CN109693416A - The equipment of full-automatic installation gift box handle - Google Patents

The equipment of full-automatic installation gift box handle Download PDF

Info

Publication number
CN109693416A
CN109693416A CN201910119097.0A CN201910119097A CN109693416A CN 109693416 A CN109693416 A CN 109693416A CN 201910119097 A CN201910119097 A CN 201910119097A CN 109693416 A CN109693416 A CN 109693416A
Authority
CN
China
Prior art keywords
plate
block
cylinder
equipment
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910119097.0A
Other languages
Chinese (zh)
Inventor
张国保
田茂斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Li'ao Intelligent Equipment Co Ltd
Original Assignee
Jiangsu Li'ao Intelligent Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Li'ao Intelligent Equipment Co Ltd filed Critical Jiangsu Li'ao Intelligent Equipment Co Ltd
Priority to CN201910119097.0A priority Critical patent/CN109693416A/en
Publication of CN109693416A publication Critical patent/CN109693416A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B31MAKING ARTICLES OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER; WORKING PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31BMAKING CONTAINERS OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31B50/00Making rigid or semi-rigid containers, e.g. boxes or cartons
    • B31B50/74Auxiliary operations
    • B31B50/81Forming or attaching accessories, e.g. opening devices, closures or tear strings
    • B31B50/86Forming integral handles; Attaching separate handles
    • B31B50/87Fitting separate handles on boxes, e.g. on drinking cups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B31MAKING ARTICLES OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER; WORKING PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31BMAKING CONTAINERS OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31B50/00Making rigid or semi-rigid containers, e.g. boxes or cartons
    • B31B50/005Making rigid or semi-rigid containers, e.g. boxes or cartons involving a particular layout of the machinery or relative arrangement of its subunits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B31MAKING ARTICLES OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER; WORKING PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31BMAKING CONTAINERS OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31B50/00Making rigid or semi-rigid containers, e.g. boxes or cartons
    • B31B50/006Controlling; Regulating; Measuring; Improving safety
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B31MAKING ARTICLES OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER; WORKING PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31BMAKING CONTAINERS OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31B50/00Making rigid or semi-rigid containers, e.g. boxes or cartons
    • B31B50/02Feeding or positioning sheets, blanks or webs
    • B31B50/04Feeding sheets or blanks
    • B31B50/042Feeding sheets or blanks using rolls, belts or chains
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B31MAKING ARTICLES OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER; WORKING PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31BMAKING CONTAINERS OF PAPER, CARDBOARD OR MATERIAL WORKED IN A MANNER ANALOGOUS TO PAPER
    • B31B50/00Making rigid or semi-rigid containers, e.g. boxes or cartons
    • B31B50/60Uniting opposed surfaces or edges; Taping
    • B31B50/62Uniting opposed surfaces or edges; Taping by adhesives
    • B31B50/622Applying glue on already formed boxes

Abstract

The invention belongs to carton board production equipment technologies, provide a kind of equipment of full-automatic installation gift box handle.The present invention successively includes feeding device, send box assembly, main transmission and rewinding stacking, the main transmission is equipped with several mounting assemblies, the mounting assembly includes the punching assembly being sequentially distributed in main transmission, pre- glue spreading assembly, viscous handle strip, glue spraying component, viscous reinforcing strip component and reinforcing strip component, the auto-feed and automatic scoreboard function of cardboard may be implemented, artificial and working strength is reduced, the working efficiency and reliability engineering effect of equipment are improved.

Description

The equipment of full-automatic installation gift box handle
Technical field
The present invention relates to carton board production equipment technologies, and in particular to a kind of full-automatic installation gift box handle is set It is standby.
Background technique
Country's dairy products at present, drink enterprise (such as Mongolia Ox, Erie, silver-colored aigret add treasured, prosperous son, Tsingtao beer) gift box Carrying buckle applies mostly is the plastics carrying buckle being molded into, and it is most of be manually performed installation, installation mentions by hand The mode low efficiency of hand, big to artificial accordance with tolerance, labor cost is high.It is slow in response speed of the busy season to market, it solves Method is exactly to recruit more personnel, causes difficult management in this way, and there are more personal safety hidden danger.
Domestic such automated package research and development just start, and some automatic installation handle carrying devices occur, including new The installation equipment of the installation equipment of profile material handle and traditional plastics carrying buckle, but some structures are in Qualify Phase, it is raw Low efficiency, unstable product quality are produced, market user complains the problems such as frequent.
Summary of the invention
For the defects in the prior art, the present invention provides the equipment of full-automatic installation gift box handle, realizes oneself of cardboard Dynamic feeding and automatic scoreboard function reduce artificial and working strength, improve the working efficiency and reliability of equipment.
In order to achieve the above objectives, it is provided by the invention it is full-automatic installation gift box handle equipment, successively include feeding device, Box assembly, main transmission and rewinding stacking are sent, the main transmission is equipped with several mounting assemblies.
The technical principle and technical effect of this programme are as follows:
By punching, pre- gluing, the techniques such as handle strip, glue spraying, viscous reinforcing band are glued, complete handle strip and gift box carton Bonding.The bonding of handle strip and gift box carton is realized by bonding agent.
Further, described that box assembly is sent to include the first conveyer belt, Anchor plate kit and preceding sending component;
The Anchor plate kit includes wheel plate and compression cylinder;
The wheel plate is set side by side with first conveyer belt, and the wheel plate is equipped with the traveller cooperated with housing slide, institute The driving end for stating compression cylinder is connected to the wheel plate, and the compression cylinder drives the wheel plate to lean on to first conveyer belt Closely, the wheel plate is equipped with several transmission wheels against to first conveyer belt;
The preceding sending component send sliding block and cylinder of before supplying gas before including, the end for sending sliding block to be located at first transmission belt before described End side portion, and it is described before send sliding block to be slidably matched in the rack along first conveyer belt direction.
Further, the mounting assembly includes the punching assembly being sequentially distributed in main transmission, pre- glue spreading assembly, viscous handle Band, glue spraying component, viscous reinforcing strip component and reinforcing strip component.
Further, the main transmission line includes unpack slide bar, guide rail, conveyer chain and unpacking shuttle mouth;
The guide rail and the unpacking slide bar are set side by side, and the feed end of the unpacking slide bar is set to the unpacking litter Feed end, and the front end of the unpacking shuttle mouth extends to and send at box assembly;
The conveyer chain is juxtaposed on above the guide rail, and the conveyer chain is equipped with to the carton promotion on guide rail Shifting block.
Carton is opened by the effect for shuttle mouth of unpacking, into the designated position of main transmission, at this time by conveyer chain Shifting block pushes carton board, carton to the distance for being pushed forward a station.By looping back and forth like this, to realize that carton is transmitted to The function of next station.
Further, punching assembly includes the first sliding rail, take-up housing, the first linking arm and bed die;
First sliding rail is set to vertically in the rack of first cam two sides, and the two sides of the slide are respectively fixed with First sliding block, first sliding block are slidably matched with first sliding rail respectively;
The both ends of first linking arm are hingedly connected to first cam and the take-up housing, go back on the take-up housing Equipped with connecting plate, the connecting plate is equipped with punch fixing plate, and vertical sliding is combined with guide post on the punch fixing plate, institute The lower end for stating guide post is horizontally fixed with briquetting mounting plate, and the both ends of the briquetting mounting plate are respectively fixed with briquetting, the punching It is also vertically fixed formed punch in head fixed plate, the formed punch is passed down through the briquetting and briquetting mounting plate, the formed punch and institute State briquetting, briquetting installation version be slidably matched, the bed die is set in the rack below the briquetting.
After carton reaches the designated position of the first bed die.The drive lower sliding block seat of the first linking arm, third connecting plate, Punch fixing plate moves up and down.In the process, the first briquetting falls before to compress carton, and then formed punch continues fortune downwards Dynamic, the punching on carton, hole punch back punching head rises, and then the first briquetting rises, and completes punching function.It is past by so recycling It is multiple, to realize carton in the punching function of the station.
Further, the pre- glue spreading assembly includes the first ball screw, the first support base, upper lower moving plate;
First ball screw, which horizontally rotates, to be matched in rack, and first ball screw is connected to by shaft coupling Motor has been threadedly engaged first movement block on first ball screw;
The first support base level is snug fit at rack, and the rear end of first support base is fixed on described first and is moved The front end of motion block, first support base is equipped with lifting cylinder, and the two sides of the lifting cylinder are respectively equipped with the second sliding rail;
The both ends of the upper lower moving plate are respectively equipped with the second sliding block, and second sliding block is slided with second sliding rail respectively Cooperation, the middle part of the upper lower moving plate are connect with the lifting cylinder, and horizontal first glue rifle that is equipped with is fixed on the upper lower moving plate The both ends of bar, the first glue rifle fixed link are respectively equipped with frictioning glue rifle.
Further, the viscous handle assemblies include holding down assembly, wear handle assemblies and sending band component;
It is described to hold down assembly including brush cylinder, compressor arm, oscillating rod and several connecting rods;
The brush cylinder is vertically arranged in rack, and the output end of the brush cylinder is equipped with link block,
Two sides of the compressor arm below the brush cylinder are horizontally disposed with respectively, the inner end top of the compressor arm and institute The lower end for stating oscillating rod is hinged, and brush block is equipped with below the inner end of the compressor arm;
The upper end of the oscillating rod and the link block are hinged, and the connecting rod is arranged in parallel, the both ends of the connecting rod It is hingedly connected to compressor arm and rack.
Through behind the hole on carton, the decline of brush cylinder drives cylinder link block to move downward, passes through swing handle strip Bar, the effect for opening and closing swing rod, rocking pin drive brush block to realize brush movement, the handle strip put on are bonded together with carton. Then brush cylinder rises, and brush block is driven to be detached from carton, to realize that brush acts.
After handle strip is adhered to carton, cylinder stretches out, and is travelled forward by the second floating junction and air cylinder fixed plate, thus Drive wears handle assemblies and travels forward, and handle strip is made to be detached from pressure zone plate.Carton is transmitted to next station, then cylinders retract, Handle assemblies return is worn in drive.
Further, the handle assemblies of wearing include third sliding rail, fixing seat and the second cam;
The third sliding rail is vertically arranged at the lower section of the brush block, and the fixing seat third that is slidably matched is sliding Rail, the upper end of the third sliding rail are equipped with the substrate slided up and down, and the middle part of the substrate is equipped with pressure zone plate, the pressure zone block with The brush block is correspondingly arranged, and the both ends of the pressure zone plate are respectively equipped with gland, the lower section of the substrate by threading steel disc with The fixing seat connection, second cam are set to the lower section of the third sliding rail, and second cam passes through the second connection Arm is connect with the fixing seat;
Described send is set to the left side for wearing handle assemblies with component.
Further, the glue spraying component includes the second ball screw and the second support base;
Second ball screw, which horizontally rotates, to be matched in rack, and second ball screw is connected to by shaft coupling Motor has been threadedly engaged the second movable block on second ball screw;
The second support base level is snug fit at rack, and the rear end of first support base is fixed on described second and is moved Motion block, the front end level of second support base are equipped with the second glue rifle fixed link, and the both ends of the second glue rifle fixed link are distinguished Equipped with glue spraying glue rifle.
Further, the rewinding stacking includes blanking guide plate, conveyer belt and storage tank platform;
The facing up for blanking guide plate is obliquely installed, the front end of blanking guide plate and the main transmission line tail End docking setting, the front other end of the blanking guide plate are provided with baffle,
The head end of the conveyer belt is located at the lower section of the blanking guide plate,
The storage tank platform is set to below the tail end of the conveyer belt, is equipped with vertically on the storage tank platform and is returned flitch, described The tail end of conveyer belt and described return between flitch are installed with storing space.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all the appended drawings, similar element Or part is generally identified by similar appended drawing reference.In attached drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 is the production line integral layout figure of the embodiment of the present invention;
Fig. 2 is the perspective view of the feeding device of the embodiment of the present invention;
Fig. 3 is the main transmission perspective view of the embodiment of the present invention;
Fig. 4 is the main transmission main view of the embodiment of the present invention;
Fig. 5 is the main transmission left view of the embodiment of the present invention;
Fig. 6 is the schematic diagram for sending box assembly of the embodiment of the present invention;
Fig. 7 is that the embodiment of the present invention send the schematic diagram that device is sent before box assembly;
Fig. 8 is the left view for sending box assembly of the embodiment of the present invention;
Fig. 9 is the perspective view of the punching assembly of the embodiment of the present invention;
Figure 10 is the punching assembly cross-sectional view of the embodiment of the present invention;
Figure 11 is the schematic diagram of the pre- glue spreading assembly of the embodiment of the present invention;
Figure 12 is the cross-sectional view of the pre- glue spreading assembly of the embodiment of the present invention;
Figure 13 is the main view of the viscous handle assemblies of the embodiment of the present invention;
Figure 14 is the perspective view of the viscous handle assemblies of the embodiment of the present invention;
Figure 15 send the schematic diagram with component for the embodiment of the present invention;
Figure 16 is the schematic diagram for wearing handle assemblies of the embodiment of the present invention;
Figure 17 is the schematic diagram of the glue spraying component of the embodiment of the present invention;
Figure 18 is the cross-sectional view of the glue spraying component of the embodiment of the present invention;
Figure 19 is the perspective view of the reinforcing strip component of the embodiment of the present invention;
Figure 20 is the cross-sectional view of the reinforcing strip component of the embodiment of the present invention;
Figure 21 is that the reinforcing strip of the embodiment of the present invention unreels the schematic diagram of box;
Figure 22 is that the handle strip of the embodiment of the present invention unreels the schematic diagram of box;
Figure 23 is that the handle strip of the embodiment of the present invention unreels the rearview of box.
Specific embodiment
It is described in detail below in conjunction with embodiment of the attached drawing to technical solution of the present invention.Following embodiment is only used for Clearly illustrate technical solution of the present invention, therefore be only used as example, and cannot be used as a limitation and limit protection model of the invention It encloses.It should be noted that unless otherwise indicated, technical term or scientific term used in this application are should be belonging to the present invention The ordinary meaning that field technical staff is understood.
Embodiment:
The present invention is the production line that paperboard carton gift box installs handle, includes successively feeding device, send box assembly, main transmission With rewinding stacking, mounting assembly is equipped in main transmission, the mounting assembly includes the punching group being sequentially distributed in main transmission Part, pre- glue spreading assembly, viscous handle strip, glue spraying component, viscous reinforcing strip component and reinforcing strip component.
Feeding device:
Storage device 1-1, the first synchronous belt 1-2, the second synchronous belt 1-3, first servo motor 1-4, the first rodless cylinder 1-5, scraping wings 1-6, stepper motor 1-7, third synchronous belt 1-8, tension balanced device 1-9, board separating device 1-10, ratchet are fixed 1-11 is enclosed, the feeding synchronous pulley of cylinder 1-12, the 4th synchronous belt 1-13, first 1-14, the 6th shaft 1-15 fall case feed device 1-16。
Wherein:
Storage device 1-1: front boxboard 1-1-1, storing bottom plate 1-1-2, scoreboard synchronous belt 1-1-3, it is rear to keep off boxboard 1-1- The rodless cylinder 1-1-6 of 4, the first lifting cylinder 1-1-5, first, the first bottom plate 1-1-7, synchronous belt support 1-1-8, linear bearing 1-1-9, support column 1-1-10, roller supporting 1-1-11, first bearing 1-1-12, the first connecting plate 1-1-13, lobe plate 1-1- 14, the second lifting cylinder 1-1-15.
Board separating device 1-10: the first pushes away boxboard 1-10-1, push plate 1-10-2, the first guide post 1-10-3, the connection of the first cylinder Part 1-10-3, scoreboard cylinder 1-10-5, the first encapsulated idler wheel 1-10-6, the second encapsulated roller shaft 1-10-7, the 5th synchronous belt 1- 10-8, the 6th synchronous pulley 1-10-9, brushless motor 1-10-10.
Case feed device 1-16: block 1-16-1 is fallen, case bar 1-16-2, pushing block 1-16-3, the second connecting plate 1-16-4 are kept off, Feeding plate 1-16-5, gripping block 1-16-6, sprocket wheel 1-16-7, the first chain 1-16-8, first motor 1-16-9 composition.
Code is placed on storing bottom plate 1-1-2 at the carton of pile, and cardboard will not under the scoreboard synchronous belt 1-1-3 effect of two sides Topple over, until piling storing plate, then the first rodless cylinder 1-1-6 drives front boxboard 1-1-1 to travel forward, and compression installs Cardboard.Then, when being connected to scarce material signal, the second lifting cylinder 1-1-15 being fixed on the first bottom plate 1-1-7 stretches out, The first connecting plate 1-1-13 and lobe plate 1-1-14 is driven to advance, so that first bearing 1-1-12 is pushed to be lifted up, Jin Ershi The rising of existing support column 1-1-10 and storing bottom plate 1-1-2, carton are detached from scoreboard synchronous belt.First servo motor 1-4 passes through band Dynamic 1-3 synchronous pulley one rotates, and driving is moved with synchronous belt support 1-1-8 the first synchronous belt 1-2 being fixed together, thus band Dynamic storage device 1-1 travels forward.When detecting cardboard in front close to switch, storage device stops forward.At this point, first Rodless cylinder 1-5 drives scraping wings 1-6 to rise, and then stepper motor 1-7 starts, and drives scraping wings by third synchronous belt 1-8 1-6 integrally travels forward, and scraping wings 1-6 declines when reaching the front boxboard front of storage device, the first lifting cylinder 1-1-5 band Gear boxboard 1-1-4 decline, pushes cardboard under the action of tension balanced device 1-9 with certain pulling force and travels forward after dynamic.Storing For device under the action of the first rodless cylinder 1-1-6 and first servo motor 1-4, discharge position in return continues feeding.
It when cardboard runs to board separating device 1-10, receives and case is sent to lack material signal, scoreboard cylinder 1-10-5 is retracted, and is led to It crosses 1-10-4 cylinder connection piece and the first guide post 1-10-3 drives first to push away boxboard 1-10-1 retraction, at this time brushless motor 1-10- 10 drive the second encapsulated roller shaft 1-10-7 rotation by the 6th synchronous pulley 1-10-9, the 5th synchronous belt 1-10-8, are wrapping Under the turning effort of the first encapsulated idler wheel 1-10-6 on rubber-surfaced roll wheel shaft, a piece of cardboard is brushed down, when cardboard reaches specific bit It sets, scoreboard cylinder stretches out, and first, which pushes away boxboard 1-10-1, blocks subsequent cardboard.Feeding cylinder 1-12 is flexible primary at this time, passes through spine Wheel retainer plate 1-11, the first synchronous pulley 1-14, the 6th shaft 1-15 come drive the 4th synchronous belt 1-13 move, realize cardboard into To primary.By looping back and forth like this, to realize automatic scoreboard function.
When cardboard is under the action of board separating device, case feed device 1-16 is fallen on.Effect of the carton in inertia and gravity Under, it is slided into after falling on feeding plate 1-16-5 in the slot of block 1-16-1, first motor 1-16-9 starts at this time, passes through sprocket wheel 1-16-7 rotation is advanced to the first chain 1-16-8 of driving, and the pushing block 1-16-3 being fixed on chain pushes carton to transport forward It is dynamic.It after carton leaves the designated position on feeding plate, issues and lacks material signal, board separating device 1-10 movement falls next cardboard. By looping back and forth like this, to realize that automatic blanking send box function.
Main transmission:
The main transmission line includes unpack slide bar, guide rail, conveyer chain and unpacking shuttle mouth;
The guide rail and the unpacking slide bar are set side by side, and the feed end of the unpacking slide bar is set to the unpacking litter Feed end, and the front end of the unpacking shuttle mouth extends to and send at box assembly;
The conveyer chain is juxtaposed on above the guide rail, and the conveyer chain is equipped with to the carton promotion on guide rail Shifting block.
Label and workflow about this part is as follows:
Driven axle 3-1, second bearing 3-2, second by movable sprocket 3-3, third chain 3-4, and unpack shuttle mouth 3-5, and carton is dialled Block 3-6, the second driving shaft 3-7, the second drive sprocket 3-8, connector sleeve 3-9, the second servo motor 3-10, upper rail 3-11 are adjusted Save baffle 3-12, lower guideway 3-13.
The carton for sending box assembly to bring is opened carton by the effect for the shuttle mouth 3-5 that unpacks, is entered during sending case The designated position of main transmission, at this time the second servo motor 3-10 start, rotate a certain angle, driving the second driving shaft 3-7 and Second drive sprocket 3-8 rotation, so that 3-4 chain be driven to travel forward, be fixed on carton shifting block 3-6 on chain carton to It is pushed forward the distance of a station.By looping back and forth like this, to realize that carton is transmitted to the function of next station.
Send box assembly:
It is described that box assembly is sent to include the first conveyer belt, Anchor plate kit and preceding sending component;
The Anchor plate kit includes wheel plate and compression cylinder;
The wheel plate is set side by side with first conveyer belt, and the wheel plate is equipped with the traveller cooperated with housing slide, institute The driving end for stating compression cylinder is connected to the wheel plate, and the compression cylinder drives the wheel plate to lean on to first conveyer belt Closely, the wheel plate is equipped with several transmission wheels against to first conveyer belt;
The preceding sending component send sliding block and cylinder of before supplying gas before including, the end for sending sliding block to be located at first transmission belt before described End side portion, and it is described before send sliding block to be slidably matched in the rack along first conveyer belt direction.
Label and workflow about this part is as follows:
First glue coating wheel 4-1, guide plate 4-2, third driving shaft 4-3, compression cylinder 4-4, send case apparatus 4-5, preceding to send dress Set 4-6, passive belt wheel 4-7, driving pulley 4-8, third motor 4-9.
Wherein:
Send the 4-5: the first sliding block of case apparatus 4-5-1, the first link block 4-5-2, the first belt 4-5-3, first pulley 4-5- 4, the preceding cylinder 4-5-5 that supplies gas;
Before send the 4-6: the second belt of device 4-6-1, the second belt wheel 4-6-2, gear 4-6-3, third belt wheel 4-6-4, bottom Seat 4-6-5, the second shaft 4-6-6, the second bottom plate 4-6-7, third shaft 4-6-8, lower gear 4-6-9.
Feeding device send box part to send carton to the designated position that 4 send box assembly after.Third motor 4-9 starting, leads to The driving pulley 4-8 that overdrives rotation, to drive passive belt wheel 4-7 and third driving shaft 4-3 to rotate by synchronous belt, 4-3 turns Moving axis drives the first belt 4-5-3 and first pulley 4-5-4 rotation, and carton is forward under the action of 2 first belt 4-5-3 It is sent before moving at device 4-6.
Carton is preceding sending the designated position at device 4-6.First belt 4-5-3 drives third belt wheel 4-6-4 rotation, into And by lower gear 4-6-9 and gear 4-6-3 to drive the second belt 4-6-1 and the second belt wheel 4-6-2 rotation, in belt Frictional force under carton travel forward.At the same time, the preceding cylinder 4-5-5 that supplies gas is forward extended out, before sending device 4-6 to push forward, And then sending carton to the designated position of main transmission, the cylinder 4-5-5 that then before supplies gas is retracted.
Punching assembly:
Punching assembly includes the first sliding rail, take-up housing, the first linking arm and bed die;
First sliding rail is set to vertically in the rack of first cam two sides, and the two sides of the slide are respectively fixed with First sliding block, first sliding block are slidably matched with first sliding rail respectively;
The both ends of first linking arm are hingedly connected to first cam and the take-up housing, go back on the take-up housing Equipped with connecting plate, the connecting plate is equipped with punch fixing plate, and vertical sliding is combined with guide post on the punch fixing plate, institute The lower end for stating guide post is horizontally fixed with briquetting mounting plate, and the both ends of the briquetting mounting plate are respectively fixed with briquetting, the punching It is also vertically fixed formed punch in head fixed plate, the formed punch is passed down through the briquetting and briquetting mounting plate, the formed punch and institute State briquetting, briquetting installation version be slidably matched, the bed die is set in the rack below the briquetting.
Label and workflow about this part is as follows:
First linking arm 5-1,3rd bearing 5-2, take-up housing 5-3, fourth bearing 5-4, third connecting plate 5-5, formed punch are solid Fixed board 5-6, guide rod 5-7, the first briquetting mounting plate 5-8, the first briquetting 5-9, the first second sliding block of guide rail 5-10,5-11, One bed die 5-12, the 4th shaft 5-13, the 4th belt wheel 5-14, the 4th motor 5-15, terminal pad 5-16, cam rotating seat 5-17, First pin shaft 5-18, the 5th belt wheel 5-19, formed punch 5-20.6 punching assembly of attached drawing.
After carton reaches the designated position of the first bed die 5-12, the 4th motor 5-15 starting drives the 4th belt wheel 5-14 Rotation drives the 5th belt wheel 5-19 rotation by synchronous belt, thus the 4th shaft 5-13, terminal pad 5-16, cam rotating seat 5- 17 make rotating motion.It is done in the drive lower sliding block seat 5-3, third connecting plate 5-5, punch fixing plate 5-6 of the first linking arm 5-1 Lower movement.In the process, the first briquetting 5-9 falls before to compress carton, and then formed punch 5-20 continues to move downward, in paper Punching on case, hole punch back punching head 5-20 rise, and then the first briquetting 5-9 rises, and complete punching function.It is past by so recycling It is multiple, to realize carton in the punching function of the station.
Pre- glue spreading assembly:
The pre- glue spreading assembly includes the first ball screw, the first support base, upper lower moving plate;
First ball screw, which horizontally rotates, to be matched in rack, and first ball screw is connected to by shaft coupling Motor has been threadedly engaged first movement block on first ball screw;
The first support base level is snug fit at rack, and the rear end of first support base is fixed on described first and is moved The front end of motion block, first support base is equipped with lifting cylinder, and the two sides of the lifting cylinder are respectively equipped with the second sliding rail;
The both ends of the upper lower moving plate are respectively equipped with the second sliding block, and second sliding block is slided with second sliding rail respectively Cooperation, the middle part of the upper lower moving plate are connect with the lifting cylinder, and horizontal first glue rifle that is equipped with is fixed on the upper lower moving plate The both ends of bar, the first glue rifle fixed link are respectively equipped with frictioning glue rifle.
Label and workflow about this part is as follows:
Third lifting cylinder 6-1, frictioning glue rifle 6-2, upper lower moving plate 6-4, third sliding block 6-5, the first support base 6-6, the Five motor 6-7, the first shaft coupling floating junction of 6-8, the first traversing movable plate 6-9, first 6-10, the second link block 6-11, first Ball-screw 6-12.The pre- glue spreading assembly of attached drawing 7.
After carton reaches the designated position of pre- gluing station, third lifting cylinder 6-1 decline passes through the first floating junction 6-10 drives the second link block 6-11, upper lower moving plate 6-4, the first glue rifle fixed link 6-3 to move downwardly together, to drive frictioning Glue rifle 6-2 is moved down, and close to the frictioning position of carton, carries out frictioning.At this point, the 5th motor 6-7 starts, the first ball is driven Lead screw 6-12 rotation, to push first traversing movable plate 6-9,6-6 supporting block mobile to motor drive direction, the realization of glue machine is moved horizontally Glue is coated on carton.Then, third lifting cylinder 6-1 rises, and frictioning glue rifle 6-2 is driven to rise, the 5th motor 6-7 starting It drives glue rifle to move horizontally and returns to initial position.By looping back and forth like this, to realize carton in the frictioning function of the station.
Viscous handle strip:
The viscous handle assemblies include holding down assembly, wear handle assemblies and sending band component;
It is described to hold down assembly including brush cylinder, compressor arm, oscillating rod and several connecting rods;
The brush cylinder is vertically arranged in rack, and the output end of the brush cylinder is equipped with link block,
Two sides of the compressor arm below the brush cylinder are horizontally disposed with respectively, the inner end top of the compressor arm and institute The lower end for stating oscillating rod is hinged, and brush block is equipped with below the inner end of the compressor arm;
The upper end of the oscillating rod and the link block are hinged, and the connecting rod is arranged in parallel, the both ends of the connecting rod It is hingedly connected to compressor arm and rack;
The handle assemblies of wearing include third sliding rail, fixing seat and the second cam;
The third sliding rail is vertically arranged at the lower section of the brush block, and the fixing seat third that is slidably matched is sliding Rail, the upper end of the third sliding rail are equipped with the substrate slided up and down, and the middle part of the substrate is equipped with pressure zone plate, the pressure zone block with The brush block is correspondingly arranged, and the both ends of the pressure zone plate are respectively equipped with gland, the lower section of the substrate by threading steel disc with The fixing seat connection, second cam are set to the lower section of the third sliding rail, and second cam passes through the second connection Arm is connect with the fixing seat;
Described send is set to the left side for wearing handle assemblies with component.
Label and workflow about this part is as follows:
Band component 7-1 is sent, handle assemblies 7-2, roller bearing follower 7-3, brush cylinder 7-4, cylinder link block 7- are worn 5, swing rod 7-6, rocking pin 7-7, compressor arm 7-8, brush block 7-9, oscillating rod 7-10 are opened and closed, brush opens link block 7-11, and the 4th connects Fishplate bar 7-12, installation base plate 7-13, sliding panel 7-14, cylinder 7-15, air cylinder fixed plate 7-16, the second fixed plate 7-17, second Floating junction 7-18.Attached drawing 8 glues handle assemblies.
Wherein:
Band component 7-1: 5th bearing 7-1-1 is sent, supply roll holds a 7-1-2, the 6th belt wheel 7-1-3, the 7th belt wheel 7-1- 4, the 6th motor 7-1-5 cross band bottom plate 7-1-6, pressure roller mandrel 7-1-7, feed roller axis 7-1-8.
Wear the 7-2: the first gland of handle assemblies 7-2-1, cutter seat 7-2-2, lifting seat 7-2-3, cutter lifter cam 7-2- 4, connecting rod 7-2-5, oscillating bearing 7-2-6, pressure zone plate 7-2-7, the second gland 7-2-8, the 7th motor 7-2-9, threading steel disc 7-2-10, fixing seat 7-2-11, threading cam 7-2-12, first bearing follower 7-2-13, the 5th shaft 7-2-14, the first tooth Take turns 7-2-15, the first cutter 7-2-16, pressure zone bar 7-2-17, pressure zone top plate 7-2-18, the second guide rail 7-2-19, second gear 7- 2-20, the 8th belt wheel 7-2-21, the 4th driving shaft 7-2-22, pressure zone pole socket 7-2-23, second bearing follower 7-2-24, photoelectricity Switch 7-2-25, the 9th belt wheel 7-2-26.
After carton reaches the designated position of viscous handle station, band component 7-1 is sent to carry out sending band.6th motor 7-1-5 is opened It is dynamic, the 7th belt wheel 7-1-4 rotation is driven, the 6th belt wheel 7-1-3 and feed roller axis 7-1-8 is driven to rotate by synchronous belt.It mentions Hand strap is fed forward under the action of feed roller axis 7-1-8 and 5th bearing 7-1-1, when paper tape reaches at optoelectronic switch 7-2-25 When, stopping send band to act.
When handle strip is sent to designated position, the 7th motor 7-2-9 starting, driving the 9th belt wheel 7-2-26 rotation passes through Synchronous belt drives the 8th belt wheel 7-2-21 and the 4th driving shaft 7-2-22 rotation, so that second gear 7-2-20 is driven to rotate, into And the rotation of first gear 7-2-15 and the 5th shaft 7-2-14 are driven, and drive cutter lifter cam 7-2-4 to move up and down, it should Cam driven first bearing follower 7-2-13, lifting seat 7-2-3 and the first cutter 7-2-16 move up and down, and completion, which is cut, to be mentioned Hand strap movement.
In handle strip cutting-off process, second gear 7-2-20 rotation is to drive threading cam 7-2-12 to rotate, thus band Dynamic second bearing follower 7-2-24 movement, and then drive the second guide rail 7-2-19, pressure zone pole socket 7-2-23, pressure zone top plate 7- 2-18 is moved upwards, and compresses handle strip by pressure zone bar 7-2-17, and then threading cam 7-2-12 rotation drives fixing seat 7- 2-11 and threading steel disc 7-2-10 move up and down, and handle strip through on carton, then pressure zone bar 7-2-17 declines, with handle Band disengages.
Through behind the hole on carton, brush cylinder 7-4 decline drives cylinder link block 7-5 to move downward, passes through handle strip Oscillating rod 7-10, the effect for opening and closing swing rod 7-6, rocking pin 7-7 drive brush block 7-9 to realize brush movement, mention what is put on Hand strap is bonded together with carton.Then brush cylinder 7-4 rises, and brush block 7-9 is driven to be detached from carton, to realize that brush is dynamic Make.
After handle strip is adhered to carton, cylinder 7-15 stretches out, and passes through the second floating junction 7-18 and air cylinder fixed plate 7-16 It travels forward, travels forward to drive and wear handle assemblies 7-2, handle strip is made to be detached from pressure zone plate 7-2-7.Carton is transmitted to next A station, then cylinder 7-15 is retracted, and handle assemblies 7-2 return is worn in drive.
By looping back and forth like this, to realize carton in the function of wearing handle strip of the station.
Glue spraying component:
The glue spraying component includes the second ball screw and the second support base;
Second ball screw, which horizontally rotates, to be matched in rack, and second ball screw is connected to by shaft coupling Motor has been threadedly engaged the second movable block on second ball screw;
The second support base level is snug fit at rack, and the rear end of first support base is fixed on described second and is moved Motion block, the front end level of second support base are equipped with the second glue rifle fixed link, and the both ends of the second glue rifle fixed link are distinguished Equipped with glue spraying glue rifle.
Label and workflow about this part is as follows:
Glue rifle fixed plate 8-1, the second glue rifle fixed link 8-2, glue spraying glue rifle 8-3, the second support base 8-4, the 8th motor 8- 5, second shaft coupling 8-6, the second ball-screw 8-7, the second traversing movable plate 8-8.9 glue spraying component of attached drawing.
After carton reaches the designated position of glue spraying station, the 8th motor 8-5 starting is driven by second shaft coupling 8-6 Second ball-screw 8-7 rotation, thus push the second traversing movable plate 8-8 and the second support base 8-4 mobile to motor drive direction, spray Glue glue rifle 8-3 realization moves horizontally and glue is sprayed on carton.Then, the 8th motor 8-5 is reversely rotated, and passes through second shaft coupling 8-6 drives the second ball-screw 8-7 rotation, to push the second traversing movable plate 8-8 and the second support base 8-4 to motor opposite direction It is mobile, drive glue spraying glue rifle 8-3 to return to initial position.By looping back and forth like this, to realize carton in the glue spraying of the station Function.
Viscous reinforcing strip component:
Lifter cam 9-1, the second linking arm 9-2,6th bearing 9-3, pressure head fixed plate 9-4, pressure zone guide rod 9-5, second Briquetting mounting plate 9-6, the second briquetting 9-7, the second bed die 9-8, mounting plate 9-9, the 4th lifting cylinder 9-10, second cutter 9- 11, cutter mounting plate 9-12, pressure zone motor 9-13, Four-slider 9-14, pressure roller shaft 9-15,7th bearing 9-16, belt conveying motor 9-17, the tenth belt wheel 9-18, the second glue coating wheel 9-19, the 11st belt wheel 9-20, directive wheel 9-21, third shaft coupling 9-22, nothing Oily bushing 9-23, slip film 9-24, rotary shaft 9-25, expansion sleeve 9-26, transition plates 9-27, Cam Follower 9-28, cut paper Connecting rod 9-29,8th bearing 9-30, the second pin shaft 9-31, cut paper link block 9-32 cross paper cap plate 9-33.
After carton reaches the designated position of viscous reinforcing strip station, belt conveying motor 9-17 starting drives the tenth belt wheel 9-18 Rotation drives the 11st belt wheel 9-20 and the second glue coating wheel 9-19 to rotate by synchronous belt, so in the second glue coating wheel 9-19 and The conveying that reinforcing strip is realized under the action of 7th bearing 9-16, the length for conveying reinforcing strip are determined according to the rotational angle of motor.
After carton and reinforcing strip reach designated position, the 4th lifting cylinder 9-10 rises, and drives mounting plate 9-9 and the Two bed die 9-8 rise, and it is following to support carton.Then, pressure zone motor 9-13 starts, and passes through third shaft coupling 9-22, rotary shaft The rotation of 9-25 drives lifter cam 9-1 movement, to drive the second linking arm 9-2, pressure head fixed plate 9-4, the second briquetting peace Loading board 9-6 and the second briquetting 9-7 are moved downward, and compress reinforcing strip.Lifter cam 9-1 moves inner track and drives Cam Follower 9-28, cut paper connecting rod 9-29, cut paper link block 9-32 and the second cutter 9-11 are moved downward, and reinforcing strip is cut off, and then Two cutter 9-11 climb away carton.Then, the second briquetting 9-7 climbs away carton, the 4th lifting cylinder 9-10 decline, carton Advance a station, completes viscous handle strip function.
By looping back and forth like this, to realize carton in the viscous handle strip function of the station.
Reinforcing strip unreels box:
First charging tray detects arm 10-1, and the first detection axis 10-2, the first guide wheel 10-3, reinforcing strip, which lacks, expects photoelectricity 10-4, the Two guide wheel 10-5, third guide wheel 10-6, four guide idler 10-7, the first send band glue coating wheel 10-8, the 9th motor 10-9, guiding axis 10-10 is held, the first paper tape guide pipe 10-11, the 9th bearing 10-12, first exempts from key set 10-13, cutting belt roller wheel 10-14, third Drive sprocket 10-15, the first sprocket shaft 10-16, the first barrel 10-17, hopper 10-18.
It is that 9 viscous reinforcing strip components supply reinforcing strip that reinforcing strip, which unreels box,.Reinforcing strip unreels box bilateral symmetry.Coiled reinforcement Band is placed on the first barrel 10-17, and reinforcing strip passes through the first guide wheel 10-3, the second guide wheel 10-5, the first paper tape guide pipe 10-11, third guide wheel 10-6 and four guide idler 10-7 enter first and send between band glue coating wheel 10-8 and cutting belt roller wheel 10-14.The One charging tray detection one end arm 10-1 is fixed with the first detection axis 10-2, the periphery of the 9th bearing 10-12 and coiled reinforcing strip Contact, the first detection axis 10-2 follow handle strip periphery to rotate, and reinforcing strip lacks material photoelectricity 10-4 and passes through the screw of detection right end Position come determine whether lack material.
When detecting that the 9th motor 10-9 starts when lacking material in hopper 10-18, driving third drive sprocket 10-15 revolves Turn, rotated by chain-driving the first sprocket shaft 10-16, so that driving first to exempt from key set 10-13 and first send band glue coating wheel 10-8 rotation send the rotation with glue coating wheel 10-8 and cutting belt roller wheel 10-14 by first to pull reinforcing strip to enter hopper In 10-18, when detecting that material is full in hopper 10-18, the 9th motor 10-9 stops.Reinforcing strip is stored temporarily in hopper 10-18 In, reinforcing strip is exported by guide bearing 10-10, is sent in 9 viscous reinforcing strip components and is provided reinforcing strip.
11 handle strip unreel box:
It lacks material photoelectricity 11-1, the second barrel 11-2, the second paper tape guide pipe 11-3, the tenth motor 11-4, second and exempts from key set 11-5, the 5th guide wheel 11-6, the 6th guide wheel 11-7, second send band glue coating wheel 11-8, belt delivering roller wheel 11-9, send band directive wheel 11- The sprocket shaft 11-12 of 10, the 4th drive sprocket 11-11, second, air-heater 11-13, the second charging tray detect arm 11-14, the second detection Axis 11-15, heater box 11-16, the 7th guide wheel 11-17, the tenth bearing 11-18.
Handle strip unreels box to send band component 7-1 to provide handle strip.Coiled handle strip is placed on the second barrel 11-2 On, handle strip is entered by the 7th guide wheel 11-17, the 5th guide wheel 11-6, the second paper tape guide pipe 11-3 and the 6th guide wheel 11-7 Second send between band glue coating wheel 11-8 and belt delivering roller wheel 11-9.Second charging tray detects the one end arm 11-14 and the second detection axis 11-15 Fixed, the tenth bearing 11-18 of the other end and the outer circle face contact of coiled handle strip, the second detection axis 11-15 follow handle Band periphery rotates, and lacks material photoelectricity 11-1 and determines whether to lack material by detecting the screw position of right end.
When detecting that the tenth motor 11-4 starts when lacking material in heater box 11-16, the 4th drive sprocket 11-11 of driving revolves Turn, rotated by chain-driving the second sprocket shaft 11-12, so that driving second to exempt from key set 11-5 and second send band glue coating wheel 11- 8 rotations send the rotation with glue coating wheel 11-8 and belt delivering roller wheel 11-9 by second to pull handle strip to enter heater box 11- In 16, when detecting that material is full in heater box 11-16, the tenth motor 11-4 stops.Handle strip is in heater box 11-16 by hot wind Machine 11-13 is preheated, and the handle strip after preheating send band directive wheel 11-10 to export by guiding, is sent in band component 7-1.
Rewinding stacking:
The rewinding stacking includes blanking guide plate, conveyer belt and storage tank platform;
The facing up for blanking guide plate is obliquely installed, the front end of blanking guide plate and the main transmission line tail End docking setting, the front other end of the blanking guide plate are provided with baffle;
The head end of the conveyer belt is located at the lower section of the blanking guide plate;
The storage tank platform is set to below the tail end of the conveyer belt, is equipped with vertically on the storage tank platform and is returned flitch, described The tail end of conveyer belt and described return between flitch are installed with storing space.
Label and workflow about this part is as follows:
Conveyer belt 2-1, the first driving shaft 2-2, transmit belt wheel 2-3, reservoir plate 2-4, first rotating shaft 2-5, splicing plate 2-6, Baffle 2-7, blanking guide plate 2-8 push away case cylinder 2-9, the first fixed plate 2-10, second and push away boxboard 2-11, the second motor 2-12, First drive sprocket 2-13, the second chain 2-14, first connects case by movable sprocket 2-15, the first pivoted arm 2-16, the second pivoted arm 2-17 Cylinder 2-18, flake connector 2-19, falls boxboard 2-20.
The carton for reinforcing band is glued, the position of rewinding stacking is entered under the action of chain moving tooth in main transmission.In moving tooth Active force lower edge blanking guide plate 2-8 reach the position baffle 2-7.After equipment starting, the second motor 2-12 rotation driving the One drive sprocket 2-13 rotation, thus be fixed together by the second chain 2-14 drive and first by movable sprocket 2-15 first Driving shaft 2-2 movement.The driving shaft of rotation drives transmission belt wheel 2-3, conveyer belt 2-1 to travel forward, in the friction of conveyer belt 2-1 Under power effect, carton travels forward, and falls at boxboard 2-20.After falling 10 cartons, falls at case or so each 1 and connect case gas Cylinder 2-18 is retracted, and drives the first pivoted arm 2-16, the second pivoted arm 2-17 rotation, so that driving is fixed on connecing on first rotating shaft 2-5 Flitch 2-6 is rotated by 90 °, and catches the carton of whereabouts.At this point, pushing away case cylinder 2-9 retraction, second is driven to push away boxboard 2-11 carton Shift the designated position of reservoir plate 2-4 onto.Then case cylinder 2-9 stretching is pushed away, each 1 is fallen at case or so and connects case cylinder 2-18 stretching, It drives the first pivoted arm 2-16, the second pivoted arm 2-17 to rotate, the carton on splicing plate 2-6 is fallen.By looping back and forth like this, from And realize the function of rewinding stacking.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme should all cover within the scope of the claims and the description of the invention.

Claims (10)

1. a kind of equipment of full-automatic installation gift box handle, which is characterized in that include successively feeding device, send box assembly, main biography Dynamic and rewinding stacking, the main transmission are equipped with several mounting assemblies.
2. the equipment of full-automatic installation gift box handle according to claim 1, which is characterized in that described to send the box assembly to include First conveyer belt, Anchor plate kit and preceding sending component;
The Anchor plate kit includes wheel plate and compression cylinder;
The wheel plate is set side by side with first conveyer belt, and the wheel plate is equipped with the traveller cooperated with housing slide, the pressure The driving end of tight cylinder is connected to the wheel plate, and the compression cylinder drives the wheel plate close to first conveyer belt, institute It states wheel plate and is equipped with several transmission wheels against to first conveyer belt;
The preceding sending component send sliding block and cylinder of before supplying gas before including, the end side for sending sliding block to be located at first transmission belt before described Portion, and it is described before send sliding block to be slidably matched in the rack along first conveyer belt direction.
3. the equipment of full-automatic installation gift box handle according to claim 1, which is characterized in that the mounting assembly includes It is sequentially distributed punching assembly, pre- glue spreading assembly, viscous handle strip, glue spraying component, viscous reinforcing strip component and reinforcement in main transmission Band component.
4. the equipment of full-automatic installation gift box handle according to claim 2, which is characterized in that the main transmission line includes Unpacking slide bar, guide rail, conveyer chain and unpacking shuttle mouth;
The guide rail and the unpacking slide bar are set side by side, the feed end of the unpacking slide bar be set to the unpacking litter into Expect end, and the front end of the unpacking shuttle mouth extends to and send at box assembly;
The conveyer chain is juxtaposed on above the guide rail, and the conveyer chain is equipped with to be dialled to what the carton on guide rail pushed Block.
5. the equipment of full-automatic installation gift box handle according to claim 2, which is characterized in that punching assembly includes first Sliding rail, take-up housing, the first linking arm and bed die;
First sliding rail is set to vertically in the rack of first cam two sides, and the two sides of the slide are respectively fixed with first Sliding block, first sliding block are slidably matched with first sliding rail respectively;
The both ends of first linking arm are hingedly connected to first cam and the take-up housing, are additionally provided on the take-up housing Connecting plate, the connecting plate are equipped with punch fixing plate, and vertical sliding is combined with guide post on the punch fixing plate, described to lead It is horizontally fixed with briquetting mounting plate to the lower end of column, the both ends of the briquetting mounting plate are respectively fixed with briquetting, and the formed punch is solid Formed punch is also vertically fixed on fixed board, the formed punch is passed down through the briquetting and briquetting mounting plate, the formed punch and the pressure Block, briquetting installation version are slidably matched, and the bed die is set in the rack below the briquetting.
6. the equipment of full-automatic installation gift box handle according to claim 2, which is characterized in that the pre- glue spreading assembly packet Include the first ball screw, the first support base, upper lower moving plate;
First ball screw, which horizontally rotates, to be matched in rack, and first ball screw is connected to electricity by shaft coupling Machine has been threadedly engaged first movement block on first ball screw;
The first support base level is snug fit at rack, and the first movement is fixed in the rear end of first support base The front end of block, first support base is equipped with lifting cylinder, and the two sides of the lifting cylinder are respectively equipped with the second sliding rail;
The both ends of the upper lower moving plate are respectively equipped with the second sliding block, and second sliding block is matched with second sliding rail sliding respectively It closes, the middle part of the upper lower moving plate is connect with the lifting cylinder, and it is horizontal on the upper lower moving plate to be equipped with the first glue rifle fixed link, The both ends of the first glue rifle fixed link are respectively equipped with frictioning glue rifle.
7. the equipment of full-automatic installation gift box handle according to claim 1, which is characterized in that
The viscous handle assemblies include holding down assembly, wear handle assemblies and sending band component;
It is described to hold down assembly including brush cylinder, compressor arm, oscillating rod and several connecting rods;
The brush cylinder is vertically arranged in rack, and the output end of the brush cylinder is equipped with link block,
Two sides of the compressor arm below the brush cylinder are horizontally disposed with respectively, inner end top and the pendulum of the compressor arm The lower end of lever is hinged, and brush block is equipped with below the inner end of the compressor arm;
The upper end of the oscillating rod and the link block are hinged, and the connecting rod is arranged in parallel, the both ends difference of the connecting rod It is articulated with compressor arm and rack.
8. the equipment of full-automatic installation gift box handle according to claim 7, which is characterized in that described to wear handle assemblies packet Include third sliding rail, fixing seat and the second cam;
The third sliding rail is vertically arranged at the lower section of the brush block, and the fixing seat is slidably matched the third sliding rail, institute The upper end for stating third sliding rail is equipped with the substrate that slides up and down, and the middle part of the substrate is equipped with pressure zone plate, the pressure zone block with it is described Brush block is correspondingly arranged, and the both ends of the pressure zone plate are respectively equipped with gland, the lower section of the substrate by threading steel disc with it is described Fixing seat connection, second cam are set to the lower section of the third sliding rail, second cam by the second linking arm with The fixing seat connection;
Described send is set to the left side for wearing handle assemblies with component.
9. the equipment of full-automatic installation gift box handle according to claim 2, which is characterized in that the glue spraying component includes Second ball screw and the second support base;
Second ball screw, which horizontally rotates, to be matched in rack, and second ball screw is connected to electricity by shaft coupling Machine has been threadedly engaged the second movable block on second ball screw;
The second support base level is snug fit at rack, and it is mobile that the rear end of first support base is fixed on described second The front end level of block, second support base is equipped with the second glue rifle fixed link, and the both ends of the second glue rifle fixed link are set respectively There is glue spraying glue rifle.
10. the equipment of full-automatic installation gift box handle according to claim 2, which is characterized in that the rewinding stacking packet Include blanking guide plate, conveyer belt and storage tank platform;
The facing up for blanking guide plate is obliquely installed, the front end of blanking guide plate and the main transmission line tail end pair Setting is connect, the front other end of the blanking guide plate is provided with baffle;
The head end of the conveyer belt is located at the lower section of the blanking guide plate;
The storage tank platform is set to below the tail end of the conveyer belt, is equipped with vertically on the storage tank platform and is returned flitch, the transmission The tail end of band and described return between flitch are installed with storing space.
CN201910119097.0A 2019-02-18 2019-02-18 The equipment of full-automatic installation gift box handle Pending CN109693416A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910119097.0A CN109693416A (en) 2019-02-18 2019-02-18 The equipment of full-automatic installation gift box handle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910119097.0A CN109693416A (en) 2019-02-18 2019-02-18 The equipment of full-automatic installation gift box handle

Publications (1)

Publication Number Publication Date
CN109693416A true CN109693416A (en) 2019-04-30

Family

ID=66234860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910119097.0A Pending CN109693416A (en) 2019-02-18 2019-02-18 The equipment of full-automatic installation gift box handle

Country Status (1)

Country Link
CN (1) CN109693416A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111252306A (en) * 2020-03-24 2020-06-09 杭州申佳包装设备有限公司 Automatic unpacking and bottom sealing machine
CN114700737A (en) * 2022-05-05 2022-07-05 汕头市甜甜乐糖果食品有限公司 Automatic assembly device of handle area of drum packing

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4124969A (en) * 1977-08-01 1978-11-14 Industrial Automation Corporation Box opening apparatus
CN101450539A (en) * 2008-12-30 2009-06-10 广州市万世德包装机械有限公司 High-speed paper carton forming device
CN204056460U (en) * 2014-07-09 2014-12-31 深圳市易迈克电子设备有限公司 Paper packaging box handle strip erecting equipment
CN204869807U (en) * 2015-07-14 2015-12-16 厦门翰林彩印股份有限责任公司 Automatic installation equipment of carton handle
CN206501487U (en) * 2017-02-27 2017-09-19 东莞市和隆机械设备有限公司 A kind of full-automatic punch-out equipment is unpacked and beats page structure
CN107283918A (en) * 2017-06-22 2017-10-24 武汉人天包装自动化技术股份有限公司 A kind of carton forming device
CN108859243A (en) * 2018-08-27 2018-11-23 唐山新联印刷机械集团有限公司 A kind of automatic feeding of packing case and wear handle method and apparatus
CN109228513A (en) * 2018-11-26 2019-01-18 江苏力奥智能装备有限公司 Carton board feeding device
CN109250205A (en) * 2017-07-14 2019-01-22 达和机械(昆山)有限公司 Automatically unpacking cartoning sealing machine
CN209794706U (en) * 2019-02-18 2019-12-17 江苏力奥智能装备有限公司 Full-automatic installation gift box handle's equipment

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4124969A (en) * 1977-08-01 1978-11-14 Industrial Automation Corporation Box opening apparatus
CN101450539A (en) * 2008-12-30 2009-06-10 广州市万世德包装机械有限公司 High-speed paper carton forming device
CN204056460U (en) * 2014-07-09 2014-12-31 深圳市易迈克电子设备有限公司 Paper packaging box handle strip erecting equipment
CN204869807U (en) * 2015-07-14 2015-12-16 厦门翰林彩印股份有限责任公司 Automatic installation equipment of carton handle
CN206501487U (en) * 2017-02-27 2017-09-19 东莞市和隆机械设备有限公司 A kind of full-automatic punch-out equipment is unpacked and beats page structure
CN107283918A (en) * 2017-06-22 2017-10-24 武汉人天包装自动化技术股份有限公司 A kind of carton forming device
CN109250205A (en) * 2017-07-14 2019-01-22 达和机械(昆山)有限公司 Automatically unpacking cartoning sealing machine
CN108859243A (en) * 2018-08-27 2018-11-23 唐山新联印刷机械集团有限公司 A kind of automatic feeding of packing case and wear handle method and apparatus
CN109228513A (en) * 2018-11-26 2019-01-18 江苏力奥智能装备有限公司 Carton board feeding device
CN209794706U (en) * 2019-02-18 2019-12-17 江苏力奥智能装备有限公司 Full-automatic installation gift box handle's equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111252306A (en) * 2020-03-24 2020-06-09 杭州申佳包装设备有限公司 Automatic unpacking and bottom sealing machine
CN114700737A (en) * 2022-05-05 2022-07-05 汕头市甜甜乐糖果食品有限公司 Automatic assembly device of handle area of drum packing
CN114700737B (en) * 2022-05-05 2023-03-14 汕头市甜甜乐糖果食品有限公司 Automatic assembly device of handle area of drum packing

Similar Documents

Publication Publication Date Title
CN202400345U (en) Labeling machine
CN109693416A (en) The equipment of full-automatic installation gift box handle
CN104105649B (en) The unwinder of the reel of web material
CN110525757B (en) Labeling system for anti-counterfeit label of bottled product
CN108466456A (en) A kind of multi-functional box machine of board-splicing type
CN113001688B (en) Automatic carpenter's board production facility that feeding bonded
CN104085553A (en) Method and device for packaging pipe
CN110712785A (en) 7 general full-automatic high-speed rolling carrier band equipment of cun
CN209633242U (en) It is exclusively used in the processing production equipment of thin bamboo strips used for weaving volume
CN108582869B (en) Medium-high density board box making machine and box making method thereof
CN212920647U (en) Full-automatic corrugated paper pasting mechanism
CN209794706U (en) Full-automatic installation gift box handle's equipment
CN211334841U (en) Production equipment for double inner bags of industrial inner bags
CN101405189B (en) Method and apparatus for transporting label strips
CN114313520B (en) Full-automatic high-efficient labeller of modular
CN202098791U (en) Rolling printing type packing case ink recorder and annular packing case conveying device
CN107042910B (en) Multi-size object packaging machine
CN208428729U (en) A kind of paper feeding component of automatic box-folding molding equipment
CN206318548U (en) The electronic lending somebody a hand of paper collecting machine
CN210339442U (en) Intelligent control device for realizing automatic conveying of books and periodicals
CN210453932U (en) Gluing device for processing corrugated paper box
CN208249438U (en) For unidirectionally presoaking the release paper feeding system of composite production device
CN201769428U (en) Manufacturing system for single-side flexible copper-clad plate
CN201471781U (en) Rotation mechanism of gluing wheel of gluer
CN108439026B (en) Enclose strip pressfitting feeder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination