CN109719323A - A kind of High-efficiency mesh drilling new method - Google Patents

A kind of High-efficiency mesh drilling new method Download PDF

Info

Publication number
CN109719323A
CN109719323A CN201910171999.9A CN201910171999A CN109719323A CN 109719323 A CN109719323 A CN 109719323A CN 201910171999 A CN201910171999 A CN 201910171999A CN 109719323 A CN109719323 A CN 109719323A
Authority
CN
China
Prior art keywords
hole
depth
drilling
cut
bores
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910171999.9A
Other languages
Chinese (zh)
Inventor
甄恒洲
王珍
王元刚
王建维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University
Original Assignee
Dalian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University filed Critical Dalian University
Priority to CN201910171999.9A priority Critical patent/CN109719323A/en
Publication of CN109719323A publication Critical patent/CN109719323A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a kind of High-efficiency mesh drilling new method, workpiece to be added is cylindrical shape, and specific steps include: each round on S1. drill bit alignment cylindrical workpieces;S2. it bores location hole: drilling out the hole of certain depth on unprocessed cylindrical workpieces surface with drill bit;S3. it bores main aperture: according to processing request, selecting the drill bit for meeting aperture, hole depth needed for each position of positioning hole is processed on cylindrical workpieces;It is every to bore certain depth of cut, it needs to exit drill bit so as to chip removal, and so on, completes the drilling in a hole;S4. it bores vent: with the drill bit thicker than boring main aperture, boring the vent of certain depth at cylindrical workpieces both ends.When the application is for continuously needing to process the workpiece in thousands of a holes for several days, once shutdown either accident power-off occurs, as long as turning back on, directly operation processing then can continue to process since the hole that last time processes.

