CN109713704A - Grid side battery energy storage power station communicating interrupt method of controlling security, system and medium - Google Patents

Grid side battery energy storage power station communicating interrupt method of controlling security, system and medium Download PDF

Info

Publication number
CN109713704A
CN109713704A CN201910167746.4A CN201910167746A CN109713704A CN 109713704 A CN109713704 A CN 109713704A CN 201910167746 A CN201910167746 A CN 201910167746A CN 109713704 A CN109713704 A CN 109713704A
Authority
CN
China
Prior art keywords
power conversion
conversion system
pcs
power
system pcs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910167746.4A
Other languages
Chinese (zh)
Other versions
CN109713704B (en
Inventor
徐浩
严亚兵
郭思源
余斌
李刚
朱维钧
李辉
吴晋波
梁文武
洪权
臧欣
刘宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, State Grid Hunan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910167746.4A priority Critical patent/CN109713704B/en
Publication of CN109713704A publication Critical patent/CN109713704A/en
Application granted granted Critical
Publication of CN109713704B publication Critical patent/CN109713704B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of grid side battery energy storage power station communicating interrupt method of controlling security, system and media; the invention also includes the communication states that real-time monitoring has each power conversion system PCS under its command; the wire-outgoing breaker of the power conversion system PCS of each communicating interrupt of automatic tripping after being delayed if any PCS communicating interrupt, so that each power conversion system PCS of institute's tripping wire-outgoing breaker connection is all shut down;After each power conversion system PCS communication of institute's tripping wire-outgoing breaker connection restores, closing the wire-outgoing breaker after delay automatically makes its restarting, redistributes whole station output power between each available power transformation system PCS.The present invention with after power conversion system PCS communicating interrupt by the autostart function of wire-outgoing breaker automatic division and power conversion system PCS; the autostop and self-healing function for realizing communicating interrupt power conversion system PCS, by energy-storage battery can the loss of discharge and recharge be preferably minimized.

Description

Grid side battery energy storage power station communicating interrupt method of controlling security, system and medium
Technical field
The present invention relates to battery energy storage power station technical fields, and in particular to a kind of grid side battery energy storage power station communicating interrupt Method of controlling security, system and medium.
Background technique
Relative to the energy storage mode such as flywheel, water-storage, battery energy storage power station is big with energy storage density, addressing is flexible, peace Fill it is convenient, can four-quadrant smooth steady operation the advantages that, entered extensive experimentation construction period, source side, power grid at home Side, load side battery energy storage power station have no small construction scale.Source side energy-accumulating power station is mainly as wind-force, photovoltaic power generation Auxiliary facility alleviates the impact that wind-force, photovoltaic power generation are intermittent and fluctuation is to power grid by energy-accumulating power station power storage function And influence.Load side energy-accumulating power station acts predominantly on load side peak load shifting, reduces transmission loss, while can transport by micro-capacitance sensor The power supply reliability of line mode raising responsible consumer.Grid side energy-accumulating power station main function is to realize that the peak clipping of network load is filled out Paddy, it is conditional to realize the functions such as primary frequency modulation by synchronous capacitor technology.The present invention is mainly suitable for unmanned values The grid side battery energy storage power station kept.
Grid side battery energy storage power station generally comprises multiple power inverters (abbreviation PCS), accesses 10kV system after in parallel, Support is provided for the economic security operation of power grid.Each power inverter PCS uses focus control mode, by whole station energy management system System (abbreviation EMS) directly controls simultaneously, and the power instruction that EMS is assigned can discharge capacity and chargeable amount weight assignment by each PCS's Power instruction realizes the power limitation control of whole station PCS.Under trystate, a PCS can be allowed to be in decentralised control mode, i.e., it is electric The control of voltage-frequency rate, remaining PCS are in power limitation control mode, realize related commissioning project.Each PCS of grid side battery energy storage power station With EMS both-way communication.EMS receive sent on PCS can the status data abundant such as discharge capacity, chargeable amount, operating status, PCS Receive the power adjustment instruction that EMS is issued.After the communicating interrupt of EMS and PCS, EMS can be identified by link layer state and be perceived, And it is unavailable to regard the PCS.But the PCS of some producers does not have the function, can not perceive communicating interrupt and former power is kept to refer to Enable operation.Thus the response of EMS whole station power instruction will be caused deviation occur due to communicating interrupt PCS output power can not monitor, The safe and stable operation of access power grid may be influenced when serious.
Summary of the invention
The technical problem to be solved in the present invention: in view of the above problems in the prior art, a kind of grid side battery energy storage is provided Power station communicating interrupt method of controlling security, system and medium, the present invention by establish power conversion system PCS wire-outgoing breaker with The joint-action mechanism of power conversion system PCS communication state, it is logical in Energy Management System EMS real-time monitoring power conversion system PCS Under conditions of news state, after Energy Management System EMS and power conversion system PCS communicating interrupt, certainly by wire-outgoing breaker The autostart function of dynamic division and power conversion system PCS, realize communicating interrupt power conversion system PCS autostop and Self-healing function, by energy-storage battery can the loss of discharge and recharge be preferably minimized
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention are as follows:
A kind of grid side battery energy storage power station communicating interrupt method of controlling security, implementation steps include:
1) real-time monitoring has the communication state of each power conversion system PCS under its command, if monitoring that any power conversion system PCS is logical News interrupt and then jump execution step 2;Otherwise execution step 1) is jumped;
2) it was delayed for the first specified time, the wire-outgoing breaker of the power conversion system PCS of automatic each communicating interrupt of tripping, so that institute Each power conversion system PCS of tripping wire-outgoing breaker connection is all shut down;In each function of institute's tripping wire-outgoing breaker connection After rate transformation system PCS communication restores, it was delayed for the second specified time, closes the wire-outgoing breaker automatically, the open circuit of the outlet later The power conversion system PCS of device connection will restart, and make whole station output power between each available power transformation system PCS It redistributes.
The detailed step of step 1) includes: the logical of the dual communication network that real-time monitoring has each power conversion system PCS under its command News state jumps if monitoring that communicating interrupt occurs for two communication networks between any power conversion system PCS Execute step 2;If monitoring that the communication state for interrogating network there are at least one is normal, execution step 1) is jumped.
If it is described monitor all power conversion system PCS exist at least one news network communication state it is normal When, it further include obtaining the status data of power conversion system PCS and to having under its command to having each power conversion system PCS acquisition under its command BMS acquires the step of status data of battery management system BMS.
The status data of the power conversion system PCS includes chargeable amount, can discharge capacity, operating status.
The status data of the battery management system BMS includes temperature, voltage, electric current, operating status.
The detailed step of step 2 includes:
2.1) start wire-outgoing breaker tripping timing, if monitoring two of the power conversion system PCS of generation communicating interrupt Any communication network of communication network restores normal, then the Trip Logic instantaneous involution at once, and jumps execution step 1);Otherwise it jumps Turn to execute step 2.2);
2.2) judge whether the timing of outlet circuit breaker trip reached for the first specified time, execution step is jumped if not yet reaching 2.1);Otherwise, it jumps and executes step 2.3);
2.3) by the linkage logic of the cabin the PCS wire-outgoing breaker distant control function and communication state that pre-establish, automatic tripping is each The wire-outgoing breaker of the power conversion system PCS of communicating interrupt, so that each power conversion system of institute's tripping wire-outgoing breaker connection The PCS that unites all is shut down;
2.4) in each power conversion system PCS and corresponding battery management system BMS allowed band, former power command value is kept It is constant, and redistribute the power level of each available power transformation system PCS, if beyond each power conversion system PCS and right The allowed band of battery management system BMS is answered, then each available power transformation system PCS is transported by real-time maximum allowable power level Row;
2.5) each wire-outgoing breaker of automatic detecting has the logical of each power conversion system PCS and corresponding battery management system BMS under its command News state, if monitoring that each wire-outgoing breaker has each power conversion system PCS under its command and corresponding battery management system BMS exists Other abnormality alarmings in addition to power conversion system PCS communication abnormality then jump and execute step 2.6);Otherwise, it jumps and executes step It is rapid 2.7);
2.6) it keeps sharing wire-outgoing breaker being off-state, until the alarm in addition to communication abnormality disappears;After alerting disappearance, It then jumps and executes step 2.7);
2.7) determine jump each wire-outgoing breaker have under its command each power conversion system PCS and correspondence battery management system BMS do not deposit In other abnormality alarmings in addition to power conversion system PCS communication abnormality, if jumping certain wire-outgoing breaker has each power conversion under its command There is no other exceptions in addition to power conversion system PCS communication abnormality to accuse by system PCS and corresponding battery management system BMS Alert, the second specified time of delay closes the wire-outgoing breaker, and the power conversion system PCS of connection will reset automatically;
2.8) it after each available power transformation system PCS starts automatically, keeps whole station power instruction constant, redistributes each available The power level of power conversion system PCS.
The present invention also provides a kind of grid side battery energy storage power station communicating interrupt safety control systems, including energy management system The system EMS and its multiple power conversion system PCS having under its command, and each power conversion system PCS has been correspondingly connected with an independence Battery management system BMS, the Energy Management System EMS is programmed to perform the aforementioned grid side battery energy storage power station of the present invention The step of communicating interrupt method of controlling security.
The present invention also provides a kind of grid side battery energy storage power station communicating interrupt safety control systems, including computer to set Standby, which is programmed to perform the aforementioned grid side battery energy storage power station communicating interrupt method of controlling security of the present invention Step.
The present invention also provides a kind of grid side battery energy storage power station communicating interrupt safety control systems, including computer to set It is standby, it is stored in the storage medium of the computer equipment and is programmed to perform the aforementioned grid side battery energy storage power station communication of the present invention The step of interrupting method of controlling security.
The present invention also provides a kind of computer readable storage medium, it is stored with and is programmed in the computer readable storage medium With the step of executing aforementioned grid side battery energy storage power station communicating interrupt method of controlling security of the invention.
Compared to the prior art, the present invention have an advantage that grid side battery energy storage power station can be realized frequency adjust, The functions such as voltage adjusting, peak load shifting, emergent control, have energy storage density is big, addressing flexibly, install convenient, can four-quadrant it is flat The advantages that sliding stable operation, the extensive experimentation construction period is entered at home.Grid side battery energy storage power station is unattended, leads to It is often made of multiple power inverter PCS parallel connections, each power conversion system PCS uses centralized control, by whole station energy pipe Reason system EMS by each power conversion system PCS chargeable amount and can discharge capacity weight assignment power instruction, realize that each power becomes Change quick, the Balance route of system PCS.When the communicating interrupt of Energy Management System EMS and power conversion system PCS will cause energy Amount management system EMS whole station power instruction response occurs due to communicating interrupt power conversion system PCS output power can not monitor Deviation may influence the safe and stable operation for accessing power grid when serious.Become to reduce grid side battery energy storage power station power as far as possible The adverse consequences of the bis- set communicating interrupts of system PCS and Energy Management System EMS is changed, the present invention proposes a kind of grid side battery energy storage Power station communicating interrupt controling mechanism is logical by establishing power conversion system PCS wire-outgoing breaker and power conversion system PCS The joint-action mechanism of news state, under conditions of Energy Management System EMS real-time monitoring power conversion system PCS communication state, Energy Management System EMS passes through the automatic division of wire-outgoing breaker and power conversion system with after power conversion system PCS communicating interrupt The autostart function of system PCS, realizes the autostop and self-healing function of communicating interrupt power conversion system PCS, by energy storage electricity Pond can the loss of discharge and recharge be preferably minimized.
Detailed description of the invention
Fig. 1 is the basic procedure schematic diagram of present invention method.
Fig. 2 is the system architecture diagram of the embodiment of the present invention.
Fig. 3 is the cabin battery energy storage power station PCS and the BMS cabin structure schematic diagram of the embodiment of the present invention.
Fig. 4 is the workflow schematic diagram of the embodiment of the present invention.
Specific embodiment
As shown in Figure 1, the implementation steps packet of the present embodiment grid side battery energy storage power station communicating interrupt method of controlling security It includes:
1) real-time monitoring has the communication state of each power conversion system PCS under its command, if monitoring that any power conversion system PCS is logical News interrupt and then jump execution step 2;Otherwise execution step 1) is jumped;
2) it was delayed for the first specified time, the wire-outgoing breaker of the power conversion system PCS of automatic each communicating interrupt of tripping, so that institute Each power conversion system PCS of tripping wire-outgoing breaker connection is all shut down;In each function of institute's tripping wire-outgoing breaker connection After rate transformation system PCS communication restores, it was delayed for the second specified time, closes the wire-outgoing breaker automatically, the open circuit of the outlet later The power conversion system PCS of device connection will restart, and make whole station output power between each available power transformation system PCS It redistributes.In the present embodiment, the first specified time, the second specified time equal value are 5s, furthermore also be can according to need point The time span of the first specified time, the second specified time Zeng Jia or not be reduced.
In the present embodiment, the detailed step of step 1) includes: that real-time monitoring has the dual logical of each power conversion system PCS under its command The communication state of network is interrogated, if monitoring that two communication networks between any power conversion system PCS communicate Interruption then jumps execution step 2;If monitoring that the communication state for interrogating network there are at least one is normal, jumps and execute step It is rapid 1).
In the present embodiment, if monitoring that all power conversion system PCS have the communication shape of at least one news network When state is normal, further include to have under its command each power conversion system PCS acquisition obtain power conversion system PCS status data and to The step of having the status data of BMS acquisition battery management system BMS under its command.
In the present embodiment, the status data of power conversion system PCS includes chargeable amount, can discharge capacity, operating status.
In the present embodiment, the status data of battery management system BMS includes temperature, voltage, electric current, operating status.
The network for having each power conversion system PCS in the present embodiment under its command is dual communication network, and any network operation is just Often, the executing subject (such as Energy Management System EMS) of the present embodiment method with have each power conversion system PCS under its command can be normal Communication interaction.Network is dual communication network between each power conversion system PCS and its corresponding battery management system BMS, is led to Cross the communication network of dual, EMS acquires the chargeable amount of each power conversion system PCS that has under its command in real time, can discharge capacity, operating status Etc. monitoring data and have the monitoring data such as each battery management system BMS temperature, voltage, electric current, operating status under its command.Real-time monitoring The executing subject (such as Energy Management System EMS) and power conversion system PCS communication network state of the present embodiment method.Work as prison Certain net communicating interrupt with certain power conversion system PCS is measured, then is determined and the power conversion system PCS net communicating interrupt.It is single When net communicating interrupt it is timely on send alarm, then entered step 2) when double-network communication interrupts.
In the present embodiment, the detailed step of step 2 includes:
2.1) start wire-outgoing breaker tripping timing, if monitoring two of the power conversion system PCS of generation communicating interrupt Any communication network of communication network restores normal, then the Trip Logic instantaneous involution at once, and jumps execution step 1);Otherwise it jumps Turn to execute step 2.2);
2.2) judge whether the timing of outlet circuit breaker trip reached for the first specified time, execution step is jumped if not yet reaching 2.1);Otherwise, it jumps and executes step 2.3);
2.3) by the linkage logic of the cabin the PCS wire-outgoing breaker distant control function and communication state that pre-establish, automatic tripping is each The wire-outgoing breaker of the power conversion system PCS of communicating interrupt, so that each power conversion system of institute's tripping wire-outgoing breaker connection The PCS that unites all is shut down;
2.4) in each power conversion system PCS and corresponding battery management system BMS allowed band, former power command value is kept It is constant, and redistribute the power level of each available power transformation system PCS, if beyond each power conversion system PCS and right The allowed band of battery management system BMS is answered, then each available power transformation system PCS is transported by real-time maximum allowable power level Row;
2.5) each wire-outgoing breaker of automatic detecting has the logical of each power conversion system PCS and corresponding battery management system BMS under its command News state, if monitoring that each wire-outgoing breaker has each power conversion system PCS under its command and corresponding battery management system BMS exists Other abnormality alarmings in addition to power conversion system PCS communication abnormality then jump and execute step 2.6);Otherwise, it jumps and executes step It is rapid 2.7);
2.6) it keeps sharing wire-outgoing breaker being off-state, until the alarm in addition to communication abnormality disappears;After alerting disappearance, It then jumps and executes step 2.7);
2.7) determine jump each wire-outgoing breaker have under its command each power conversion system PCS and correspondence battery management system BMS do not deposit In other abnormality alarmings in addition to power conversion system PCS communication abnormality, if jumping certain wire-outgoing breaker has each power conversion under its command There is no other exceptions in addition to power conversion system PCS communication abnormality to accuse by system PCS and corresponding battery management system BMS Alert, the second specified time of delay closes the wire-outgoing breaker, and the power conversion system PCS of connection will reset automatically;
2.8) it after each available power transformation system PCS starts automatically, keeps whole station power instruction constant, redistributes each available The power level of power conversion system PCS.
In addition, the present embodiment also provides a kind of grid side battery energy storage power station communicating interrupt safety control system, including energy Amount management system EMS(Energy Management System) and its multiple power conversion system PCS(Power for having under its command Conversion System), and each power conversion system PCS has been correspondingly connected with an independent battery management system BMS (Battery Management System), as shown in Fig. 2, to be programmed to perform the present embodiment aforementioned by Energy Management System EMS The step of grid side battery energy storage power station communicating interrupt method of controlling security.Through Energy Management System EMS real-time monitoring under Have jurisdiction over the communication state of each power conversion system PCS and the operating status of battery management system BMS;Increase Energy Management System EMS With the shared wire-outgoing breaker automatic control function in the cabin PCS (power conversion system cabin) that has each power conversion system PCS under its command with The linkage logic of communication state realizes the autostop of communication abnormality power conversion system PCS.In the present embodiment, an outlet Two power conversion system PCS of breaker lower connection, practical whole station have 48 power conversion system PCS.
In the present embodiment, Energy Management System EMS, any power conversion system PCS are realized by the Ethernet of dual Centralized control, control system framework are as shown in Figure 2.Dual communication network is made of identical A net and B net, one of them Network failure does not influence the normal communication of another network, which thereby enhances the reliability of data transmission.It is only depicted in Fig. 2 A single net in dual network, another network are identical.As shown in Figure 2, Energy Management System EMS and power conversion System PCS and battery management system BMS pass through the ethernet communication based on IEC61850 specification;Power conversion system PCS and right Between the BMS answered while having hard contact point signal, the signal based on Modbus specification, and be it is unidirectional, i.e., signal stream only from and Battery management system BMS flows to power conversion system PCS.
In the present embodiment, each power conversion system PCS is placed in the cabin PCS, each battery management system BMS is put It sets in the cabin BMS (battery flat), the cabin BMS and the cabin PCS are constituted as shown in Figure 3.In Fig. 3, each cabin BMS includes two battery piles, Each battery pile is made of the battery cluster parallel connection of identical quantity, and each battery cluster is again in series by the battery pack of identical quantity; Each cabin PCS includes that two Voltage type converters and two dry type boostings become;Battery pile, Voltage type converter VSC, dry type become one One is corresponding, is interconnected by multiple switch, and finally becomes high-pressure side parallel connection in dry type, is external to system through wire-outgoing breaker.Fig. 3 In, the remote-controlled division of wire-outgoing breaker AC01, AC1-1, AC1-2 of dry type low pressure side, AC circuit breaker, battery pile outlet are straight Flow breaker DC1-1, DC1-2 and the manual division on the spot automatically of high-voltaghe compartment disconnecting switch, A.C. contactor, dc circuit breaker and cluster Contactor is by process control division, and wherein the wire-outgoing breaker AC01 of dry type low pressure side is each power conversion system PCS Shared wire-outgoing breaker.
Grid side battery energy storage power station is unattended station, to reduce power conversion system PCS and energy management system as far as possible Adverse consequences caused by the bis- set communicating interrupts of EMS of uniting, best bet are realized in communication by backstage automatic control mode The autostop of disconnected power conversion system PCS, and further realize accurate response and the electricity of Energy Management System EMS power instruction The economic stability of net is run.Grid side battery energy storage power station power conversion system PCS quantity is larger, while to reduce energy storage station fortune The manual intervention of row process, after Energy Management System EMS power instruction issues, rear grid-connected power conversion system PCS is except friendship Whole alternating current-direct current breakers outside stream contactor and dc circuit breaker close in coincidence and without starting automatically when fault warning A.C. contactor and dc circuit breaker, and respond the power instruction of Energy Management System EMS.At this point, Energy Management System EMS meeting Again by each chargeable amount of power conversion system PCS and can discharge capacity distribution power, realize the equilibrium of each power conversion system PCS Operation.In addition, disconnecting wire-outgoing breaker AC01 when the two power conversion system PCS shown in Fig. 3 are operated normally, then two voltage-types become Flow device VSC exchange side decompression, cause isolated island protection act make Voltage type converter VSC shut down, while tripping A.C. contactor and Dc circuit breaker.Therefore it can realize communicating interrupt power conversion system PCS's by the automatic control to wire-outgoing breaker AC01 Autostop.When there is the equal communicating interrupt of double nets, wire-outgoing breaker AC01 is disconnected automatically through certain time-delay, then communicating interrupt It PCS and communicates non-interrupt power transformation system PCS and is shut down because of decompression, but other available power transformation systems PCS is still at this time Continue to allow, only power can be redistributed.After certain time (the main stabilization time for considering battery and powering off suddenly), from Wire-outgoing breaker AC01 in dynamic circuit connector, communicating non-interrupt power transformation system PCS at this time can restart, and communicating interrupt power becomes The system PCS of changing can not then start due to there are communication failure, it is thus achieved that communicating interrupt power conversion system PCS's stops automatically Machine.But it should be recognized that after communicating interrupt power conversion system PCS communicates recovery, and can start automatically, thus Realize the self diagnosis and self-healing function of battery energy storage power station.
As shown in figure 4, the work step of the present embodiment grid side battery energy storage power station communicating interrupt safety control system is such as Under:
S1: the linkage logic of the cabin PCS wire-outgoing breaker distant control function and communication state is established.When Energy Management System EMS is under When having jurisdiction over double set network communications interruption of certain power conversion system PCS, the wire-outgoing breaker AC01 in the cabin 5s automatic tripping PCS that is delayed.
S2: if any communication network restores normal between period Energy Management System EMS and power conversion system PCS, The Trip Logic instantaneous involution at once.When double set communicating interrupts occur again in Energy Management System EMS and power conversion system PCS When, restart wire-outgoing breaker tripping timing.
S3: after wire-outgoing breaker tripping, in power conversion system PCS and battery management system BMS allowed band, energy Measuring management system EMS keeps former power command value constant, and redistributes the power level of each available power transformation system PCS. If exceeding power conversion system PCS and battery management system BMS allowed band, each power conversion system PCS is by maximum in real time Power level is allowed to run.
S4: automatic detecting disconnected wire-outgoing breaker have the communication shape of power conversion system PCS and battery management system BMS under its command State.Power conversion system PCS and battery management system BMS is individually communicated with Energy Management System EMS, only energy management System EMS only controls power conversion system PCS.Energy Management System EMS real-time monitoring power conversion system PCS and battery management The state of system BMS, when Energy Management System EMS monitors that broken wire-outgoing breaker has power conversion system PCS and battery under its command When management system BMS state has other abnormality alarmings in addition to power conversion system PCS communication abnormality, into S5.Otherwise into Enter S6.
S5: the wire-outgoing breaker for keeping the disconnected power conversion system PCS of institute is off-state, up to announcement in addition to communication abnormality It is alert to disappear.After alerting disappearance, then S6 is reentered.
S6: when wire-outgoing breaker has power conversion system PCS and battery management system BMS under its command without its in addition to communication abnormality When he alerts, delay 5s clock closes power conversion system PCS wire-outgoing breaker automatically.It is not interrupted when the switch has former communication under its command Power conversion system PCS starts automatically when communication abnormality disappears, and the communication abnormality of former communicating interrupt power conversion system PCS Same automatic starting, otherwise will remain shut off state because of the presence of failure resultant signal if having restored.
S7: after power conversion system PCS starts automatically, Energy Management System EMS keeps former power instruction constant, divides again Power level with each available power transformation system PCS.
In addition, the present embodiment also provides a kind of grid side battery energy storage power station communicating interrupt safety control system, including meter Machine equipment is calculated, which is programmed to perform the aforementioned grid side battery energy storage power station communicating interrupt of the present embodiment and controls safely The step of method processed.In addition, the present embodiment also provides a kind of grid side battery energy storage power station communicating interrupt safety control system, packet Computer equipment is included, is stored in the storage medium of the computer equipment and is programmed to perform the aforementioned grid side battery of the present embodiment The step of energy-accumulating power station communicating interrupt method of controlling security.In addition, the present embodiment also provides a kind of computer readable storage medium, It is stored with and is programmed to perform in the aforementioned grid side battery energy storage power station communication of the present embodiment in the computer readable storage medium The step of disconnected method of controlling security.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of grid side battery energy storage power station communicating interrupt method of controlling security, it is characterised in that implementation steps include:
1) real-time monitoring has the communication state of each power conversion system PCS under its command, if monitoring that any power conversion system PCS is logical News interrupt and then jump execution step 2;Otherwise execution step 1) is jumped;
2) it was delayed for the first specified time, the wire-outgoing breaker of the power conversion system PCS of automatic each communicating interrupt of tripping, so that institute Each power conversion system PCS of tripping wire-outgoing breaker connection is all shut down;In each function of institute's tripping wire-outgoing breaker connection After rate transformation system PCS communication restores, it was delayed for the second specified time, closes the wire-outgoing breaker automatically, the open circuit of the outlet later The power conversion system PCS of device connection will restart, and make whole station output power between each available power transformation system PCS It redistributes.
2. grid side battery energy storage power station communicating interrupt method of controlling security according to claim 1, which is characterized in that step Rapid detailed step 1) includes: the communication state that real-time monitoring has the dual communication network of each power conversion system PCS under its command, if Monitor that two communication networks between any power conversion system PCS occur communicating interrupt and then jump execution step 2; If monitoring that the communication state for interrogating network there are at least one is normal, execution step 1) is jumped.
3. grid side battery energy storage power station communicating interrupt method of controlling security according to claim 1, which is characterized in that institute If state monitor all power conversion system PCS exist at least one news network communication state it is normal when, further include to Each power conversion system PCS acquisition is had under its command to obtain the status data of power conversion system PCS and acquire cell tube to BMS is had under its command The step of status data of reason system BMS.
4. grid side battery energy storage power station communicating interrupt method of controlling security according to claim 3, which is characterized in that institute The status data for stating power conversion system PCS includes chargeable amount, can discharge capacity, operating status.
5. grid side battery energy storage power station communicating interrupt method of controlling security according to claim 3, which is characterized in that institute The status data for stating battery management system BMS includes temperature, voltage, electric current, operating status.
6. the grid side battery energy storage power station communicating interrupt method of controlling security according to any one of claim 2~5, It is characterized in that, the detailed step of step 2 includes:
2.1) start wire-outgoing breaker tripping timing, if monitoring two of the power conversion system PCS of generation communicating interrupt Any communication network of communication network restores normal, then the Trip Logic instantaneous involution at once, and jumps execution step 1);Otherwise it jumps Turn to execute step 2.2);
2.2) judge whether the timing of outlet circuit breaker trip reached for the first specified time, execution step is jumped if not yet reaching 2.1);Otherwise, it jumps and executes step 2.3);
2.3) by the linkage logic of the cabin the PCS wire-outgoing breaker distant control function and communication state that pre-establish, automatic tripping is each The wire-outgoing breaker of the power conversion system PCS of communicating interrupt, so that each power conversion system of institute's tripping wire-outgoing breaker connection The PCS that unites all is shut down;
2.4) in each power conversion system PCS and corresponding battery management system BMS allowed band, former power command value is kept It is constant, and redistribute the power level of each available power transformation system PCS, if beyond each power conversion system PCS and right The allowed band of battery management system BMS is answered, then each available power transformation system PCS is transported by real-time maximum allowable power level Row;
2.5) each wire-outgoing breaker of automatic detecting has the logical of each power conversion system PCS and corresponding battery management system BMS under its command News state, if monitoring that each wire-outgoing breaker has each power conversion system PCS under its command and corresponding battery management system BMS exists Other abnormality alarmings in addition to power conversion system PCS communication abnormality then jump and execute step 2.6);Otherwise, it jumps and executes step It is rapid 2.7);
2.6) it keeps sharing wire-outgoing breaker being off-state, until the alarm in addition to communication abnormality disappears;After alerting disappearance, It then jumps and executes step 2.7);
2.7) determine jump each wire-outgoing breaker have under its command each power conversion system PCS and correspondence battery management system BMS do not deposit In other abnormality alarmings in addition to power conversion system PCS communication abnormality, if jumping certain wire-outgoing breaker has each power conversion under its command There is no other exceptions in addition to power conversion system PCS communication abnormality to accuse by system PCS and corresponding battery management system BMS Alert, the second specified time of delay closes the wire-outgoing breaker, and the power conversion system PCS of connection will reset automatically;
2.8) it after each available power transformation system PCS starts automatically, keeps whole station power instruction constant, redistributes each available The power level of power conversion system PCS.
7. a kind of grid side battery energy storage power station communicating interrupt safety control system, including Energy Management System EMS and its have under its command Multiple power conversion system PCS, and each power conversion system PCS has been correspondingly connected with an independent battery management system BMS, which is characterized in that the Energy Management System EMS is programmed to perform electricity described in any one of claim 1~6 The step of net side battery energy storage power station communicating interrupt method of controlling security.
8. a kind of grid side battery energy storage power station communicating interrupt safety control system, including computer equipment, it is characterised in that: should Computer equipment is programmed to perform grid side battery energy storage power station communicating interrupt described in any one of claim 1~6 The step of method of controlling security.
9. a kind of grid side battery energy storage power station communicating interrupt safety control system, including computer equipment, it is characterised in that: should It is stored in the storage medium of computer equipment and is programmed to perform the electricity of grid side described in any one of claim 1~6 The step of pond energy-accumulating power station communicating interrupt method of controlling security.
10. a kind of computer readable storage medium, it is characterised in that: be stored with and be programmed in the computer readable storage medium The step of grid side battery energy storage power station communicating interrupt method of controlling security described in any one of perform claim requirement 1~6.
CN201910167746.4A 2019-03-06 2019-03-06 Communication interruption safety control method, system and medium for power grid side battery energy storage power station Active CN109713704B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910167746.4A CN109713704B (en) 2019-03-06 2019-03-06 Communication interruption safety control method, system and medium for power grid side battery energy storage power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910167746.4A CN109713704B (en) 2019-03-06 2019-03-06 Communication interruption safety control method, system and medium for power grid side battery energy storage power station

Publications (2)

Publication Number Publication Date
CN109713704A true CN109713704A (en) 2019-05-03
CN109713704B CN109713704B (en) 2020-07-03

Family

ID=66266375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910167746.4A Active CN109713704B (en) 2019-03-06 2019-03-06 Communication interruption safety control method, system and medium for power grid side battery energy storage power station

Country Status (1)

Country Link
CN (1) CN109713704B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110165689A (en) * 2019-05-23 2019-08-23 远景能源(江苏)有限公司 A kind of control system for energy-storage system and corresponding energy-storage system
CN110488199A (en) * 2019-09-04 2019-11-22 国网湖南省电力有限公司 A kind of high capacity cell energy-accumulating power station battery system alarm response method
CN110854889A (en) * 2019-10-28 2020-02-28 江西赣锋电池科技有限公司 Energy storage system and multi-stage protection method thereof
CN110880811A (en) * 2019-11-25 2020-03-13 国网湖南省电力有限公司 Battery energy storage power station communication device and method
CN114123195A (en) * 2021-12-08 2022-03-01 国网陕西省电力公司西安供电公司 Active power electronic device and method for reducing transformer and line loss
CN116826795A (en) * 2023-06-01 2023-09-29 中能建储能科技(武汉)有限公司 Energy storage power station non-planned island operation load distribution control equipment and method
CN117353358A (en) * 2023-12-04 2024-01-05 法罗电力(浙江)有限公司 Energy storage inverter management method, system and energy storage device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103606943A (en) * 2013-12-02 2014-02-26 深圳先进储能材料国家工程研究中心有限公司 Microgrid nickel-metal hydride battery energy storage system
CN104253488A (en) * 2014-09-17 2014-12-31 宁德时代新能源科技有限公司 Battery energy storage system and power supply system
CN104734259A (en) * 2013-12-20 2015-06-24 上海电气集团股份有限公司 Sodium-sulfur cell operation management system
CN105141037A (en) * 2015-09-02 2015-12-09 国网上海市电力公司 Energy storage monitoring system
KR20160038239A (en) * 2014-09-30 2016-04-07 한국전력공사 Apparatus and method for controlling energy storage system
CN106655230A (en) * 2016-11-28 2017-05-10 北京汉能创昱科技有限公司 Intelligent battery management method and system for micro-grid
CN109217673A (en) * 2018-11-06 2019-01-15 西安交通大学 A kind of energy accumulation current converter and its control method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103606943A (en) * 2013-12-02 2014-02-26 深圳先进储能材料国家工程研究中心有限公司 Microgrid nickel-metal hydride battery energy storage system
CN104734259A (en) * 2013-12-20 2015-06-24 上海电气集团股份有限公司 Sodium-sulfur cell operation management system
CN104253488A (en) * 2014-09-17 2014-12-31 宁德时代新能源科技有限公司 Battery energy storage system and power supply system
KR20160038239A (en) * 2014-09-30 2016-04-07 한국전력공사 Apparatus and method for controlling energy storage system
CN105141037A (en) * 2015-09-02 2015-12-09 国网上海市电力公司 Energy storage monitoring system
CN106655230A (en) * 2016-11-28 2017-05-10 北京汉能创昱科技有限公司 Intelligent battery management method and system for micro-grid
CN109217673A (en) * 2018-11-06 2019-01-15 西安交通大学 A kind of energy accumulation current converter and its control method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国储能网新闻中心: "《分布式储能电站运行维护规程》标准征求意见", 《中国储能网》 *
周钰 等: "电池储能站监控系统的设计", 《电气应用》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110165689A (en) * 2019-05-23 2019-08-23 远景能源(江苏)有限公司 A kind of control system for energy-storage system and corresponding energy-storage system
CN110488199A (en) * 2019-09-04 2019-11-22 国网湖南省电力有限公司 A kind of high capacity cell energy-accumulating power station battery system alarm response method
CN110488199B (en) * 2019-09-04 2021-06-01 国网湖南省电力有限公司 Alarm response method for battery system of high-capacity battery energy storage power station
CN110854889A (en) * 2019-10-28 2020-02-28 江西赣锋电池科技有限公司 Energy storage system and multi-stage protection method thereof
CN110880811A (en) * 2019-11-25 2020-03-13 国网湖南省电力有限公司 Battery energy storage power station communication device and method
CN110880811B (en) * 2019-11-25 2024-04-19 国网湖南省电力有限公司 Communication device and method for battery energy storage power station
CN114123195A (en) * 2021-12-08 2022-03-01 国网陕西省电力公司西安供电公司 Active power electronic device and method for reducing transformer and line loss
CN116826795A (en) * 2023-06-01 2023-09-29 中能建储能科技(武汉)有限公司 Energy storage power station non-planned island operation load distribution control equipment and method
CN116826795B (en) * 2023-06-01 2024-03-15 中能建储能科技(武汉)有限公司 Energy storage power station non-planned island operation load distribution control equipment and method
CN117353358A (en) * 2023-12-04 2024-01-05 法罗电力(浙江)有限公司 Energy storage inverter management method, system and energy storage device
CN117353358B (en) * 2023-12-04 2024-03-22 法罗电力(浙江)有限公司 Energy storage inverter management method, system and energy storage device

Also Published As

Publication number Publication date
CN109713704B (en) 2020-07-03

Similar Documents

Publication Publication Date Title
CN109713704A (en) Grid side battery energy storage power station communicating interrupt method of controlling security, system and medium
WO2021088502A1 (en) Control system of direct-current energy consumption device and control method therefor
KR101412742B1 (en) Stand-alone Microgrid Control System and Method
CN101594002B (en) Self-healing control method for operation of urban distribution network
CN110224482B (en) Independent power supply and charging system for electric ship main power supply and storage battery grouping
KR102113868B1 (en) System for power controlling of grid-connected solar inverter
CN102324741B (en) Micro-power grid off-grid energy balance and control device and method
EP3591798A1 (en) Uninterruptible power supply system comprising energy storage system
KR20110050858A (en) Micro-grid system and method for controlling load in static transfer switch
CN104242338A (en) Micro grid system for transformer substation with distributed power supplies and control method
CN110488199A (en) A kind of high capacity cell energy-accumulating power station battery system alarm response method
KR102369839B1 (en) Method for replacing emergency generator with energy storage system(ESS) and system comprising the same
CN106329524B (en) A kind of control method of micro-grid system and micro-grid system
WO2023093172A1 (en) Energy control system of direct current networking ship hybrid power laboratory and control method therefor
CN116131311B (en) Energy storage system and protection method thereof
CN218482665U (en) Redundancy coordination control device for high-capacity energy storage system
CN108199400A (en) Container energy storage intelligent scheduling system and method
KR102040063B1 (en) Energy storage system and method
KR102324325B1 (en) Energy storage system hierarchical management system
JP2022084512A (en) Intelligent switch device and power generating system
CN117439138A (en) Cluster-missing operation control method and device for energy storage system, storage medium and electronic equipment
CN104953614B (en) Distributed generation resource grid-connection control system
CN113541215A (en) Intelligent control system and control method for electric power of communication base station
CN115579922A (en) Battery energy storage power station control system and control method
RU2726943C1 (en) Method of reducing fuel consumption by diesel-generator units in hybrid power plant with renewable energy resources

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant