CN109727096A - Materials for capital construction purchasing management method and system suitable for internet - Google Patents
Materials for capital construction purchasing management method and system suitable for internet Download PDFInfo
- Publication number
- CN109727096A CN109727096A CN201811635364.1A CN201811635364A CN109727096A CN 109727096 A CN109727096 A CN 109727096A CN 201811635364 A CN201811635364 A CN 201811635364A CN 109727096 A CN109727096 A CN 109727096A
- Authority
- CN
- China
- Prior art keywords
- materials
- information
- purchase
- goods
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The embodiment of the present invention discloses a kind of materials for capital construction purchasing management method and system suitable for internet, wherein method includes the following steps: the project information for obtaining construction project indicated by procurement contract, and the project information includes the purchase of goods and materials side, material supply side and project planning information of the construction project;The historical purchase information of the purchase of goods and materials side and/or the material supply side is searched in internet database;It is that the materials for capital construction for needing to purchase in the procurement contract carries out goods and materials matching according to the historical purchase information and/or the project planning information, so that goods and materials both sides generates purchase order according to the matched result of goods and materials, the goods and materials matching is matching raw material supply side and/or matching materials for capital construction.Using the present invention, intelligentized goods and materials matching can be realized when materials for capital construction is purchased, so as to reduce the basket purchase cost of goods and materials, guarantees running smooth for construction project.
Description
Technical field
The present invention relates to materials for capital construction area of procurement more particularly to a kind of materials for capital construction purchasing managements suitable for internet
Method and system.
Background technique
In capital construction industry, the clear stipulaties both sides of materials for capital construction, capital construction object in the procurement contract of construction project
Buying side is provided when purchasing materials for capital construction on electric business platform Internet-based, it is only necessary to the material supply specified to procurement contract
Fang Faqi procurement request completes goods and materials transaction.
Above-mentioned purchase behavior depends on procurement contract, does not have the control of the intelligent buying adjustment to grow with each passing hour.In base
When building material supply side and supply problem the problems such as (for example, insufficient or off quality) occur, purchase of goods and materials is increased
The purchase cost of side's adjustment buying materials for capital construction, affects running smooth for construction project.
Summary of the invention
The embodiment of the present invention provides a kind of materials for capital construction purchasing management method and system suitable for internet, can be in base
Realize that intelligentized goods and materials matching guarantees construction project so as to reduce the basket purchase cost of goods and materials when building purchase of goods and materials
Run smooth.
First aspect of the embodiment of the present invention provides a kind of materials for capital construction purchasing management method suitable for internet, can wrap
It includes:
The project information of construction project indicated by procurement contract is obtained, the project information includes the construction project
Purchase of goods and materials side, material supply side and project planning information;
The historical purchase information of the purchase of goods and materials side and/or the material supply side is searched in internet database;
It is the base for needing to purchase in the procurement contract according to the historical purchase information and/or the project planning information
It builds goods and materials and carries out goods and materials matching, so that goods and materials both sides generates purchase order, the goods and materials according to the matched result of goods and materials
With for matching raw material supply side and/or matching materials for capital construction.
Second aspect of the embodiment of the present invention provides a kind of materials for capital construction procurement management system suitable for internet, can wrap
It includes:
Project information acquiring unit, for obtaining the project information of construction project indicated by procurement contract, the project
Information includes the purchase of goods and materials side, material supply side and project planning information of the construction project;
Information searching unit, for searching the purchase of goods and materials side and/or the material supply in internet database
The historical purchase information of side;
Goods and materials matching unit, for being the buying according to the historical purchase information and/or the project planning information
The materials for capital construction for needing to purchase in contract carries out goods and materials matching, so that goods and materials both sides is adopted according to the matched result generation of goods and materials
Order is purchased, the goods and materials matching is matching raw material supply side and/or matching materials for capital construction.
In embodiments of the present invention, believed by searching the historical purchase of materials for capital construction both sides in internet database
Breath is that the materials for capital construction for needing to purchase in procurement contract carries out intelligent according to historical purchase information or project planning information
Match, reduces the basket purchase cost of goods and materials, ensure that running smooth for construction project.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is that a kind of process of materials for capital construction purchasing management method suitable for internet provided in an embodiment of the present invention is shown
It is intended to;
Fig. 2 is the process of another materials for capital construction purchasing management method for being suitable for internet provided in an embodiment of the present invention
Schematic diagram;
Fig. 3 is that a kind of structure of materials for capital construction procurement management system suitable for internet provided in an embodiment of the present invention is shown
It is intended to;
Fig. 4 is the structure of another materials for capital construction procurement management system for being suitable for internet provided in an embodiment of the present invention
Schematic diagram.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Below in conjunction with attached drawing 1 and attached drawing 2, data distribution formula storage method provided in an embodiment of the present invention is carried out detailed
It introduces.
Referring to Figure 1, for the embodiment of the invention provides a kind of materials for capital construction purchasing management methods suitable for internet
Flow diagram.As shown in Figure 1, the embodiment of the present invention the method may include following steps S101- step S103.
S101 obtains the project information of construction project indicated by procurement contract.
Specifically, the project information of construction project indicated by the available procurement contract of procurement management system, Ke Yili
Solution, when carrying out purchase of goods and materials based on internet platform, materials for capital construction buying side or materials for capital construction supplier can be by institutes
The procurement contract of maintenance is uploaded to procurement management system.It is understood that after the completion of construction project bid, the item
Middle target materials for capital construction both sides has been specified in mesh information.It should be noted that further including item in the project information
Mesh planning information, the project planning information can be the project layout of the construction project entirety, for example, may include project
The information such as construction time, all construction sites for being covered of project progress, engineering.
S102 searches the historical purchase of the purchase of goods and materials side and/or the material supply side in internet database
Information.
Specifically, the procurement management system can search the purchase of goods and materials side and/or institute in internet database
State the historical purchase information of material supply side, it is to be understood that the history can be the purchase of goods and materials for procurement information
The relevant information for the materials for capital construction purchased before the material supply side, the capital construction purchased before may include
The type of goods and materials and for the information such as the original supplier of goods and materials.
S103 is to need to adopt in the procurement contract according to the historical purchase information and/or the project planning information
The materials for capital construction of purchase carries out goods and materials matching.
Specifically, the procurement management system can be according to the historical purchase information and/or the project planning information
Materials for capital construction to need to purchase in the procurement contract carries out goods and materials matching.It is understood that the goods and materials matching is
With raw material supply side and/or matching materials for capital construction.
Further, the purchase of goods and materials side or the material supply side can generate buying according to the matched result of goods and materials
Order.The purchase order may include the material information of the materials for capital construction of purchase of goods and materials side's actual purchase.
In an alternative embodiment, the procurement management system can search the corresponding history of the historical purchase information
Materials for capital construction, further, the procurement management system can by the history materials for capital construction with needed in the procurement contract
The consistent history materials for capital construction of the materials for capital construction type of buying and/or the corresponding raw material supply side of history materials for capital construction recommend
The purchase of goods and materials side and/or the material supply side.
In an alternative embodiment, the base indicated by the available project planning information of the procurement management system
The segment information of each construction site of project is built, the segment information includes ground segment information and construction ground of each construction site
The attribute information of the materials for capital construction of Duan Suoxu, for example, railway projects A is related to multiple areas, materials for capital construction required for area 1 is
1 ton of rail, 10 tons of sandstones are suitble to land transportation, such as train transport or Freight Transport according to the landform in area 1;Regional 2 institutes
The materials for capital construction needed is 2 tons of rails, and 8 tons of sandstones are suitble to water transportation, such as ship transportation according to the landform in area 2.
Further, the procurement management system can search and the segment information matching degree in internet database
Highest raw material supply side and/or materials for capital construction, by this with spend highest raw material supply side and/or materials for capital construction recommend it is described
Purchase of goods and materials side and/or the material supply side, it is to be understood that the matching degree highest, which can be, is best suitable for the segmentation
The Ferry Status of construction site described in information or the selection of material requirements.Optionally, the matching degree highest can also be with
The most suitable selection that the address of multi-transportation tool and raw material supply side provides under the premise of considering transportation cost.
In embodiments of the present invention, believed by searching the historical purchase of materials for capital construction both sides in internet database
Breath is that the materials for capital construction for needing to purchase in procurement contract carries out intelligent according to historical purchase information or project planning information
Match, reduces the basket purchase cost of goods and materials, ensure that running smooth for construction project.
Fig. 2 is referred to, for the embodiment of the invention provides another materials for capital construction purchasing management sides for being suitable for internet
The flow diagram of method.As shown in Fig. 2, the embodiment of the present invention the method may include following steps S201- step S209.
S201 obtains the procurement contract of purchase of goods and materials or the maintenance of material supply side.
Specifically, the procurement contract of the available purchase of goods and materials of procurement management system or the maintenance of material supply side, described to adopt
Purchase contract can be the procurement scheme that project implementation side is specified after the completion of construction project calls for bid.
S202 obtains the project information of construction project indicated by procurement contract.
Specifically, the project information of construction project indicated by the available procurement contract of procurement management system, it can
With understanding, when carrying out purchase of goods and materials based on internet platform, materials for capital construction buying side or materials for capital construction supplier can be with
The procurement contract safeguarded is uploaded to procurement management system.It is understood that after the completion of construction project bid, institute
It states and has specified middle target materials for capital construction both sides in project information.It should be noted that also being wrapped in the project information
Project planning information is included, the project planning information can be the project layout of the construction project entirety, for example, may include
The information such as all construction sites that the construction time of project, project progress, engineering are covered.
S203 searches the historical purchase of the purchase of goods and materials side and/or the material supply side in internet database
Information.
Specifically, the procurement management system can search the purchase of goods and materials side and/or institute in internet database
State the historical purchase information of material supply side, it is to be understood that the history can be the purchase of goods and materials for procurement information
The relevant information for the materials for capital construction purchased before the material supply side, the capital construction purchased before may include
The type of goods and materials and for the information such as the original supplier of goods and materials.
S204 searches the corresponding history materials for capital construction of the historical purchase information.
It is understood that the purchase of goods and materials side or the material supply side may participate in the excessively described construction project class
As project purchase transaction, the data information of the materials for capital construction of its historical purchase may be stored in internet database.
Specifically, the procurement management system can search the corresponding history capital construction object of the historical purchase information
Money.
S205 consistent will be gone through in the history materials for capital construction with the materials for capital construction type of buying is needed in the procurement contract
History materials for capital construction and/or the corresponding raw material supply side of history materials for capital construction recommend the purchase of goods and materials side and/or the object
Provide supplier.
It is understood that in the history materials for capital construction there may be with needed in the procurement contract buying capital construction object
The consistent history materials for capital construction of type is provided, for example, needing to purchase cement in the procurement contract, in the history materials for capital construction
There is cement.It should be noted that since the history materials for capital construction is to have purchased in other construction projects and used
Materials for capital construction can be used as the first choice for choosing materials for capital construction again.
Specifically, the procurement management system can by the history materials for capital construction with need to purchase in the procurement contract
The consistent history materials for capital construction of materials for capital construction type and/or the corresponding raw material supply side of history materials for capital construction recommend it is described
Purchase of goods and materials side and/or the material supply side.
S206 obtains the segment information of each construction site of the construction project indicated by the project planning information.
Specifically, the construction project indicated by the available project planning information of procurement management system
The segment information of each construction site, the segment information include needed for the ground segment information and the construction site of each construction site
The attribute information of materials for capital construction, for example, railway projects A is related to multiple areas, materials for capital construction required for area 1 is 1 ton of rail,
10 tons of sandstones are suitble to land transportation, such as train transport or Freight Transport according to the landform in area 1;Base required for area 2
Building goods and materials is 2 tons of rails, and 8 tons of sandstones are suitble to water transportation, such as ship transportation according to the landform in area 2.
S207 is searched and the highest raw material supply side of the segment information matching degree and/or base in internet database
Goods and materials are built, this is recommended into the purchase of goods and materials side and/or the goods and materials with the highest raw material supply side of degree and/or materials for capital construction
Supplier.
Specifically, the procurement management system can be searched with the segment information matching degree most in internet database
This is recommended the object with the highest raw material supply side of degree and/or materials for capital construction by high raw material supply side and/or materials for capital construction
Provide buying side and/or the material supply side, it is to be understood that the matching degree highest, which can be, is best suitable for the segmentation letter
Cease the described Ferry Status of construction site or the selection of material requirements.Optionally, the matching degree highest can also be
The most suitable selection that the address of multi-transportation tool and raw material supply side provides under the premise of consideration transportation cost.
Further, the purchase of goods and materials side or the material supply side can recommend according to the procurement management system
Raw material supply side and/or materials for capital construction carry out purchase of goods and materials, and then generate purchase order.The purchase order may include described
The material information of the materials for capital construction of purchase of goods and materials side's actual purchase.
S208 obtains the purchase order.
S209 carries out order processing to the purchase order.
Specifically, the procurement management system can carry out order processing to the purchase order, it is to be understood that institute
Stating order processing includes at least one of purchasing storage, carrying out buying clearing, generate purchase bill and generate payment information.
In embodiments of the present invention, believed by searching the historical purchase of materials for capital construction both sides in internet database
Breath is that the materials for capital construction for needing to purchase in procurement contract carries out intelligent according to historical purchase information or project planning information
Match, reduces the basket purchase cost of goods and materials, ensure that running smooth for construction project.
Below in conjunction with attached drawing 3 and attached drawing 4, the materials for capital construction provided in an embodiment of the present invention suitable for internet is purchased
Management system describes in detail.It should be noted that attached drawing 3 and attached procurement management system shown in Fig. 4, for executing this hair
The method of bright Fig. 1 and embodiment illustrated in fig. 2, for ease of description, only parts related to embodiments of the present invention are shown, specifically
What technical detail did not disclosed, please refer to Fig. 1 of the present invention and embodiment shown in Fig. 2.
Fig. 3 is referred to, for the embodiment of the invention provides a kind of materials for capital construction procurement management systems suitable for internet
Structural schematic diagram.As shown in figure 3, the procurement management system 100 of the embodiment of the present invention may include: that project information obtains
Unit 101, information searching unit 102 and goods and materials matching unit 103.
Project information acquiring unit 101, for obtaining the project information of construction project indicated by procurement contract.
In the specific implementation, the project of construction project indicated by the available procurement contract of project information acquiring unit 101
Information, it is to be understood that when carrying out purchase of goods and materials based on internet platform, materials for capital construction buying side or materials for capital construction supply
The procurement contract safeguarded can be uploaded to procurement management system 100 by side.It is understood that calling for bid in the construction project
After the completion, middle target materials for capital construction both sides has been specified in the project information.It should be noted that the project letter
It further include project planning information in breath, the project planning information can be the project layout of the construction project entirety, for example,
It may include the information such as all construction sites that construction time of project, project progress, engineering are covered.
Information searching unit 102 is supplied for searching the purchase of goods and materials side and/or the goods and materials in internet database
The historical purchase information for the side of answering.
In the specific implementation, information searching unit 102 can be searched in internet database the purchase of goods and materials side and/or
The historical purchase information of the material supply side, it is to be understood that the history can be the goods and materials for procurement information and adopt
The relevant information for the materials for capital construction purchased before purchaser and/or the material supply side, the base purchased before may include
Build goods and materials type and for the information such as the original supplier of goods and materials.
Goods and materials matching unit 103, for being described adopt according to the historical purchase information and/or the project planning information
The materials for capital construction for needing to purchase in purchase contract carries out goods and materials matching.
In the specific implementation, goods and materials matching unit 103 can be believed according to the historical purchase information and/or the project planning
Breath is that the materials for capital construction for needing to purchase in the procurement contract carries out goods and materials matching.It is understood that the goods and materials matching is
Match raw material supply side and/or matching materials for capital construction.
Further, the purchase of goods and materials side or the material supply side can generate buying according to the matched result of goods and materials
Order.The purchase order may include the material information of the materials for capital construction of purchase of goods and materials side's actual purchase.
In an alternative embodiment, it is corresponding described can to search the historical purchase information for the procurement management system 100
History materials for capital construction, further, the procurement management system 100 can will close in the history materials for capital construction with the buying
With the consistent history materials for capital construction of the middle materials for capital construction type that need to be purchased and/or the corresponding raw material supply side of history materials for capital construction
Recommend the purchase of goods and materials side and/or the material supply side.
In an alternative embodiment, institute indicated by the available project planning information of the procurement management system 100
State the segment information of each construction site of construction project, the segment information include each construction site ground segment information and this apply
The attribute information of materials for capital construction needed for the section of building site, for example, railway projects A is related to multiple areas, capital construction object required for area 1
Money is 1 ton of rail, and 10 tons of sandstones are suitble to land transportation, such as train transport or Freight Transport according to the landform in area 1;Ground
Materials for capital construction required for area 2 is 2 tons of rails, and 8 tons of sandstones are suitble to water transportation, such as wheel shipping according to the landform in area 2
It is defeated.
Further, the procurement management system 100 can search and the segment information in internet database
With highest raw material supply side and/or materials for capital construction is spent, this is recommended with the highest raw material supply side of degree and/or materials for capital construction
The purchase of goods and materials side and/or the material supply side, it is to be understood that the matching degree highest can be best suitable for it is described
The Ferry Status of construction site described in segment information or the selection of material requirements.Optionally, the matching degree highest
It can the address of multi-transportation tool and raw material supply side provides under the premise of considering transportation cost most suitable selection.
In embodiments of the present invention, believed by searching the historical purchase of materials for capital construction both sides in internet database
Breath is that the materials for capital construction for needing to purchase in procurement contract carries out intelligent according to historical purchase information or project planning information
Match, reduces the basket purchase cost of goods and materials, ensure that running smooth for construction project.
Fig. 4 is referred to, for the embodiment of the invention provides another materials for capital construction purchasing management systems for being suitable for internet
The structural schematic diagram of system.As shown in figure 4, the procurement management system 200 of the embodiment of the present invention may include: that project information obtains
Take unit 201, information searching unit 202, contract acquiring unit 203, goods and materials searching unit 204, first information recommendation unit
205, segment information acquiring unit 206, the second information recommendation unit 207, order acquiring unit 208 and order processing unit 209.
Contract acquiring unit 203, for obtaining the procurement contract of purchase of goods and materials or the maintenance of material supply side.
In the specific implementation, the procurement contract of the available purchase of goods and materials of contract acquiring unit 203 or the maintenance of material supply side,
The procurement contract can be the procurement scheme that project implementation side is specified after the completion of construction project calls for bid.
Project information acquiring unit 201, for obtaining the project information of construction project indicated by procurement contract.
In the specific implementation, the project of construction project indicated by the available procurement contract of project information acquiring unit 201
Information, it is to be understood that when carrying out purchase of goods and materials based on internet platform, materials for capital construction buying side or materials for capital construction supply
The procurement contract safeguarded can be uploaded to procurement management system 200 by side.It is understood that calling for bid in the construction project
After the completion, middle target materials for capital construction both sides has been specified in the project information.It should be noted that the project letter
It further include project planning information in breath, the project planning information can be the project layout of the construction project entirety, for example,
It may include the information such as all construction sites that construction time of project, project progress, engineering are covered.
Information searching unit 202 is supplied for searching the purchase of goods and materials side and/or the goods and materials in internet database
The historical purchase information for the side of answering.
In the specific implementation, information searching unit 202 can be searched in internet database the purchase of goods and materials side and/or
The historical purchase information of the material supply side, it is to be understood that the history can be the goods and materials for procurement information and adopt
The relevant information for the materials for capital construction purchased before purchaser and/or the material supply side, the base purchased before may include
Build goods and materials type and for the information such as the original supplier of goods and materials.
Goods and materials searching unit 204, for searching the corresponding history materials for capital construction of the historical purchase information.
It is understood that the purchase of goods and materials side or the material supply side may participate in the excessively described construction project class
As project purchase transaction, the data information of the materials for capital construction of its historical purchase may be stored in internet database.
In the specific implementation, goods and materials searching unit 204 can search the corresponding history capital construction of the historical purchase information
Goods and materials.
First information recommendation unit 205, for by the history materials for capital construction with needed in the procurement contract buying
The consistent history materials for capital construction of materials for capital construction type and/or the corresponding raw material supply side of history materials for capital construction recommend the object
Provide buying side and/or the material supply side.
It is understood that in the history materials for capital construction there may be with needed in the procurement contract buying capital construction object
The consistent history materials for capital construction of type is provided, for example, needing to purchase cement in the procurement contract, in the history materials for capital construction
There is cement.It should be noted that since the history materials for capital construction is to have purchased in other construction projects and used
Materials for capital construction can be used as the first choice for choosing materials for capital construction again.
In the specific implementation, first information recommendation unit 205 can by the history materials for capital construction with the procurement contract
The middle consistent history materials for capital construction of materials for capital construction type that need to be purchased and/or the corresponding raw material supply side of history materials for capital construction push away
It recommends to the purchase of goods and materials side and/or the material supply side.
Segment information acquiring unit 206, for obtaining each of the construction project indicated by the project planning information
The segment information of construction site.
In the specific implementation, the base indicated by the available project planning information of segment information acquiring unit 206
The segment information of each construction site of project is built, the segment information includes ground segment information and construction ground of each construction site
The attribute information of the materials for capital construction of Duan Suoxu, for example, railway projects A is related to multiple areas, materials for capital construction required for area 1 is
1 ton of rail, 10 tons of sandstones are suitble to land transportation, such as train transport or Freight Transport according to the landform in area 1;Regional 2 institutes
The materials for capital construction needed is 2 tons of rails, and 8 tons of sandstones are suitble to water transportation, such as ship transportation according to the landform in area 2.
Second information recommendation unit 207, for being searched and the segment information matching degree highest in internet database
Raw material supply side and/or materials for capital construction, by this with spending highest raw material supply side and/or materials for capital construction recommends the goods and materials
The side of buying and/or the material supply side.
In the specific implementation, the second information recommendation unit 207 can be searched and the segment information in internet database
The highest raw material supply side of matching degree and/or materials for capital construction recommend this with the highest raw material supply side of degree and/or materials for capital construction
To the purchase of goods and materials side and/or the material supply side, it is to be understood that the matching degree highest, which can be, is best suitable for institute
State the Ferry Status of construction site described in segment information or the selection of material requirements.Optionally, the matching degree highest
It can also the address of multi-transportation tool and raw material supply side provides under the premise of considering transportation cost most suitable selection.
Further, the purchase of goods and materials side or the material supply side can be pushed away according to the procurement management system 200
The raw material supply side recommended and/or materials for capital construction carry out purchase of goods and materials, and then generate purchase order.The purchase order may include
The material information of the materials for capital construction of purchase of goods and materials side's actual purchase.
Order acquiring unit 208, for obtaining the purchase order.
Order processing unit 209, for carrying out order processing to the purchase order.
In the specific implementation, order processing unit 209 can carry out order processing to the purchase order, it is possible to understand that
It is that the order processing includes purchasing at least one for being put in storage, carry out buying clearing, generate purchase bill and generating in payment information
It is a.
In embodiments of the present invention, believed by searching the historical purchase of materials for capital construction both sides in internet database
Breath is that the materials for capital construction for needing to purchase in procurement contract carries out intelligent according to historical purchase information or project planning information
Match, reduces the basket purchase cost of goods and materials, ensure that running smooth for construction project.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with
Relevant hardware is instructed to complete by computer program, the program can be stored in a computer-readable storage medium
In, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, the storage medium can be magnetic
Dish, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random Access
Memory, RAM) etc..
The above disclosure is only the preferred embodiments of the present invention, cannot limit the right model of the present invention with this certainly
It encloses, therefore equivalent changes made in accordance with the claims of the present invention, is still within the scope of the present invention.
Claims (10)
1. a kind of materials for capital construction purchasing management method suitable for internet characterized by comprising
The project information of construction project indicated by procurement contract is obtained, the project information includes the goods and materials of the construction project
Buying side, material supply side and project planning information;
The historical purchase information of the purchase of goods and materials side and/or the material supply side is searched in internet database;
It is the capital construction object for needing to purchase in the procurement contract according to the historical purchase information and/or the project planning information
Money carries out goods and materials matching, and so that goods and materials both sides generates purchase order according to the matched result of goods and materials, the goods and materials matching is
Match raw material supply side and/or matching materials for capital construction.
2. the method according to claim 1, wherein in the project for obtaining construction project indicated by procurement contract
Before information, the method also includes:
Obtain the procurement contract of purchase of goods and materials or the maintenance of material supply side.
3. according to the method described in claim 2, it is characterized in that, which comprises
Search the corresponding history materials for capital construction of the historical purchase information;
By in the history materials for capital construction with needed in the procurement contract buying the consistent history capital construction object of materials for capital construction type
Money and/or the corresponding raw material supply side of history materials for capital construction recommend the purchase of goods and materials side and/or the material supply side.
4. according to the method described in claim 2, it is characterized in that, which comprises
Obtain the segment information of each construction site of the construction project indicated by the project planning information, the segmentation letter
Breath includes the attribute information of materials for capital construction needed for the ground segment information and the construction site of each construction site;
Lookup and the highest raw material supply side of the segment information matching degree and/or materials for capital construction in internet database, will
The purchase of goods and materials side and/or the material supply side should be recommended with the highest raw material supply side of degree and/or materials for capital construction.
5. the method according to claim 1, wherein according to the historical purchase information and/or the project
After planning information carries out goods and materials matching for the materials for capital construction for needing to purchase in purchase order, the method also includes:
Obtain the purchase order;
Order processing is carried out to the purchase order, the order processing includes buying storage, carries out buying clearing, generates buying
At least one of invoice and generation payment information.
6. a kind of materials for capital construction procurement management system suitable for internet characterized by comprising
Project information acquiring unit, for obtaining the project information of construction project indicated by procurement contract, the project information
Purchase of goods and materials side, material supply side and project planning information including the construction project;
Information searching unit, for searching the purchase of goods and materials side and/or the material supply side in internet database
Historical purchase information;
Goods and materials matching unit, for being the procurement contract according to the historical purchase information and/or the project planning information
The middle materials for capital construction for needing to purchase carries out goods and materials matching, orders so that goods and materials both sides generates buying according to the matched result of goods and materials
Single, the goods and materials matching is matching raw material supply side and/or matching materials for capital construction.
7. system according to claim 6, which is characterized in that the system also includes:
Contract acquiring unit, for obtaining the procurement contract of purchase of goods and materials or the maintenance of material supply side.
8. system according to claim 7, which is characterized in that the system also includes:
Goods and materials searching unit, for searching the corresponding history materials for capital construction of the historical purchase information;
First information recommendation unit, for by the history materials for capital construction with needed in the procurement contract buying materials for capital construction
The consistent history materials for capital construction of type and/or the corresponding raw material supply side of history materials for capital construction recommend the purchase of goods and materials side
The material supply side and/or.
9. system according to claim 7, which is characterized in that the system also includes:
Segment information acquiring unit, for obtaining each construction site of the construction project indicated by the project planning information
Segment information, the segment information includes materials for capital construction needed for the ground segment information and the construction site of each construction site
Attribute information;
Second information recommendation unit is supplied for searching in internet database with the highest raw material of the segment information matching degree
This is recommended the purchase of goods and materials side with the highest raw material supply side of degree and/or materials for capital construction by Ying Fang and/or materials for capital construction
The material supply side and/or.
10. system according to claim 6, which is characterized in that the system also includes:
Order acquiring unit, for obtaining the purchase order;
Order processing unit, for carrying out order processing to the purchase order, the order processing includes buying storage, carries out
Buying clearing generate at least one of purchase bill and generation payment information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811635364.1A CN109727096A (en) | 2018-12-29 | 2018-12-29 | Materials for capital construction purchasing management method and system suitable for internet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811635364.1A CN109727096A (en) | 2018-12-29 | 2018-12-29 | Materials for capital construction purchasing management method and system suitable for internet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109727096A true CN109727096A (en) | 2019-05-07 |
Family
ID=66297534
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811635364.1A Pending CN109727096A (en) | 2018-12-29 | 2018-12-29 | Materials for capital construction purchasing management method and system suitable for internet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109727096A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110765780A (en) * | 2019-11-15 | 2020-02-07 | 国网电力科学研究院武汉南瑞有限责任公司 | Purchasing demand evaluation system and method based on semantic recognition |
CN111080409A (en) * | 2019-12-09 | 2020-04-28 | 政采云有限公司 | Computer device, method, equipment and medium for pushing information |
CN114418711A (en) * | 2021-12-24 | 2022-04-29 | 珠海大横琴科技发展有限公司 | Method and device for automatically executing creation task |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050010491A1 (en) * | 2003-07-11 | 2005-01-13 | Luo Sheng Chi | Consolidated procurement management system and method |
CN105160463A (en) * | 2015-08-19 | 2015-12-16 | 武汉海王新能源工程技术有限公司 | Enterprise management system on basis of project management |
CN109034574A (en) * | 2018-07-12 | 2018-12-18 | 国网山东省电力公司枣庄供电公司 | material supply platform and system |
CN109086920A (en) * | 2018-07-19 | 2018-12-25 | 中国神华能源股份有限公司 | Purchase of goods and materials prediction technique, device and material purchase management system |
-
2018
- 2018-12-29 CN CN201811635364.1A patent/CN109727096A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050010491A1 (en) * | 2003-07-11 | 2005-01-13 | Luo Sheng Chi | Consolidated procurement management system and method |
CN105160463A (en) * | 2015-08-19 | 2015-12-16 | 武汉海王新能源工程技术有限公司 | Enterprise management system on basis of project management |
CN109034574A (en) * | 2018-07-12 | 2018-12-18 | 国网山东省电力公司枣庄供电公司 | material supply platform and system |
CN109086920A (en) * | 2018-07-19 | 2018-12-25 | 中国神华能源股份有限公司 | Purchase of goods and materials prediction technique, device and material purchase management system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110765780A (en) * | 2019-11-15 | 2020-02-07 | 国网电力科学研究院武汉南瑞有限责任公司 | Purchasing demand evaluation system and method based on semantic recognition |
CN111080409A (en) * | 2019-12-09 | 2020-04-28 | 政采云有限公司 | Computer device, method, equipment and medium for pushing information |
CN114418711A (en) * | 2021-12-24 | 2022-04-29 | 珠海大横琴科技发展有限公司 | Method and device for automatically executing creation task |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sarkar et al. | A sustainable flexible manufacturing–remanufacturing model with improved service and green investment under variable demand | |
Huang et al. | Impact of secondary market on consumer return policies and supply chain coordination | |
Seifert | Collaborative planning, forecasting, and replenishment: How to create a supply chain advantage | |
Krumwiede et al. | A model for reverse logistics entry by third-party providers | |
Bruun et al. | Lean production and the Internet | |
Ng et al. | Port-focal logistics and global supply chains | |
Becker | The Dynamics of Business-Government Relations: Industry and Exports, 1893-1921 | |
Mandják et al. | The DUC model and the stages of the project marketing process | |
Lee et al. | Contracting for vendor-managed inventory with consignment stock and stockout-cost sharing | |
CN107851024A (en) | Parallel processing for solution space segmentation | |
CN109727096A (en) | Materials for capital construction purchasing management method and system suitable for internet | |
Jonas | A collaborative strategy for deteriorating inventory system with imperfect items and supplier credits | |
Özceylan | Simultaneous optimization of closed-and open-loop supply chain networks with common components | |
Zammori et al. | A standard agreement for vendor managed inventory | |
Shi et al. | Delivery efficiency and supplier performance evaluation in China’s E-retailing industry | |
Bardakçi | Benefits of digitalization in international logistics sector | |
Lin et al. | Key success factors of international market development: An empirical study of the Taiwan bulk shipping industry | |
Govindasamy et al. | Enhanced inventory management using blockchain technology under cloud sector enabled by hybrid multi-verse with whale optimization algorithm | |
Agrawal | Textbook of Logistics and Supply Chain Management | |
Roy et al. | Optimizing profit in a controlled environment: Assessing the synergy between preservation technology and cap-and-trade policy | |
Millington et al. | Local assembly units in the motor components industry: a case study of exhaust manufacture | |
Udayakumar et al. | Supply chain coordination with controllable lead time under imperfect production process | |
Haddad | FMCG Distribution Challenges & Workable Solutions | |
Jauhari | Lot size decisions for vendor-buyer system with quantity discount, partial backorder, and stochastic demand | |
Stratton | Variation and uncertainty buffering: a grocery supply case |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190507 |