CN109710669A - The method of raising full electric network model data accuracy based on verification rule base - Google Patents

The method of raising full electric network model data accuracy based on verification rule base Download PDF

Info

Publication number
CN109710669A
CN109710669A CN201811480495.7A CN201811480495A CN109710669A CN 109710669 A CN109710669 A CN 109710669A CN 201811480495 A CN201811480495 A CN 201811480495A CN 109710669 A CN109710669 A CN 109710669A
Authority
CN
China
Prior art keywords
model
data
network model
whole network
verification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811480495.7A
Other languages
Chinese (zh)
Other versions
CN109710669B (en
Inventor
何鹏
李坤
刘明峰
王萍
孟建
彭碧君
李�昊
夏静怡
侯路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811480495.7A priority Critical patent/CN109710669B/en
Publication of CN109710669A publication Critical patent/CN109710669A/en
Application granted granted Critical
Publication of CN109710669B publication Critical patent/CN109710669B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to a kind of methods of raising full electric network model data accuracy based on verification rule base, belong to electric system electric power network technique field.The present invention includes the following steps: step 1: the foundation of various regions tune heterogeneous system model mapping definition table: the model of flexibly configurable defines mapping table, the device model of each heterogeneous system and attribute are all converted into the definition format of unified standard, form unified data pattern file;Step 2: the planning and foundation of model checking rule base, and flexibly verify rule using the part of rule base according to demand and comprehensive check analysis is carried out to the whole network model of generation;Step 3: circulation carries out the work of acquisition and the verification of the whole network model.It solves the problems, such as that artificial experience is relied on to verify inefficiency in the past;By successive ignition, the whole network model data accuracy is greatly improved until accuracy rate reaches acceptable range, solves the problems, such as that the accuracy of data in large-scale power grid model heterogeneous system is difficult to ensure.

Description

The method of raising full electric network model data accuracy based on verification rule base
Technical field
The present invention relates to a kind of methods of raising full electric network model data accuracy based on verification rule base, belong to electric power System electric power network technique field.
Background technique
Electric network model is the basis of electric system software analysis;Therefore correct reliable electric network model is automation and scheduling The basis to work, it is necessary to attach great importance to.At present since provincial company and the automation EMS system of each department are by multiple factories Family is built, and the system of " differentiated control, hierarchical control, distribution process " has been formd, in order to realize to interconnected power grid It comprehensively and accurately analyzes and controls, require consideration for how the whole network model data for efficiently integrating and obtaining complete and accurate.At present It is bigger apparently to effectively integrate model data difficulty.
Electric system is fast changing entirety, when every grade of power grid is analyzed in real time, requires to be related to the adjacent electricity of interconnection The influence of net and upper and lower grade power grid.But it is shared due to being deficient in resources at this stage, it can only be right when carrying out the analytical calculation of this power grid The model of adjacent power grid carries out simplified and equivalence to a certain extent, and this method is for contacting less close subnet certain Accuracy rating in can satisfy actual requirement of engineering, but be inaccurate for the interconnection large power system being closely connected. Therefore based on the fusion that model file mode carries out heterogeneous system model it is a feasible scheme, but adjusts in view of each province different The accuracy of data is difficult to ensure in construction system, each heterogeneous system for data definition inconsistency, therefore for integration after Full model file have to carry out detailed verification, problem is fed back, carries out the integration of model file after rectification again. This step of iteration is until getting the high full electric network model data of accuracy.
Summary of the invention
In view of the foregoing defects the prior art has, the invention proposes a kind of raising full electric networks based on verification rule base The method of model data accuracy.
The method of raising full electric network model data accuracy of the present invention based on verification rule base, including walk as follows It is rapid:
Step 1: the foundation of various regions tune heterogeneous system model mapping definition table: the model of flexibly configurable defines mapping table, The device model of each heterogeneous system and attribute are all converted into the definition format of unified standard, form unified data model text Part, including following small step:
Classify step 1: model defines mapping table according to device object type, according to each heterogeneous system equipment pair As table structure defines the map field of each equipment specific object, the definition of on-demand device model Mapping and Converting table, shape are completed At the independent model mapping definition table of various regions tune;
Step 2: reading the specific model mapping definition table of various regions tune using ETL tool, each attribute field is combined into tool The SQL statement of body, the specific data of relevant device object are read using SQL statement, and write the result into the unified mould of standard Type file;
It is integrated under catalogue step 3: being uniformly sent to concrete model using the model file of generation, with getting each province After adjusting device model file, each department reading data is carried out to the integration conversion of model data using ETL tool into memory simultaneously It is written in target database;
Step 2: the planning and foundation of model checking rule base, and flexibly verified according to demand using the part of rule base Rule carries out comprehensive check analysis to the whole network model of generation;
Step 3: circulation carries out the work of acquisition and the verification of the whole network model, including following small step:
Step 1: each department user modifies model according to the abnormal data Study document of acquisition and resubmits amendment rear mold Type file reacquires the whole network model data using ETL tool and carries out to the full electric network model data in written data library The operation that additions and deletions change is to obtain newest the whole network model data;
Step 2: carrying out verification point to the whole network model data using selected rule base again on the basis of previous step Analysis, this process of loop iteration is until obtaining accurately and reliably full electric network data model;
Step 3: on the basis of previous step according to reliable full electric network model can be carried out the whole network model monitoring, Analyze work.
Further to limit, in the step 2, comprehensive check analysis is divided into common data verification, business rule school It tests, the topological relation of node verification three parts.
Further to limit, in the step 2, comprehensive check analysis includes following small step:
Step 1: device object can't wrap in the whole network model of formation according to the specific requirement of the whole network model of generation Containing whole device object attributes, thus only need to select it is necessary to verification rule these device objects are verified, Button triggering is clicked after selected verification rule to the verifying work of the whole network model, and according to equipment affiliated area and rule type Two dimensions carry out taxonomic revision to the abnormal data of acquisition;
Step 2: forming the abnormal data Study document of a verification according to each area, and by the abnormal data of generation File distributing is to various regions tune and issues alarm prompt related personnel and handles.
The beneficial effects of the present invention are: the raising full electric network model data of the present invention based on verification rule base is accurate The method of property, can integrate the model of all kinds of heterogeneous systems in large-scale power grid, form the complete model of the whole network, solve model not Unified problem;It can be completed according to specific configurable inspection rule library abundant to model data analysis of the accuracy, and according to Equipment affiliated area, which is formed, saves reconciliation various regions tune case study file, solves in the past by artificial experience verification inefficiency Problem;By successive ignition, the whole network model data accuracy is greatly improved until accuracy rate reaches acceptable range, is solved The problem of accuracy of data is difficult to ensure in large-scale power grid model heterogeneous system.
Detailed description of the invention
Fig. 1 is the whole network model integration and checking process figure of the invention.
Specific embodiment
In order to which the object of the invention, technical solution is more clearly understood, below with reference to embodiment, the present invention is made further It is described in detail.
Embodiment 1:
As shown in Figure 1, the method for the raising full electric network model data accuracy of the present invention based on verification rule base, It is obtained firstly the need of according to the model mapping definition table of foundation and on this basis using ETL (such as KETTLE) tool from various regions tune The model file of various regions tune heterogeneous system is taken, and data are carried out with the model data for being integrally formed the whole network.Due to the whole network pattern number According to being provided to monitoring, analysis etc. using it is accurate and can capture in time to abnormal data and anti-to be applied to data Capable processing is transferred in various regions of feeding.Therefore need to establish a configurable flexible comprehensive verification rule base to the whole network mould of acquisition Type data are verified, and to obtained abnormal data statistic of classification and are distributed to each region to allow each zone user to carry out in time whole Change.
The method of raising full electric network model data accuracy of the present invention based on verification rule base, including walk as follows It is rapid:
Step 1: the foundation of various regions tune heterogeneous system model mapping definition table: the model of flexibly configurable defines mapping table, The device model of each heterogeneous system and attribute are all converted into the definition format of unified standard, form unified data model text Part, including following small step:
Classify step 1: model defines mapping table according to device object type, according to each heterogeneous system equipment pair As table structure defines the map field of each equipment specific object, the definition of on-demand device model Mapping and Converting table, shape are completed At the independent model mapping definition table of various regions tune;
Step 2: reading the specific model mapping definition table of various regions tune using ETL tool, each attribute field is combined into tool The SQL statement of body, the specific data of relevant device object are read using SQL statement, and write the result into the unified mould of standard Type file;
It is integrated under catalogue step 3: being uniformly sent to concrete model using the model file of generation, with getting each province After adjusting device model file, each department reading data is carried out to the integration conversion of model data using ETL tool into memory simultaneously It is written in target database;
Step 2: the planning and foundation of model checking rule base, and flexibly verified according to demand using the part of rule base Rule carries out comprehensive check analysis to the whole network model of generation;
Step 3: circulation carries out the work of acquisition and the verification of the whole network model, including following small step:
Step 1: each department user modifies model according to the abnormal data Study document of acquisition and resubmits amendment rear mold Type file reacquires the whole network model data using ETL tool and carries out to the full electric network model data in written data library The operation that additions and deletions change is to obtain newest the whole network model data;
Step 2: carrying out verification point to the whole network model data using selected rule base again on the basis of previous step Analysis, this process of loop iteration is until obtaining accurately and reliably full electric network data model;
Step 3: on the basis of previous step according to reliable full electric network model can be carried out the whole network model monitoring, Analyze work.
Further to limit, in the step 2, comprehensive check analysis is divided into common data verification, business rule school It tests, the topological relation of node verification three parts.
Further to limit, in the step 2, comprehensive check analysis includes following small step:
Step 1: device object can't wrap in the whole network model of formation according to the specific requirement of the whole network model of generation Containing whole device object attributes, thus only need to select it is necessary to verification rule these device objects are verified, Button triggering is clicked after selected verification rule to the verifying work of the whole network model, and according to equipment affiliated area and rule type Two dimensions carry out taxonomic revision to the abnormal data of acquisition;
Step 2: forming the abnormal data Study document of a verification according to each area, and by the abnormal data of generation File distributing is to various regions tune and issues alarm prompt related personnel and handles.
The beneficial effects of the present invention are: the raising full electric network model data of the present invention based on verification rule base is accurate The method of property, can integrate the model of all kinds of heterogeneous systems in large-scale power grid, form the complete model of the whole network, solve model not Unified problem;It can be completed according to specific configurable inspection rule library abundant to model data analysis of the accuracy, and according to Equipment affiliated area, which is formed, saves reconciliation various regions tune case study file, solves in the past by artificial experience verification inefficiency Problem;By successive ignition, the whole network model data accuracy is greatly improved until accuracy rate reaches acceptable range, is solved The problem of accuracy of data is difficult to ensure in large-scale power grid model heterogeneous system.
Embodiment 2:
Main contents of the invention include: how research carries out unification to each device model and attribute data of heterogeneous system The device model of each heterogeneous system and attribute are all converted into unified standard definition format using model mapping definition table by definition, Form unified data pattern file, the distribution on line formula electric network model standard currently based on 61970 standard of IEC be one not Wrong selection, it is of course possible to flexibly change the format of definition according to oneself demand, it is only necessary to reconfigure model mapping definition table It can meet the requirements.
The foundation that rule base is verified after research model integration is broadly divided into common data verification, business rule verification, node Topological relation verify three parts.
Verification rule is introduced by taking plant stand and current transformer as an example below to be defined as follows:
Check whether plant stand affiliated area is filled in, this attribute is a required item;Checking the affiliated voltage class of plant stand is No to fill in, this attribute is also a required item;Check whether plant stand telephone number meets format and meet cell-phone number or with area code Fixed telephone number rule, specific regular expression:
(^1 [3,4,5,7,8] d { 9 } $) | (^0 [0-9] { 2,3 }-([2-9] [0-9] { 6,7 })+(- [0-9] { 1,4 })? $));
Check plant stand E-mail address whether meet format meet E-mail address rule (specific regular expression:
^[a-zA-Z0-9_-]+@[a-zA-Z0-9_-]+(\.[a-zA-Z0-9_-]+)+$];
Check whether plant stand postcode is six bit digitals, specific regular expression:
^\d{6}$)。
The voltage of current transformer is less than or equal to the ceiling voltage type of plant stand;
The operating status of current transformer meets rule and requires, and judges operating status according to date of putting into operation, retired date;
Date of putting into operation < current date, operating status cannot be equal to (planning, building);Retired date < current date, operation State I n (moves back fortune, scrap);
The retired date of current transformer meets rule and requires (if operating status is to move back fortune, to fill out, be later than day of putting into operation Phase);
The secondary current rated value of current transformer is 1A or 5A;
The primary current rated value of current transformer is in 5~25000A range.
How some attribute of the whole network model data class device object is efficiently applied to corresponding rule by research, first Specific rules are first formed into a fixed name dynamic library file, strictly all rules all develop a diacritic fixed name dynamic Library.Then full electric network model file data are stored in memory, the model file of the whole network mainly includes transformer, winding, switch, knife The device datas such as lock, grounding switch, bus, capacitor, reactor, route, load, and suggest that good rope ELT draws mechanism, side Just quick and precisely position and obtain the total data of a certain generic attribute of a certain device object.It is critical to establish an equipment later The attribute of object configuration file corresponding with rule, it is specific will to be accurately passed to after a certain device attribute data all acquisition The dynamic base of verification rule is verified.The analysis of abnormal data is finally formed after carrying out full validation to the whole network model data Destination file, and the exception information that data affiliated area based on the analysis results will be seen that is distributed to each region.
The method of raising full electric network model data accuracy of the present invention based on verification rule base, can integrate big The model of all kinds of heterogeneous systems in type power grid, forms the complete model of the whole network, solves the problems, such as that model is skimble-scamble;It being capable of basis Specific configurable inspection rule library abundant is completed to model data analysis of the accuracy, and is formed to save according to equipment affiliated area and be adjusted With various regions tune case study file, solve the problems, such as that artificial experience is relied on to verify inefficiency in the past;By successive ignition, greatly Width improves the whole network model data accuracy until accuracy rate reaches acceptable range, solves large-scale power grid model heterogeneous system The problem of accuracy of middle data is difficult to ensure.
The present invention can be widely used in electric system power grid occasion.
The foregoing is merely presently preferred embodiments of the present invention and oneself, not with the present invention for limitation, it is all in essence of the invention Made impartial modifications, equivalent substitutions and improvements etc., should be included in patent covering scope of the invention within mind and principle.

Claims (3)

1. a kind of method of the raising full electric network model data accuracy based on verification rule base, which is characterized in that including as follows Step:
Step 1: the foundation of various regions tune heterogeneous system model mapping definition table: the model of flexibly configurable defines mapping table, will be each The device model and attribute of heterogeneous system are all converted into the definition format of unified standard, form unified data pattern file, wrap Include following small step:
Classify step 1: model defines mapping table according to device object type, according to each heterogeneous system device object table Structure defines the map field of each equipment specific object, completes the definition of on-demand device model Mapping and Converting table, is formed each The independent model mapping definition table of ground tune;
Step 2: reading the specific model mapping definition table of various regions tune using ETL tool, each attribute field is combined into specifically SQL statement, the specific data of relevant device object are read using SQL statement, and write the result into the unified model text of standard Part;
It integrates under catalogue step 3: being uniformly sent to concrete model using the model file of generation, is set adjusting with getting each province After standby model file, the integration that each department reading data is carried out to model data using ETL tool into memory is converted and is written Into target database;
Step 2: the planning and foundation of model checking rule base, and rule flexibly is verified using the part of rule base according to demand Comprehensive check analysis is carried out to the whole network model of generation;
Step 3: circulation carries out the work of acquisition and the verification of the whole network model, including following small step:
Step 1: model is literary after each department user modifies model and resubmit amendment according to the abnormal data Study document of acquisition Part reacquires the whole network model data using ETL tool and carries out additions and deletions to the full electric network model data in written data library The operation changed is to obtain newest the whole network model data;
Step 2: carrying out check analysis to the whole network model data using selected rule base again on the basis of previous step, follow This process of ring iterative is until obtaining accurately and reliably full electric network data model;
Step 3: can be carried out monitoring, the analysis of the whole network model according to reliable full electric network model on the basis of previous step Work.
2. the method for the raising full electric network model data accuracy according to claim 1 based on verification rule base, special Sign is, in the step 2, comprehensive check analysis is divided into common data verification, business rule verifies, the topology of node is closed System's verification three parts.
3. the method for the raising full electric network model data accuracy according to claim 2 based on verification rule base, special Sign is, in the step 2, comprehensive check analysis includes following small step:
Step 1: device object can't be comprising complete in the whole network model of formation according to the specific requirement of the whole network model of generation The device object attribute in portion, thus only need to select it is necessary to verification rule these device objects are verified, selected Button triggering is clicked after verification rule to the verifying work of the whole network model, and according to equipment affiliated area and rule type two Dimension carries out taxonomic revision to the abnormal data of acquisition;
Step 2: forming the abnormal data Study document of a verification according to each area, and by the abnormal data file of generation It is distributed to various regions tune and issues alarm prompt related personnel and handle.
CN201811480495.7A 2018-12-05 2018-12-05 Method for improving accuracy of full power grid model data based on check rule base Active CN109710669B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811480495.7A CN109710669B (en) 2018-12-05 2018-12-05 Method for improving accuracy of full power grid model data based on check rule base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811480495.7A CN109710669B (en) 2018-12-05 2018-12-05 Method for improving accuracy of full power grid model data based on check rule base

Publications (2)

Publication Number Publication Date
CN109710669A true CN109710669A (en) 2019-05-03
CN109710669B CN109710669B (en) 2022-07-29

Family

ID=66254634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811480495.7A Active CN109710669B (en) 2018-12-05 2018-12-05 Method for improving accuracy of full power grid model data based on check rule base

Country Status (1)

Country Link
CN (1) CN109710669B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111553576A (en) * 2020-04-20 2020-08-18 国电南瑞科技股份有限公司 Data verification method, device and system suitable for electric power spot market
CN117271648A (en) * 2023-11-23 2023-12-22 北京邮电大学 Adaptation method of bottom data model and storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080140609A1 (en) * 2005-05-13 2008-06-12 Abb Research Ltd Generating a unique representation of physical assets
CN101272051A (en) * 2008-05-06 2008-09-24 江苏省电力公司南京供电公司 Information system integration method of electric network production control region and management information region
CN102750358A (en) * 2012-06-12 2012-10-24 中国电力科学研究院 Mapping method and system of system data model to common information model (CIM)
CN104361105A (en) * 2014-11-28 2015-02-18 国家电网公司 Power distribution network model and topology checking method based on ontology reasoning
CN104463715A (en) * 2014-12-29 2015-03-25 国网甘肃省电力公司武威供电公司 Pattern and model verifying method of distribution automation master station system and geographical information system
CN107272615A (en) * 2017-06-14 2017-10-20 国网上海市电力公司 A kind of substation model processing method for allocating integral system
WO2018120893A1 (en) * 2016-12-28 2018-07-05 国电南瑞科技股份有限公司 Power grid model on-line calibration method, device, and storage medium
CN108446396A (en) * 2018-03-26 2018-08-24 电子科技大学 A kind of electric power data processing method based on modified CIM model

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080140609A1 (en) * 2005-05-13 2008-06-12 Abb Research Ltd Generating a unique representation of physical assets
CN101272051A (en) * 2008-05-06 2008-09-24 江苏省电力公司南京供电公司 Information system integration method of electric network production control region and management information region
CN102750358A (en) * 2012-06-12 2012-10-24 中国电力科学研究院 Mapping method and system of system data model to common information model (CIM)
CN104361105A (en) * 2014-11-28 2015-02-18 国家电网公司 Power distribution network model and topology checking method based on ontology reasoning
CN104463715A (en) * 2014-12-29 2015-03-25 国网甘肃省电力公司武威供电公司 Pattern and model verifying method of distribution automation master station system and geographical information system
WO2018120893A1 (en) * 2016-12-28 2018-07-05 国电南瑞科技股份有限公司 Power grid model on-line calibration method, device, and storage medium
CN107272615A (en) * 2017-06-14 2017-10-20 国网上海市电力公司 A kind of substation model processing method for allocating integral system
CN108446396A (en) * 2018-03-26 2018-08-24 电子科技大学 A kind of electric power data processing method based on modified CIM model

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
BOYA QIN等: "Formal modeling and verification of flexible load control for power grid CPS based on differential dynamic logic", 《IEEE XPLORE》, 4 January 2018 (2018-01-04) *
王瑞杰: "面向电力调度控制系统的多源异构数据处理方法研究", 《中国优秀博硕士学位论文全文数据库(硕士) 工程科技Ⅱ辑》, no. 03, 15 March 2018 (2018-03-15) *
马冬冬: "宁夏电网模型拼接系统的开发与应用", 《宁夏电力》, no. 05, 28 October 2015 (2015-10-28) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111553576A (en) * 2020-04-20 2020-08-18 国电南瑞科技股份有限公司 Data verification method, device and system suitable for electric power spot market
CN111553576B (en) * 2020-04-20 2022-06-07 国电南瑞科技股份有限公司 Data verification method, device and system suitable for electric power spot market
CN117271648A (en) * 2023-11-23 2023-12-22 北京邮电大学 Adaptation method of bottom data model and storage medium

Also Published As

Publication number Publication date
CN109710669B (en) 2022-07-29

Similar Documents

Publication Publication Date Title
US9798310B2 (en) Method for searching cross-regional power supply area based on CIM model and system thereof
Kezunovic et al. The role of big data in improving power system operation and protection
CN102957205B (en) A kind of method and system setting up electricity distribution network model
CN104951997B (en) Various dimensions artwork mass analysis method towards power distribution network
CN104318027B (en) The design method of model information table closed loop automatic interaction based on information table template
Cavalieri et al. Integration of IEC 61850 SCL and OPC UA to improve interoperability in Smart Grid environment
CN109284346A (en) Cloud computing-based power distribution network planning method and device
CN110276532A (en) A kind of distribution network reliability calculation method of the research based on load piecemeal
CN104933631A (en) Power distribution network operation online analysis and evaluation system
CN105354680B (en) GIS-based power grid section auxiliary determination analysis method
KR101397380B1 (en) System for integrating meta-modeling
CN104732322A (en) Mobile operation and maintenance method for power communication network machine rooms
KR101397381B1 (en) Method for integrating meta-modeling
CN107591802A (en) A kind of abstract method of calibration of distribution network model
CN109710669A (en) The method of raising full electric network model data accuracy based on verification rule base
CN106981876A (en) Distribution network reliability evaluation method based on line segment model
CN107103110A (en) The uniform information model and modeling method of big data analysis are monitored towards grid equipment
CN112150096A (en) System and method for generating equipment ledger hierarchical tree from EMS substation graph model
Mukherjee et al. A CIM based data integration framework for distribution utilities
KR101397379B1 (en) System for transformation meta-modeling
CN105633970B (en) Distribution back scheduling control system building method based on major network scheduling system
CN116843284A (en) Method, device and equipment for generating operation ticket of distribution network operation
Ten et al. Extraction of geospatial topology and graphics for distribution automation framework
Santodomingo et al. IEC 61970 for energy management system integration
CN109522045B (en) A kind of secondary system of intelligent substation quickly configuration method based on information flow chart

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant