CN109710686A - The analysis system of visualization building chart - Google Patents
The analysis system of visualization building chart Download PDFInfo
- Publication number
- CN109710686A CN109710686A CN201811616452.7A CN201811616452A CN109710686A CN 109710686 A CN109710686 A CN 109710686A CN 201811616452 A CN201811616452 A CN 201811616452A CN 109710686 A CN109710686 A CN 109710686A
- Authority
- CN
- China
- Prior art keywords
- chart
- field
- visualization
- component
- name
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses the analysis systems of visualization building chart.Belong to visualization building graphic analyses technical field, which is generated data by visualized operation rapid build chart and show report, easy to learn without programming.Analysis system includes chart module, reporting modules, map visualization component, tree graph visualization component, parallel coordinate visualization component, time flow graph visualization component, network diagramming visualization component, cake chart visualization component and line chart visualization component;Chart module includes Graphic Design module and management through figures module;The reporting modules include reporting design module and report management module;The visualized operation method of Graphic Design module be the model data that is provided according to data center platform in conjunction with each component after generate object diagram, and generate the icon of corresponding object diagram;The visualized operation method of reporting design module is the icon good with Graphic Design module design, and the data displaying report of multiple charts is generated by pulling.
Description
Technical field
The present invention relates to visualizations to construct graphic analyses technical field, and in particular to the analysis system of visualization building chart
System.
Background technique
Big data is specially passed through into the analysis system of visualization building chart currently not yet.Now to the processing of big data
Using being increasingly taken seriously, but it is now to carry out big data into intuitive visual chart to show and becomes relatively difficult.Cause
Show it is a more complicated process to become the big data to visualize intuitive chart, user is to being ignorant of journey
Sequence, therefore design a kind of visualize and construct chart to generate data and show that the analysis system of report is very necessary.
Summary of the invention
The present invention is to solve currently not yet specially to lead big data by the analysis system of visualization building chart
The deficiency for causing big data visualization building graphic analyses more difficult, provide it is a kind of by visualized operation rapid build chart come
It generates data and shows report, without programming, the analysis system of visualization building chart easy to learn.
The above technical problem is solved through the following technical scheme:
The analysis system of visualization building chart, analysis system includes visualization of presence unit, the visualization of presence list
Member includes chart module, reporting modules, map visualization component, tree graph visualization component, parallel coordinate visualization component, time
Flow graph visualization component, scatter plot visualization component, histogram visualization component, network diagramming visualization component, cake chart are visual
Change component and line chart visualization component;
The chart module includes Graphic Design module and management through figures module;The reporting modules include reporting design mould
Block and report management module;
The method for visualizing of the Graphic Design module is the model data provided according to data center platform and each component
In conjunction with rear generation object diagram, and generate the icon of corresponding object diagram;
The method for visualizing of the reporting design module is the icon good with Graphic Design module design, is generated by pulling
The data of multiple charts show report.
This programme is generated data by visualized operation rapid build chart and shows report, easy to learn without programming.
Preferably, the method for visualizing of the reporting design module further includes following content:
(L1) the list workspace page is unfolded;
It is " component & chart " list area on the left of the page, first job area is only unfolded in default, but allows multiple workspaces
It is unfolded simultaneously;It can be carried out keyword retrieval, chart title retrieved, by the work where all charts comprising keyword retrieved
Make Qu Zhankai, only display includes the chart of keyword;Mouse is moved to the key words text frame of fill substance, automatic full choosing
Content after deletion, is restored to show all charts;
(L2) rich text component can be dragged to reporting design area;
Rich text includes following function: font size, overstriking, italic, underscore, unordered list, has sequence at font style
Table, character background color, left-justify, align center, Right Aligns, removes all formats at font color;Reporting design area can be deleted
Rich text component is deleted without prompt;
(L3) picture component can be dragged to reporting design area;
The icon energy uploading pictures file of uploading pictures is hit at picture component midpoint;Component pattern after uploading pictures file
It is shown as uploading pictures;If non-uploading pictures, the picture component in reporting design area can be deleted, it, can if uploading pictures
It deletes the picture component in reporting design area or only deletes the picture of upload;
(L4) chart components can be dragged to reporting design area, and chart components pattern is completely the same as chart module design;
(L5) component of reporting design area's not paging, reporting design area is non-overlapping;Size, the position of component can be changed;
(L6) when user's New Report, in reporting design area, for default there are a title, title name is same to report name,
It can modify, unsuppressible-suppression;Report name synchronous vacations when modifying title content, in report list;
(L7) during reporting design, every single stepping of user is automatically saved from the background;User often does once-through operation, all
It prompts " saving successfully ";Such as save that the used time is slightly long, and first prompt: " in preservation " after success, prompts " saving successfully ".
Preferably, the method for visualizing of the Graphic Design module further includes following content:
(H1) left side shows filename or database name and table name and all field names;
(H2) the Back button is clicked, when four row, column, numerical value, screening frame at least one frames have content, into leaving
Prompt the page, prompt: " content of edit will not be saved ", enter page when coming after determining: chart is checked in data processing;
Otherwise, it is directly entered page when coming;
(H3) when in three row, column, numerical value frames at least one frame be it is substantial, " completion " button is just can be dotted
State;" completion " button is clicked, into checking the chart page;
(H4) field can be dragged to row, column, numerical value, screened in four frames with plan structure;When user pulls word
When section is to the position that can be placed, four row, column, numerical value, screening frames change colour to prompt;When a field is dragged to two fields
Between when, the latter field location moves back, and vacates a position for newer field, the position discoloration prompt user being available can unclamp
Mouse;During dragging, the full name of display field under mouse;
(H5) row, column, numerical value, the width of field in four frames of screening are fixed, and at most show 5 Chinese characters, this 5 Chinese characters
A Chinese character is accounted for including two letters, number, English symbol, Chinese bracket accounts for a Chinese character, when field name is more than 5
Chinese character then shows preceding 4 words and an omission mark " ... ";Mouse is moved in field, small bullet frame display field full name;
(H6) since the field in four row, column, numerical value, screening frames is wide, so the field number that every row can be placed, by
Screen resolution determines;It is automatic to enter a new line when being dragged in field a line and not showing, but default an only display the first row, when mouse moves
When moving row, column, numerical value, screening on four frames, the width amplification of frame shows all fields;Mouse is removed, and still only shows first
Row;
(H7) in row, column, numerical value, the upper right corner for screening four frames, there is " an emptying " small icon, click the icon, frame
In all fields be removed;
(H8) field can be pulled to other any regions in four row, column, numerical value, screening frames, field will be moved from frame
It removes;
(H9) there is " ranks transposition " button between ranks, click field between ranks and exchange;
(H10) have to the operation of field in row: sequence, removes edit field name;
Sequence includes ascending order, descending and cancellation sequence;
It clicks " edit field name ", the text in field is in editable state, can be modified, and any other area of the page is clicked
Domain saves modification;
(H11) have to the operation of field in column: sequence, display/hide, removes edit field name;
There are two buttons for display/hidden function: hiding field name, unhides;It clicks " hiding field name ", then the field
Name is not shown in Graphic Design area;
(H12) there is the operation of field in logarithm: switching evaluation mode, sequence, edit field name, screening washer, removal:
Switching evaluation mode has: total, average, maximum, minimum, counting, initial value are defaulted as initial value;
(H13) have to the operation of field in screening: screening washer cancels screening;
(H14) chart name is defaulted as the name of data source table, clicks " editor " icon, and chart name becomes editable
State after modification, clicks any other positions of the page, that is, saves modification;
(H15) when the chart style of selection is table, every page display data 20 are shown, has " load in page bottom
More " button, click reload 20;
(H16) it Graphic Design area: can only see, not editable;
(H17) diagrammatic representation pattern switches: backstage detection can adapt to the chart style of current chart structure, not adapt to
Pattern set grey, can not choose;New chart when not having design content also, defaults the equal gray of all chart styles.
Preferably, analysis system further includes the smart phone for being equipped with visualization synchronizing software APP, smart phone and existing
Field visualized unit networks connection;Every step mode of operation of visualization of presence unit can synchronize soft in the visualization on smart phone
Simultaneous display on part APP;When user's appearance that visualization of presence unit uses cannot be by visualized operation rapid build chart
Report is shown to generate data, and the user that visualization of presence unit uses can request the people of mobile phone end to help on smart phone
It is busy to realize that visualized operation rapid build chart shows report to generate data.
The present invention can reach following effect:
The present invention is generated data by visualized operation rapid build chart and shows report, easy to learn without programming.
Detailed description of the invention
Fig. 1 is a kind of connection structure schematic block diagram of the embodiment of the present invention.
Specific embodiment
The present invention will be further described below with reference to the accompanying drawings and embodiments.
Embodiment, the analysis system of visualization building chart, shown in Figure 1, analysis system includes visualization of presence list
Member, the visualization of presence unit includes chart module, reporting modules, map visualization component, tree graph visualization component, parallel
Coordinate visualization component, time flow graph visualization component, scatter plot visualization component, histogram visualization component, network diagramming can
Depending on changing component, cake chart visualization component and line chart visualization component;
The chart module includes Graphic Design module and management through figures module;The reporting modules include reporting design mould
Block and report management module;
The method for visualizing of the Graphic Design module is the model data provided according to data center platform and each component
In conjunction with rear generation object diagram, and generate the icon of corresponding object diagram;
The method for visualizing of the reporting design module is the icon good with Graphic Design module design, is generated by pulling
The data of multiple charts show report.
The method for visualizing of the reporting design module further includes following content:
(L1) the list workspace page is unfolded;
It is " component & chart " list area on the left of the page, first job area is only unfolded in default, but allows multiple workspaces
It is unfolded simultaneously;It can be carried out keyword retrieval, chart title retrieved, by the work where all charts comprising keyword retrieved
Make Qu Zhankai, only display includes the chart of keyword;Mouse is moved to the key words text frame of fill substance, automatic full choosing
Content after deletion, is restored to show all charts;
(L2) rich text component can be dragged to reporting design area;
Rich text includes following function: font size, font style, overstriking, italic, underscore, unordered list (small side
Block), ordered list (number 1,2,3), font color, character background color, left-justify, align center, Right Aligns, remove the possessive case
Formula;The rich text component in reporting design area can be deleted, is deleted without prompt;
(L3) picture component can be dragged to reporting design area;
The icon energy uploading pictures file of uploading pictures is hit at picture component midpoint;Component pattern after uploading pictures file
It is shown as uploading pictures;If non-uploading pictures, the picture component in reporting design area can be deleted, it, can if uploading pictures
It deletes the picture component in reporting design area or only deletes the picture of upload;
(L4) chart components can be dragged to reporting design area, and chart components pattern is completely the same as chart module design;
(L5) component of reporting design area's not paging, reporting design area is non-overlapping, pulls mode similar to chart show;It can be more
Reorganize size, the position of part;
(L6) when user's New Report, in reporting design area, for default there are a title, title name is same to report name,
It can modify, unsuppressible-suppression;Report name synchronous vacations when modifying title content, in report list;
(L7) during reporting design, every single stepping of user is automatically saved from the background;User often does once-through operation, all
It prompts " saving successfully ";Such as save that the used time is slightly long, and first prompt: " in preservation " after success, prompts " saving successfully ".
The method for visualizing of the Graphic Design module further includes following content:
(H1) left side shows filename or database name and table name and all field names;
(H2) the Back button is clicked, when four row, column, numerical value, screening frame at least one frames have content, into leaving
Prompt the page, prompt: " content of edit will not be saved ", enter page when coming after determining: chart is checked in data processing;
Otherwise, it is directly entered page when coming;
(H3) when in three row, column, numerical value frames at least one frame be it is substantial, " completion " button is just can be dotted
State;" completion " button is clicked, into checking the chart page;
(H4) field can be dragged to row, column, numerical value, screened in four frames with plan structure;When user pulls word
When section is to the position that can be placed, four row, column, numerical value, screening frames change colour to prompt;When a field is dragged to two fields
Between when, the latter field location moves back, and vacates a position for newer field, the position discoloration prompt user being available can unclamp
Mouse;During dragging, the full name of display field under mouse;
(H5) row, column, numerical value, the width of field in four frames of screening are fixed, and at most show 5 Chinese characters, this 5 Chinese characters
A Chinese character is accounted for including two letters, number, English symbol, Chinese bracket accounts for a Chinese character, when field name is more than 5
Chinese character then shows preceding 4 words and an omission mark " ... ";Mouse is moved in field, small bullet frame display field full name;
(H6) since the field in four row, column, numerical value, screening frames is wide, so the field number that every row can be placed, by
Screen resolution determines;It is automatic to enter a new line when being dragged in field a line and not showing, but default an only display the first row, when mouse moves
When moving row, column, numerical value, screening on four frames, the width amplification of frame shows all fields;Mouse is removed, and still only shows first
Row;
(H7) in row, column, numerical value, the upper right corner for screening four frames, there is " an emptying " small icon, click the icon, frame
In all fields be removed;
(H8) field can be pulled in four row, column, numerical value, screening frames to other any regions (except this four frames),
Field will be removed from frame;
(H9) there is " ranks transposition " button between ranks, click field between ranks and exchange;
(H10) have to the operation of field in row: sequence, removes edit field name;
Sequence includes ascending order, descending and cancellation sequence;
It clicks " edit field name ", the text in field is in editable state, can be modified, and any other area of the page is clicked
Domain saves modification;
(H11) have to the operation of field in column: sequence, display/hide, removes edit field name;
There are two buttons for display/hidden function: hiding field name, unhides;It clicks " hiding field name ", then the field
Name is not shown in Graphic Design area;
(H12) there is the operation of field in logarithm: switching evaluation mode, sequence, edit field name, screening washer, removal:
Switching evaluation mode has: total, average, maximum, minimum, counting, initial value are defaulted as initial value;
(H13) have to the operation of field in screening: screening washer cancels screening;
(H14) chart name is defaulted as the name of data source table, clicks " editor " icon, and chart name becomes editable
State after modification, clicks any other positions of the page, that is, saves modification;
(H15) when the chart style of selection is table, every page display data 20 are shown, has " load in page bottom
More " button, click reload 20;
(H16) it Graphic Design area: can only see, not editable;
(H17) diagrammatic representation pattern switches: backstage detection can adapt to the chart style of current chart structure, not adapt to
Pattern set grey, can not choose;New chart when not having design content also, defaults the equal gray of all chart styles.
Analysis system further includes the smart phone for being equipped with visualization synchronizing software APP, smart phone and visualization of presence
Unit networks connection;Every step mode of operation of visualization of presence unit can be on the visualization synchronizing software APP on smart phone
Simultaneous display;When the user that visualization of presence unit uses occurs that number cannot be generated by visualized operation rapid build chart
It is reported according to showing, the user that visualization of presence unit uses can request the people of mobile phone end to help realization on smart phone can
Report is shown depending on changing operation rapid build chart to generate data.If this example Field Force cannot be fast by visualized operation
Speed building chart can request people from distal end to help to generate when data show report, substantially increase dependable with function.Also easily
In allow Field Force learn use, it is convenient and simple.
Advanced visual chart, map can quickly be made online through this embodiment;Rectangle tree graph, bubble diagram, radar map,
String figure;Modular production method only produces data analysis report with simple several steps, enriches comprehensive data type and supports,
Real time data, without waiting, support file type (excel, csv, txt), type of database (Mysql, Sqlserver,
0racle, PostgreSql), the access of the multiple data sources such as customized online list.
The present embodiment is generated data by visualized operation rapid build chart and shows report, without programming, simply easily
It learns.
Claims (4)
1. the analysis system of visualization building chart, which is characterized in that analysis system includes visualization of presence unit, the scene
Visualization includes chart module, reporting modules, map visualization component, tree graph visualization component, parallel coordinate visualization
Component, time flow graph visualization component, scatter plot visualization component, histogram visualization component, network diagramming visualization component, cake
Shape figure visualization component and line chart visualization component;
The chart module includes Graphic Design module and management through figures module;The reporting modules include reporting design module and
Report management module;
The method for visualizing of the Graphic Design module is the model data according to data center platform offer in conjunction with each component
After generate object diagram, and generate the icon of corresponding object diagram;
The method for visualizing of the reporting design module is the icon good with Graphic Design module design, multiple by pulling generation
The data of chart show report.
2. the analysis system of visualization building chart according to claim 1, which is characterized in that the reporting design module
Method for visualizing further includes following content:
(L1) the list workspace page is unfolded;
It is " component & chart " list area on the left of the page, first job area is only unfolded in default, but allows multiple workspaces simultaneously
Expansion;It can be carried out keyword retrieval, chart title retrieved, by the workspace where all charts comprising keyword retrieved
Expansion, only display includes the chart of keyword;Mouse is moved to the key words text frame of fill substance, in automatic full choosing
Hold, after deletion, restores to show all charts;
(L2) rich text component can be dragged to reporting design area;
Rich text includes following function: font size, font style, overstriking, italic, underscore, unordered list, ordered list,
Font color, left-justify, align center, Right Aligns, removes all formats at character background color;The richness in reporting design area can be deleted
Text component is deleted without prompt;
(L3) picture component can be dragged to reporting design area;
The icon energy uploading pictures file of uploading pictures is hit at picture component midpoint;Component pattern is shown after uploading pictures file
For uploading pictures;If non-uploading pictures, the picture component in reporting design area can be deleted, if uploading pictures, can be deleted
The picture component in reporting design area or the picture for only deleting upload;
(L4) chart components can be dragged to reporting design area, and chart components pattern is completely the same as chart module design;
(L5) component of reporting design area's not paging, reporting design area is non-overlapping;Size, the position of component can be changed;
(L6) when user's New Report, in reporting design area, there are a titles, title name can repair with name is reported for default
Change, unsuppressible-suppression;Report name synchronous vacations when modifying title content, in report list;
(L7) during reporting design, every single stepping of user is automatically saved from the background;User often does once-through operation, all prompts
" saving successfully ";Such as save that the used time is slightly long, and first prompt: " in preservation " after success, prompts " saving successfully ".
3. the analysis system of visualization building chart according to claim 2, which is characterized in that the Graphic Design module
Method for visualizing further includes following content:
(H1) left side shows filename or database name and table name and all field names;
(H2) the Back button is clicked, when four row, column, numerical value, screening frame at least one frames have content, into leaving prompt
The page prompts: " content of edit will not be saved ", enter page when coming after determining: chart is checked in data processing;It is no
Then, it is directly entered page when coming;
(H3) when in three row, column, numerical value frames at least one frame be it is substantial, " completion " button is just can dotted state;Point
" completion " button is hit, into checking the chart page;
(H4) field can be dragged to row, column, numerical value, screened in four frames with plan structure;It is arrived when user pulls field
When the position that can be placed, four row, column, numerical value, screening frame discolorations are to prompt;It is dragged between two fields when by a field
When, the latter field location moves back, and vacates a position for newer field, the position discoloration prompt user being available can unclamp mouse
?;During dragging, the full name of display field under mouse;
(H5) row, column, numerical value, the width of field in four frames of screening are fixed, and at most show that 5 Chinese characters, this 5 Chinese characters include
Two letters, number, English symbol account for a Chinese character, and Chinese bracket accounts for a Chinese character, when field name is more than 5 Chinese
Word then shows preceding 4 words and an omission mark " ... ";Mouse is moved in field, small bullet frame display field full name;
(H6) since the field in four row, column, numerical value, screening frames is wide, so the field number that every row can be placed, by screen
Resolution ratio determines;It is automatic to enter a new line when being dragged in field a line and not showing, but default an only display the first row, when mouse is moved to
Row, column, numerical value, screening four frames on when, frame width amplification, show all fields;Mouse is removed, and still only shows the first row;
(H7) in row, column, numerical value, the upper right corner for screening four frames, there is " an emptying " small icon, click the icon, in frame
All fields are removed;
(H8) field can be pulled to other any regions in four row, column, numerical value, screening frames, field will be removed from frame;
(H9) there is " ranks transposition " button between ranks, click field between ranks and exchange;
(H10) have to the operation of field in row: sequence, removes edit field name;
Sequence includes ascending order, descending and cancellation sequence;
It clicks " edit field name ", the text in field is in editable state, can be modified, and clicks any other region of the page, i.e.,
Save modification;
(H11) have to the operation of field in column: sequence, display/hide, removes edit field name;
There are two buttons for display/hidden function: hiding field name, unhides;It clicks " hiding field name ", then the field name is not
It is shown in Graphic Design area;
(H12) there is the operation of field in logarithm: switching evaluation mode, sequence, edit field name, screening washer, removal:
Switching evaluation mode has: total, average, maximum, minimum, counting, initial value are defaulted as initial value;
(H13) have to the operation of field in screening: screening washer cancels screening;
(H14) chart name is defaulted as the name of data source table, clicks " editor " icon, and chart name becomes editable shape
State after modification, clicks any other positions of the page, that is, saves modification;
(H15) when the chart style of selection is table, every page display data 20 are shown, there are " load is more " in page bottom
Button, click reload 20;
(H16) it Graphic Design area: can only see, not editable;
(H17) diagrammatic representation pattern switches: backstage detection can adapt to the chart style of current chart structure, immalleable sample
Formula sets grey, can not choose;New chart when not having design content also, defaults the equal gray of all chart styles.
4. the analysis system of the according to claim 1 or 2 or 3 visualization building charts, which is characterized in that analysis system is also wrapped
The smart phone for being equipped with visualization synchronizing software APP is included, smart phone is connect with visualization of presence unit networks;It is live visual
Change unit every step mode of operation can on the visualization synchronizing software APP on smart phone simultaneous display;Work as visualization of presence
The user that unit uses occurs that data displaying report, visualization of presence cannot be generated by visualized operation rapid build chart
The user that unit uses can request the people of mobile phone end to help on smart phone and realize visualized operation rapid build chart
Report is shown to generate data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811616452.7A CN109710686A (en) | 2018-12-27 | 2018-12-27 | The analysis system of visualization building chart |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811616452.7A CN109710686A (en) | 2018-12-27 | 2018-12-27 | The analysis system of visualization building chart |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109710686A true CN109710686A (en) | 2019-05-03 |
Family
ID=66258722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811616452.7A Pending CN109710686A (en) | 2018-12-27 | 2018-12-27 | The analysis system of visualization building chart |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109710686A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110674227A (en) * | 2019-09-20 | 2020-01-10 | 上海东方富联科技有限公司 | Method, system, medium and terminal for generating data visualization chart and page |
CN110908649A (en) * | 2019-10-14 | 2020-03-24 | 成都西山居世游科技有限公司 | Detachable and combinable chart drawing method and system |
CN111078094A (en) * | 2019-12-04 | 2020-04-28 | 北京邮电大学 | Distributed machine learning visualization device |
CN111274302A (en) * | 2020-01-21 | 2020-06-12 | 北京明略软件系统有限公司 | Editing method and system of webpage chart component, electronic equipment and storage medium |
CN111626036A (en) * | 2020-05-27 | 2020-09-04 | 南京蓝鲸人网络科技有限公司 | Novel image-text typesetting processing method |
CN112540760A (en) * | 2020-12-08 | 2021-03-23 | 杭州讯酷科技有限公司 | UI (user interface) quick construction method based on data source field |
CN112711460A (en) * | 2021-01-18 | 2021-04-27 | 深圳市至简科技设计有限公司 | Page linkage based display method and system and electronic equipment |
CN114911544A (en) * | 2021-02-09 | 2022-08-16 | 北京同邦卓益科技有限公司 | Data analysis report generation method and device, electronic equipment and storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103984755A (en) * | 2014-05-28 | 2014-08-13 | 中国地质大学(北京) | Multidimensional model based oil and gas resource data key system implementation method and system |
CN106776963A (en) * | 2016-12-05 | 2017-05-31 | 同济大学 | The light-weighted online method for visualizing of BIM big datas and system |
CN107844299A (en) * | 2017-12-01 | 2018-03-27 | 浪潮软件股份有限公司 | A kind of implementation method of Web application development tools |
CN107918516A (en) * | 2017-10-17 | 2018-04-17 | 广东广业开元科技有限公司 | A kind of system and method for Visual Dynamic configuration generation chart |
CN108717430A (en) * | 2018-05-11 | 2018-10-30 | 重庆工商职业学院 | A kind of the webpage report form generation method and system of big data analysis |
CN108804513A (en) * | 2018-04-24 | 2018-11-13 | 华东计算技术研究所(中国电子科技集团公司第三十二研究所) | Automatic visual analysis method for big data platform |
-
2018
- 2018-12-27 CN CN201811616452.7A patent/CN109710686A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103984755A (en) * | 2014-05-28 | 2014-08-13 | 中国地质大学(北京) | Multidimensional model based oil and gas resource data key system implementation method and system |
CN106776963A (en) * | 2016-12-05 | 2017-05-31 | 同济大学 | The light-weighted online method for visualizing of BIM big datas and system |
CN107918516A (en) * | 2017-10-17 | 2018-04-17 | 广东广业开元科技有限公司 | A kind of system and method for Visual Dynamic configuration generation chart |
CN107844299A (en) * | 2017-12-01 | 2018-03-27 | 浪潮软件股份有限公司 | A kind of implementation method of Web application development tools |
CN108804513A (en) * | 2018-04-24 | 2018-11-13 | 华东计算技术研究所(中国电子科技集团公司第三十二研究所) | Automatic visual analysis method for big data platform |
CN108717430A (en) * | 2018-05-11 | 2018-10-30 | 重庆工商职业学院 | A kind of the webpage report form generation method and system of big data analysis |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110674227A (en) * | 2019-09-20 | 2020-01-10 | 上海东方富联科技有限公司 | Method, system, medium and terminal for generating data visualization chart and page |
CN110908649A (en) * | 2019-10-14 | 2020-03-24 | 成都西山居世游科技有限公司 | Detachable and combinable chart drawing method and system |
CN111078094A (en) * | 2019-12-04 | 2020-04-28 | 北京邮电大学 | Distributed machine learning visualization device |
CN111274302A (en) * | 2020-01-21 | 2020-06-12 | 北京明略软件系统有限公司 | Editing method and system of webpage chart component, electronic equipment and storage medium |
CN111626036A (en) * | 2020-05-27 | 2020-09-04 | 南京蓝鲸人网络科技有限公司 | Novel image-text typesetting processing method |
CN112540760A (en) * | 2020-12-08 | 2021-03-23 | 杭州讯酷科技有限公司 | UI (user interface) quick construction method based on data source field |
CN112711460A (en) * | 2021-01-18 | 2021-04-27 | 深圳市至简科技设计有限公司 | Page linkage based display method and system and electronic equipment |
CN112711460B (en) * | 2021-01-18 | 2021-07-20 | 深圳市至简科技设计有限公司 | Page linkage based display method and system and electronic equipment |
CN114911544A (en) * | 2021-02-09 | 2022-08-16 | 北京同邦卓益科技有限公司 | Data analysis report generation method and device, electronic equipment and storage medium |
CN114911544B (en) * | 2021-02-09 | 2024-04-05 | 北京同邦卓益科技有限公司 | Method and device for generating data analysis report, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109710686A (en) | The analysis system of visualization building chart | |
KR101794373B1 (en) | Temporary formatting and charting of selected data | |
CN109614424A (en) | Page layout generation method, calculates equipment and medium at device | |
CN109597954A (en) | Data item methods of exhibiting, calculates equipment and medium at device | |
CN109375914B (en) | Information remote interaction method and system | |
CN109933322A (en) | A kind of page editing method, apparatus and computer readable storage medium | |
KR20080046907A (en) | Apparatus for simultaneously saving the areas selected on image and apparatus for making documents by automatically recording image informations | |
CN109145272B (en) | Text rendering and layout method, device, equipment and storage medium | |
CN109656654A (en) | The edit methods and computer readable storage medium of large-size screen monitors scene | |
US11288337B2 (en) | Object selection in web page authoring | |
CN109189532A (en) | Control column display methods, device, equipment and the storage medium of electronic whiteboard | |
CN114048111A (en) | Vue framework-based user-defined data visualization large-screen implementation method | |
CN109508187A (en) | Wechat public platform video text editing device construction method and its editing machine based on HTML | |
CN110175026B (en) | Webpage visual editing method, device and storage medium | |
CN112364496A (en) | Avionics simulation panel generation system based on HTML5 and VUE technology | |
CN112352214A (en) | Display control device, display control method, and display control program | |
CN112783494A (en) | Automatic skeleton screen generation method and device and application page updating method and device | |
CN116610394A (en) | Template and module-based data visualization page configuration method, system and device | |
CN115630926A (en) | Workshop equipment management method, device, equipment and storage medium | |
CN115544405A (en) | Page rendering method and device, electronic equipment and storage medium | |
Cisco | Objective View Editor | |
JPH0511952A (en) | Method and device for displaying information | |
CN110119502A (en) | A method of dynamic table single domain is realized based on OFD document | |
CN109814864A (en) | A kind of data visualization method, visualization system, Web browsing system and equipment | |
US11966572B2 (en) | Commenting feature for graphic design systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190503 |