Description

A kind of High-efficiency mesh drilling new method
Technical field
The present invention relates to a kind of High-efficiency mesh drilling new methods, are applied to automobile, mold, printing machinery, package packing machine, food In the machinings in equipment manufacturings field such as product machinery, aerospace.
Background technique
In machining, when the hole that drill diameter is smaller, depth is very big, especially when drilling on steel part, usually deposit In following main problem: chip removal difficulty, cutter cooling difficulty, drilling axis are easily crooked.These problems can be properly settled, Be related to quality and productivity, the machining accuracy and Thermal Distortion of Cutting Tool etc. of deep hole machining, in some instances it may even be possible to make processing can not normally into Row.For example, when boring deep mesh, it such as cannot be in time by chip discharge, then chip is possible to be blocked in flute of drill, this is not It only will affect machining accuracy, drill bit will be made to lose when serious.
Since the hole number for needing to bore on workpiece is especially more, bit wear probably occurs in process and then needs Perhaps the stopping processing that may come off duty, the unusual conditions such as power failure more likely occur during processing for more bit change.Therefore, it also needs To remember the hole location currently processed at any time in drilling process, after after bit change-over or power interruption recovering power supply after, or After turning back on, it still is able to continue drilling processing since the last processing hole location.
Summary of the invention
The application provides a kind of High-efficiency mesh drilling new method, more to a hole in process since hole is deep It is secondary to pierce extraction back and forth to meet chip removal needs;When for continuously needing to process within several days the workpiece in thousands of a holes, once hair The raw either accident power-off that shuts down, as long as turning back on, directly operation processing can then continue to add since the hole that last time processes Work.
To achieve the above object, the technical solution of the application are as follows: a kind of High-efficiency mesh drilling new method, workpiece to be added are Cylindrical shape specifically includes:
S1. each round on drill bit alignment cylindrical workpieces;
S2. bore location hole: drilling out depth on unprocessed cylindrical workpieces surface with thinner drill bit is 2mm's or so Hole;
S3. it bores main aperture: according to processing request, selecting the drill bit for meeting aperture, each position of positioning hole adds on cylindrical workpieces Hole depth needed for work;It is every to bore certain depth of cut, it needs to exit drill bit so as to chip removal, and so on, completes the drilling in a hole;
S4. it bores vent: with the drill bit slightly thicker than boring main aperture, boring the vent of certain depth at cylindrical workpieces both ends.
Further, the step S1 drill bit in the application moves along the x-axis direction, and cylindrical workpieces are around center axis rotation, drill bit It is directed at any hole that same row is on cylindrical workpieces;Drill bit is moved along the z-axis, and is drilled to workpiece, or exits drill bit.
Further, when boring main aperture, to the same main aperture by m times back and forth into the mistake for boring and moving back brill realization drilling and chip removal Journey, specifically: the 1st bores, the 2nd is drilled into m brill, and the described 1st bores, the 2nd hole depth for being drilled into m brill gradually reduces.
Further, the 1st brill limits the depth of cut as H1;2nd bores and limits the depth of cut and limit the depth of cut as H3 as H2, the 3rd brill, 4th, which is drilled into m brill, limits the depth of cut and is then set as identical value as H4;Then, according to the actual depth P to be drilled, the hole is designed Into bore number u and it is each bore practical depth of cut K1, K2 ..., Ku;The actual depth P that is drilled and the hole into boring number u, with And the 1st bore practical depth of cut K1, the 2nd bore practical depth of cut K2 ..., the practical depth of cut Ku of u brill have following relationship:
(1) if P≤H1,
Actually into brill number u=1;
1st bores practical depth of cut K1=P;
(2) if H1 < P≤H1+H2,
Actually into brill number u=2;
1st bores practical depth of cut K1=H1;
2nd bores practical depth of cut K2=P-H1;
(3) if H1+H2 < P≤H1+H2+H3,
Actually into brill number u=3;
1st bores practical depth of cut K1=H1;
2nd bores practical depth of cut K2=H2;
3rd bores practical depth of cut K3=P-H1-H2;Ki=0, i >=4;
(4) if H1+H2+H3 < P,
Actually into brill number u=3+ [{ P- (H1+H2+H3) }/H4]+1;[] indicates to be rounded by lower bound in formula;
1st bores practical depth of cut D1=S1;
2nd bores practical depth of cut D2=S2;
3rd bores practical depth of cut D3=S3;
4th, which is drilled into u-1, bores practical depth of cut Ki=H4,4≤i < u;
U bores practical depth of cut Ku=P-H1-H2-H3- (u-4) H4.
Further, when boring vent, the depth of the 1st row's vent of cylindrical workpieces both ends is F1, cylindrical workpieces both ends the 2nd The depth F2 of vent is arranged, the depth of the 3rd row's vent of cylindrical workpieces both ends is F3, and cylindrical workpieces both ends 4 arrange the beginning without decompression Hole;F1 < F2 < F3.
Further, the algorithm steps run in the machine when boring location hole are as follows:
(1) user presses loop start button;
(2) x-axis, central axis C axis and z-axis are moved, drill bit to starting is enabled to queue beginning hole surface position;
(3) prompt user adjusts drilling attachment and accurately adjusts bit location so that user is after installing green bit;
(4) user presses loop start button, and drill bit starts to rotate;
(5) user confirms that drill speed reaches setting value, presses loop start button, starts to process;
(6) number of rows is terminated if originating number of rows and being less than, or starting number of rows is equal to termination number of rows and starting hole count is less than or equal to Hole count is terminated, then continues step 7;Otherwise, turn step 12;
(7) drill bit is along z-axis drilling to depth of positioning hole;
(8) drill bit retreats to workpiece surface along z-axis;
(9) starter hole parameter adds 1;
(10) if starter hole parameter is greater than total hole count, starter hole parameter sets 1, and starting row's parameter adds 1;
(11) drilling parameter is deposited;Turn step 6;
(12) audible and visual alarm is prompted;
(13) processing program is exited.
Further, the algorithm steps run in the machine when boring main aperture are as follows:
(1) user presses loop start button;
(2) x-axis, central axis C axis and z-axis are moved, drill bit to starting is enabled to queue beginning hole surface position;
(3) prompt user adjusts drilling attachment and accurately adjusts bit location so that user is after installing green bit;
(4) user presses loop start button, and drill bit starts to rotate;
(5) user confirms that drill speed reaches setting value, presses loop start button, starts to process;
(6) number of rows is terminated if originating number of rows and being less than, or starting number of rows is equal to termination number of rows and starting hole count is less than or equal to Hole count is terminated, then continues step 7;Otherwise, turn step 14;
(7) according to when front-seat parameter and hole parameter and whether reaming, determine current hole initial position z coordinate and Drilling depth;
(8) according to Present Borehole depth and the restriction depth of cut, determine that current hole drilling number u and the 1st is drilled into u and bores reality Depth of cut K1~Ku;
(9) according to current hole initial position z coordinate, reciprocal drilling number u and drilling depth K1~Ku each time, back and forth U times, complete the drilling to the hole;
(10) drill bit retreats to workpiece surface along z-axis;
(11) starter hole parameter adds 1;
(12) if starter hole parameter is greater than total hole count, starter hole parameter sets 1, and starting row's parameter adds 1;
(13) drilling parameter is deposited;Turn step 6;
(14) audible and visual alarm is prompted;
(15) processing program is exited.
Due to using the technology described above, can obtain following technical effect: the application is for needing the company of boring by the present invention When continuing the workpiece in several days thousands of a holes of processing, if shutdown either accident power-off once occurs, it is only necessary to it turns back on, Directly run processing program, so that it may continue to process since the hole that last time processes.After being bored for a part of hole leakage after the breaking of rod, need The case where mending brill equally also need to only rewrite starting round number parameter and terminate parameters of rows of holes, can be to this partial hole Carry out benefit brill.In practical applications, user only needs to modify drilling parameter, and drilling processing can be realized.
Detailed description of the invention
Fig. 1 is wellbore part and cylindrical workpieces schematic diagram;
Fig. 2 is the schematic diagram that drill bit back and forth carries out drilling and chip removal during boring main aperture;
Fig. 3 is to bore vent schematic diagram.
Specific embodiment
The present invention is described in further detail in the following with reference to the drawings and specific embodiments: doing as example to the application Further description explanation.
Embodiment 1
As shown in Figure 1-3, workpiece to be added is cylindrical shape, specifically the present embodiment provides a kind of High-efficiency mesh drilling new method Step includes:
S1. drill bit moves along the x-axis direction, and workpiece is rotated around central axis C axis, and drill bit can be to be in same row in alignment pieces Any hole;Drill bit is moved along the z-axis, and can be drilled to workpiece, or exit drill bit.
S2. bore location hole: boring location hole is to be bored with thinner drill bit in the position that unprocessed workpiece surface needs to drill The purpose of hole of depth about 2mm or so out, location hole is that the main drill bit of guidance enters bore position.
S3. it bores main aperture: referring to according to processing request, select the drill bit for meeting aperture requirement, each location hole on cylindrical workpieces The hole depth bored required for position.When boring main aperture, often due to drilling depth is deeper, it is every to bore certain depth of cut, it needs to exit drill bit So as to chip removal, and so on many times, the drilling in a hole could be completed.To the same hole by m times back and forth into boring and move back brill Realize drilling and chip removal process description be the 1st bore, the 2nd bore ..., m bore.Since the 1st brill drilling depth is apart from workpiece surface Closer, chip removal is easier when moving back brill, and subsequent and m bores drilling depth and becomes larger with a distance from workpiece surface, So the 1st bore, the 2nd bore ..., m bore drilling depth gradually reduce.
Provide that the maximum allowable depth of cut of the 1st brill is H1;Similarly define the 2nd bore limits the depth of cut as H2, the 3rd brill limit into Knife amount is H3, and it is H4 that the 4th restriction depth of cut for being drilled into m brill, which is then set as identical value,.Then, according to the practical depth to be drilled Spend P, the Automated Design hole into bore number u and each brill practical depth of cut K1, K2 ..., Ku.The actual depth P to be drilled With the hole into bore number u and the 1st bore practical depth of cut K1 ..., the practical depth of cut Ku of u brill have following relationship:
(1) practical into brill number u=1 if P≤H1;1st bores practical depth of cut K1=P.
(2) practical into brill number u=2 if H1 < P≤H1+H2;1st bores practical depth of cut K1=H1;2nd bores reality Depth of cut K2=P-H1.
(3) practical into brill number u=3 if H1+H2 < P≤H1+H2+H3;1st bores practical depth of cut K1=H1;2nd Bore practical depth of cut K2=H2;3rd bores practical depth of cut K3=P-H1-H2;Ki=0, i >=4.
(4) practical into brill number if H1+H2+H3 < P;U=3+ [{ P- (H1+H2+H3) }/H4]+1;[] table in formula Show and is rounded by lower bound.1st bores practical depth of cut D1=S1;2nd bores practical depth of cut D2=S2;3rd bores practical depth of cut D3= S3;4th, which is drilled into u-1, bores practical depth of cut Ki=H4,4≤i < u;U bores practical depth of cut Ku=P-H1-H2-H3- (u-4) H4;
S4. vent is bored: the cylinder fluid pressure that cylindrical workpieces are generated because of itself rotation in use, Vent is necessary.The specific method for boring vent bores certain depth at cylinder both ends with the drill bit slightly thicker than boring main aperture. The main aperture depth at cylinder both ends is reduced in this way.As shown in figure 3, the depth of the 1st row's vent of workpiece both ends is F1, workpiece both ends the The depth F2 of 2 row's vents, the depth of the 3rd row's vent of workpiece both ends are F3;Workpiece both ends the 4th arrange the beginning without vent.
Common parameter is to require the parameter used when boring positioning, boring main aperture, bore vent, wherein specifically including that
(1) total number of rows: total number of rows in hole on cylindrical workpieces;
(2) the total hole count of every row: total hole count of each row on workpiece;
(3) spacing: the distance between adjacent two group in the x-direction is arranged;
(4) it changes and bores position z coordinate: being located at the position, old drill bit can be dismantled and green bit is installed;
(5) the 1st bore the restriction depth of cut;
(6) the 2nd bore the restriction depth of cut;
(7) the 3rd bore the restriction depth of cut;
(8) the 4th brills and the depth of cut defined above.
Location hole parameter is the parameter for needing to use when boring location hole, is specifically included that
(1) which row the hole that starting row (working as front row) record is currently bored belongs to;
(2) hole that starter hole (current hole) record is currently bored belongs to when which front-seat hole;
(3) row of termination: it is desirable that the serial number arranged where the last one hole that present procedure bores;
(4) hole is terminated: it is desirable that serial number of the last one hole of present procedure brill in row;
(5) hole depth is positioned.
Main aperture parameter is the parameter for needing to use when boring main aperture, is specifically included that
(1) which row the hole that starting row (working as front row) record is currently bored belongs to;
(2) hole that starter hole (current hole) record is currently bored belongs to when which front-seat hole;
(3) row of termination: it is desirable that the serial number arranged where the last one hole that present procedure bores;
(4) hole is terminated: it is desirable that serial number of the last one hole of present procedure brill in row;
(5) main aperture depth: depth of positioning hole is generally 1~2mm, and main aperture depth may not necessarily consider depth of positioning hole;
(6) vent (1: having bored;0: not boring): if vent has bored, for having bored vent, drilling depth is Main aperture depth subtracts vent depth.
Vent parameter is the parameter for needing to use in vent, is specifically included that
(1) which row the hole that starting row (working as front row) record is currently bored belongs to;
(2) hole that starter hole (current hole) record is currently bored belongs to when which front-seat hole;
(3) row of termination: it is desirable that the serial number arranged where the last one hole that present procedure bores;
(4) hole is terminated: it is desirable that serial number of the last one hole of present procedure brill in row;
(5) 1 round of side is deep: the 1st row of cylindrical workpieces both ends depressurizes hole depth;
(6) 2 round of side is deep: the 2nd row of cylindrical workpieces both ends depressurizes hole depth;
(7) 3 round of side is deep: the 3rd row of cylindrical workpieces both ends depressurizes hole depth.
Embodiment 2
The present embodiment provides the algorithm steps run in the machine when a kind of brill location hole are as follows:
(1) user presses loop start button;
(2) x-axis, C rotary shaft and z-axis are moved, drill bit starting is enabled to queue beginning hole surface position;
(3) prompt user adjusts drilling attachment and accurately adjusts bit location so that user is after installing green bit;
(4) user presses loop start button, and drill bit starts to rotate;
(5) user confirms that drill speed reaches normally, presses loop start button, starts to process;
(6) number of rows is terminated if originating number of rows and being less than, or starting number of rows is equal to termination number of rows and starting hole count is less than or equal to Hole count is terminated, then continues step 7;Otherwise, turn step 12;
(7) drill bit is along z-axis drilling to depth of positioning hole;
(8) drill bit retreats to workpiece surface along z-axis;
(9) starter hole parameter adds 1;
(10) if starter hole parameter is greater than total hole count, starter hole parameter sets 1, and starting row's parameter adds 1;
(11) drilling parameter is deposited;Turn step 6;
(12) audible and visual alarm is prompted;
(13) processing program is exited.
Embodiment 3
The algorithm steps run in the machine when boring main aperture are as follows:
(1) user presses loop start button;
(2) x-axis, C rotary shaft and z-axis are moved, drill bit starting is enabled to queue beginning hole surface position;
(3) prompt user adjusts drilling attachment and accurately adjusts bit location so that user is after installing green bit;
(4) user presses loop start button, and drill bit starts to rotate;
(5) user confirms that drill speed reaches normally, presses loop start button, starts to process;
(6) number of rows is terminated if originating number of rows and being less than, or starting number of rows is equal to termination number of rows and starting hole count is less than or equal to Hole count is terminated, then continues step 7;Otherwise, turn step 14;
(7) according to when front-seat parameter and current hole parameter, and whether reaming, determine that current hole initial position z is sat Mark and current hole drill hole depth;
(8) according to the restriction depth of cut in current hole drill hole depth and common parameter, current hole drilling number u and are determined 1, which is drilled into u, bores practical depth of cut K1~Ku;
(9) according to current hole initial position z coordinate, reciprocal drilling number u and drilling depth K1~Ku each time, back and forth U times, complete the drilling to the hole;
(10) drill bit retreats to workpiece surface along z-axis;
(11) starter hole parameter adds 1;
(12) if starter hole parameter is greater than total hole count, starter hole parameter sets 1, and starting row's parameter adds 1;
(13) drilling parameter is deposited;Turn step 6;
(14) audible and visual alarm is prompted;
(15) processing program is exited.
Embodiment 4
The present embodiment provides a kind of rational design of drilling tool and selections: the geometry of drilling tool is a pass to deep hole machining The factor of key, the size of drill flute and the discharge of spacial influence drilling cuttings.Current technology has been able to make Tool Manufacturer according to brill The characteristic for cutting processing designs the drilling tool for being more advantageous to chip removal, and farthest cutter can be avoided to overheat.Using higher Alloy steel making cutter, can be improved service life;With new special shape, deep hole machining can be assisted.It is opened on drilling tool Groove can enable drilling cuttings to flow up, and be easy to be discharged out of hole.As using used in shaft-penetrating type high pressure cooling system Drill gun, wide type drill flute are more advantageous to drilling cuttings discharge.Alloy knife has the cooling hole through entire cutter hub, can make high-pressure coolant The bottom in through hole, washes away drilling cuttings out by coolant liquid and takes away heat.In actual production, straight trough drill gun makes with the most use.Rifle Brill can have one or two circular cooling hole, or an independent kidney-shaped cooling hole, coolant liquid are sprayed from the aperture in flank Out.Since drill gun cutter head system is manufactured with hard alloy, so cutting speed is much higher than high-speed steel drill, can increase per minute The amount of feeding.In addition, when using high-pressure coolant, chip can effectively be discharged from processed hole, be not necessarily to regular withdrawing chip removal. It since the drilling rod of drill gun is elongated, is easily deformed, therefore the necessary installation activity bearing on machine tool guideway, bearing can appointing in drilling rod Meaning carries out on position.The distance between each supporting point of drilling rod is usually 20~50 times of bit diameter.Before drilling, drill gun The support that guide sleeve and guide hole must be obtained could start main shaft.
The degree of skewness in hole is one important technical indicator of processing quality.In reality production, the processing request of part is got over Come higher, the degree of skewness of device to hole proposes higher technical requirements.Especially deeper hole, control deflection seem especially heavy It wants.The principal element for influencing deep hole axis verticality, is the symmetry of drill edge and the guiding condition of drill bit.Therefore, mention The symmetry of high cutting edge, and longer guiding is used, it is the major measure for improving deep hole axis verticality.Part to be processed table The not gentle inclination in face, is also large impact the straightness of deep hole axis, because glancing off in rigid drilling, then drilled can be cured Deep, deflection is bigger, thus must pay attention to carefully correcting at any time.
Using NC deep hole drilling machine it should be noted that other technologies problem:
(1) because of processing the coolant liquid big using flow when, pressure is high, therefore coolant liquid will be filtered strictly, keep cleaning dry Only, fixture design will also have good leakproofness.
(2) cutter starts should have good guiding performance when cutting, and guiding is typically all to be close to workpiece, also to examine in guiding Consider the circuit of coolant liquid and the window of chip removal.
(3) deflection of the assembly precision device to hole of guide sleeve has most important influence, and most sensitive factor, has to Guarantee the concentricity of guide sleeve and work spindle and drill rod box main shaft.The deflection of deep hole machining mesoporous is linear with processing length Relationship, if guide sleeve length is 50mm, if guide sleeve axis and work spindle axis deviant are 0.04mm, then process hole When depth is the hole of 1200mm, deflection may reach 0.8mm or more.
(4) degree of skewness of the uniformity coefficient device to hole of workpiece material influences equally very big, and in drilling progress, drill bit can be towards The position offset that the material is soft.So the workpiece more demanding to degree of skewness, should make as far as possible material structure refinement uniform, this When the heat treatment of material is just seemed very important.
(5) degree of skewness of the reasonable selection device to hole of cutting parameter also has a degree of influence.Do not influencing manufacturing schedule In the case where, excessive feed should not be generally used, to avoid the deflection for causing processing hole.
Reasonable drill bit is designed, shank drilling rod apex point is driven;Guarantee that coolant liquid can timely be sent to apex point, drill bit material Select good heat conductivity.It secondly is exactly that chip removal is hydraulic by force will greatly being capable of timely scrap fallaway.
The application is added to 100 macro-variables that can power off preservation;The thread for being added to a 20ms changes brill for handling It is required that.When for needing to bore the continuously workpiece in several days thousands of a holes of processing, once shutdown either accident power-off occurs, It needs to turn back on, directly operation processing program, so that it may continue to process since the hole that last time processes.For one after the breaking of rod After dividing hole leakage to bore, the case where mending brill is needed, equally also need to only rewrite starting round number parameter and termination parameters of rows of holes Benefit brill is carried out to this partial hole.In practical applications, in most cases, user only needs to modify drilling parameter, i.e., Drilling processing can be achieved.
The preferable specific embodiment of the above, only the invention, but the protection scope of the invention is not It is confined to this, anyone skilled in the art is in the technical scope that the invention discloses, according to the present invention The technical solution of creation and its inventive concept are subject to equivalent substitution or change, should all cover the invention protection scope it It is interior.

Claims (7)

1. a kind of High-efficiency mesh drilling new method, workpiece to be added is cylindrical shape, which is characterized in that specific steps include:
S1. each round on drill bit alignment cylindrical workpieces;
S2. it bores location hole: drilling out the hole of certain depth on unprocessed cylindrical workpieces surface with drill bit;
S3. it bores main aperture: according to processing request, selecting the drill bit for meeting aperture, each position of positioning hole processes institute on cylindrical workpieces Need hole depth;It is every to bore certain depth of cut, it needs to exit drill bit so as to chip removal, and so on, completes the drilling in a hole;
S4. it bores vent: with the drill bit thicker than boring main aperture, boring the vent of certain depth at cylindrical workpieces both ends.
2. a kind of High-efficiency mesh drilling new method according to claim 1, which is characterized in that the step S1 drill bit in the application It moves along the x-axis direction, for cylindrical workpieces around center axis rotation, drill bit is directed at any hole that same row is on cylindrical workpieces;Drill bit It is moved along the z-axis, drills to workpiece, or exit drill bit.
3. a kind of High-efficiency mesh drilling new method according to claim 1, which is characterized in that when boring main aperture, to the same master Hole by m time back and forth into bore and move back bore realize drilling and chip removal process, specifically: the 1st bore, the 2nd be drilled into m bore, the described 1st It bores, the 2nd hole depth for being drilled into m brill gradually reduces.
4. a kind of High-efficiency mesh drilling new method according to claim 1, which is characterized in that the 1st brill limits the depth of cut as H1; 2nd brill limits the depth of cut and limits the depth of cut as H3 as H2, the 3rd brill, and the 4th, which is drilled into the m brill restriction depth of cut, is then set as identical value For H4;Then, according to the actual depth P to be drilled, design the hole into bore number u and it is each bore practical depth of cut K1, K2,…,Ku;The actual depth P to be drilled bores practical depth of cut K1, the 2nd practical feed of brill into number u and the 1st is bored with the hole Amount K2 ..., u bores practical depth of cut Ku following relationship:
(1) if P≤H1,
Actually into brill number u=1;
1st bores practical depth of cut K1=P;
(2) if H1 < P≤H1+H2,
Actually into brill number u=2;
1st bores practical depth of cut K1=H1;
2nd bores practical depth of cut K2=P-H1;
(3) if H1+H2 < P≤H1+H2+H3,
Actually into brill number u=3;
1st bores practical depth of cut K1=H1;
2nd bores practical depth of cut K2=H2;
3rd bores practical depth of cut K3=P-H1-H2;Ki=0, i >=4;
(4) if H1+H2+H3 < P,
Actually into brill number u=3+ [{ P- (H1+H2+H3) }/H4]+1;[] indicates to be rounded by lower bound in formula;
1st bores practical depth of cut D1=S1;
2nd bores practical depth of cut D2=S2;
3rd bores practical depth of cut D3=S3;
4th, which is drilled into u-1, bores practical depth of cut Ki=H4,4≤i < u;
U bores practical depth of cut Ku=P-H1-H2-H3- (u-4) H4.
5. a kind of High-efficiency mesh drilling new method according to claim 1, which is characterized in that when boring vent, cylindrical workpieces The depth of the 1st row's vent of both ends is F1, the depth F2 of the 2nd row's vent of cylindrical workpieces both ends, and the 3rd row of cylindrical workpieces both ends subtracts The depth for pressing hole is F3, and cylindrical workpieces both ends 4 arrange the beginning without vent;F1 < F2 < F3.
6. a kind of High-efficiency mesh drilling new method according to claim 1, which is characterized in that transported in the machine when boring location hole Capable algorithm steps are as follows:
(1) user presses loop start button;
(2) x-axis, central axis C axis and z-axis are moved, drill bit to starting is enabled to queue beginning hole surface position;
(3) prompt user adjusts drilling attachment and accurately adjusts bit location so that user is after installing green bit;
(4) user presses loop start button, and drill bit starts to rotate;
(5) user confirms that drill speed reaches setting value, presses loop start button, starts to process;
(6) number of rows is terminated if originating number of rows and being less than, or starting number of rows is equal to termination number of rows and starting hole count is less than or equal to terminate Hole count then continues step 7;Otherwise, turn step 12;
(7) drill bit is along z-axis drilling to depth of positioning hole;
(8) drill bit retreats to workpiece surface along z-axis;
(9) starter hole parameter adds 1;
(10) if starter hole parameter is greater than total hole count, starter hole parameter sets 1, and starting row's parameter adds 1;
(11) drilling parameter is deposited;Turn step 6;
(12) audible and visual alarm is prompted;
(13) processing program is exited.
7. a kind of High-efficiency mesh drilling new method according to claim 1, which is characterized in that run in the machine when boring main aperture Algorithm steps it is as follows:
(1) user presses loop start button;
(2) x-axis, central axis C axis and z-axis are moved, drill bit to starting is enabled to queue beginning hole surface position;
(3) prompt user adjusts drilling attachment and accurately adjusts bit location so that user is after installing green bit;
(4) user presses loop start button, and drill bit starts to rotate;
(5) user confirms that drill speed reaches setting value, presses loop start button, starts to process;
(6) number of rows is terminated if originating number of rows and being less than, or starting number of rows is equal to termination number of rows and starting hole count is less than or equal to terminate Hole count then continues step 7;Otherwise, turn step 14;
(7) according to front-seat parameter and hole parameter and whether reaming is worked as, current hole initial position z coordinate and drilling are determined Depth;
(8) according to Present Borehole depth and the restriction depth of cut, determine that current hole drilling number u and the 1st is drilled into u and bores practical feed Measure K1~Ku;
It is (9) u times reciprocal according to current hole initial position z coordinate, reciprocal drilling number u and drilling depth K1~Ku each time, Complete the drilling to the hole;
(10) drill bit retreats to workpiece surface along z-axis;
(11) starter hole parameter adds 1;
(12) if starter hole parameter is greater than total hole count, starter hole parameter sets 1, and starting row's parameter adds 1;
(13) drilling parameter is deposited;Turn step 6;
(14) audible and visual alarm is prompted;
(15) processing program is exited.
CN201910171999.9A 2019-03-07 2019-03-07 A kind of High-efficiency mesh drilling new method Pending CN109719323A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910171999.9A CN109719323A (en) 2019-03-07 2019-03-07 A kind of High-efficiency mesh drilling new method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910171999.9A CN109719323A (en) 2019-03-07 2019-03-07 A kind of High-efficiency mesh drilling new method

Publications (1)

Publication Number Publication Date
CN109719323A true CN109719323A (en) 2019-05-07

Family

ID=66301989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910171999.9A Pending CN109719323A (en) 2019-03-07 2019-03-07 A kind of High-efficiency mesh drilling new method

Country Status (1)

Country Link
CN (1) CN109719323A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111515433A (en) * 2020-05-11 2020-08-11 山西平阳重工机械有限责任公司 Method for machining deep hole on stainless steel part by numerical control deep hole drilling machine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202291494U (en) * 2011-09-30 2012-07-04 李鹏 Deep hole machining device
CN102974995A (en) * 2012-11-30 2013-03-20 武汉船用机械有限责任公司 Small hole processing method
CN106837295A (en) * 2017-01-25 2017-06-13 河南理工大学 Intelligent safe and efficient automatic drilling control system and control method
CN108343375A (en) * 2018-04-18 2018-07-31 冀凯河北机电科技有限公司 A kind of measurable hydraulic drill rig is drilled the device and method of depth

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202291494U (en) * 2011-09-30 2012-07-04 李鹏 Deep hole machining device
CN102974995A (en) * 2012-11-30 2013-03-20 武汉船用机械有限责任公司 Small hole processing method
CN106837295A (en) * 2017-01-25 2017-06-13 河南理工大学 Intelligent safe and efficient automatic drilling control system and control method
CN108343375A (en) * 2018-04-18 2018-07-31 冀凯河北机电科技有限公司 A kind of measurable hydraulic drill rig is drilled the device and method of depth

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡东红等: "钻孔与排屑方案自动优化技术", 《机床与液压》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111515433A (en) * 2020-05-11 2020-08-11 山西平阳重工机械有限责任公司 Method for machining deep hole on stainless steel part by numerical control deep hole drilling machine

Similar Documents

Publication Publication Date Title
CN106425286A (en) Machining method for deformation control of high-precision thin-wall cylinder shaft
CN107127406A (en) A kind of numerical control milling method in titanium alloy fine thread hole
CN104400008A (en) Numerical-control processing method of sealed ring-shaped deep cavity
CN109746651A (en) A kind of generator pit and end cap pin hole are the same as the processing method that drills and reams
CN107414117B (en) Drilling process for deep hole machining of hard material
CN109719323A (en) A kind of High-efficiency mesh drilling new method
CN102145448A (en) Method for machining blind holes on high-hardness metal material in batches
CN205816834U (en) A kind of compound tool
CN103480919A (en) Method for finish machining of tooth profile of large-modulus hard-tooth-face rack
CN109604682A (en) Large-scale shield electric machine temperature sensor casing high-precision conical surface deep hole processing technology
CN105945520B (en) A kind of cross holes thin wall special-shaped inner hole of cylinder processing method
CN108000081A (en) A kind of high speed CNC deep hole processing methods
CN106425592A (en) Clamp and method for even deburring for oblique wall drilling
CN108788635B (en) Method for machining taper hole by using taper hole cutter
CN105522340A (en) Main valve hole machining method for water press distributor valve body
CN110744071A (en) Method for machining deep and narrow groove with angle
CN105458384B (en) The method of digital-control boring-milling machine planing operation narrow slot
CN214291755U (en) A frock clamp for numerical control lathe processing step hole
CN111890052B (en) Special chamfering tool for multi-shaft deep hole machining tool
CN111515433A (en) Method for machining deep hole on stainless steel part by numerical control deep hole drilling machine
CN112372024A (en) Method for machining deep hole with diameter more than 30 times by using inner-cooling drill bit
CN203030946U (en) Multifunctional tool clamp special for numerically controlled lathe
CN105537700A (en) Chuck screwer and machining method
CN218015853U (en) Composite stepped boring cutter for rough machining of cylinder hole
CN204321221U (en) For processing the slotting tool of keyway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190507