power beMaximum power isMeasure available flag is(0 is no, and 1 is), then NCA regulation measure forms online regulation measure space C0:
The regulation measure type of regulation measure includes internal routine or the adjustment of new energy unit output, unit booting, contact Line Plan rescheduling and DC power modulation.Special, if j-th of regulation measure is new energy measure,For new energy Prediction power output.
The step 3) specifically includes the following steps:
3-1) based on basic method of operation F0Under load aggregation L to be restored0In each load it is sensitive to the trend of each key sections Degree calculates the restorability index of each load
Wherein,For the restorability index of i-th of load to be restored,For F0The nargin of lower k-th of section,For F0The active power (direction for taking power to be positive is section positive direction) of lower k-th of section,It is k-th The stability limitation (taking positive limit) of section,For F0Active spirit of lower i-th of the load to be restored to k-th of key sections Sensitivity (being positive indicates to be located at the sending end of section, is otherwise located at receiving end),For F0Lower i-th to be restored negative The perturbation variable quantity (generally 1) and k-th of section of lotus active power variable quantity, N because caused by perturbing load0,INTFor F0Under Section narginLess than specified threshold value ε0,INTKey sections number,WithRespectively F0Lower i-th to be restored negative Lotus to the synthesis active po wer sensitivity and corresponding per unit value of each key sections,It indicatesIt takes absolute value, the present embodiment ε0, INT takes 0.3.
3-2) according to each load priority(it is higher to be worth smaller priority) is from small to large to L0Be ranked up, obtain to At the beginning of restoring load
Walk ordered set L0′;Restorability index according to each loadFrom big to small to L0' middle load priority one The measure of cause carries out internal secondary sequence, obtains load ordered set L to be restored1:
Wherein,For set L1In i-th of load to be restored,WithRespectively set L1In i-th it is to be restored The restorability index and load priority of load, if it is in L0In be ordered as i0, then
Regulation measure Sorting space C is generated in the step 4)1, specifically includes the following steps:
4-1) it is based on F0Lower C0In each measure each measure is calculated to the trend sensitivity of each key sections and measure response time Performance of control index
Wherein,For the performance of control index of j-th of regulation measure,K-th is closed for j-th of regulation measure The active po wer sensitivity (being positive indicates to be located at the sending end of section, is otherwise located at receiving end) of key section,WithRespectively F0The perturbation variable quantity (the present embodiment 1) and k-th of section of lower j-th of regulation measure have because caused by perturbing measure power Function power variation,For for F0The nargin of lower k-th of section,WithRespectively j-th of regulation measure is to each key The synthesis active po wer sensitivity and corresponding per unit value of section,WithThe climbing rate and phase of respectively j-th regulation measure The per unit value answered,WithThe available delay time and corresponding per unit value of respectively j-th regulation measure,Table ShowIt takes absolute value,It indicatesIt takes absolute value;
4-2) according to each regulation measure priority(it is higher to be worth smaller priority) is from small to large to C0It is ranked up, obtains To regulation measure Sorting space C0';According to each regulation measure load restoration performance indicatorFrom big to small to C0' in measure it is excellent The first consistent measure of grade carries out internal secondary sequence, is regulated sequence for measures space C1:
Wherein,For set C1In j-th of regulation measure,WithRespectively C1In j-th of regulation measure load restoration performance indicator, measure priority, current power, maximum power and measure can with mark Will, if j-th of regulation measure is in C0In be ordered as j0, then measure priorityLoad restoration performance indicatorIts dependent variable and so on.
The step 5) specifically includes the following steps:
5-1)F0Lower power grid current frequency is f0, rated frequency fr, then generated energy P needed for frequency retrievalfCalculation method Are as follows:
Wherein, PLFor F0Lower load is the sum of active, KLFor the active static frequency characteristic coefficient of load of power grid, KSFor power grid Network Loss Rate,WithRespectively C1In j-th of regulation measure current power, maximum power.Section 2 is worked as in formula J works when belonging to new energy unit and its prediction power output less than current power output, whenIt is 0 that max is taken when being negative The exactly purpose of formula;Even new energy unit future contributesLess than current power outputPower grid can lose power generation Power, need to fall into a trap in frequence estimation and.
5-2)F0The lower current spare capacity of power grid is Pb,0, spare capacity requirement is Pb,r, by C1Sequence passes sequentially through following formula meter Calculate the spare capacity surplus after j-th of regulation measure usesUntilOr it all calculates and completes:
Wherein,WithRespectively C1The spinning reserve unit mark of k-th of regulation measure Will (0 no 1 is), measure available flag, maximum power and current power.
If it existsThen enable the available regulation measure number N after considering spinning reserveC,b=j and by subsequent all categories It is set to 0 in the measure available flag of spinning reserve unit, and modifies the maximum power of j-th of regulation measure;Otherwise N is enabledC,b= NC
L 5-3) is calculated by formula (5-3-1)-(5-3-3)1In load total amount PL to be restored1,h, C1In can with power generation total amount PC1,h, it is contemplated that load total amount PH can be restored1:
PH1=min (PL1,h,(PC1,h-Pf)×(1-KS)) (5-3-3)
Wherein,For L1In i-th of load to be restored active power,WithRespectively C1In Measure available flag, current power and the maximum power of j-th of regulation measure, KSFor the Network Loss Rate of power grid, PfFor frequency retrieval institute The generated energy needed.
5-4) press L1What sequence passed sequentially through that formula (5-4-1) calculate i-th load restores powerUntilOr it all calculates and completes:
If it existsSubsequent all loads to be restored then can be restored into powerIt is set to 0:
5-5) press C1Sequence passes sequentially through formula (5-5) and calculates the control amount that j-th of regulation measure matched load is restored UntilOr it all calculates and completes:
If it existsThen by the control amount of subsequent regulation measureIt is set to 0:
The step 7) specifically includes the following steps:
7-1) it is based on F1Lower L1In restored load to the aid decision of each load of trend Calculation of Sensitivity of each out-of-limit section Performance indicatorBased on F1Lower C1In can be with measure to the auxiliary of each regulation measure of trend Calculation of Sensitivity of each out-of-limit section Help decision performance indicator
Wherein,For for F1The nargin of lower k-th of section,For F1The active power of lower k-th of section (takes power The direction being positive is section positive direction),For the stability limitation (taking positive limit) of k-th of section,For F0Under I-th of load to be restored to the active po wer sensitivity of k-th of key sections (being positive indicates to be located at the sending end of section, be otherwise located at by End),For F1The perturbation variable quantity (generally 1) of lower i-th of load to be restored and k-th of section are because of load Active power variable quantity caused by perturbation, N1,INTFor F1Lower section narginKey sections number less than 0,With Respectively F1Lower i-th of load to be restored to the synthesis active po wer sensitivity and corresponding per unit value of each key sections,It is J regulation measure to the active po wer sensitivity of k-th of key sections (being positive indicates to be located at the sending end of section, is otherwise located at receiving end),WithRespectively F1The perturbation variable quantity (generally 1) of lower j-th of regulation measure and k-th of section are because of measure function Active power variable quantity caused by rate perturbation,WithSynthesis of respectively j-th of the regulation measure to each key sections Active po wer sensitivity and corresponding per unit value,It indicatesIt takes absolute value,It indicatesIt takes absolute value;.
7-2) according to each load priorityFrom big to small to L1It resequences, and according further to each load Aid decision performance indicatorFrom big to small to L1The middle consistent measure of load priority carries out internal secondary sequence;Foundation Each regulation measure priority(it is higher to be worth smaller priority) is from big to small to C1It resequences, and according further to each The aid decision performance indicator of regulation measureFrom big to small to C1The middle consistent measure of measure priority carries out internal secondary Sequence.
7-3) enable initial control step-lengthControl precision εstep=50MW.
7-4) enable the control step-length of the m times iterationAccording to L1、C1Sequence selects rule by ancillary measure Then successively selecting ancillary measure makes the control amount to beJudge whether cross section limit can solve based on sensitivity, if out-of-limit solution Certainly then enter 7-5);If it is unresolved but still have measure it is available if enable m=m+1 enter 7-4);Otherwise out-of-limit to eliminate, into 7- 5);
Ancillary measure picking rule the following steps are included:
A) by wattful power after the matched control for sending receiving end control amount and each section of each step-length need of formula (7-4-1) calculating Rate.
Wherein, Pr is that receiving end controls surplus (including increasing power output load down), and Ps is that sending end controls surplus (including drop power output),For active power after the control of k-th of section, KSFor the Network Loss Rate of power grid,For F1Lower k-th of section has Function power,For the control step-length of the m times iteration, m >=0.
B) sending end control considers regulation measure drop power output: pressing C1Positive sequence is successively handled, if measure available flagAndAnd Ps > 0, then:
Wherein, εsFor active po wer sensitivity threshold value,Active spirit for j-th of regulation measure to k-th of key sections Sensitivity,For the aid decision amount of j-th of regulation measure,WithRespectively j-th of regulation measure Current power, the control amount restored of minimum power and matched load, the present embodiment εsTake 0.1;
C) regulation measure increasing power output is paid the utmost attention in receiving end control: by C1Inverted order is successively handled, if measure available flagAndAnd Pr > 0, then:
If d) receiving end regulation measure increases power output insufficient space, consider that receiving end has restored load and reduced amount of recovery: by L1Just Sequence is successively handled, ifAndAnd Pr > 0, then:
If e) all sections all meetThen out-of-limit elimination, it is otherwise out-of-limit not eliminate.
If 7-5) out-of-limit solution, according to cross section limit aid decision measure, restoring power, regulating and controlling to arrange for load is updated The control amount applied;It need not be updated if out-of-limit do not solve;
Wherein,For L1In i-th of load aid decision amount,For C1In j-th of regulation measure auxiliary Decision content.
Step 8) the load currently can recovery capability be formula (8-1):
Currently can corresponding estimate time-consuming of recovery capability be formula (8-2):
Wherein, PL1,h,realFor L1Reality can restore load total amount i.e. load currently can recovery capability,For L1In I-th load restores power, T1For currently can recovery capability estimate time-consuming,With Respectively C1In j-th of regulation measure measure available flag, can with delay time, matched load restore control amount and climbing Rate.
In the instructions provided here, numerous specific details are set forth.It is to be appreciated, however, that implementation of the invention Example can be practiced without these specific details.In some instances, well known method, knot is not been shown in detail Structure and technology, so as not to obscure the understanding of this specification.
Similarly, it should be understood that in order to simplify the disclosure and help to understand one or more of the various inventive aspects, Above in the description of exemplary embodiment of the present invention, each feature of the invention is grouped together into single implementation sometimes In example, figure or descriptions thereof.However, the disclosed method should not be interpreted as reflecting the following intention: i.e. required to protect Shield the present invention claims than feature more features expressly recited in each claim.More precisely, as right is wanted As asking book to reflect, inventive aspect is all features less than single embodiment disclosed above.Therefore, it then follows specific Thus claims of embodiment are expressly incorporated in the specific embodiment, wherein each claim itself is as this The separate embodiments of invention.
Those skilled in the art should understand that the module of the equipment in example disclosed herein or unit or groups Between can be arranged in equipment as depicted in this embodiment, or alternatively can be positioned at and the equipment in the example In different one or more equipment.Module in aforementioned exemplary can be combined into a module or furthermore be segmented into multiple Submodule.
Those skilled in the art will understand that can be carried out adaptively to the module in the equipment in embodiment Change and they are arranged in one or more devices different from this embodiment.It can be the module or list in embodiment Be combined into one between module or unit or group between member or group, and furthermore they can be divided into multiple submodule or subelement or Between subgroup.Other than such feature and/or at least some of process or unit exclude each other, it can use any Combination is to all features disclosed in this specification (including adjoint claim, abstract and attached drawing) and so disclosed All process or units of what method or apparatus are combined.Unless expressly stated otherwise, this specification is (including adjoint power Benefit require, abstract and attached drawing) disclosed in each feature can carry out generation with an alternative feature that provides the same, equivalent, or similar purpose It replaces.
In addition, it will be appreciated by those of skill in the art that although some embodiments described herein include other embodiments In included certain features rather than other feature, but the combination of the feature of different embodiments mean it is of the invention Within the scope of and form different embodiments.For example, in the following claims, embodiment claimed is appointed Meaning one of can in any combination mode come using.
In addition, be described as herein can be by the processor of computer system or by executing by some in the embodiment The combination of method or method element that other devices of the function are implemented.Therefore, have for implementing the method or method The processor of the necessary instruction of element forms the device for implementing this method or method element.In addition, Installation practice Element described in this is the example of following device: the device be used for implement as in order to implement the purpose of the invention element performed by Function.
Various technologies described herein are realized together in combination with hardware or software or their combination.To the present invention Method and apparatus or the process and apparatus of the present invention some aspects or part can take insertion tangible media, such as it is soft The form of program code (instructing) in disk, CD-ROM, hard disk drive or other any machine readable storage mediums, Wherein when program is loaded into the machine of such as computer etc, and is executed by the machine, the machine becomes to practice this hair Bright equipment.
In the case where program code executes on programmable computers, calculates equipment and generally comprise processor, processor Readable storage medium (including volatile and non-volatile memory and or memory element), at least one input unit, and extremely A few output device.Wherein, memory is configured for storage program code;Processor is configured for according to the memory Instruction in the said program code of middle storage executes method of the invention.
By way of example and not limitation, computer-readable medium includes computer storage media and communication media.It calculates Machine readable medium includes computer storage media and communication media.Computer storage medium storage such as computer-readable instruction, The information such as data structure, program module or other data.Communication media is generally modulated with carrier wave or other transmission mechanisms etc. Data-signal processed passes to embody computer readable instructions, data structure, program module or other data including any information Pass medium.Above any combination is also included within the scope of computer-readable medium.
As used in this, unless specifically stated, come using ordinal number " first ", " second ", " third " etc. Description plain objects, which are merely representative of, is related to the different instances of similar object, and is not intended to imply that the object being described in this way must Must have the time it is upper, spatially, sequence aspect or given sequence in any other manner.
Although the embodiment according to limited quantity describes the present invention, above description, the art are benefited from It is interior it is clear for the skilled person that in the scope of the present invention thus described, it can be envisaged that other embodiments.Additionally, it should be noted that Language used in this specification primarily to readable and introduction purpose and select, rather than in order to explain or limit Determine subject of the present invention and selects.Therefore, without departing from the scope and spirit of the appended claims, for this Many modifications and changes are obvious for the those of ordinary skill of technical field.For the scope of the present invention, to this Invent done disclosure be it is illustrative and not restrictive, it is intended that the scope of the present invention be defined by the claims appended hereto.
Those skilled in the art can to the present invention be modified or modification design but do not depart from think of of the invention Think and range.Therefore, if these modifications and changes of the present invention belongs to the claims in the present invention and its equivalent technical scope Within, then the present invention is also intended to include these modifications and variations.

Claims (10)

1. meter and the load restoration ability estimation on line method of key sections limit constraint, which comprises the following steps:
1) the cutting load action message of the system protection based on acquisition, source net G system generates load aggregation L to be restored0If to Restore load aggregation L0It is not sky, enters step 2), otherwise, exit load restoration ability estimation on line;
2) model parameter based on power grid and current operating status generate basic method of operation F0, based on basic method of operation F0、 Preassigned regulation measure, direct current restore plan, tie line plan and new energy predictive information and generate online regulation measure sky Between C0
3) based on basic method of operation F0Under load aggregation L to be restored0In trend sensitivity of each load to each key sections, meter The restorability index of each load is calculated, considers that the restorability index of load priority and each load generates load sequence to be restored Set L1
4) based on basic method of operation F0Online regulation measure space C down0In each measure to the trend sensitivity of each key sections and The measure response time calculates the performance of control index of each measure, considers that the performance of control index of measure priority and measure generates Regulation measure Sorting space C1
5) basic method of operation F is calculated based on frequency estimation0Generated energy P needed for frequency retrievalf, sorted according to load to be restored Set L1In load total amount to be restored, regulation measure Sorting space C1In can with power generation total amount and frequency retrieval needed for generated energy Pf, and consider that system losses and spinning reserve determine that load can restore total amount and matched regulation power generation total amount, to be restored negative Lotus ordered set L1, regulation measure Sorting space C1It is middle that load can be restored into total amount and matched regulation power generation total amount by suitable respectively Sequence is shared to each load to be restored and each regulation measure;
6) based on basic method of operation F0, load ordered set L to be restored1, regulation measure Sorting space C1It generates and envisions after restoring Mode F1, Load flow calculation is carried out, and judge whether key sections are out-of-limit, and key sections are out-of-limit if it exists according to cross-section limitation, into Enter step 7), otherwise enters step 8);
7) based on anticipation mode F after restoring1Under load ordered set L to be restored1In restored load to the trend of each out-of-limit section Sensitivity calculates the aid decision performance indicator of each load, comprehensively considers load priority and load aid decision performance indicator To load ordered set L to be restored1Rearrangement;Based on anticipation mode F after recovery1Down regulation sequence for measures space C1In can use Trend sensitivity of the measure to each out-of-limit section calculates the aid decision performance indicator of each regulation measure, considers measure priority With measure aid decision performance indicator to regulation sequence for measures space C1Rearrangement;According to regulation measure Sorting space C1Weight New sort successively selects ancillary measure and solves cross section limit, terminates if it can not solve, and is otherwise updated according to aid decision result Load ordered set L to be restored1, regulation measure Sorting space C1In load can restore power and regulation measure control amount;
8) load ordered set L to be restored is counted1Middle recovery load total amount be load currently can recovery capability, regulation measure sequence Space C1It is middle that measure is used to need the mating regulation measure taken, regulation measure Sorting space C for load restoration1In it is all using arranging The maximum regulation time applied is currently can recovery capability be corresponding estimates time-consuming.
2. meter according to claim 1 and the load restoration ability estimation on line method of key sections limit constraint, special Sign is,
Load aggregation L to be restored is generated in step 1)0, specifically includes the following steps:
There is N in power gridLA load to be restored,For i-th of load to be restored, then NLA load to be restored constitutes to be restored negative Lotus set L0:
3. meter according to claim 1 and the load restoration ability estimation on line method of key sections limit constraint, special Sign is,
Step 2) generates online regulation measure space C0, specifically includes the following steps:
There is N in power gridCA controllable measure, j-th of regulation measureCurrent power beMaximum power is Measure available flag is(0 is no, and 1 is), then NCA regulation measure forms online regulation measure space C0:
The regulation measure type of regulation measure includes internal routine or the adjustment of new energy unit output, unit booting, interconnection meter Draw adjustment and DC power modulation.
4. meter according to claim 1 and the load restoration ability estimation on line method of key sections limit constraint, special Sign is,
The step 3) specifically includes the following steps:
3-1) based on basic method of operation F0Under load aggregation L to be restored0In each load to the trend sensitivity meters of each key sections Calculate the restorability index of each load
Wherein,For the restorability index of i-th of load to be restored,For F0The nargin of lower k-th of section, For F0The active power of lower k-th of section,For the stability limitation of k-th of section,For F0Lower i-th to be restored Load to the active po wer sensitivity of k-th of key sections,WithFor F0The perturbation of lower i-th of load to be restored becomes Change amount and k-th of section active power variable quantity, N because caused by perturbing load0,INTFor F0Lower section narginLess than specified Threshold value ε0,INTKey sections number,WithRespectively F0Lower i-th of load to be restored is to the comprehensive of each key sections Active po wer sensitivity and corresponding per unit value are closed,It indicatesIt takes absolute value;
3-2) according to each load priorityFrom small to large to load aggregation L to be restored0It is ranked up, obtains load to be restored Preliminary ordered set L0';Restorability index according to each loadFrom big to small to L0' in load priority is consistent arranges It applies and carries out internal secondary sequence, obtain load ordered set L to be restored1:
Wherein,For load ordered set L to be restored1In i-th of load to be restored,WithRespectively set L1In i-th The restorability index and load priority of a load to be restored, if it is in load aggregation L to be restored0In be ordered as i0, then
5. meter according to claim 1 and the load restoration ability estimation on line method of key sections limit constraint, special Sign is, regulation measure Sorting space C is generated in the step 4)1, specifically includes the following steps:
4-1) based on basic method of operation F0Online regulation measure space C down0In trend sensitivity of each measure to each key sections The performance of control index of each measure is calculated with the measure response time
Wherein,For the performance of control index of j-th of regulation measure,It is crucial disconnected to k-th for j-th of regulation measure The active po wer sensitivity in face,WithRespectively F0The perturbation variable quantity and k-th of section of lower j-th of regulation measure The active power variable quantity because of caused by the perturbation of measure power,For for F0The nargin of lower k-th of section,WithPoint Not Wei j-th of regulation measure to the synthesis active po wer sensitivity and corresponding per unit value of each key sections,WithRespectively The climbing rate of j-th regulation measure and corresponding per unit value,WithThe available delay of respectively j-th regulation measure Time and corresponding per unit value,It indicatesIt takes absolute value,It indicatesIt takes absolute value;
4-2) according to each regulation measure priorityFrom small to large to C0It is ranked up, is regulated sequence for measures space C0'; According to each regulation measure load restoration performance indicatorFrom big to small to C0' middle measure priority consistent measure progress inside Second level sequence, is regulated sequence for measures space C1:
Wherein,For set C1In j-th of regulation measure,WithRespectively C1In Load restoration performance indicator, measure priority, current power, maximum power and the measure available flag of j-th of regulation measure.
6. meter according to claim 1 and the load restoration ability estimation on line method of key sections limit constraint, special Sign is,
The step 5) specifically includes the following steps:
5-1) basic method of operation F0Lower power grid current frequency is f0, rated frequency fr, then generated energy P needed for frequency retrievalf Calculation method are as follows:
Wherein, PLFor basic method of operation F0Lower load is the sum of active, KLFor the active static frequency characteristic coefficient of load of power grid, KS For the Network Loss Rate of power grid,WithRespectively C1In j-th of regulation measure current power, maximum power;
5-2) basic method of operation F0The lower current spare capacity of power grid is Pb,0, spare capacity requirement is Pb,r, by C1Sequence is successively led to It crosses following formula and calculates the spare capacity surplus after j-th of regulation measure usesUntilOr it all calculates and completes:
Wherein,WithRespectively C1The spinning reserve machine group mark of k-th of regulation measure is arranged Apply available flag, maximum power and current power;
If it existsThen enable the available regulation measure number N after considering spinning reserveC,b=j simultaneously all belongs to rotation for subsequent The measure available flag for turning spare unit is set to 0, and modifies the maximum power of j-th of regulation measure;Otherwise N is enabledC,b=NC
Load ordered set L to be restored 5-3) is calculated by formula (5-3-1)-(5-3-3)1In load total amount PL to be restored1,h, C1In Power generation total amount PC can be used1,h, it is contemplated that load total amount PH can be restored1:
PH1=min (PL1,h,(PC1,h-Pf)×(1-KS)) (5-3-3)
Wherein,For load ordered set L to be restored1In i-th of load to be restored active power,WithRespectively C1In j-th of regulation measure measure available flag, current power and maximum power, KSFor the network loss of power grid Rate, PfFor generated energy needed for frequency retrieval;
5-4) press load ordered set L to be restored1What sequence passed sequentially through that formula (5-4-1) calculate i-th load restores powerUntilOr it all calculates and completes:
If it existsSubsequent all loads to be restored then can be restored into powerIt is set to 0:
5-5) press C1Sequence passes sequentially through formula (5-5) and calculates the control amount that j-th of regulation measure matched load is restoredUntilOr it all calculates and completes:
If it existsThen by the control amount of subsequent regulation measureIt is set to 0:
7. meter according to claim 1 and the load restoration ability estimation on line method of key sections limit constraint, special Sign is,
The step 7) specifically includes the following steps:
7-1) based on anticipation mode F after restoring1Under load ordered set L to be restored1In restored load to the tide of each out-of-limit section Flow the aid decision performance indicator of each load of Calculation of SensitivityBased on anticipation mode F after recovery1Lower C1In can use measure To the aid decision performance indicator of each regulation measure of trend Calculation of Sensitivity of each out-of-limit section
Wherein,To envision mode F after recovery1The nargin of lower k-th of section,To envision mode F after recovery1Lower kth The active power of a section,For the stability limitation of k-th of section,For F0Lower i-th of load to be restored is to kth The active po wer sensitivity of a key sections,For F1The perturbation variable quantity of lower i-th of load to be restored and k-th Section active power variable quantity, N because caused by perturbing load1,INTTo envision mode F after recovery1Lower section narginLess than 0 Key sections number,WithRespectively F1Synthesis active po wer sensitivity of lower i-th of the load to be restored to each key sections With corresponding per unit value,It is j-th of regulation measure to the active po wer sensitivity of k-th of key sections,With Mode F is envisioned after respectively restoring1The perturbation variable quantity and k-th of section of lower j-th of regulation measure are due to measure power perturbs Caused active power variable quantity,WithRespectively j-th of regulation measure is active to the synthesis of each key sections sensitive Degree and corresponding per unit value,It indicatesIt takes absolute value,It indicatesIt takes absolute value;
7-2) according to each load priorityFrom big to small to L1It resequences, and according further to the auxiliary of each load Decision performance indicatorFrom big to small to L1The middle consistent measure of load priority carries out internal secondary sequence;According to each tune Control measure priorityFrom big to small to C1It resequences, and according further to the aid decision performance of each regulation measure IndexFrom big to small to C1The middle consistent measure of measure priority carries out internal secondary sequence;
7-3) initialization control step-lengthWith control precision εstep
7-4) enable the control step-length of the m times iterationAccording to L1And C1Ancillary measure picking rule is pressed in sequence Successively selecting ancillary measure makes the control amount to beJudge whether cross section limit can solve based on sensitivity, if out-of-limit solution Then enter 7-5);If it is unresolved but still have measure it is available if enable m=m+1 enter 7-4);Otherwise out-of-limit to eliminate, into 7- 5);
If 7-5) out-of-limit solution, according to cross section limit aid decision measure, update load restores power, regulation measure Control amount;It need not be updated if out-of-limit do not solve;
Wherein,For L1In i-th of load aid decision amount,For C1In j-th of regulation measure aid decision Amount.
8. meter according to claim 7 and the load restoration ability estimation on line method of key sections limit constraint, special Sign is,
Ancillary measure picking rule the following steps are included:
A) by active power after the matched control for sending receiving end control amount and each section of each step-length need of formula (7-4-1) calculating;
Wherein, Pr is that receiving end controls surplus, and Ps is that sending end controls surplus,For active power after the control of k-th of section, KSFor the Network Loss Rate of power grid,For F1The active power of lower k-th of section,For the control step-length of the m times iteration, m ≥0;
B) sending end control considers regulation measure drop power output: pressing C1Positive sequence is successively handled, if measure available flagAndAnd Ps > 0, then:
Wherein, εsFor active po wer sensitivity threshold value,It is j-th of regulation measure to the active po wer sensitivity of k-th of key sections,For the aid decision amount of j-th of regulation measure,WithRespectively j-th regulation measure is worked as The control amount that preceding power, minimum power and matched load are restored, the present embodiment εsTake 0.1;
C) regulation measure increasing power output is paid the utmost attention in receiving end control: by C1Inverted order is successively handled, if measure available flagAndAnd Pr > 0, then:
If d) receiving end regulation measure increases power output insufficient space, consider that receiving end has restored load and reduced amount of recovery: by L1Positive sequence is successively It is handled, ifAndAnd Pr > 0, then:
If e) all sections all meetThen out-of-limit elimination, it is otherwise out-of-limit not eliminate.
9. meter according to claim 1 and the load restoration ability estimation on line method of key sections limit constraint, special Sign is,
Step 8) the load currently can recovery capability be formula (8-1):
Currently can corresponding estimate time-consuming of recovery capability be formula (8-2):
Wherein, PL1,h,realFor L1Reality can restore load total amount i.e. load currently can recovery capability,For L1In i-th Load restores power, T1For currently can recovery capability estimate time-consuming,WithRespectively C1In j-th of regulation measure measure available flag, can with delay time, matched load restore control amount and climbing rate.
10. meter according to claim 1 and the load restoration ability estimation on line method of key sections limit constraint, special Sign is,
Model parameter includes the static parameter of generator, load, exchange line segment, transformer, direct current line segment and capacitive reactance device.
CN201811492000.2A 2018-12-07 2018-12-07 Load recovery capacity online estimation method considering key section quota constraint Active CN109740855B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811492000.2A CN109740855B (en) 2018-12-07 2018-12-07 Load recovery capacity online estimation method considering key section quota constraint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811492000.2A CN109740855B (en) 2018-12-07 2018-12-07 Load recovery capacity online estimation method considering key section quota constraint

Publications (2)

Publication Number Publication Date
CN109740855A true CN109740855A (en) 2019-05-10
CN109740855B CN109740855B (en) 2022-08-23

Family

ID=66358637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811492000.2A Active CN109740855B (en) 2018-12-07 2018-12-07 Load recovery capacity online estimation method considering key section quota constraint

Country Status (1)

Country Link
CN (1) CN109740855B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113381434A (en) * 2021-06-16 2021-09-10 国网冀北电力有限公司检修分公司 Method and device for optimizing operation mode of flexible direct-current power grid

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108808738A (en) * 2018-05-29 2018-11-13 国电南瑞科技股份有限公司 A kind of power grid security Corrective control method considering constraint priority

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108808738A (en) * 2018-05-29 2018-11-13 国电南瑞科技股份有限公司 A kind of power grid security Corrective control method considering constraint priority

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113381434A (en) * 2021-06-16 2021-09-10 国网冀北电力有限公司检修分公司 Method and device for optimizing operation mode of flexible direct-current power grid

Also Published As

Publication number Publication date
CN109740855B (en) 2022-08-23

Similar Documents

Publication Publication Date Title
Das et al. Optimal placement of distributed energy storage systems in distribution networks using artificial bee colony algorithm
Yumbla et al. Optimal power flow subject to security constraints solved with a particle swarm optimizer
Guedes et al. A unit commitment algorithm and a compact MILP model for short-term hydro-power generation scheduling
CN105071385B (en) A kind of grid operation data real-time analyzer
Sreejith et al. Analysis of FACTS devices on security constrained unit commitment problem
CN109301880B (en) Method, device and system for determining minimum startup of direct current near zone
CN102184472A (en) Wind, water and fire united dispatching method based on power grid dispatching side demand
Abbasi et al. A new intelligent method for optimal allocation of D-STATCOM with uncertainty
AlRashidi et al. Particle swarm optimization and its applications in power systems
CN105244912B (en) Active power distribution network isolated island restores electricity and black-start method
CN108493998B (en) Robust power transmission network planning method considering demand response and N-1 expected faults
CN104933505A (en) Decision and evaluation method for intelligent power distribution network group based on fuzzy assessment
Sun et al. Experiences with implementing optimal power flow for reactive scheduling in the Taiwan power system
Balasubbareddya et al. A non-dominated Sorting Hybrid Cuckoo Search Algorithm for multi-objective optimization in the presence of FACTS devices
CN105939017A (en) Engineering practical solution to reactive power optimization considering coupling among period
CN110276487A (en) Reactive Power Ancillary Services mechanism of exchange under virtual plant environment
Shayanfar et al. Optimal PID power system stabilizer tuning via artificial bee colony
CN109740855A (en) Meter and the load restoration ability estimation on line method of key sections limit constraint
CN110649652B (en) New energy sending-out system phase modulator configuration method and device based on risk quantitative evaluation
Liu et al. Start-up sequence of generators in power system restoration avoiding the backtracking algorithm
CN105279297A (en) PSS/E power system equivalent method based on engineering application
CN109936134A (en) A kind of thermostabilization passway for transmitting electricity power limit section recognition methods and equipment
CN109449951A (en) The method and relevant apparatus of reactive power optimization of power system under a kind of electricity market background
CN115459258A (en) Load accurate regulation and control method and system based on distribution automation
CN115603308A (en) Source network coordination planning method and system considering demand response substitution benefit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant