CN109687466A - A kind of site selecting method and device of trend router - Google Patents
A kind of site selecting method and device of trend router Download PDFInfo
- Publication number
- CN109687466A CN109687466A CN201811644761.5A CN201811644761A CN109687466A CN 109687466 A CN109687466 A CN 109687466A CN 201811644761 A CN201811644761 A CN 201811644761A CN 109687466 A CN109687466 A CN 109687466A
- Authority
- CN
- China
- Prior art keywords
- bus
- trend
- trend router
- router
- profit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 230000005611 electricity Effects 0.000 claims abstract description 74
- 238000009434 installation Methods 0.000 claims abstract description 62
- 230000009467 reduction Effects 0.000 claims description 21
- 239000011159 matrix material Substances 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims description 7
- 230000017105 transposition Effects 0.000 claims description 3
- 230000008901 benefit Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
- H02J3/06—Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Power Engineering (AREA)
- Quality & Reliability (AREA)
- Biodiversity & Conservation Biology (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Operations Research (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
This application discloses the site selecting methods and device of a kind of trend router, and wherein method includes: 101, installs trend router on all buses of electricity grid network to be installed, and each trend router includes: multiple flow controllers;102, using optimal load flow as target, electricity grid network to be installed corresponding profit in the trend router of separately installed each bus is calculated, and determine the maximum bus of profit;103, judge whether the corresponding profit of the maximum bus of the profit is greater than zero, if, then using the maximum bus of the profit as the installation bus of the trend router of the electricity grid network to be installed, solves the technical issues of existing addressing for trend router is without correlative study.
Description
Technical field
The application belongs to power flowcontrol technical field more particularly to a kind of site selecting method and device of trend router.
Background technique
For the control problem for solving renewable energy and electric network swim, domestic and international more scholar proposes flow controller
The concept of (Power Flow Controller, PFC), such as TSC, SSSC, STATCOM, U flow controller FACTS equipment,
Can flexible modulation transmission line watt level, the conveying capacity of power grid entirety can be obviously improved, the disadvantage is that single can only be controlled
Route, regulating power is limited and higher cost, limits its popularization and application.Therefore, trend router (Power Flow
Router, PFR) concept come into being, i.e., installed in several inlet-outlet lines of bus and flow controller and be integrated into one with bus
A equipment, and receive the uniformly coordinated control of central controller.
The addressing of each component is the key points and difficulties work in distribution system planning in electric power electricity grid network to be installed,
Therefore overall grid reliability of operation, economy and safety are greatly improved to the correct addressing of trend router.It is existing
Site selecting method is predominantly using more scene plan models, probabilistic loadflow technology, the double-deck Transmission Expansion Planning in Electric model, although existing choosing
Location method there are many, but method above-mentioned is primarily directed to flow controller, is not yet directed to the choosing of trend router
Location problem carries out correlative study or proposes respective algorithms, causes its installation site to lack technological guidance and theoretical foundation, is mounted to
This is higher, and resource, which is unable to get, to be made full use of.
Summary of the invention
In view of this, this application provides the site selecting methods and device of a kind of trend router, for trend router
Addressing solves the technical issues of existing addressing for trend router is without correlative study.
The application first aspect provides a kind of site selecting method of trend router, comprising:
101, trend router, each trend router packet are installed on all buses of electricity grid network to be installed
It includes: multiple flow controllers;
102, using optimal load flow as target, the electricity grid network to be installed is calculated in the trend of separately installed each bus
Corresponding profit when router, and determine the maximum bus of profit;
103, judge whether the corresponding profit of the maximum bus of the profit is greater than zero, if so, the profit is maximum
Bus as the electricity grid network to be installed trend router installation bus.
Preferably, step 102 specifically includes:
Using optimal load flow as target, the electricity grid network to be installed is calculated separately installed by profit calculating formula group
Income when the trend router of each bus;
The corresponding income of each bus is subtracted into the installation cost in bus installation trend router, is obtained
To the electricity grid network to be installed in the trend router of separately installed each bus corresponding profit;
In all buses, the maximum bus of profit is determined.
Preferably, the profit calculating formula group specifically:
Wherein, f is the maximum delivery power of electricity grid network to be installed, and i is bus, nbFor bus quantity, PLi,0And QLi,0For
The basic active power and reactive power of bus i, P before installation trend routerLiAnd QLiFor bus i after installation trend router
Practical active power and reactive power, j is constant, ετAnd εsFor non-negative real coefficient, ζsFor the set of fingers equipped with PFC,W is positive semidefinite matrix, W > 0 and rank (W)=1, W=VV*,*Representing matrix is total to
Yoke transposition operation, V are flow controller side voltage vector, For set of complex numbers, E be route (i,
K) quantity,For the diagonal entry of matrix W,For the off diagonal element of matrix W, For yikConjugate operation, yikFor the admittance parameter of route (i, k), N is power grid to be installed
The bus set of network, ΩiFor the node set of flow controller in electricity grid network to be installed, p is average sales rate of electricity, ThFor
Load annual utilization hours, f0Power delivery capabilities coefficient when not installing trend router for electricity grid network to be installed is maximum
The ratio of transmission power and basic transmission power, f (u, v) are that electricity grid network power delivery capabilities coefficient to be installed and decision become
The functional relation of amount,Whether determining for trend router is installed for each bus of electricity grid network to be installed
Plan variable, if ui=1 represents the installation trend router on bus i, u on the contraryi=0 does not install then,For
Whether route (i, k) installs flow controller, if vi,j=1 represents installation, on the contrary then do not install.
Preferably, after step 103 further include:
104, it individually stops transport each flow controller of trend router installed on the installation bus, and really
Order solely stop transport each flow controller when income reduction amount and cost saving amounts;
105, judge all flow controllers corresponding income reduction amounts and cost saving amounts on the installation bus
Size, and remove the flow controller that income reduction amount is less than cost saving amounts.
Preferably, after step 105 further include:
106, the capacity of each flow controller in the first trend router, first tide are determined according to constant volume formula
Stream router is the trend router after the trend router execution step 105 installed on the installation bus.
Preferably, the constant volume formula are as follows:
Wherein, SPFCFor the capacity of flow controller,For the reactive compensation amount of bus, SBFor benchmark capacity, S1p.uFor
The series connection capacity that series voltage introduces.
The application second aspect provides a kind of addressing device of trend router, comprising:
Installation unit, for installing trend router, each trend on all buses of electricity grid network to be installed
Router includes: multiple flow controllers;
Computing unit, for using optimal load flow as target, calculating the electricity grid network to be installed in separately installed each mother
Corresponding profit when the trend router of line, and determine the maximum bus of profit;
Judging unit, for judging whether the corresponding profit of the maximum bus of the profit is greater than zero, if so, by institute
State installation bus of the maximum bus of profit as the trend router of the electricity grid network to be installed.
Preferably, computing unit specifically includes:
Computation subunit, for calculating the power grid to be installed by profit calculating formula group using optimal load flow as target
Income of the network in the trend router of separately installed each bus;
Subtraction subunit, for subtracting the corresponding income of each bus in bus installation trend routing
It is corresponding in the trend router of separately installed each bus to obtain the electricity grid network to be installed for the installation cost of device
Profit;
Subelement is determined, for determining the maximum bus of profit in all buses.
Preferably, further includes:
Stoppage in transit unit, each trend control for the trend router installed on the installation bus of individually stopping transport
Device processed, and determine income reduction amount and cost saving amounts when individually stopping transport each flow controller;
Comparing unit, for judge it is described installation bus on the corresponding income reduction amount of all flow controllers and at
The size of this saving, and remove the flow controller that income reduction amount is less than cost saving amounts.
Preferably, further includes:
Constant volume unit, for determining the capacity of each flow controller in the first trend router, institute according to constant volume formula
Stating the first trend router is the trend router after the trend router execution step 105 installed on the installation bus.
As can be seen from the above technical solutions, the embodiment of the present application has the advantage that
This application provides a kind of site selecting methods of trend router, comprising: 101, owning in electricity grid network to be installed
Trend router is installed, each trend router includes: multiple flow controllers on bus;102, it is with optimal load flow
Target calculates electricity grid network to be installed corresponding profit in the trend router of separately installed each bus, and determines
The maximum bus of profit;103, judge whether the corresponding profit of the maximum bus of the profit is greater than zero, if so, will be described
Installation bus of the maximum bus of profit as the trend router of the electricity grid network to be installed.
In the application, trend router is installed first at multiple buses of electricity grid network to be installed, is then calculated separately
The profit of electricity grid network to be installed when the trend router of separately installed each bus, and profit is determined in all buses
Maximum bus, then judges whether profit corresponding to the maximum bus of profit is greater than zero, if so, by the maximum mother of profit
Line installs bus as the trend router of electricity grid network to be installed, and the installation addresses of trend router have thus been determined, solves
The technical issues of existing addressing for trend router determined without correlative study.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of the first embodiment of the site selecting method of trend router in the embodiment of the present application;
Fig. 2 is a kind of flow diagram of the second embodiment of the site selecting method of trend router in the embodiment of the present application;
Fig. 3 is a kind of structural schematic diagram of the addressing device of trend router in the embodiment of the present application.
Specific embodiment
The embodiment of the present application provides the site selecting method and device of a kind of trend router, the choosing for trend router
Location solves the technical issues of existing addressing for trend router is without correlative study.
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application
Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only
Some embodiments of the present application, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people
Member's every other embodiment obtained without making creative work, shall fall in the protection scope of this application.
Referring to Fig. 1, a kind of process of the first embodiment of the site selecting method of trend router is shown in the embodiment of the present application
It is intended to, comprising:
Step 101 installs trend router, each trend router packet on all buses of electricity grid network to be installed
It includes: multiple flow controllers.
It should be noted that it is respectively mounted a trend router at each bus first on electricity grid network to be installed,
It is understood that each trend router includes multiple flow controllers.
Step 102, using optimal load flow as target, calculate electricity grid network to be installed in the trend of separately installed each bus
Corresponding profit when router, and determine the maximum bus of profit.
It should be noted that described herein separately installed to only have a bus to be mounted with trend router, other are female
Line does not install trend router, for example, sharing 10 buses is mounted with trend router, goes to judge one by one from the bus of 1-10,
The profit of electricity grid network to be installed when being only fitted into the trend router an of bus.
Step 103 judges whether the corresponding profit of the maximum bus of profit is greater than zero, if so, by the maximum mother of profit
Installation bus of the line as the trend router of electricity grid network to be installed.
In the present embodiment, trend router is installed first at multiple buses of electricity grid network to be installed, is then counted respectively
The profit of electricity grid network to be installed when calculating the trend router of separately installed each bus, and benefit is determined in all buses
Moisten maximum bus, then judge whether profit corresponding to the maximum bus of profit is greater than zero, if so, profit is maximum
Bus installs bus as the trend router of electricity grid network to be installed, and the installation addresses of trend router have thus been determined,
Solves the technical issues of existing addressing for trend router is without correlative study.
The above are a kind of first embodiment of the site selecting method of trend router provided by the embodiments of the present application, the following are
A kind of second embodiment of the site selecting method of trend router provided by the embodiments of the present application.
Referring to Fig. 2, a kind of process of the second embodiment of the site selecting method of trend router is shown in the embodiment of the present application
It is intended to, comprising:
Step 201 installs trend router, each trend router packet on all buses of electricity grid network to be installed
It includes: multiple flow controllers.
Step 202, using optimal load flow as target, electricity grid network to be installed is calculated independent by profit calculating formula group
Income when the trend router of each bus is installed.
It should be noted that profit calculating formula group specifically:
Wherein, f is the maximum delivery power of electricity grid network to be installed, and i is bus, nbFor bus quantity, PLi,0And QLi,0For
The basic active power and reactive power of bus i, P before installation trend routerLiAnd QLiFor bus i after installation trend router
Practical active power and reactive power, j is constant, ετAnd εsFor non-negative real coefficient, ζsFor the set of fingers equipped with PFC,W is positive semidefinite matrix, W > 0 and rank (W)=1, W=VV*,*Representing matrix is total to
Yoke transposition operation, V are flow controller side voltage vector, For set of complex numbers, E be route (i,
K) quantity,For the diagonal entry of matrix W,For the off diagonal element of matrix W, For yikConjugate operation, yikFor the admittance parameter of route (i, k), N is power grid to be installed
The bus set of network, ΩiFor the node set of flow controller in electricity grid network to be installed, p is average sales rate of electricity, ThFor
Load annual utilization hours, f0Power delivery capabilities coefficient when not installing trend router for electricity grid network to be installed is maximum
The ratio of transmission power and basic transmission power, f (u, v) are that electricity grid network power delivery capabilities coefficient to be installed and decision become
The functional relation of amount,Whether determining for trend router is installed for each bus of electricity grid network to be installed
Plan variable, if ui=1 represents the installation trend router on bus i, u on the contraryi=0 does not install then,For
Whether route (i, k) installs flow controller, if vi,j=1 represents installation, on the contrary then do not install.
It is understood thatConnecting line of the route (i, k) between bus i and bus k herein
Road, For series electrical potential source voltage change ratio,For phase shifter no-load voltage ratio,
For route (i, k) close to the side bus i flow controller voltage,
The corresponding income of each bus is subtracted the installation cost in bus installation trend router by step 203, is obtained
To electricity grid network to be installed in the trend router of separately installed each bus corresponding profit.
Step 204, in all buses, determine the maximum bus of profit.
It should be noted that determining that the mode of the maximum bus of profit can be to describe in above-mentioned steps in the present embodiment
Content, certainly for calculation amount the considerations of, or: determine trend router on separately installed each bus first
Then income finds the bus of Income Maximum, then the corresponding income of the bus is subtracted to the installation of trend router on the bus
Cost thinks that the bus is the maximum bus of profit.
Step 205 judges whether the corresponding profit of the maximum bus of profit is greater than zero, if so, by the maximum mother of profit
Installation bus of the line as the trend router of electricity grid network to be installed.
It should be noted that when determining profit corresponding to the maximum bus of profit greater than 0, profit is maximum
Installation bus of the bus as the trend router of electricity grid network to be installed, if it is not, then illustrating to be not required to installation trend on the bus
It is maximum when income when router, keep the existing structure of electricity grid network to be installed constant.
The each flow controller for the trend router installed in step 206, installation bus of individually stopping transport, and really
Order solely stop transport each flow controller when income reduction amount and cost saving amounts.
It should be noted that after the installation addresses that step 205 determines trend router, also to installation in the present embodiment
The structure for the trend router installed on bus optimizes, the trend road installed on installation bus of individually stopping transport first
By each flow controller of device, and determine the income reduction amount and cost saving amounts when individually stopping transport each flow controller.
All flow controllers corresponding income reduction amounts and cost saving amounts in step 207, judgement installation bus
Size, and remove the flow controller that income reduction amount is less than cost saving amounts.
It should be noted that the flow controller that income reduction amount is less than cost saving amounts is considered It is not necessary to installation
Flow controller, then the flow controller that will install this type on bus in the trend router installed removes.
Step 208, the capacity that each flow controller in the first trend router is determined according to constant volume formula, the first tide
Stream router is the trend router installed after the trend router execution step 105 installed on bus.
It should be noted that obtaining the first tide after removing income reduction amount to be less than the flow controller of cost saving amounts
Stream router also carries out the capacity of each flow controller for the trend router installed on installation bus in the present embodiment
It calculates, wherein the constant volume formula used are as follows:
Wherein, SPFCFor the capacity of flow controller,For the reactive compensation amount of bus, SBFor benchmark capacity, S1p.uFor
The series connection capacity that series voltage introduces.
In the present embodiment, trend router is installed first at multiple buses of electricity grid network to be installed, is then counted respectively
The profit of electricity grid network to be installed when calculating the trend router of separately installed each bus, and benefit is determined in all buses
Moisten maximum bus, then judge whether profit corresponding to the maximum bus of profit is greater than zero, if so, profit is maximum
Bus installs bus as the trend router of electricity grid network to be installed, and the installation addresses of trend router have thus been determined,
Solves the technical issues of existing addressing for trend router is without correlative study.
The above are a kind of second embodiment of the site selecting method of trend router provided by the embodiments of the present application, the following are
A kind of embodiment of the addressing device of trend router provided by the embodiments of the present application, please refers to Fig. 3.
A kind of addressing device of the trend router provided in the embodiment of the present application, comprising:
Installation unit 301, for installing trend router, each trend on all buses of electricity grid network to be installed
Router includes: multiple flow controllers.
Computing unit 302, for calculating electricity grid network to be installed in separately installed each mother using optimal load flow as target
Corresponding profit when the trend router of line, and determine the maximum bus of profit.
Judging unit 303, for judging whether the corresponding profit of the maximum bus of profit is greater than zero, if so, by profit
Installation bus of the maximum bus as the trend router of electricity grid network to be installed.
Further, computing unit specifically includes:
Computation subunit, for calculating electricity grid network to be installed by profit calculating formula group using optimal load flow as target
Income in the trend router of separately installed each bus;
Subtraction subunit, for the corresponding income of each bus to be subtracted to the installation in bus installation trend router
Cost obtains electricity grid network to be installed corresponding profit in the trend router of separately installed each bus;
Subelement is determined, for determining the maximum bus of profit in all buses.
Further, further include
Stoppage in transit unit, for each flow controller for installing the trend router installed on bus of individually stopping transport,
And determine income reduction amount and cost saving amounts when individually stopping transport each flow controller;
Comparing unit, for judging to install the corresponding income reduction amount of all flow controllers and Cheng Benjie on bus
The size about measured, and remove the flow controller that income reduction amount is less than cost saving amounts.
Further, further includes:
Constant volume unit, for determining the capacity of each flow controller in the first trend router according to constant volume formula, the
One trend router is the trend router installed after the trend router triggering comparing unit installed on bus.
In the present embodiment, trend router is installed first at multiple buses of electricity grid network to be installed, is then counted respectively
The profit of electricity grid network to be installed when calculating the trend router of separately installed each bus, and benefit is determined in all buses
Moisten maximum bus, then judge whether profit corresponding to the maximum bus of profit is greater than zero, if so, profit is maximum
Bus installs bus as the trend router of electricity grid network to be installed, and the installation addresses of trend router have thus been determined,
Solves the technical issues of existing addressing for trend router is without correlative study.
It is apparent to those skilled in the art that for convenience and simplicity of description, foregoing description wait pacify
Electricity grid network is filled, the specific work process of device and unit can refer to corresponding processes in the foregoing method embodiment, herein
It repeats no more.
In several embodiments provided herein, it should be understood that disclosed device and method can pass through
Other modes are realized.For example, the apparatus embodiments described above are merely exemplary, for example, the unit is drawn
Point, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components
It may be combined or can be integrated into another electricity grid network to be installed, or some features can be ignored or not executed.It is another
Point, shown or discussed mutual coupling, direct-coupling or communication connection can be through some interfaces, device or
The indirect coupling or communication connection of unit can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, as unit
The component of display may or may not be physical unit, it can and it is in one place, or may be distributed over more
In a network unit.Some or all of unit therein can be selected to realize this embodiment scheme according to the actual needs
Purpose.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, the technical solution essence of the application
On all or part of the part that contributes to existing technology or the technical solution can be with the shape of software product in other words
Formula embodies, which is stored in a storage medium, including some instructions are used so that a calculating
Machine equipment (can be personal computer, server or the network equipment etc.) executes each embodiment the method for the application
All or part of the steps.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-
OnlyMemory), random access memory (RAM, RandomAccessMemory), magnetic or disk etc. are various to deposit
Store up the medium of program code.
The above, above embodiments are only to illustrate the technical solution of the application, rather than its limitations;Although reference
The application is described in detail in previous embodiment, those skilled in the art should understand that: it still can be right
Technical solution documented by foregoing embodiments is modified or equivalent replacement of some of the technical features;And this
It modifies or replaces, the spirit and model of each embodiment technical solution of the application that it does not separate the essence of the corresponding technical solution
It encloses.
Claims (10)
1. a kind of site selecting method of trend router characterized by comprising
101, trend router is installed on all buses of electricity grid network to be installed, each trend router includes: more
A flow controller;
102, using optimal load flow as target, the electricity grid network to be installed is calculated in the trend router of separately installed each bus
When corresponding profit, and determine the maximum bus of profit;
103, judge whether the corresponding profit of the maximum bus of the profit is greater than zero, if so, by the maximum mother of the profit
Installation bus of the line as the trend router of the electricity grid network to be installed.
2. the site selecting method of trend router according to claim 1, which is characterized in that step 102 specifically includes:
Using optimal load flow as target, the electricity grid network to be installed is calculated in separately installed each mother by profit calculating formula group
Income when the trend router of line;
The corresponding income of each bus is subtracted into the installation cost in bus installation trend router, is obtained described
Electricity grid network to be installed corresponding profit in the trend router of separately installed each bus;
In all buses, the maximum bus of profit is determined.
3. the site selecting method of trend router according to claim 2, which is characterized in that the profit calculating formula group tool
Body are as follows:
Wherein, f is the maximum delivery power of electricity grid network to be installed, and i is bus, nbFor bus quantity, PLi,0And QLi,0For installation
The basic active power and reactive power of bus i, P before trend routerLiAnd QLiFor the reality of bus i after installation trend router
Border active power and reactive power, j are constant, ετAnd εsFor non-negative real coefficient, ζsFor the set of fingers equipped with PFC,W is positive semidefinite matrix,And rank (W)=1, W=VV*,*Representing matrix is total to
Yoke transposition operation, V are flow controller side voltage vector, For set of complex numbers, E be route (i,
K) quantity,For the diagonal entry of matrix W,For the off diagonal element of matrix W, For yikConjugate operation, yikFor route (i,k) admittance parameter, N be power grid to be installed
The bus set of network, ΩiFor the node set of flow controller in electricity grid network to be installed, p is average sales rate of electricity, ThFor
Load annual utilization hours, f0Power delivery capabilities coefficient when not installing trend router for electricity grid network to be installed is maximum defeated
The ratio of power and basic transmission power is sent, f (u, v) is electricity grid network power delivery capabilities coefficient to be installed and decision variable
Functional relation,The decision for whether installing trend router for each bus of electricity grid network to be installed becomes
Amount, if ui=1 represents the installation trend router on bus i, u on the contraryi=0 does not install then,For route
Whether (i, k) installs flow controller, if vi,j=1 represents installation, on the contrary then do not install.
4. the site selecting method of trend router according to claim 1, which is characterized in that after step 103 further include:
104, it individually stops transport each flow controller of trend router installed on the installation bus, and determines independent
Stop transport each flow controller when income reduction amount and cost saving amounts;
105, judge the size of all flow controllers corresponding the income reduction amount and cost saving amounts on the installation bus,
And remove the flow controller that income reduction amount is less than cost saving amounts.
5. the site selecting method of trend router according to claim 4, which is characterized in that after step 105 further include:
106, the capacity of each flow controller in the first trend router, the first trend routing are determined according to constant volume formula
Device is the trend router after the trend router execution step 105 installed on the installation bus.
6. the site selecting method of trend router according to claim 5, which is characterized in that the constant volume formula are as follows:
Wherein, SPFCFor the capacity of flow controller,For the reactive compensation amount of bus, SBFor benchmark capacity, S1p.uFor series electrical
Press the series connection capacity introduced.
7. a kind of addressing device of trend router characterized by comprising
Installation unit, for installing trend router, each trend routing on all buses of electricity grid network to be installed
Device includes: multiple flow controllers;
Computing unit, for using optimal load flow as target, calculating the electricity grid network to be installed in separately installed each bus
Corresponding profit when trend router, and determine the maximum bus of profit;
Judging unit, for judging whether the corresponding profit of the maximum bus of the profit is greater than zero, if so, by the profit
Installation bus of the maximum bus as the trend router of the electricity grid network to be installed.
8. the addressing device of trend router according to claim 7, which is characterized in that computing unit specifically includes:
Computation subunit, for calculating the electricity grid network to be installed by profit calculating formula group using optimal load flow as target
Income in the trend router of separately installed each bus;
Subtraction subunit, for the corresponding income of each bus to be subtracted to the peace in bus installation trend router
This is dressed up, the electricity grid network to be installed corresponding profit in the trend router of separately installed each bus is obtained;
Subelement is determined, for determining the maximum bus of profit in all buses.
9. the addressing device of trend router according to claim 7, which is characterized in that further include stoppage in transit unit, be used for
Individually stop transport each flow controller of trend router installed on the installation bus, and determine individually stop transport it is each
Income reduction amount and cost saving amounts when flow controller;
Comparing unit, for judging the corresponding income reduction amount of all flow controllers and cost savings on the installation bus
The size of amount, and remove the flow controller that income reduction amount is less than cost saving amounts.
10. the addressing device of trend router according to claim 9, which is characterized in that further include:
Constant volume unit, for determining the capacity of each flow controller in the first trend router according to constant volume formula, described
One trend router is that the trend router installed on the installation bus triggers the trend router after the comparing unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811644761.5A CN109687466B (en) | 2018-12-30 | 2018-12-30 | Method and device for selecting address of power flow router |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811644761.5A CN109687466B (en) | 2018-12-30 | 2018-12-30 | Method and device for selecting address of power flow router |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109687466A true CN109687466A (en) | 2019-04-26 |
CN109687466B CN109687466B (en) | 2021-06-08 |
Family
ID=66191447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811644761.5A Active CN109687466B (en) | 2018-12-30 | 2018-12-30 | Method and device for selecting address of power flow router |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109687466B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110247400A (en) * | 2019-05-09 | 2019-09-17 | 广东电网有限责任公司 | A kind of trend router planing method |
CN111327079A (en) * | 2020-04-07 | 2020-06-23 | 广东电网有限责任公司电力科学研究院 | Power system with power flow router and scheduling method thereof |
CN111967740A (en) * | 2020-08-03 | 2020-11-20 | 国网天津市电力公司 | Operation ticket safety checking system and method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103138255A (en) * | 2011-11-25 | 2013-06-05 | 沈阳工业大学 | Decomposition calculating method of optimal power flow of power system with unified power flow controller |
US20150019038A1 (en) * | 2009-09-15 | 2015-01-15 | Volta Energy, Inc. | Smart-Grid Adaptive Power Management Method and System With Power Factor Optimization and Total Harmonic Distortion Reduction |
CN105226668A (en) * | 2015-08-18 | 2016-01-06 | 国家电网公司 | A kind of addressing for UPFC and capacity collocation method |
CN105703370A (en) * | 2016-03-08 | 2016-06-22 | 全球能源互联网研究院 | Series compensation and transverter-combined unified power flow controller |
CN108206538A (en) * | 2018-01-10 | 2018-06-26 | 国网福建省电力有限公司 | A kind of distributed generation resource Optimizing Site Selection constant volume planing method for considering that network loss is optimal |
-
2018
- 2018-12-30 CN CN201811644761.5A patent/CN109687466B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150019038A1 (en) * | 2009-09-15 | 2015-01-15 | Volta Energy, Inc. | Smart-Grid Adaptive Power Management Method and System With Power Factor Optimization and Total Harmonic Distortion Reduction |
CN103138255A (en) * | 2011-11-25 | 2013-06-05 | 沈阳工业大学 | Decomposition calculating method of optimal power flow of power system with unified power flow controller |
CN105226668A (en) * | 2015-08-18 | 2016-01-06 | 国家电网公司 | A kind of addressing for UPFC and capacity collocation method |
CN105703370A (en) * | 2016-03-08 | 2016-06-22 | 全球能源互联网研究院 | Series compensation and transverter-combined unified power flow controller |
CN108206538A (en) * | 2018-01-10 | 2018-06-26 | 国网福建省电力有限公司 | A kind of distributed generation resource Optimizing Site Selection constant volume planing method for considering that network loss is optimal |
Non-Patent Citations (1)
Title |
---|
李顺等: "基于多指标效能分析的分布式潮流控制器选址定容优化策略", 《电力系统自动化》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110247400A (en) * | 2019-05-09 | 2019-09-17 | 广东电网有限责任公司 | A kind of trend router planing method |
CN110247400B (en) * | 2019-05-09 | 2022-01-25 | 广东电网有限责任公司 | Planning method for power flow router |
CN111327079A (en) * | 2020-04-07 | 2020-06-23 | 广东电网有限责任公司电力科学研究院 | Power system with power flow router and scheduling method thereof |
CN111327079B (en) * | 2020-04-07 | 2021-07-30 | 广东电网有限责任公司电力科学研究院 | Power system with power flow router and scheduling method thereof |
CN111967740A (en) * | 2020-08-03 | 2020-11-20 | 国网天津市电力公司 | Operation ticket safety checking system and method thereof |
CN111967740B (en) * | 2020-08-03 | 2024-02-20 | 国网天津市电力公司 | Operation ticket safety checking system and method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN109687466B (en) | 2021-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109687466A (en) | A kind of site selecting method and device of trend router | |
CN105027379B (en) | The distribution method of secondary battery system and charge-discharge electric power with multiple batteries etc. | |
Zhang et al. | A multi-agent based integrated volt-var optimization engine for fast vehicle-to-grid reactive power dispatch and electric vehicle coordination | |
CN107749629A (en) | A kind of control method based on the access of charging station load Real-Time Scheduling charging pile | |
CN105429185B (en) | A kind of economic load dispatching method with the harmonious property of robust | |
CN105870949B (en) | A kind of micro-capacitance sensor energy-storage units optimal control method based on distributed gradient algorithm | |
Cheng et al. | Consumer-centered energy system for electric vehicles and the smart grid | |
KR102210084B1 (en) | Movable Charging station COnnected New Regeneration Energy and charging station management system | |
CN109066659A (en) | Micro-capacitance sensor isolated operation reliability estimation method and terminal device | |
CN102158387A (en) | Protection fault information processing system based on dynamic load balance and mutual hot backup | |
CN108281982A (en) | Charge transport circuit and charging system for electric automobile | |
CN106059918A (en) | Energy internet control layered architecture based on SDN (Software Defined Networking) and scheduling method | |
Jung et al. | Infrastructure-assisted cooperative multi-UAV deep reinforcement energy trading learning for big-data processing | |
CN104090496A (en) | Smart grid control operation continuous analog simulation method | |
CN116404683A (en) | Energy regulation and control method, device, terminal and medium of flexible-direct interconnection system | |
CN105391060A (en) | Optimization scheduling method for power distribution network comprising microgrids | |
CN102882970B (en) | Based on the method that cloud computing platform keeps host resource stable | |
CN116316716A (en) | Multi-stage planning method for energy storage power station, computer equipment and storage medium | |
CN108629448A (en) | A kind of data center's heat abstractor optimal control method and system based on Lyapunov optimizations | |
Zhang et al. | A cloud data center virtual machine placement scheme based on energy optimization | |
CN103593709B (en) | A kind of multiple failure service restoration method based on load balancing | |
CN112491067A (en) | Active power distribution network capacity configuration method based on composite energy storage | |
CN106161614A (en) | A kind of layered distribution type charging electric vehicle service system and control method | |
CN106160034A (en) | A kind of battery balanced control device and method | |
CN114022026B (en) | Electric vehicle charging scheduling method based on event triggering consistency algorithm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |