CN109707932A - High-efficiency high-accuracy flow detection device - Google Patents
High-efficiency high-accuracy flow detection device Download PDFInfo
- Publication number
- CN109707932A CN109707932A CN201811610873.9A CN201811610873A CN109707932A CN 109707932 A CN109707932 A CN 109707932A CN 201811610873 A CN201811610873 A CN 201811610873A CN 109707932 A CN109707932 A CN 109707932A
- Authority
- CN
- China
- Prior art keywords
- side wall
- fixed
- plate
- fixed plate
- symmetrically arranged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses high-efficiency high-accuracy flow detection devices, including flow detector, flow detector includes tube body, the side side wall of tube body is connected with multiple connectors, tube body is fixed with multiple symmetrically arranged support columns close to the side side wall of connector, the side of support column is provided with clamp system, clamp system includes that the other end of every two support column is fixed with annular slab jointly, and connector passes through annular slab, annular slab lateral wall offers symmetrically arranged first through hole, sliding sleeve is equipped with guide rod in first through hole, one end of guide rod is fixed with vertically disposed arc panel, and arc panel side side wall close to each other is connected with foam-rubber cushion.The present invention can be clamped processing to pipe and joints junction, reduce the case where pipe and joints falls off, and improve detection efficiency, and can carry out secondary fixation to the pipe near junction, reduce the amplitude of fluctuation of pipe, improve the precision of detection.
Description
Technical field
The present invention relates to flow detection technical field more particularly to high-efficiency high-accuracy flow detection devices.
Background technique
Calculate whether water pollution load is more than environmental carrying capacity and evaluation control effect, it is total to grasp discharge of pollutant sources pollutant
Amount and displacement etc. need to carry out flow monitoring to corresponding water body.When evaluating the influence of draining environmental pollution according to total amount of pollutants discharged,
On the one hand, comprehensive analysis can be carried out to technical process and blowdown situation in conjunction with the material balance and water balance of enterprise to compare;
On the other hand, the drawbacks of sewerage being diluted using a large amount of fresh waters to avoid individual enterprises, be conducive to the progress of water conservation.
In existing flow detection use process, the pipe for generally requiring will test is covered in the joint of detector, only
It is fixed by the friction between pipe and joints, in the detection process, since water flow impact pressure is big, is easy to cause pipe
It is loosened with joint, moreover, it is located at the pipes of near joints when being passed through liquid and being flowed, since liquid flow velocity is fast,
Neighbouring pipe is easy to swing, and detection effect is influenced, for this purpose, we have proposed a kind of high-efficiency high-accuracy flow detection devices.
Summary of the invention
The purpose of the present invention is to solve disadvantages existing in the prior art, and the high-efficiency high-accuracy flow detection proposed
Equipment.
To achieve the goals above, present invention employs following technical solutions:
High-efficiency high-accuracy flow detection device, including flow detector, the flow detector include tube body, the tube body
Side side wall be connected with multiple connectors, the tube body is fixed with multiple symmetrically arranged supports close to the side side wall of connector
Column, the side of support column are provided with clamp system, and clamp system includes that the other end of support column described in every two is fixed with jointly
Annular slab, and connector passes through the annular slab, the annular slab lateral wall offers symmetrically arranged first through hole, first through hole
Interior sliding sleeve is equipped with guide rod, and one end of guide rod is fixed with vertically disposed arc panel, and the side that arc panel is close to each other
Side wall is connected with foam-rubber cushion, and the arc panel is equipped with the first bullet connecting with annular slab side wall far from the side side wall of foam-rubber cushion
Spring, the top side wall of the annular slab offer symmetrically arranged second through-hole, and the top of two arc panels is respectively and fixedly provided with
Push plate, and push plate both passes through the second through-hole, the tube body is respectively and fixedly provided with symmetrically arranged branch close to the side side wall both ends of connector
Fagging is provided with fixed mechanism between support plate.
Preferably, the fixed mechanism includes the first fixed plate and the second fixed plate being arranged between support plate, described
First fixed plate is located at the surface of the second fixed plate, and is arranged in parallel between the first fixed plate and the second fixed plate, and described
One fixed plate and the second fixed plate side side wall close to each other offer the third through-hole of arcuate structure.
Preferably, support plate side side wall close to each other offers symmetrically arranged first groove, the first groove
Side side wall offer sliding slot along its length, slidably connect sliding block on sliding slot, and the other end of sliding block and first solid
The both ends of fixed board are fixed, and the top of one of them support plate is connected with the first bolt, the top of one of them sliding block
Jack is offered, and the first bolt and jack clamping are arranged.
Preferably, first fixed plate offers the second groove, the second groove close to the side side wall of the second fixed plate
Side side wall offer third groove, third groove is internally provided with position-limit mechanism.
Preferably, the position-limit mechanism includes the movable plate being slidably connected between the side wall of third groove two sides, movable plate
Side side wall the second spring connecting with third recess sidewall, side side wall of the movable plate far from second spring are installed
It is fixed with the block board of arcuate structure.
Preferably, second fixed plate is fixed with symmetrically arranged connecting plate close to the side side wall of the first fixed plate,
The side side wall of connecting plate offers detent slot, and setting is clamped between detent slot and block board.
Preferably, the side side wall of the movable plate is fixed with vertically disposed push rod, the side of first fixed plate
Side wall offers symmetrically arranged fourth hole, and push rod passes through fourth hole far from one end of movable plate and extends to third groove
Outside, and push rod slides setting in fourth hole.
Preferably, the side side wall of the annular slab is connected with symmetrically arranged second bolt, the side of the guide rod
Side wall offers multiple jacks, and the second bolt and jack are clamped.
Compared with prior art, the beneficial effects of the present invention are:
1: by the clamp system of setting, processing can be clamped to pipe and joints junction, pipe is reduced and connects
The case where head falls off, improves detection efficiency;
2: by the fixed mechanism and position-limit mechanism of setting, secondary fixation can be carried out to the pipe near junction,
The amplitude of fluctuation for reducing pipe, improves the precision of detection;
The present invention can be clamped processing to pipe and joints junction, reduce pipe and joints and the feelings to fall off occur
Condition improves detection efficiency, and can carry out secondary fixation to the pipe near junction, reduces the amplitude of fluctuation of pipe,
Improve the precision of detection.
Detailed description of the invention
Fig. 1 is the structural side view of high-efficiency high-accuracy flow detection device proposed by the present invention;
Fig. 2 is the annular slab structure top view of high-efficiency high-accuracy flow detection device proposed by the present invention;
Fig. 3 is the annular slab structural side view of high-efficiency high-accuracy flow detection device proposed by the present invention;
Fig. 4 is the first fixed plate structure top view of high-efficiency high-accuracy flow detection device proposed by the present invention;
Fig. 5 is the first fixed plate structure side view of high-efficiency high-accuracy flow detection device proposed by the present invention;
Fig. 6 is the part A enlarged structure schematic diagram of high-efficiency high-accuracy flow detection device proposed by the present invention.
In figure: 1 flow detector, 101 tube bodies, 102 connectors, 2 support columns, 3 annular slabs, 4 first through hole, 5 guide rods, 6
Arc panel, 7 foam-rubber cushions, 8 first springs, 9 second through-holes, 10 push plates, 11 support plates, 12 first fixed plates, 13 first grooves, 14
Sliding block, 15 first bolts, 16 second fixed plates, 17 third through-holes, 18 second grooves, 19 third grooves, 20 movable plates, 21 second
Spring, 22 block boards, 23 connecting plates, 24 detent slots, 25 push rods, 26 second bolts.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-6, high-efficiency high-accuracy flow detection device, including flow detector 1, flow detector 1 include tube body
101, the side side wall of tube body 101 is connected with multiple connectors 102, and tube body 101 is fixed with multiple close to the side side wall of connector 102
Symmetrically arranged support column 2, the side of support column 2 are provided with clamp system, and clamp system includes the another of every two support column 2
End is fixed with annular slab 3 jointly, and connector 102 passes through annular slab 3, and it is logical that 3 lateral wall of annular slab offers symmetrically arranged first
Hole 4, sliding sleeve is equipped with guide rod 5 in first through hole 4, and one end of guide rod 5 is fixed with vertically disposed arc panel 6, and arc
The side side wall close to each other of plate 6 is connected with foam-rubber cushion 7, and arc panel 6 is equipped with far from the side side wall of foam-rubber cushion 7 and annular slab
First spring 8 of 3 side walls connection, the top side wall of annular slab 3 offer symmetrically arranged second through-hole 9, two arc panels 6
Top is respectively and fixedly provided with push plate 10, and push plate 10 both passes through the second through-hole 9, and tube body 101 is equal close to the side side wall both ends of connector 102
It is fixed with symmetrically arranged support plate 11, is provided with fixed mechanism between support plate 11.
Fixed mechanism includes the first fixed plate 12 and the second fixed plate 16 being arranged between support plate 11, the first fixed plate
12 are located at the surface of the second fixed plate 16, and are arranged in parallel between the first fixed plate 12 and the second fixed plate 16, and first is fixed
Plate 12 and the second fixed plate 16 side side wall close to each other offer the third through-hole 17 of arcuate structure, and support plate 11 is mutually leaned on
Close side side wall offers symmetrically arranged first groove 13, and the side side wall of the first groove 13 offers along its length
Sliding slot slidably connects sliding block 14 on sliding slot, and the other end of sliding block 14 and the both ends of the first fixed plate 12 are fixed, one of them
The top of support plate 11 is connected with the first bolt 15, and the top of one of sliding block 14 offers jack, and the first bolt 15 with
Jack clamping setting, the first fixed plate 12 offer the second groove 18, the second groove close to the side side wall of the second fixed plate 16
18 side side wall offers third groove 19, and third groove 19 is internally provided with position-limit mechanism, and position-limit mechanism includes sliding
The movable plate 20 being connected between 19 two sides side wall of third groove, the side side wall of movable plate 20 are equipped with and 19 side of third groove
The second spring 21 of wall connection, movable plate 20 are fixed with the block board 22 of arcuate structure far from the side side wall of second spring 21,
Second fixed plate 16 is fixed with symmetrically arranged connecting plate 23, the side of connecting plate 23 close to the side side wall of the first fixed plate 12
Side wall offers detent slot 24, and setting is clamped between detent slot 24 and block board 22, and the side side wall of movable plate 20 is fixed with
Vertically disposed push rod 25, the side side wall of the first fixed plate 12 offer symmetrically arranged fourth hole, and push rod 25 is far from shifting
One end of movable plate 20 passes through the outside that fourth hole extends to third groove 19, and push rod 25 slides setting in fourth hole,
The side side wall of annular slab 3 is connected with symmetrically arranged second bolt 26, and the side side wall of guide rod 5 offers multiple jacks,
And second bolt 26 be clamped with jack.
Embodiment: by pushing push plate 10, push plate 10 drives arc panel 3 mobile, and arc panel 3 drives the movement of guide rod 5
Simultaneously squeeze the first spring 8, plug the second bolt 26,6 position of arc panel be fixed, pipe is then moved, by pipe with
Connector 102 be socketed, take out the second bolt 24, the first spring 8 elastic force effect under, arc panel 6 tightly against pipe outer wall,
The second bolt 26 is plugged again, and 5 position of guide rod is fixed, so that 6 position of arc panel is fixed, meanwhile, pass through
Mobile first fixed plate 12, the first fixed plate 12 are slided in the first groove 13 with movable slider 14, and the first fixed plate 12 is mobile
When to required position, the first bolt 15 is plugged, 12 position of the first fixed plate is fixed, pipe is then put into third through-hole
17, mobile second fixed plate 16 is closed the first fixed plate 12 and the second fixed plate 16, so that pipe be made to be located at third through-hole 17
Inside limits the swing of pipe, and in 16 moving process of the second fixed plate, the second fixed plate 16 drives connecting plate 23 to enter
Second groove 18, connecting plate 23 squeeze the arcwall face of block board 22, and block board 22 is made to enter third groove 19, until block board 22
Under the elastic force effect of second spring 21, the detent slot 24 for opening up block board 22 and 23 side wall of connecting plate is clamped, to complete
Closure, when to the first fixed plate 12 and the separation of the second fixed plate 16, by pushing push rod 25, push rod 25 drives movable plate 20,
Movable plate 20 drives block board 22 to separate with detent slot 24, removes the second fixed plate 16, the design is simple and fast, can be to pipe
It is clamped processing with joint, the case where pipe and joints falls off is reduced, improves detection efficiency, and can
Secondary fixation is carried out to the pipe near junction, reduces the amplitude of fluctuation of pipe, improves the precision of detection.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (8)
1. high-efficiency high-accuracy flow detection device, including flow detector (1), which is characterized in that flow detector (1) packet
It includes tube body (101), the side side wall of the tube body (101) is connected with multiple connectors (102), and the tube body (101) is close to connector
(102) side side wall is fixed with multiple symmetrically arranged support columns (2), and the side of support column (2) is provided with clamp system, folder
Tight mechanism includes that the other end of support column described in every two (2) is fixed with annular slab (3) jointly, and connector (102) is across described
Annular slab (3), annular slab (3) lateral wall offer symmetrically arranged first through hole (4), first through hole (4) interior sliding sleeve
Equipped with guide rod (5), one end of guide rod (5) is fixed with vertically disposed arc panel (6), and arc panel (6) is close to each other
Side side wall is connected with foam-rubber cushion (7), and the arc panel (6) is equipped with and annular slab (3) far from the side side wall of foam-rubber cushion (7)
The first spring (8) of side wall connection, the top side wall of the annular slab (3) offer symmetrically arranged second through-hole (9), and two
The top of the arc panel (6) is respectively and fixedly provided with push plate (10), and push plate (10) both passes through the second through-hole (9), the tube body (101)
Side side wall both ends close to connector (102) are respectively and fixedly provided with symmetrically arranged support plate (11), and support plate is provided between (11)
Fixed mechanism.
2. high-efficiency high-accuracy flow detection device according to claim 1, which is characterized in that the fixed mechanism includes setting
The first fixed plate (12) and the second fixed plate (16) between support plate (11) are set, first fixed plate (12) is located at second
The surface of fixed plate (16), and be arranged in parallel between the first fixed plate (12) and the second fixed plate (16), described first is fixed
Plate (12) and the second fixed plate (16) side side wall close to each other offer the third through-hole (17) of arcuate structure.
3. high-efficiency high-accuracy flow detection device according to claim 1, which is characterized in that the support plate (11) is mutual
Close side side wall offers symmetrically arranged first groove (13), and the side side wall of the first groove (13) is along its length
Sliding slot is offered, is slidably connected on sliding slot sliding block (14), and the both ends of the other end of sliding block (14) and the first fixed plate (12)
Fixed, the top of one of them support plate (11) is connected with the first bolt (15), the top of one of them sliding block (14)
End offers jack, and the first bolt (15) and jack clamping are arranged.
4. high-efficiency high-accuracy flow detection device according to claim 2, which is characterized in that first fixed plate (12)
It is offered the second groove (18) close to the side side wall of the second fixed plate (16), the side side wall of the second groove (18) offers the
Three grooves (19), third groove (19) are internally provided with position-limit mechanism.
5. high-efficiency high-accuracy flow detection device according to claim 4, which is characterized in that the position-limit mechanism includes sliding
The dynamic movable plate (20) being connected between the side wall of third groove (19) two sides, the side side wall of movable plate (20) is equipped with and third
The second spring (21) of groove (19) side wall connection, the movable plate (20) are fixed with far from the side side wall of second spring (21)
The block board (22) of arcuate structure.
6. high-efficiency high-accuracy flow detection device according to claim 4, which is characterized in that second fixed plate (16)
Side side wall close to the first fixed plate (12) is fixed with symmetrically arranged connecting plate (23), and the side side wall of connecting plate (23) is opened
Equipped with detent slot (24), and setting is clamped between detent slot (24) and block board (22).
7. high-efficiency high-accuracy flow detection device according to claim 5, which is characterized in that the one of the movable plate (20)
Side side wall is fixed with vertically disposed push rod (25), and the side side wall of first fixed plate (12) offers symmetrically arranged
Four through-holes, push rod (25) passes through fourth hole far from the one end of movable plate (20) and extends to the outside of third groove (19), and pushes away
Bar (25) slides setting in fourth hole.
8. high-efficiency high-accuracy flow detection device according to claim 1, which is characterized in that the one of the annular slab (3)
Side side wall is connected with symmetrically arranged second bolt (26), and the side side wall of the guide rod (5) offers multiple jacks, and
Two bolts (26) and jack are clamped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811610873.9A CN109707932B (en) | 2018-12-27 | 2018-12-27 | High-efficient high accuracy flow detection equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811610873.9A CN109707932B (en) | 2018-12-27 | 2018-12-27 | High-efficient high accuracy flow detection equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109707932A true CN109707932A (en) | 2019-05-03 |
CN109707932B CN109707932B (en) | 2020-09-04 |
Family
ID=66258695
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811610873.9A Active CN109707932B (en) | 2018-12-27 | 2018-12-27 | High-efficient high accuracy flow detection equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109707932B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2767972Y (en) * | 2004-12-13 | 2006-03-29 | 芶文 | Integral pipe joint and pipe strap of gas meter |
CN1920366A (en) * | 2005-08-24 | 2007-02-28 | 东京流量仪器仪表株式会社 | Pipe assembly unit with built-in flow sensors |
KR20100092149A (en) * | 2009-02-12 | 2010-08-20 | 조창제 | Pipe for water meter with laminarflow stablizer and manufacture method therefor |
CN104303022A (en) * | 2012-05-21 | 2015-01-21 | 爱知时计电机株式会社 | Flow volume detector |
CN204387492U (en) * | 2015-01-09 | 2015-06-10 | 安徽江淮汽车股份有限公司 | A kind of pipe clamp of fixing pipeline |
CN208074452U (en) * | 2018-03-30 | 2018-11-09 | 天津一鉴楼文化科技有限公司 | A kind of VR camera mounts |
-
2018
- 2018-12-27 CN CN201811610873.9A patent/CN109707932B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2767972Y (en) * | 2004-12-13 | 2006-03-29 | 芶文 | Integral pipe joint and pipe strap of gas meter |
CN1920366A (en) * | 2005-08-24 | 2007-02-28 | 东京流量仪器仪表株式会社 | Pipe assembly unit with built-in flow sensors |
KR20100092149A (en) * | 2009-02-12 | 2010-08-20 | 조창제 | Pipe for water meter with laminarflow stablizer and manufacture method therefor |
CN104303022A (en) * | 2012-05-21 | 2015-01-21 | 爱知时计电机株式会社 | Flow volume detector |
CN204387492U (en) * | 2015-01-09 | 2015-06-10 | 安徽江淮汽车股份有限公司 | A kind of pipe clamp of fixing pipeline |
CN208074452U (en) * | 2018-03-30 | 2018-11-09 | 天津一鉴楼文化科技有限公司 | A kind of VR camera mounts |
Also Published As
Publication number | Publication date |
---|---|
CN109707932B (en) | 2020-09-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205449571U (en) | Portable distance depthkeeping water environment detects uses sampling device | |
CN109707932A (en) | High-efficiency high-accuracy flow detection device | |
CN209293241U (en) | A kind of assembled architecture wallboard intermediate connecting body | |
CN216115936U (en) | Thickness measuring device for pressure pipeline detection | |
CN217177850U (en) | Plastic pipe convenient to butt joint and install | |
CN209244072U (en) | A kind of brick | |
CN108426763A (en) | A kind of rectangular slab of stone builds stone walling mortar joint mechanical test method by laying bricks or stones | |
CN213089373U (en) | Device for automatically determining detection position and automatically recording | |
CN212178338U (en) | Mechanical equipment position detection device | |
CN210032135U (en) | Crossbeam and stand connected node structure | |
CN217060179U (en) | Based on hydraulic engineering uses portable detection device | |
CN103675265B (en) | Elisa plate shelf applicable to microplate reader | |
CN208736388U (en) | Automobile flanges disk cubing | |
CN207336290U (en) | A kind of prestressed pore passage grouting compactness inspection instrument | |
CN209589411U (en) | Water hammer effect analyzer device | |
CN206353102U (en) | A kind of Concrete and reinforced concrete drainage and sewer pipes external load test device | |
CN218824094U (en) | Pressure pipeline TOFD detection device | |
CN219504023U (en) | Pipeline construction fixing tool | |
CN213748615U (en) | Bidirectional ultrasonic water meter | |
CN208688374U (en) | Multifunctional stainless steel water segregator detection device | |
CN209945873U (en) | Building materials bearing performance testing arrangement for antidetonation disaster reduction | |
CN213632281U (en) | Adjustable installation mechanism of thing networking intelligence water gauge | |
CN209656447U (en) | A kind of static/dynamic universal testing machine | |
CN216212281U (en) | Splicing structure of high-density piano plate | |
CN220816971U (en) | Loose-leaf steel plate plugging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |