CN109736845A - Disturbance displacement compacting grouting construction method - Google Patents

Disturbance displacement compacting grouting construction method Download PDF

Info

Publication number
CN109736845A
CN109736845A CN201910074829.9A CN201910074829A CN109736845A CN 109736845 A CN109736845 A CN 109736845A CN 201910074829 A CN201910074829 A CN 201910074829A CN 109736845 A CN109736845 A CN 109736845A
Authority
CN
China
Prior art keywords
slip casting
grouting
hole
construction method
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910074829.9A
Other languages
Chinese (zh)
Inventor
彭峰
张继昶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Rui Wei Century Railway Engineering Co Ltd
Original Assignee
Beijing Rui Wei Century Railway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Rui Wei Century Railway Engineering Co Ltd filed Critical Beijing Rui Wei Century Railway Engineering Co Ltd
Priority to CN201910074829.9A priority Critical patent/CN109736845A/en
Publication of CN109736845A publication Critical patent/CN109736845A/en
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of disturbances to replace compacting grouting construction method, comprising: interval calibrates several slip casting hole locations in plum blossom-shaped at the earth's surface to slip casting section;It carries out high-pressure blast in one of slip casting hole location to drill to projected depth to disturb destruction to the stratum original structure of slip casting section and form injected hole, the diameter of injected hole is set as 80~100 millimeters;After successively merogenesis transfers Grouting Pipe to the end of injected hole in injected hole, configured sleeve shell material is injected between Grouting Pipe and injected hole;High-pressure slip-casting is carried out to carry out displacement and compacted consolidation process to Grouting Pipe using slip casting core pipe, during high-pressure slip-casting, grouting pressure is set as 8~10 megapascal;And repeat the above steps, until completing the disturbance displacement compacting grouting process to slip casting section.It is drilled by high-pressure blast, disturbance destroys the original compact texture of thin silt in advance, keeps stratum slightly loose, then high pressure injects fine grained slurries, carries out displacement and compacted consolidation, has achieved the effect that water reinforcement.

Description

Disturbance displacement compacting grouting construction method
Technical field
The present invention relates to Tunnel Engineering technical field more particularly to a kind of notes for water reinforcement rich water thin silt Starch construction method.
Background technique
The aqueous rich water fine sand layer of saturation dynamic is a great problem of tunneling and underground engineering soft rock water rich strata construction, Water burst easily occurs when tunneling is constructed in this stratum and gushes the engineering project disasters such as sand.Slurry injection technique is tunnel and underground work The important householder method of weak surrounding rock and water rich strata is handled in journey construction.But in rich water thin silt, due to original place layer Particle is very thin, and the mechanism of infiltration and filling slip casting cannot be applicable in.
Currently, fracture grouting progress water reinforcement is generallyd use in rich water thin silt, but fracture grouting mechanism Although can occur under superelevation grouting pressure, because fine sand layer is very fine and close, splitting homogenate rapid pulse amount is few, cannot effective shape At intertwining form, water plugging effect is poor.
A kind of rich water thin silt mobilism mortar depositing construction as disclosed in Chinese patent application 201310576180.3 Method, comprising: entire range of grouting is divided by sealing area, water sealing consolidation area according to stratum and groundwater condition from outside to inside And stabilization zone;It detects formation parameter and carries out preparation of construction;Water-stop slurry is configured according to formation parameter, slip casting is carried out to sealing area and is stopped Water;Sealing and strengthening stratum slurries are configured according to formation parameter, ejection for water plugging and strengthening stratum are carried out to water sealing consolidation area;According to Formation parameter configures strengthening stratum slurries, carries out Grouting Consolidation to stabilization zone;Excavation area, which carries out the water pressure test, is waited for tunnel, Infiltration coefficient is examined, and is tested to soil strength, checks slip casting effect;When inspection result is that slip casting effect is good, into Row tunnel excavation, in inspection result be slip casting effect it is bad when, find slip casting weak link, to slip casting weak link specific aim into Row supplement slip casting.But the invention still remains following disadvantage or deficiency: (1), this method fail to disclose how carry out slip casting add Solid process and method;(2), slip casting is directly carried out, slip casting osmotic effect is poor, and water reinforcement effect is not significant.
Therefore it provides a kind of disturbance displacement compacting grouting construction method of water reinforcement for being suitable for rich water thin silt As urgent problem in the industry.
Summary of the invention
The object of the present invention is to provide a kind of disturbances to replace compacting grouting construction method, is drilled by high-pressure blast, in advance Disturbance destroy the original compact texture of thin silt, keep stratum slightly loose, then high pressure inject fine grained slurries, carry out displacement and Compacted consolidation solves the problems, such as that rich water thin silt water plugging effect is poor, enhances the overall stability on stratum.
To achieve the goals above, the present invention provides a kind of disturbance replace compacting grouting construction method, comprising: (1), in Several slip casting hole locations in plum blossom-shaped are calibrated to interval at the earth's surface of slip casting section;(2), in one of slip casting hole location It carries out high-pressure blast to drill to projected depth to disturb destruction to the stratum original structure of slip casting section and form injected hole, injected hole Diameter be set as 80~100 millimeters;(3), it after successively merogenesis transfers Grouting Pipe to the end of injected hole in injected hole, is infusing Configured sleeve shell material is injected between slurry pipe and injected hole;High-pressure slip-casting is carried out to replace to Grouting Pipe using slip casting core pipe With compacted consolidation process, during high-pressure slip-casting, grouting pressure is set as 8~10 megapascal;And (4) repeat step (2) and (3), until completing the disturbance displacement compacting grouting process to slip casting section.
Preferably, in step (1), the distance between two neighboring slip casting hole location is set as 2~3 meters, it is highly preferred that phase The distance between adjacent two slip casting hole locations are set as 1~2 meter, so that original compact texture of thin silt is effectively destroyed, pine Stratum is dissipated, subsequent grouting for water blocking effect is convenient for.
Preferably, in step (2), the pressure of high-pressure blast is set as 2~5 standard atmospheric pressures, it is highly preferred that high-pressure blast Pressure be set as 3~4 standard atmospheric pressures.
Selectively, it in step (2), carries out being placed with several outlet air on the peripheral wall of the air hose drill bit of high-pressure blast drilling Mouthful, the revolving speed of air hose drill bit is set as 10~20 revs/min.
Preferably, air outlet is arranged in the shape of a spiral.
Preferably, the working time of air hose drill bit is set as 3~10 minutes, it is highly preferred that the working time of air hose drill bit It is set as 6 minutes.
Selectively, in step (3), the diameter of Grouting Pipe is 40~60 millimeters, is equidistantly equipped in Grouting Pipe several Group penetrates slurry hole, and every group is penetrated between slurry hole 30~50 centimetres of distance.
Preferably, Grouting Pipe is made of PVC, and the outer wall for the Grouting Pipe for penetrating slurry hole corresponding to every group is arranged with elastic tape.
Preferably, the wall thickness of Grouting Pipe is 5~6 millimeters.
Selectively, in step (3), slip casting process takes segmentation retrusive grouting process, and slip casting is segmented step pitch setting It is 40~60 centimetres.
Selectively, in step (3), sleeve shell material includes water, cement and the clay that weight ratio is 1.5~1.6:1:1.
Preferably, in step (3), during slip casting, injection slurry include weight ratio be 1:1~0.8 cement slurry and Waterglass slurry, wherein the concentration of waterglass slurry is set as 35 Baume degrees.
Selectively, in step (4), the high-pressure blast drilling sequences and grouting sequence of injected hole are from centrally located The slip casting hole location progressive action of slip casting hole location around.
The beneficial effects of the present invention are: (1), pass through high-pressure blast drill, in advance disturbance destroy the original densification of thin silt Structure keeps stratum slightly loose, then high pressure injects fine grained slurries, carries out displacement and compacted consolidation, reaches the effect of water reinforcement Fruit;(2), it is more suitable for rich water thin silt, solves the problems, such as rich water thin silt water reinforcement, enhance stratum Overall stability;(3), the slurries and Extra-fine sand of slip casting form complex morphological, change the attribute of thin silt completely, further Improve grouting consolidation effect.
Detailed description of the invention
Fig. 1 shows the flow chart of disturbance displacement compacting grouting construction method of the invention.
Fig. 2 shows the structural schematic diagrams of air hose drill bit of the invention.
Specific embodiment
Disturbance displacement compacting grouting construction method of the invention is specifically described referring next to attached drawing.
Firstly, as shown in Figure 1, in step sl, if interval is calibrated in plum blossom-shaped at the earth's surface to slip casting section Dry slip casting hole location.When setting slip casting hole location, the distance between two adjacent slip casting hole locations can be set as 2~3 meters, no It only can guarantee that effective disturbance destroys the effect of thin silt, but also the workload of bored grouting can be reduced, reduce construction Cost.
Then, in step s 2, select one of slip casting hole location to carry out high-pressure blast to drill to projected depth, thus real Now disturbance, which is destroyed, obtains effect to the stratum original structure of slip casting section, has been formed simultaneously an injected hole, the diameter of injected hole is set It is set to 80~100 millimeters.
In the non-limiting embodiment, the pressure of high-pressure blast is set as 2~5 standard atmospheric pressures, as shown in Fig. 2, The air hose drill bit 100 for carrying out high-pressure blast drilling includes drill bit (not shown) and the air hose being connected with drill bit, and air hose is adjacent to drill bit One section of peripheral wall on be placed with the high-pressure blasts of several 200,2~5 standard atmospheric pressures of air outlet and arranged from air outlet 200 Out, the revolving speed of air hose drill bit is set as 10~20 revs/min, and the working time is set as 3~10 minutes.
Then, in step s3, after successively merogenesis transfers Grouting Pipe to the end of injected hole in injected hole, in Grouting Pipe Configured sleeve shell material is injected between injected hole;High-pressure slip-casting is carried out to be replaced and be squeezed to Grouting Pipe using slip casting core pipe Close consolidation process, during high-pressure slip-casting, grouting pressure is set as 8~10 megapascal.
As a kind of non-limiting embodiment, the diameter of Grouting Pipe is 40~60 millimeters, is equidistantly equipped in Grouting Pipe Several groups penetrate slurry hole, and every group is penetrated between slurry hole 30~50 centimetres of distance, i.e. are distributed with two groups or three groups in every meter of Grouting Pipe and penetrate slurry Hole.
During slip casting, segmentation retrusive grouting process is taken, slip casting segmentation step pitch is set as 50 centimetres.Sleeve shell material is Weight ratio is water, cement and the clay of 1.5~1.6:1:1, and injection slurry includes the cement slurry and water glass that weight ratio is 1:1~0.8 Glass slurry, wherein the concentration of waterglass slurry is set as 35 Baume degrees.
It is to repeat step S2 and S3, until completing the brill in whole slip castings vacancy in step s 4 after completing above-mentioned steps Hole and slip casting, that is, complete the disturbance displacement compacting grouting process to slip casting section.
As another non-limiting embodiment, in step s 4, the high-pressure blast drilling sequences of injected hole and slip casting are suitable Sequence is the slip casting hole location progressive action from centrally located slip casting hole location around, while also to be bored in a manner of jumping hole Hole and slip casting, so that subsequent water reinforcement effect be effectively ensured.
Although detailed description of the present invention preferred embodiment herein, it is to be understood that the invention is not limited to this In the specific structure being described in detail and show and step, without departing from the spirit and scope of the present invention can be by this field Technical staff realize other modifications and variant.

Claims (10)

1. compacting grouting construction method is replaced in a kind of disturbance, comprising:
(1), interval calibrates several slip casting hole locations in plum blossom-shaped at the earth's surface to slip casting section;
(2), high-pressure blast is carried out in one of those described slip casting hole location to drill to projected depth to disturb described in destruction to slip casting The stratum original structure of section simultaneously forms injected hole, and the diameter of the injected hole is set as 80~100 millimeters;
(3), after successively merogenesis transfers Grouting Pipe to the end of the injected hole in the injected hole, in the Grouting Pipe and institute It states and injects configured sleeve shell material between injected hole;High-pressure slip-casting is carried out to replace to the Grouting Pipe using slip casting core pipe With compacted consolidation process, during the high-pressure slip-casting, grouting pressure is set as 8~10 megapascal;And
(4) step (2) and (3) are repeated, until completing the disturbance displacement compacting grouting process to slip casting section.
2. disturbance displacement compacting grouting construction method as described in claim 1, which is characterized in that in step (1), adjacent two The distance between a described slip casting hole location is set as 2~3 meters.
3. disturbance displacement compacting grouting construction method as claimed in claim 2, which is characterized in that in step (2), high-pressure blast Pressure be set as 2~5 standard atmospheric pressures.
4. disturbance displacement compacting grouting construction method as claimed in claim 2, which is characterized in that in step (2), carry out high It presses and is placed with several air outlets on the peripheral wall of the air hose drill bit in air drill hole, the revolving speed of the air hose drill bit is set as 10~20 Rev/min.
5. disturbance displacement compacting grouting construction method as claimed in claim 4, which is characterized in that the work of the air hose drill bit Time is set as 3~10 minutes.
6. disturbance displacement compacting grouting construction method as claimed in claim 5, which is characterized in that in step (3), the note The diameter for starching pipe is 40~60 millimeters, and several groups are equidistantly equipped in the Grouting Pipe and penetrate slurry hole, every group is penetrated distance between slurry hole 30~50 centimetres.
7. disturbance displacement compacting grouting construction method as claimed in claim 6, which is characterized in that in step (3), the note Slurry process takes segmentation retrusive grouting process, and slip casting segmentation step pitch is set as 40~60 centimetres.
8. disturbance displacement compacting grouting construction method as claimed in claim 7, which is characterized in that in step (3), the set Shell material includes water, cement and the clay that weight ratio is 1.5~1.6:1:1.
9. disturbance displacement compacting grouting construction method as claimed in claim 8, which is characterized in that in step (3), described During slip casting, the injection slurry includes the cement slurry that weight ratio is 1:1~0.8 and waterglass slurry, wherein the waterglass slurry Concentration be set as 35 Baume degrees.
10. disturbance displacement compacting grouting construction method as claimed in claim 9, which is characterized in that described in step (4) The high-pressure blast drilling sequences and grouting sequence of injected hole are progressive from the slip casting hole location of centrally located slip casting hole location around Operation.
CN201910074829.9A 2019-01-25 2019-01-25 Disturbance displacement compacting grouting construction method Pending CN109736845A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910074829.9A CN109736845A (en) 2019-01-25 2019-01-25 Disturbance displacement compacting grouting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910074829.9A CN109736845A (en) 2019-01-25 2019-01-25 Disturbance displacement compacting grouting construction method

Publications (1)

Publication Number Publication Date
CN109736845A true CN109736845A (en) 2019-05-10

Family

ID=66366203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910074829.9A Pending CN109736845A (en) 2019-01-25 2019-01-25 Disturbance displacement compacting grouting construction method

Country Status (1)

Country Link
CN (1) CN109736845A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640120A (en) * 2016-10-31 2017-05-10 彭峰 Ground-surface fixed-point deep hole layered grouting construction method
CN106837352A (en) * 2017-01-22 2017-06-13 中南大学 Fault belt surrounding rock tunnel construction method
WO2017219792A1 (en) * 2016-06-23 2017-12-28 北京建工环境修复股份有限公司 In situ repair system and method for in situ injection - high pressure rotary jet injection in soil and groundwater
CN207598184U (en) * 2017-11-15 2018-07-10 中国水利水电第十六工程局有限公司 Suitable for the air-driven impact formula geological drilling rig of rockfill area drilling
CN108951612A (en) * 2018-07-20 2018-12-07 中铁三局集团有限公司 A kind of subway tunnel shield end reinforcement means
CN109162736A (en) * 2018-10-26 2019-01-08 中国矿业大学 A kind of liquid mixed deep hole circulation Application of High pressure Split Grouting method of air-water mud

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017219792A1 (en) * 2016-06-23 2017-12-28 北京建工环境修复股份有限公司 In situ repair system and method for in situ injection - high pressure rotary jet injection in soil and groundwater
CN106640120A (en) * 2016-10-31 2017-05-10 彭峰 Ground-surface fixed-point deep hole layered grouting construction method
CN106837352A (en) * 2017-01-22 2017-06-13 中南大学 Fault belt surrounding rock tunnel construction method
CN207598184U (en) * 2017-11-15 2018-07-10 中国水利水电第十六工程局有限公司 Suitable for the air-driven impact formula geological drilling rig of rockfill area drilling
CN108951612A (en) * 2018-07-20 2018-12-07 中铁三局集团有限公司 A kind of subway tunnel shield end reinforcement means
CN109162736A (en) * 2018-10-26 2019-01-08 中国矿业大学 A kind of liquid mixed deep hole circulation Application of High pressure Split Grouting method of air-water mud

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
宋宝钟: "岩巷风钻打眼", 31 March 1997, 煤炭工业出版社, pages: 8 - 25 *
张杰: "软土地基高压射水置换灌浆施工技术", 《四川水泥》, no. 10, pages 118 - 119 *
王春华;夏传友;: "高压注浆置换技术在滨海地区桥梁桩基中的应用", 世界桥梁, no. 01, pages 26 - 29 *

Similar Documents

Publication Publication Date Title
AU2020101047A4 (en) Method for filling underground cavity in bedrock by grouting and hydraulic filling device
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN103061785B (en) Grouting process for borehole casing pressure-proof seepage sealing grouting device for drilling roadway breaking water burst surrounding rock
CN103510964B (en) A kind of method when using shield formula TBM to construct to beans gravel rockfill grouting
CN107642360A (en) Tunneling boring front pre-grouting construction method
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN108533271B (en) A kind of two-tube tunnel radial grouting construction method in a hole
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN101498220B (en) Vertical shaft working surface artesian flow sand layer slurry protecting rotary spraying grouting process
CN102296621B (en) Construction method of ground sectional water-stop curtain
CN105484269B (en) Foundation pit enclosure structure seepage prevention and treatment construction method under blasting condition
CN106320354A (en) Anti-seepage construction method for karst cave development stratum under overburden
CN108166535A (en) A kind of construction method of bellows leak stopping
CN107313744A (en) A kind of small guide hole grouting and reinforcing coal bed gas well passes through the construction method in goaf
CN202644538U (en) A grouting device used for a water-rich quicksand stratum
CN105257309A (en) Tool changing construction method for in-chamber grouting of earth pressure balance shield machine in sand bed
CN107642364A (en) Tunneling boring mud jacking shield construction method in rich water rock stratum under sensitivity building
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN107339108A (en) The layer of sand location subway pipe shed construction method of underground water enrichment
CN114233188A (en) Tree-shaped framework supporting method for coal mine tunnel
CN112482415B (en) Consolidation grouting method for underground cavern under high external water pressure and flowing water condition
CN101358529A (en) Short tube and short tube sand consolidation agent strengthening construction process
CN106192987B (en) It is a kind of to be crushed the construction method that geology is reinforced to stake periphery
CN108005662A (en) A kind of processing method of underground water seal cave depot bank area geology crushed zone
CN105507939B (en) A kind of slip casting displaced type drilling solidification sealing and method of the gas without pipe extraction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination