CN109709923A - Test control method and device, system, computer readable storage medium - Google Patents
Test control method and device, system, computer readable storage medium Download PDFInfo
- Publication number
- CN109709923A CN109709923A CN201811623321.1A CN201811623321A CN109709923A CN 109709923 A CN109709923 A CN 109709923A CN 201811623321 A CN201811623321 A CN 201811623321A CN 109709923 A CN109709923 A CN 109709923A
- Authority
- CN
- China
- Prior art keywords
- test
- test step
- determinand
- identifier information
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
This application involves a kind of test control methods and device, system, computer readable storage medium.This method, comprising: by when the determinand is in current test step, obtaining the first identifier information of the first test step, first test step is and the cascade next test step of presently described test step;The control instruction for entering the second test step is received, and obtains the second identifier information of second test step, the control instruction is used to indicate the determinand into second test step;When the first identifier information is consistent with the second identifier information, the determinand is controlled into second test step, can prevent determinand from not testing during the test by regulation testing process, improve the reliability of test.
Description
Technical field
This application involves technical field of electronic equipment, more particularly to a kind of test control method and device, system, calculating
Machine readable storage medium storing program for executing.
Background technique
With the rapid development of Internet, intelligent terminal has become the most common electronic equipment of many users, such as intelligence
Energy mobile phone, plate battery plate etc..Market also proposed bigger challenge to the output of intelligent terminal.The manufacture of product, which produces, to be needed
It is realized according to different process requirements by corresponding process flow, and every process flow is up to thousands of a steps, each
Step all binds all multi informations, including equipment, formula, process data specification etc., in order to obtain better yield in technique, in life
Produce the test that carry out product after the assembly is completed.
Traditionally, MES (manufacturing execution system, manufacturing execution system) is applied and is surveyed in product
To promote testing efficiency during examination, still, during the test, the reliability of test not can guarantee.
Summary of the invention
The embodiment of the present application provides a kind of test control method and device, system, computer readable storage medium, Ke Yiti
The reliability of height test, to promote production quality.
The embodiment of the present application provides a kind of test control method, carries out test control to determinand applied to manufacturing execution system
System, which comprises
When the determinand is in current test step, the first identifier information of the first test step is obtained, described the
One test step be and the cascade next test step of presently described test step;
The control instruction for entering the second test step is received, and obtains the second identifier information of second test step,
The control instruction is used to indicate the determinand into second test step;
When the first identifier information is consistent with the second identifier information, the determinand is controlled into described second
Test step.
The embodiment of the present application also provides a kind of test control device, tests applied to manufacturing execution system determinand
Control, described device include:
First obtains module, for when the determinand be in current test step, the of the first test step of acquisition
One identification information, first test step are and the cascade next test step of presently described test step;
Second obtains module, for receiving the instruction for entering the second test step, so that the determinand is into described the
Two test steps, and obtain the second identifier information of second test step;
Control module, for controlling described to be measured when the first identifier information is consistent with the second identifier information
Object enters second test step.
The embodiment of the present invention also provides a kind of test control system, including server, client and testing station, the service
Computer program is stored in device, when the computer program is executed by the testing station, so that testing station executes following steps:
When the determinand is in current test step, the first identifier information of the first test step is obtained, described the
One test step be and the cascade next test step of presently described test step;
The control instruction for entering the second test step is received, and obtains the second identifier information of second test step,
The control instruction is used to indicate the determinand into second test step;
When the first identifier information is consistent with the second identifier information, the determinand is controlled into described second
Test step.
The embodiment of the present invention also provides a kind of non-volatile computer readable storage medium storing program for executing, is stored thereon with computer journey
Sequence, the computer program realize following steps when being executed by processor:
When the determinand is in current test step, the first identifier information of the first test step is obtained, described the
One test step be and the cascade next test step of presently described test step;
The control instruction for entering the second test step is received, and obtains the second identifier information of second test step,
The control instruction is used to indicate the determinand into second test step;
When the first identifier information is consistent with the second identifier information, the determinand is controlled into described second
Test step.
Test control method and device, system, the computer readable storage medium of above-mentioned offer, by working as the determinand
When in current test step, obtain the first test step first identifier information, first test step for current institute
State the cascade next test step of test step;The control instruction for entering the second test step is received, and obtains described second and surveys
The second identifier information of trial work sequence, the control instruction are used to indicate the determinand into second test step;Work as institute
State first identifier information it is consistent with the second identifier information when, control the determinand into second test step, can
To prevent determinand from not testing during the test by defined testing process, the reliability of test is improved.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of application for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of test macro in one embodiment;
Fig. 2 is the internal structure block diagram of the server provided in one embodiment;
Fig. 3 is the test control method flow chart provided in one embodiment;
Fig. 4 is the test control method flow chart provided in another embodiment;
Fig. 5 is the test control method flow chart provided in further embodiment;
Fig. 6 is the structural schematic diagram of the test control device provided in one embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood
The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, and
It is not used in restriction the application.
It is appreciated that term " first " used in this application, " second " etc. can be used to describe various elements herein,
But these elements should not be limited by these terms.These terms are only used to distinguish the first element from the other element.Citing comes
It says, in the case where not departing from scope of the present application, the first acquisition module can be known as the second acquisition module, and similarly,
Second acquisition module can be known as the first acquisition module.First acquisition module and the second acquisition module both obtain module,
But it is not same acquisition module.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention
The normally understood meaning of technical staff is identical.Term used herein is intended merely to the mesh of description specific embodiment
, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more relevant listed items
Any and all combinations.
Fig. 1 is the structural schematic diagram of test macro in one embodiment.As shown in Figure 1, the test macro includes: server
110, client 120 and testing station 130.
Server 110 comprising the TPOK central database server based on SQL Server.TPOK central database clothes
Business device is used to store the related data information for carrying out each test step, the identification information etc. including test step.
Client 120, client 120 are connected to server 110, are connected with acquisition workstation, service workstations, packaging
Work station and excessively station equipment, for missing the stop for information collection, maintenance of equipment, product packaging and product.
Testing station 130, centrally disposed computer room are simultaneously connected to client 120, for according to the transmission of client 120
Instruction handles test program.Testing station includes test equipment and testboard, the corresponding test work of each testboard
Sequence, for testing the performance of determinand.
Computer program is stored in server 110, when the tested station 130 of the computer program executes, so that test
Stand 130 execute following steps:
When the determinand is in current test step, the first identifier information of the first test step is obtained, described the
One test step be and the cascade next test step of presently described test step;
The control instruction for entering the second test step is received, and obtains the second identifier information of second test step,
The control instruction is used to indicate the determinand into second test step;
When the first identifier information is consistent with the second identifier information, the determinand is controlled into described second
Test step.
Fig. 2 is the schematic diagram of internal structure of server in one embodiment.As shown in Fig. 2, the server includes passing through to be
Processor, non-volatile memory medium, built-in storage and the network interface of bus of uniting connection.Wherein, the processor is for providing
Calculating and control ability, support the operation of entire electronic equipment.Memory for storing data, program etc., stored on memory
At least one computer program, the computer program can be executed by processor, to realize that is provided in the embodiment of the present application is applicable in
In the wireless network communication method of electronic equipment.Memory may include non-volatile memory medium and built-in storage.It is non-volatile
Storage medium is stored with operating system and computer program.The computer program can performed by processor, with for realizing with
Under a kind of test control method provided by each embodiment.Built-in storage is the operating system meter in non-volatile memory medium
The running environment of calculation machine program offer cache.Network interface can be Ethernet card or wireless network card etc., be used for and outside
Electronic equipment communicated.Server can with the server cluster of independent server either multiple servers composition come
It realizes.It will be understood by those skilled in the art that structure shown in Figure 2, only part-structure relevant to application scheme
Block diagram, do not constitute the restriction for the server being applied thereon to application scheme, specific server may include ratio
More or fewer components as shown in the figure perhaps combine certain components or with different component layouts.
Fig. 3 is the flow chart of test control method in one embodiment.As shown in figure 3, test control method includes step
310 to step 330.
Step 310, when the determinand is in current test step, the first identifier letter of the first test step is obtained
Breath, first test step are and the cascade next test step of presently described test step.
Determinand can be electronic equipment, such as can be PC (personal computer, PC), plate electricity
The terminal devices such as brain, smart phone, personal digital assistant (personal digital assistant, PDA).The above is only acts
Example explanation, type the application of determinand is with no restriction.In all embodiments of the application, determinand is taken the mobile phone as an example
It is bright.
Testing station 130 may include multiple testing process, and each testing process includes multiple testboards.Each testboard pair
A test step is answered, each test step is respectively connected with corresponding test equipment, the testing mobile phone in each test step
Different performance.For example, entire testing process includes 5 test steps, respectively test step 1, test step 2, test work
Sequence 3, test step 4 and test step 5.Wherein, the camera shooting of the loudspeaker of 1 testing mobile phone of test step, 2 testing mobile phone of test step
Head, the battery of 3 testing mobile phone of test step, 4 testing mobile phone of test step relevant parameter whether in scheduled parameter area
Interior, 5 testing mobile phone of test step available machine time.
In the embodiment of the present application, each test step carries corresponding identification information, and the identification information is uniquely marked
Know sequence of the test step in testing process.MES can be by the identification information storage of each test step in database
In, by directly acquire identification information in database can quick obtaining determinand should enter testing process which
Test step.
Before testing mobile phone, each of testing process can be tested according to the actual process sequence of mobile phone
Process is identified, and the identification information of two neighboring test step meets preset condition, and by the mark of each test step
Information is stored in the TPOK central database server of MES.The actual process sequence of mobile phone can be the assemble sequence of mobile phone,
Corresponding test step is identified according to the sequencing of mobile phone component assembly.In the embodiment of the present application, the assembly of mobile phone
Sequence is test step 1, test step 2, test step 3, test step 4 and test step 5.
Optionally, the appearance form of identification information is not unique, can be the forms such as number, sequence number or bar code.One
In a embodiment, the identification information of test step is bar code information, can be with quick obtaining identification information by information scanning device.
PDA barcode scanner specifically can be used in information scanning device, by the bar code of PDA barcode scanner sweep test process, obtains
The bar code information of test step.Wherein, the concrete form of bar code information is also not uniquely, and in the present embodiment, bar code information is
Two-dimensional barcode information.The identification information of test step is obtained by two-dimensional code scanning, it is simple and efficient to handle reliable.Band can also be passed through
There is the reading equipment of camera installation (such as camera) to read.It should be understood that after camera installation shooting image in 2 D code, two dimension
The relevant information that code is recorded can interpreted and display.Identification information can be set at any position of test step, can
Selection of land, the two dimensional code or bar code are pasted on the test board of test step with printing type, or are arranged in a manner of marking
On test board.
In one embodiment, identification information can be number, and the coding rule of test step is according to the practical work of mobile phone
Skill sequence is numbered.Such as it can be descending, ascending sequence, and the number of two neighboring test step meets
Preset condition.Preset condition can be preset function relationship, and the embodiment of the present application is not intended to be limited in any.For example, test step by
It is small to being numbered greatly, i.e. test step 1, test step 2, test step 3, test step 4 and the corresponding mark of test step 5
Information is 1,2,3,4 and 5 respectively.
By taking identification information is number as an example, after being identified to the test step in testing process, the server of MES system
110 store the corresponding number of each test step in mobile phone test process according to number order.Testing station 130 is connecing
It receives after opening test command, mobile phone enters testing process.Test command can be in client 120, and user presses unlatching
Testing button;It is also possible to server 110 and testing process, specific this Shen of mode for opening testing process is started by software mode
Please embodiment be not intended to be limited in any.For example, mobile phone enters first of work of testing process after receiving unlatching test command
Sequence, i.e. test step 1, can be entering test step 1 or obtain the of the first test step after the completion of test step 1 is tested
One identification information, first test step are under test step where the current phone stored in the manufacturing execution system
One test step.
In one embodiment, it can be when determinand enters current test step, obtain the of the first test step
One identification information;Can also be in determinand when current test step enters test mode, or work as the current test step of determinand
Middle test passes through, and obtains the first identifier information of the first test step.The specific first identifier information for obtaining the first test step
Time select according to the actual situation, as long as meet determinand enter next test step before.
Step 320, the control instruction for entering the second test step is received, and obtains the second mark of second test step
Know information, the control instruction is used to indicate the determinand into second test step.
Identification information can be can be set in the form of key in the corresponding any position of test step.In test process
In, control instruction can be in client 120, the corresponding number of the key that user presses, and to be measured according to the digital indication
Object enters the corresponding test step of number;The number that can also be selected according to system program, instruction determinand enter corresponding survey
Trial work sequence.Wherein, the second test step is the corresponding test step of the number.Receiving the control into the second test step
When system instruction, the second identifier information of the second test step is obtained.
Step 330, it when the first identifier information is consistent with the second identifier information, controls the determinand and enters
Second test step.
The first identifier information that will acquire is compared with second identifier information, if first identifier information and second identifier are believed
Breath is consistent, then illustrating that determinand test step to be entered is is the test carried out according to the sequence of testing process correctly,
Therefore, control determinand enters the second test step and is tested.
Test control method in the present embodiment, by obtain determinand the first test step first identifier information,
First test step is next test step of the current test step stored in the manufacturing execution system;It receives and enters
The control instruction of second test step, and the second identifier information of second test step is obtained, the control instruction is used for
Indicate that the determinand enters second test step;When the first identifier information is consistent with the second identifier information
When, the determinand is controlled into second test step, can prevent determinand during the test not by defined survey
Examination process is tested, and is occurred jumping station phenomenon, is improved the reliability of test.
Fig. 4 is the flow chart of test control method in one embodiment.As shown in figure 4, test control method includes step
410 to step 430.
Step 410, when the determinand is in current test step, the first identifier letter of the first test step is obtained
Breath, first test step are and the cascade next test step of presently described test step.
Step 420, the control instruction for entering the second test step is received, and obtains the second mark of second test step
Know information, the control instruction is used to indicate the determinand into second test step.
Step 310 and step 320 correspond in step 410 and step 420 and above-described embodiment, here, repeating no more.
Step 430, when first identifier information and second identifier information are inconsistent, then the determinand is locked, to prevent
Determinand is stated into the second test step.
For example, determinand is currently tested in second operation work, the identification information for obtaining second test step is 2,
And obtain the first identifier information 3 of third road test step (the first test step).Receive the finger into the second test step
When enabling, the second identifier information of the second test step is obtained.If second identifier information is 4, second identifier information and the first mark
Know information it is inconsistent, illustrate control instruction selection test step to be entered be it is wrong, not according to the suitable of testing process
Sequence is tested, that is, occurs jumping station.It prevents determinand from entering the second test step at this time, determinand is locked in current test
Process.So as to prevent determinand from not tested by test distance during the test, occur jumping station phenomenon, and to appearance
The determinand for jumping station is handled in time.
In one embodiment, it is outbound that determinand can be controlled after locking determinand, and determinand is then put into first
Road test program restarts to test, or reselects the second test step according to identification information, how to determinand after locking
It is handled, can be selected according to the actual situation, the embodiment of the present application is with no restriction.
Fig. 5 is the flow chart of test control method in one embodiment.Including step 510 and step 520.
Step 510, the test equipment based on presently described test step carries out functional test to the determinand.
Step 520, if the functional test is qualified, the determinand is controlled into second test step.
In one embodiment, it can be and determining that the second test step to be entered is under current test step is cascade
One test step before meeting testing process, is further tested the function of determinand;It can also determine the second survey
After trial work sequence meets testing process, further the function of determinand is tested.If the second test step meets test stream
Journey and determinand are qualified in the functional test of current test step, then control the determinand into second test step,
So as to promote the reliability of test.
In one embodiment, it takes the mobile phone as an example, current phone is in test step 4, is judging the second test step symbol
After closing testing process, whether the relevant parameter of testing mobile phone is in scheduled parameter area, if whether relevant parameter is pre-
In fixed parameter area, then in test step 4, the corresponding function of mobile phone be it is qualified, control mobile phone enter second test
Process enters test step 5 and is tested.
In one embodiment, test control method further includes step 530, if functional test is unqualified, is surveyed to current
The test equipment that trial work sequence is tested carries out fault detection.
Specifically, if the test equipment breaks down, stop the test to the determinand, and generate failure report
It accuses;If the test equipment is normal, controls the determinand and enter maintenance procedures.
When functional test exception, it may be possible to which mobile phone itself function occurs abnormal, it is also possible to be for testing mobile phone
Test equipment breaks down (exception occur in the disconnecting of such as mobile phone and test equipment or the test program in test equipment).
In the present embodiment, in order to prevent to the undesirable erroneous judgement of mobile phone itself, when cell-phone function tests abnormal, first to test equipment
Fault detection is carried out, i.e., exclusion peripheral test device influences mobile phone functional test bring.Fault detection can be detection and survey
The response of test program and the unobstructed degree of the connection of test equipment and mobile phone etc. in equipment are tried, operator can be according to common
Peripheral test plant failure the fault detection is arranged accordingly.If since test equipment breaks down, to test
The failure of equipment is purged processing, and fault clearance processing, which can be, restarts reset or in test equipment to test equipment
Test program reload etc., specific fault clearance processing method can according to common peripheral test device therefore
Barrier is arranged accordingly.After fault clearance processing, fault detection is carried out again to test equipment, to guarantee test equipment just
Often.If the failure of test equipment can not be automatically repaired, cell-phone function test pause carries out the fault alarm of test equipment;If
Test equipment is normal, then it is abnormal to illustrate that determinand function itself occurs, handles the dysfunction of determinand.It can control
Determinand enters maintenance procedures to eliminate the dysfunction of determinand, to promote the accuracy of test.
In one embodiment, if test equipment is normal, the test of preset times can be carried out to the function of determinand, is prevented
Only judge by accident.Take the mobile phone as an example, current phone is in test step 4,4 testing mobile phone of test step relevant parameter whether
In scheduled parameter area, if abnormal in the process functional test, it may be possible to not due to electrostatic or mobile phone test program
Stability causes the functional test to fail, therefore the functional test of preset times can be carried out to the mobile phone.Such as in preset times
Interior functional test fails, then carries out the processing of functional test failure.It in this way can be to avoid recoverable external factors to function
It is influenced caused by test, further reduced the cost of functional test, improve the accuracy rate of cell-phone function test.
In one embodiment, the method also includes issuing prompt information, the prompt information for prompt it is described to
Survey abnormality test information of the object in current test step.
In one embodiment, there is test exception in current test step in determinand, can be determinand not by survey
Examination process is tested, and the functional test for being also possible to determinand is abnormal.Prompt information can be according to abnormal type calling pair
The processing strategie answered, to prompt user to carry out specific aim processing to failure.For example, determinand is currently surveyed in test step 2
Examination, the identification information for obtaining test step 2 is 2, and obtains the first identifier information 3 of test step 3 (the first test step).It connects
When receiving the control instruction for entering the second test step, the second identifier information of the second test step is obtained.If second identifier is believed
Breath is 4, then second identifier information and first identifier information are inconsistent, illustrates that the test step to be entered of control instruction selection is
Mistake, i.e., do not tested according to the sequence of testing process, occur jump station, then prompt user's determinand not by process into
Row test, test step to be entered should be test step 3.If second identifier information is 3, second identifier information and the first mark
It is consistent to know information, illustrates mobile phone functional fault itself or corresponding test equipment failure.At this point it is possible to further detect the test
Process corresponds to test equipment with the presence or absence of failure.If test equipment is normal, prompt user mobile phone corresponding to the test step
Dysfunction, and corresponding processing strategie is recommended in the cell-phone function display tested for the test function.
In one embodiment, test exception reporting can be generated in prompt information, is also possible to the mode of voice broadcast, mentions
Show that the concrete form of information selects according to the actual situation, the embodiment of the present application is with no restriction.
In the embodiment of the present application, when test exception occurs in determinand, prompt information can be issued, to prompt determinand to exist
Test in the current test step is abnormal, to can timely handle during the test abnormal, improves and surveys
Try efficiency.
It should be understood that although each step in the flow chart of Fig. 3 to Fig. 5 is successively shown according to the instruction of arrow,
But these steps are not that the inevitable sequence according to arrow instruction successively executes.Unless expressly state otherwise herein, these
There is no stringent sequences to limit for the execution of step, these steps can execute in other order.Moreover, Fig. 3 is into Fig. 5
At least part step may include that perhaps these sub-steps of multiple stages or stage are not necessarily same to multiple sub-steps
One moment executed completion, but can execute at different times, and the execution in these sub-steps or stage sequence is also not necessarily
Be successively carry out, but can at least part of the sub-step or stage of other steps or other steps in turn or
Alternately execute.
Fig. 6 is the structural block diagram of the test control device of one embodiment.Test control device 60 is for executing test control
Method processed.As shown in fig. 6, test control device 60 includes: that the first acquisition module 61, second obtains module 62, control module 63.
First obtains module 61, for obtaining the first test step when the determinand is in current test step
First identifier information, first test step are and the cascade next test step of presently described test step.
Second obtains module 62, for receiving the control instruction for entering the second test step, and obtains second test
The second identifier information of process, the control instruction are used to indicate the determinand into second test step.
Control module 63, for when the first identifier information is consistent with the second identifier information, described in control to
It surveys object and enters second test step.
Test control device 60 in the present embodiment obtains module 61 by first and obtains determinand in the first test step
First identifier information, first test step is the next survey of current test step stored in the manufacturing execution system
Trial work sequence;Second, which obtains module 62, receives the instruction for entering the second test step, surveys so that the determinand enters described second
Trial work sequence, and obtain the second identifier information of second test step;For working as the first identifier information and described second
When identification information is consistent, control module 63 controls the determinand into second test step, can prevent determinand from existing
Occur jumping station in test process, improves the reliability of test.
In one embodiment, when first identifier information and second identifier information are inconsistent, then the determinand is locked,
To prevent the determinand from entering second test step.
In one embodiment, test control device 60 further includes mark module (showing in figure), is used for:
Each test step is identified according to the process sequence of the determinand, and the mark of two neighboring test step
Know information and meets preset condition;
By the identification information storage of each test step in the manufacturing execution system.
In one embodiment, when the determinand is in current test step, the first of the first test step is obtained
Identification information, comprising:
When the determinand enters current test step, or, when the determinand enters test in current test step
When state, the first identifier information of the first test step is obtained.
In one embodiment, test control device 60 further includes functional test module (showing in figure), is used for:
Test equipment based on presently described test step carries out functional test to the determinand;
If the functional test is qualified, the determinand is controlled into next test step.
If the functional test is unqualified, the test equipment tested presently described test step carries out failure inspection
It surveys;
If the test equipment breaks down, stop the test to the determinand, and generate Trouble Report;
If the test equipment is normal, controls the determinand and enter maintenance procedures.
In one embodiment, test control device 60 further includes cue module (showing in figure), for issuing prompt
Information, the prompt information is for prompting abnormality test information of the determinand in the current test step.
The division of modules is only used for for example, in other embodiments, can incite somebody to action in above-mentioned test control device 60
Test control device 60 is divided into different modules as required, to complete all or part of function of above-mentioned test control device 60
Energy.
Specific about test control device 60 limits the restriction that may refer to above for test control method, herein
It repeats no more.Modules in above-mentioned 60 device of test control device can be fully or partially through software, hardware and combinations thereof
To realize.Above-mentioned each module can be embedded in the form of hardware or independently of in the processor in computer equipment, can also be with soft
Part form is stored in the memory in computer equipment, executes the corresponding behaviour of the above modules in order to which processor calls
Make.
Realizing for the modules in test control device 60 provided in the embodiment of the present application can be computer program
Form.The computer program can be run in terminal or server.The program module that the computer program is constituted is storable in end
On the memory of end or server.When the computer program is executed by processor, method described in the embodiment of the present application is realized
The step of.
The embodiment of the present application also provides a kind of computer readable storage mediums.One or more is executable comprising computer
The non-volatile computer readable storage medium storing program for executing of instruction, when the computer executable instructions are executed by one or more processors
When, so that the step of processor executes test control method.
A kind of computer program product comprising instruction, when run on a computer, so that computer executes test
The step of control method.
It may include non-to any reference of memory, storage, database or other media used in the embodiment of the present application
Volatibility and/or volatile memory.Suitable nonvolatile memory may include read-only memory (ROM), programming ROM
(PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include
Random access memory (RAM), it is used as external cache.By way of illustration and not limitation, RAM in a variety of forms may be used
, such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDR SDRAM),
Enhanced SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM
(RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM).
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
The limitation to the application the scope of the patents therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the concept of this application, various modifications and improvements can be made, these belong to the guarantor of the application
Protect range.Therefore, the scope of protection shall be subject to the appended claims for the application patent.
Claims (10)
1. a kind of test control method is applied to manufacturing execution system and carries out testing and control to determinand, which is characterized in that is described
Method includes:
When the determinand is in current test step, the first identifier information of the first test step is obtained, described first surveys
Trial work sequence be and the cascade next test step of presently described test step;
The control instruction for entering the second test step is received, and obtains the second identifier information of second test step, it is described
Control instruction is used to indicate the determinand into second test step;
When the first identifier information is consistent with the second identifier information, controls the determinand and enter second test
Process.
2. the method according to claim 1, wherein the method also includes:
When the first identifier information and the second identifier information are inconsistent, then the determinand is locked, described in preventing
Determinand enters second test step.
3. the method according to claim 1, wherein the method also includes:
Each test step is identified according to the process sequence of the determinand, and the mark of the two neighboring test step
Know information and meets preset condition;
By the identification information storage of each test step in the manufacturing execution system.
4. the method according to claim 1, wherein described when the determinand is in current test step,
Obtain the first identifier information of the first test step, comprising:
When the determinand enters current test step, or, when the determinand enters test mode in current test step
When, obtain the first identifier information of first test step.
5. the method according to claim 1, wherein the control determinand enters the second test work
Before sequence, the method also includes:
Test equipment based on presently described test step carries out functional test to the determinand;
If the functional test is qualified, the determinand is controlled into next test step.
6. according to the method described in claim 5, it is characterized in that, the method also includes:
If the functional test is unqualified, the test equipment tested presently described test step carries out fault detection;
If the test equipment breaks down, stop the test to the determinand, and generate Trouble Report;
If the test equipment is normal, controls the determinand and enter maintenance procedures.
7. method according to claim 1-6, which is characterized in that the method also includes:
Prompt information is issued, the prompt information is for prompting abnormality test of the determinand in the current test step
Information.
8. a kind of test control device is applied to manufacturing execution system and carries out testing and control to determinand, which is characterized in that is described
Device includes:
First obtains module, for when the determinand is in current test step, obtaining the first mark of the first test step
Know information, first test step is and the cascade next test step of presently described test step;
Second obtains module, for receiving the instruction for entering the second test step, surveys so that the determinand enters described second
Trial work sequence, and obtain the second identifier information of second test step;
Control module, for when the first identifier information is consistent with the second identifier information, control the determinand into
Enter second test step.
9. a kind of test control system, including server, client and testing station, computer journey is stored in the server
Sequence, when the computer program is executed by the testing station, so that the testing station executes such as any one of claims 1 to 7
The step of described test control method.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program
The step of method as described in any one of claims 1 to 7 is realized when being executed by processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811623321.1A CN109709923B (en) | 2018-12-28 | 2018-12-28 | Test control method, device, system and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811623321.1A CN109709923B (en) | 2018-12-28 | 2018-12-28 | Test control method, device, system and computer readable storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109709923A true CN109709923A (en) | 2019-05-03 |
CN109709923B CN109709923B (en) | 2020-05-26 |
Family
ID=66259140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811623321.1A Active CN109709923B (en) | 2018-12-28 | 2018-12-28 | Test control method, device, system and computer readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109709923B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110502383A (en) * | 2019-08-27 | 2019-11-26 | Oppo(重庆)智能科技有限公司 | The test method and device of terminal device |
CN111142954A (en) * | 2019-12-30 | 2020-05-12 | Oppo(重庆)智能科技有限公司 | Startup control method and device and computer readable storage medium |
CN113030692A (en) * | 2019-12-09 | 2021-06-25 | 新唐科技股份有限公司 | Test system and test method |
CN113433921A (en) * | 2020-03-23 | 2021-09-24 | 北京新能源汽车股份有限公司 | Method and device for testing real vehicle function and control equipment |
CN116820863A (en) * | 2023-07-10 | 2023-09-29 | 北京鲲鹏凌昊智能技术有限公司 | Cascade test method, cascade test device, electronic equipment and storage medium |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2910234A (en) * | 1954-11-18 | 1959-10-27 | Ibm | Bit count checking circuit |
CN101634961A (en) * | 2009-08-12 | 2010-01-27 | 方正科技集团苏州制造有限公司 | Self-checking method of computer finished product production line |
CN104951380A (en) * | 2014-03-24 | 2015-09-30 | 环旭电子股份有限公司 | Test method and system used for testing on-line products |
CN105137925A (en) * | 2015-07-23 | 2015-12-09 | 上海极熵数据科技有限公司 | Automatic industrial equipment work scheduling method |
CN105975370A (en) * | 2015-07-23 | 2016-09-28 | 乐视致新电子科技(天津)有限公司 | Method and device for testing |
CN107390658A (en) * | 2017-08-01 | 2017-11-24 | 西安易朴通讯技术有限公司 | The management-control method and system of intelligent terminal production process |
CN108490337A (en) * | 2018-03-14 | 2018-09-04 | 广州视源电子科技股份有限公司 | Board card testing method and system, readable storage medium and computer equipment |
-
2018
- 2018-12-28 CN CN201811623321.1A patent/CN109709923B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2910234A (en) * | 1954-11-18 | 1959-10-27 | Ibm | Bit count checking circuit |
CN101634961A (en) * | 2009-08-12 | 2010-01-27 | 方正科技集团苏州制造有限公司 | Self-checking method of computer finished product production line |
CN104951380A (en) * | 2014-03-24 | 2015-09-30 | 环旭电子股份有限公司 | Test method and system used for testing on-line products |
CN105137925A (en) * | 2015-07-23 | 2015-12-09 | 上海极熵数据科技有限公司 | Automatic industrial equipment work scheduling method |
CN105975370A (en) * | 2015-07-23 | 2016-09-28 | 乐视致新电子科技(天津)有限公司 | Method and device for testing |
CN107390658A (en) * | 2017-08-01 | 2017-11-24 | 西安易朴通讯技术有限公司 | The management-control method and system of intelligent terminal production process |
CN108490337A (en) * | 2018-03-14 | 2018-09-04 | 广州视源电子科技股份有限公司 | Board card testing method and system, readable storage medium and computer equipment |
Non-Patent Citations (1)
Title |
---|
林忠钦: "《复杂产品制造精度控制的数字化方法及其发展趋势》", 《机械工程学报》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110502383A (en) * | 2019-08-27 | 2019-11-26 | Oppo(重庆)智能科技有限公司 | The test method and device of terminal device |
CN113030692A (en) * | 2019-12-09 | 2021-06-25 | 新唐科技股份有限公司 | Test system and test method |
CN113030692B (en) * | 2019-12-09 | 2024-04-09 | 新唐科技股份有限公司 | Test system and test method |
CN111142954A (en) * | 2019-12-30 | 2020-05-12 | Oppo(重庆)智能科技有限公司 | Startup control method and device and computer readable storage medium |
CN111142954B (en) * | 2019-12-30 | 2023-06-23 | Oppo(重庆)智能科技有限公司 | Startup control method and device and computer readable storage medium |
CN113433921A (en) * | 2020-03-23 | 2021-09-24 | 北京新能源汽车股份有限公司 | Method and device for testing real vehicle function and control equipment |
CN116820863A (en) * | 2023-07-10 | 2023-09-29 | 北京鲲鹏凌昊智能技术有限公司 | Cascade test method, cascade test device, electronic equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN109709923B (en) | 2020-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109709923A (en) | Test control method and device, system, computer readable storage medium | |
CN109947646A (en) | Interface test method, device, computer equipment and storage medium | |
CN110460460B (en) | Service link fault positioning method, device and equipment | |
CN111199353B (en) | Test method and test system | |
CN109816125A (en) | Maintenance management method, device, computer equipment and the storage medium of equipment | |
CN109760985B (en) | Method and device for material circulation checking, electronic equipment and readable storage medium | |
CN110008204A (en) | Detection method, device, computer equipment and the storage medium of the quality of data | |
CN104077217A (en) | Method and system for compiling and issuing code file | |
CN109656205B (en) | Defective product control method and device, electronic device and readable storage medium | |
CN112486749B (en) | Test method and device based on 5G communication terminal and readable storage medium | |
CN109614527A (en) | Overhaul view generation method and device, computer equipment and storage medium | |
CN110134795A (en) | Generate method, apparatus, computer equipment and the storage medium of validation problem group | |
CN110221967A (en) | Test data building method, device, computer equipment and storage medium | |
US20220327458A1 (en) | Battery specification lookup and aggregation method | |
CN110471853A (en) | APP test method, device, computer equipment and storage medium | |
CN109784502A (en) | On-site maintenance processing method and system based on fault equipment | |
CN110874691A (en) | General assembly offline control method and system | |
CN110109828A (en) | Question and answer interface test method, device, computer equipment and storage medium | |
CN110930075B (en) | Power equipment fault positioning method, device, computer equipment and storage medium | |
CN110069364B (en) | Spare part data error correction method and device, computer equipment and storage medium | |
CN108647106A (en) | Using abnormality eliminating method, storage medium and computer equipment | |
US11949076B2 (en) | Maintenance support method, maintenance support system, maintenance support device, and computer program | |
CN108024090B (en) | Abnormity positioning method and device for video monitoring platform | |
CN109815139A (en) | Interface test method, device, computer equipment and storage medium | |
CN110704319B (en) | Test case risk analysis method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |