CN109706932A - 一种溶洞堵头结构及施工方法 - Google Patents
一种溶洞堵头结构及施工方法 Download PDFInfo
- Publication number
- CN109706932A CN109706932A CN201811465792.4A CN201811465792A CN109706932A CN 109706932 A CN109706932 A CN 109706932A CN 201811465792 A CN201811465792 A CN 201811465792A CN 109706932 A CN109706932 A CN 109706932A
- Authority
- CN
- China
- Prior art keywords
- film bag
- solution cavity
- concrete
- high pressure
- stopper structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明提供了一种溶洞堵头结构的施工方法,包括以下步骤:设置灌浆孔‑放置膜袋‑连接灌浆装置‑灌浆‑形成堵头。本发明保证混凝土和膜袋整体不被溶洞内的地下水推走,形成堵水作用,同时膜袋可以保护混凝土不被地下水带走,待混凝土凝固后,混凝土和膜袋一并留在溶洞内,形成永久性堵头,形成永久性堵头后,有良好的阻水效果,可有效避免混凝土和砂浆随着地下水而流失。
Description
技术领域
本发明涉及一种溶洞堵头结构及施工方法,属于岩溶管道堵漏技术领域。
背景技术
在水库建设中,常常因为岩溶管道发生渗漏,岩溶管道堵漏,历来是岩溶地区堵洞成库的重点。
如图1所示,是普通的灌浆方法,在灌浆过程中,遇到无充填溶洞时,现在常常采用的方式为:泵入高流态混凝土或水泥砂浆、或者投入级配骨料再灌注水泥砂浆,但是是溶洞内有地下水时,常常会造成混凝土或砂浆顺着溶洞内的地下水而流失,达不到预定的灌浆效果。
发明内容
为解决上述技术问题,本发明提供了一种溶洞堵头结构及施工方法,该溶洞堵头结构及施工方法可有效避免混凝土和砂浆随着地下水而流失。
本发明通过以下技术方案得以实现。
本发明提供的一种溶洞堵头结构的施工方法,包括以下步骤:
①设置灌浆孔:在原地面的堵洞位置设置灌浆孔,灌浆孔的出口设于溶洞内;
②放置膜袋:在灌浆孔内置入膜袋;
③连接灌浆装置:在原地面上放置混凝土罐和高压混凝土泵,通过灌浆管将混凝土罐、高压混凝土泵、膜袋依次连接;
④灌浆:采用高压压入的方法,向膜袋内灌入高流态混凝土;
⑤形成堵头:高流态混凝土在膜袋内膨胀,形成堵头。
所述步骤②中,膜袋放置于溶洞中。
基于一种溶洞堵头结构;包括设置在原地面堵洞位置的灌浆孔,所述灌浆孔的出口设于溶洞内;所述溶洞内放置有膜袋;所述原地面上设有混凝土罐和高压混凝土泵,混凝土罐、高压混凝土泵、膜袋依次连接。
所述混凝土罐、高压混凝土泵、膜袋通过灌浆管依次连接。
所述膜袋位于溶洞的地下水上。
本发明的有益效果在于:保证混凝土和膜袋整体不被溶洞内的地下水推走,形成堵水作用,同时膜袋可以保护混凝土不被地下水带走,待混凝土凝固后,混凝土和膜袋一并留在溶洞内,形成永久性堵头,形成永久性堵头后,有良好的阻水效果,可有效避免混凝土和砂浆随着地下水而流失。
附图说明
图1是普通的灌浆方案示意图;
图2是本发明灌浆前的结构示意图;
图3是本发明灌浆后的结构示意图;
图中:1-原地面,2-灌浆孔,3-溶洞,4-地下水,5-混凝土,6-混凝土罐,7-高压混凝土泵,8-灌浆管,9-膜袋,10-高流态混凝土。
具体实施方式
下面进一步描述本发明的技术方案,但要求保护的范围并不局限于所述。
如图2和图3所示,一种溶洞堵头结构的施工方法,包括以下步骤:
①设置灌浆孔2:在原地面1的堵洞位置设置灌浆孔2,灌浆孔2的出口设于溶洞3内;
②放置膜袋9:在灌浆孔2内置入膜袋9;
③连接灌浆装置:在原地面1上放置混凝土罐6和高压混凝土泵7,通过灌浆管8将混凝土罐6、高压混凝土泵7、膜袋9依次连接;
④灌浆:采用高压压入的方法,向膜袋9内灌入高流态混凝土10;
⑤形成堵头:高流态混凝土10在膜袋9内膨胀,形成堵头。
所述步骤②中,膜袋9放置于溶洞3中。
基于一种溶洞堵头结构,包括设置在原地面1堵洞位置的灌浆孔2,所述灌浆孔2的出口设于溶洞3内;所述溶洞3内放置有膜袋9;所述原地面1上设有混凝土罐6和高压混凝土泵7,混凝土罐6、高压混凝土泵7、膜袋9依次连接。
所述混凝土罐6、高压混凝土泵7、膜袋9通过灌浆管8依次连接。
所述膜袋9位于溶洞3的地下水4上。
综上所述,膜袋9因膨胀后,会挤压溶洞壁,使得高流态混凝土10和膜袋9整体不被地下水4推走,形成堵水作用;同时膜袋9可以保护高流态混凝土10不被水流带走,待高流态混凝土10凝固后,高流态混凝土10和膜袋9一并留在溶洞内,形成永久性堵头。
Claims (5)
1.一种溶洞堵头结构的施工方法,其特征在于:包括以下步骤:
①设置灌浆孔(2):在原地面(1)的堵洞位置设置灌浆孔(2),灌浆孔(2)的出口设于溶洞(3)内;
②放置膜袋(9):在灌浆孔(2)内置入膜袋(9);
③连接灌浆装置:在原地面(1)上放置混凝土罐(6)和高压混凝土泵(7),通过灌浆管(8)将混凝土罐(6)、高压混凝土泵(7)、膜袋(9)依次连接;
④灌浆:采用高压压入的方法,向膜袋(9)内灌入高流态混凝土(10);
⑤形成堵头:高流态混凝土(10)在膜袋(9)内膨胀,形成堵头。
2.如权利要求1所述的溶洞堵头结构的施工方法,其特征在于:所述步骤②中,膜袋(9)放置于溶洞(3)中。
3.一种溶洞堵头结构,其特征在于:包括设置在原地面(1)堵洞位置的灌浆孔(2),所述灌浆孔(2)的出口设于溶洞(3)内;所述溶洞(3)内放置有膜袋(9);所述原地面(1)上设有混凝土罐(6)和高压混凝土泵(7),混凝土罐(6)、高压混凝土泵(7)、膜袋(9)依次连接。
4.如权利要求3所述的溶洞堵头结构,其特征在于:所述混凝土罐(6)、高压混凝土泵(7)、膜袋(9)通过灌浆管(8)依次连接。
5.如权利要求3所述的溶洞堵头结构,其特征在于:所述膜袋(9)位于溶洞(3)的地下水(4)上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811465792.4A CN109706932A (zh) | 2018-12-03 | 2018-12-03 | 一种溶洞堵头结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811465792.4A CN109706932A (zh) | 2018-12-03 | 2018-12-03 | 一种溶洞堵头结构及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109706932A true CN109706932A (zh) | 2019-05-03 |
Family
ID=66255460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811465792.4A Pending CN109706932A (zh) | 2018-12-03 | 2018-12-03 | 一种溶洞堵头结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109706932A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111058451A (zh) * | 2019-12-06 | 2020-04-24 | 广西建工集团第三建筑工程有限责任公司 | 桩基麻袋裹浆堵水补洞造壁的方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106498965A (zh) * | 2016-12-05 | 2017-03-15 | 广西大学 | 一种岩溶地区止水加固施工方法 |
-
2018
- 2018-12-03 CN CN201811465792.4A patent/CN109706932A/zh active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106498965A (zh) * | 2016-12-05 | 2017-03-15 | 广西大学 | 一种岩溶地区止水加固施工方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111058451A (zh) * | 2019-12-06 | 2020-04-24 | 广西建工集团第三建筑工程有限责任公司 | 桩基麻袋裹浆堵水补洞造壁的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103343543B (zh) | 一种基坑降水井减压式封堵方法 | |
CN207920633U (zh) | 隧道衬砌拱顶带模注浆装置 | |
CN104963324B (zh) | 一种导流洞封堵头排气结构及其排气方法 | |
CN103498486B (zh) | 一种采用套管对后浇带降水管井实施封堵的方法 | |
CN106544961A (zh) | 一种混凝土裂缝堵漏方法 | |
CN106592614B (zh) | 基坑截水帷幕中漏水点的封堵方法 | |
CN207537993U (zh) | 一种导流洞混凝土堵头 | |
CN203362181U (zh) | 一种应用于隧道施工防水堵漏的压浆式膜袋 | |
CN109138904B (zh) | 双封隔器分层注浆止水装置及其使用方法 | |
CN204728353U (zh) | 深基坑地下连续墙外侧管涌封堵结构 | |
CN107700440A (zh) | 一种导流洞混凝土堵头及其施工方法 | |
CN106320728A (zh) | 双液注浆囊袋式快速封孔装置 | |
CN109706932A (zh) | 一种溶洞堵头结构及施工方法 | |
CN104674817B (zh) | 倒压式密封注浆封堵预留孔洞的方法 | |
CN105220700A (zh) | 基坑止水帷幕补强方法 | |
CN209444310U (zh) | 一种降水井封堵结构 | |
CN204753654U (zh) | 地下连续墙阴角部位管涌封堵结构 | |
CN204533836U (zh) | 管道穿楼板防渗漏装置 | |
CN103898913B (zh) | 一种内布袋袖阀管注浆施工方法 | |
CN207419503U (zh) | 地下基坑堵漏结构 | |
CN107747317B (zh) | 一种软岩基础防渗墙槽底沉渣处理方法及软岩基础防渗墙槽底结构 | |
CN206667305U (zh) | 地下室渗水点渐堵漏结构 | |
CN206189365U (zh) | 用于导流洞封堵体浇筑的导流封堵结构 | |
CN205531429U (zh) | 双液注浆囊袋式快速封孔装置 | |
CN204199324U (zh) | 地下连续墙施工中连接钢筋笼用工字钢 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190503 |
|
RJ01 | Rejection of invention patent application after publication |