A kind of electric energy meter mistake assets position finding and detection method, device and terminal device
Technical field
The invention belongs to field of computer technology more particularly to a kind of electric energy meter mistake assets position finding and detection methods, device
And terminal device.
Background technique
Measuring asset is intensive, lean management requirement to implement, and specification tears back the sorting way to manage and industry of electric energy meter open
It is engaged in process, according to the management principle of " sorting in time, sufficiently reuse, standardize disposition ", development electric energy meter tears back sorting work open.For
The sorting management for tearing back electric energy meter open, which is divided into, tears Hui Liuku, equipment sorting, equipment reinspection, classification disposition four processes open, wherein equipment
Sorting includes equipment sorting, sorting detection and sorting three service links of Analysis of The Disposal.
Currently, region, which is usually taken, in equipment method for sorting concentrates sorting management business mode, each point is needed in entire area
Area, which is torn open back after table is uniformly back to measurement centre, carries out equipment sorting business.This equipment method for sorting is tearing back table receive process open
In, it is necessary first to by scanning each electric energy meter assets, the data comparison work being manually scanned in data and database,
It was found that manpower is organized to select not in the meter for returning dispatching detail after assets mistake meter again.Working efficiency is low and time-consuming, sternly
Ghost image rings the development of reception and the follow-up separation work of process.
Summary of the invention
In view of this, the embodiment of the invention provides a kind of electric energy meter mistake assets position finding and detection method, device and terminals
Equipment, to solve the problems, such as in the prior art to the equipment sorting work inefficiency of electric energy meter and time-consuming.
The first aspect of the embodiment of the present invention provides electric energy meter mistake assets position finding and detection method, comprising:
Obtain the meter assets detail to be confirmed of turnover box to be scanned;The turnover box is at least one;
The electric energy meter in each turnover box is scanned by scanner, obtains the meter of electric energy meter in each turnover box
Scanning information;
According to the corresponding meter assets to be confirmed of the meter scanning information of electric energy meter in each turnover box and each turnover box
Detail, judges whether there is the first turnover box, and first turnover box is that there are the turnover boxes of assets mistake;
First turnover box if it exists then obtains the detection and localization of each electric energy meter in the first turnover box as a result, and according to
The detection and localization result of each electric energy meter determines position of the wrong electric energy meter in first turnover box in one turnover box.
The second aspect of the embodiment of the present invention provides a kind of electric energy meter mistake assets locating and detecting device, comprising:
Assets detail obtains module, for obtaining the meter assets detail to be confirmed of turnover box to be scanned;The turnover
Case is at least one;;
Scanning information obtains module, for being scanned by scanner to the electric energy meter in each turnover box, obtains each
The meter scanning information of electric energy meter in a turnover box;
Mistake assets judgment module, for the meter scanning information and each turnover box according to electric energy meter in each turnover box
Corresponding meter assets detail to be confirmed, judges whether there is the first turnover box, and first turnover box is that there are assets mistakes
Turnover box;
Mistake assets locating module then obtains each electric energy meter in the first turnover box for the first turnover box if it exists
Detection and localization according to the detection and localization result of each electric energy meter in the first turnover box as a result, and determine wrong electric energy meter described the
Position in one turnover box.
The third aspect of the embodiment of the present invention provides a kind of terminal device, including memory, processor and is stored in
In the memory and the computer program that can run on the processor, when the processor executes the computer program
The step of realizing electric energy meter mistake assets position finding and detection method as described above.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage
Media storage has computer program, and the computer program realizes that electric energy meter mistake assets as described above are fixed when being executed by processor
The step of position detecting method.
Existing beneficial effect is the embodiment of the present invention compared with prior art: the embodiment of the present invention obtains week to be scanned
The meter assets detail to be confirmed of turnning box;The electric energy meter in each turnover box is scanned by scanner, obtains each week
The meter scanning information of electric energy meter in turnning box;According to the meter scanning information and each turnover box pair of electric energy meter in each turnover box
The meter assets detail to be confirmed answered, judges whether there is the first turnover box, and first turnover box is that there are assets mistakes
Turnover box;First turnover box if it exists then obtains the detection and localization of each electric energy meter in the first turnover box as a result, and according to first
The detection and localization result of each electric energy meter determines position of the wrong electric energy meter in first turnover box in turnover box.This implementation
Example realizes the wrong assets in automatic detection turnover box and after the turnover box for detecting to exist wrong assets to wrong electric energy
Table is positioned, to improve the efficiency of equipment sorting work, is shortened verification duration, is reduced cost of labor.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some
Embodiment for those of ordinary skill in the art without any creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is the implementation flow chart of electric energy meter mistake assets position finding and detection method provided in an embodiment of the present invention;
Fig. 2 is the implementation process schematic diagram of S104 in Fig. 1 provided in an embodiment of the present invention;
Fig. 3 is the implementation process schematic diagram of S202 in Fig. 2 provided in an embodiment of the present invention;
Fig. 4 is the implementation process schematic diagram of S202 in Fig. 2 provided in an embodiment of the present invention;
Fig. 5 is the structural schematic diagram of electric energy meter mistake assets locating and detecting device provided in an embodiment of the present invention;
Fig. 6 is the schematic diagram that electric energy meter positions in turnover box provided in an embodiment of the present invention;
Fig. 7 is turnover box detection and localization provided in an embodiment of the present invention schematic diagram as the result is shown;
Fig. 8 is the schematic diagram of electric energy meter mistake assets position detecting system provided in an embodiment of the present invention;
Fig. 9 is the schematic diagram of terminal device provided in an embodiment of the present invention.
Specific embodiment
In being described below, for illustration and not for limitation, the tool of such as particular system structure, technology etc is proposed
Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific
The present invention also may be implemented in the other embodiments of details.In other situations, it omits to well-known system, device, electricity
The detailed description of road and method, in case unnecessary details interferes description of the invention.
Description and claims of this specification and term " includes " and their any deformations in above-mentioned attached drawing, meaning
Figure, which is to cover, non-exclusive includes.Such as process, method or system comprising a series of steps or units, product or equipment do not have
It is defined in listed step or unit, but optionally further comprising the step of not listing or unit, or optionally also wrap
Include the other step or units intrinsic for these process, methods, product or equipment.In addition, term " first ", " second " and
" third " etc. is for distinguishing different objects, not for description particular order.
In order to illustrate technical solutions according to the invention, the following is a description of specific embodiments.
Embodiment 1:
Fig. 1 shows a kind of realization of electric energy meter mistake assets position finding and detection method of one embodiment of the present of invention offer
Process, process main body of the invention can be terminal device, and details are as follows for process:
In S101, the meter assets detail to be confirmed of turnover box to be scanned is obtained;The turnover box is at least one.
In the present embodiment, after terminal device gets scanning verification task, MDS (Master Demand is read
Schedule, master demand schedule) middle database data import meter assets detail to be confirmed.
In S102, the electric energy meter in each turnover box is scanned by scanner, is obtained electric in each turnover box
The meter scanning information of energy table.
In the present embodiment, it can choose scan pattern before starting scan task, scan pattern may include single case
Scanning and batch scanning.Quantity is 1 when single case scans, and is scanned by scanner to single turnover box, when batch scanning
Quantity be it is multiple, can by scanner in multiple turnover boxes electric energy meter carry out batch scanning, specifically, multiple turnover boxes
It can be 5, terminal device is once scanned five turnover boxes.
It is corresponding to be confirmed according to the meter scanning information of electric energy meter in each turnover box and each turnover box in S103
Meter assets detail, judges whether there is the first turnover box, and first turnover box is that there are the turnover boxes of assets mistake.
In the present embodiment, the meter assets detail to be confirmed and meter scanning letter of the electric energy meter in each turnover box are checked
Breath judges whether there is the turnover box of assets mistake, and the assets that the present embodiment is mentioned are electric energy meter, and meter scanning information is assets
Number.
In S104, the first turnover box if it exists, then obtain the detection and localization of each electric energy meter in the first turnover box as a result,
And determine wrong electric energy meter in first turnover box according to the detection and localization result of each electric energy meter in the first turnover box
Position.
In the present embodiment, the first turnover box if it exists then carries out positioning to the electric energy meter in the first turnover box again and sweeps
It retouches, identifies the wrong electric energy meter in the first turnover box and its position.
In the present embodiment, mistake electric energy meter is asset number and the meter assets to be confirmed in the first turnover box where it
The electric energy meter that asset number is not inconsistent in detail.
From above-described embodiment it is found that the embodiment of the present invention obtains the meter assets detail to be confirmed of turnover box to be scanned;
The electric energy meter in each turnover box is scanned by scanner, obtains the meter scanning letter of electric energy meter in each turnover box
Breath;According to the corresponding meter assets detail to be confirmed of the meter scanning information of electric energy meter in each turnover box and each turnover box,
The first turnover box is judged whether there is, first turnover box is that there are the turnover boxes of assets mistake;First turnover box if it exists,
The detection and localization of each electric energy meter in the first turnover box is then obtained as a result, and according to the positioning of each electric energy meter in the first turnover box
Testing result determines position of the wrong electric energy meter in first turnover box.The present embodiment realizes in automatic detection turnover box
Wrong assets and wrong electric energy meter is positioned after the turnover box for detecting to exist wrong assets, to improve equipment point
The efficiency of work is picked, shortens verification duration, reduces cost of labor.
In one embodiment of the invention, scanner includes RFID scanner, and meter scanning information includes asset number, figure
The specific implementation flow of S102 includes: the asset number that electric energy meter in each turnover box is identified by RFID scanner, Mei Gezhou in 1
Turnning box is provided with multiple electric energy meters.
In the present embodiment, when first time carrying out batch scanning to turnover box, RFID (Radio can be passed through
Frequency Identification, radio frequency identification) scanner scanning turnover box in electric energy meter electronic tag, electronic tag
Inside include the meter bar code of electric energy meter, the electronic tag of electric energy meter is scanned by RFID, to identify the assets of electric energy meter
Number, and then the asset number of each electric energy meter and meter assets detail to be confirmed are checked, determining in turnover box whether there is
The electric energy meter of assets mistake.
As shown in Fig. 2, in one embodiment of the invention, Fig. 2 shows the specific implementation flow of S104 in Fig. 1,
Include:
In S201, the meter bar code of the first electric energy meter in the first turnover box is scanned by infrared scanner, obtains institute
The first scanning information of the first electric energy meter is stated, first electric energy meter is any electric energy meter in first turnover box.
In one embodiment of the invention, turnover box structure as shown in fig. 6, in Fig. 6 for 4 rows three column turnover box,
It can store 12 electric energy meters in turnover box.When to being checked there are the turnover box of assets mistake, using infrared scanner
Scan the meter bar code of each electric energy meter in turnover box.
Determine when the beginning sweep time for recording the infrared scanner in S202 and scanning are to first electric energy meter
The bit scan time, and according to first electric energy meter corresponding beginning sweep time and the positioning sweep time, described in calculating
The coordinate position of first electric energy meter.
In S203, using first scanning information of first electric energy meter and the coordinate position as described first
The detection and localization result of electric energy meter.
In S204, the detection and localization of each electric energy meter in first turnover box is obtained as a result, and by each electric energy meter
Detection and localization result meter assets detail to be confirmed corresponding with first turnover box compare, determine described first week
The position of wrong electric energy meter and the wrong electric energy meter in first turnover box in turnning box.
In the present embodiment, the first scanning information is the asset number of electric energy meter, and coordinate position is to pass through the adjacent of turnover box
Two sides are as the position in the coordinate system horizontally and vertically formed.
From above-described embodiment it is found that carrying out detection and localization to the first turnover box by infrared scanner, can quickly determine
The efficiency of equipment verification is improved to reject wrong assets in time in the position of bit-errors electric energy meter.
As shown in figure 3, in one embodiment of the invention, each column correspondence of turnover box is equipped with an infrared scan
Instrument, coordinate position include abscissa and ordinate;The specific implementation flow of S202 includes: in Fig. 2
In S301, beginning sweep time of infrared scanner and when positioning scanning when writing scan is to the first electric energy meter
Between, and according to first electric energy meter corresponding beginning sweep time and positioning sweep time, scanning is calculated to first electricity
The first scanning duration when energy table.
In the present embodiment, the specification of turnover box is unified, and each turnover box stores 12 electric energy meters, each electric energy meter
Position fix, encoded according to 12 storage locations of turnover box, then it is relatively-stationary when the position of 12 electric energy meters.
In the present embodiment, positioning is scanned to electric energy meter by method of direct coordinate.It first can be according to turnover box
Structure installs an infrared scanner, its electric energy meter for corresponding to row/column of each scanner scanning for the electric energy meter of every row/each column
Meter bar code, for example, for above-mentioned four row three column turnover box, three infrared scanners are installed respectively to the electricity in each column
Energy table is scanned, or four scanners of installation are respectively scanned the electric energy meter of every row.
In S302, according to the first scanning duration and the default scanning speed of the infrared scanner, described in calculating
The ordinate of first electric energy meter.
In S303, the instrument number of the infrared scanner of scanning to first electric energy meter is compiled as the first instrument
Number.
In S304, is numbered according to first instrument, determine the abscissa of first electric energy meter.
In the present embodiment, as shown in figure 5, by taking four rows, three column turnover box as an example, using the electric energy meter of the position B3 as this
First electric energy meter of detection, using three position lines when infrared scanner does not scan as horizontal axis, by the right side of turnover box
As the longitudinal axis.
When scan task starts, infrared scanner scans the electric energy meter of each column from starting position in the vertical direction, and obtains
Take infrared scanner start scanning time and scanning to the first electric energy meter of the position B3 meter bar code when time, can be with
Beginning sweep time is subtracted by positioning sweep time, obtains the first scanning duration;Then by the default scanning of infrared scanner
Speed obtains distance Y (b3) of first electric energy meter to horizontal axis, that is, the vertical seat of the first electric energy meter multiplied by the first scanning duration
Mark.
In the present embodiment, it after getting the meter bar code of the first electric energy meter, obtains and scans first electric energy meter
The instrument number of infrared scanner is numbered as the first instrument, since each infrared scanner is relatively fixed in lateral position,
Therefore, it is numbered according to the first instrument, then can determine linear distance X (b3) of the infrared scanner apart from the longitudinal axis, and then determine
The abscissa of first electric energy meter.
In the present embodiment, using the abscissa of the first electric energy meter, ordinate and meter bar code as positioning scanning result.
According to the above method, obtain the coordinate position and asset number of each electric energy meter in the first turnover box, then with the first turnover box pair
The meter assets detail to be confirmed verification answered, searches wrong electric energy meter and its position.
As shown in figure 4, in one embodiment of the invention, the every a line correspondence of turnover box is equipped with an infrared scan
Instrument, coordinate position include abscissa and ordinate;The specific implementation flow of S202 includes: in Fig. 2
In S401, beginning sweep time of infrared scanner and when positioning scanning when writing scan is to the first electric energy meter
Between, and according to first electric energy meter corresponding beginning sweep time and positioning sweep time, scanning is calculated to first electricity
The second scanning duration when energy table.
In S402, according to the second scanning duration and the default scanning speed of the infrared scanner, described in calculating
The abscissa of first electric energy meter.
In S403, the instrument number of the infrared scanner of scanning to first electric energy meter is compiled as the second instrument
Number.
In S404, is numbered according to second instrument, determine the ordinate of first electric energy meter.
In the present embodiment, infrared scanner installation on longitudinal axis, for scanning the electric energy meter of every row, when starting to scan
When, infrared scanner is in the horizontal direction scanned the electric energy meter of every row from the starting position of the longitudinal axis, and obtains infrared scan
Time when the meter bar code for the first electric energy meter that instrument starts the time of scanning and the position B3 is arrived in scanning, then it can pass through positioning
Sweep time, which subtracts, starts sweep time, obtains the second scanning duration;Then by the default scanning speed of infrared scanner multiplied by
Second scanning duration, obtains linear distance X (b3) of first electric energy meter to the longitudinal axis, that is, the abscissa of the first electric energy meter.
In the present embodiment, it after getting the meter bar code of the first electric energy meter, obtains and scans first electric energy meter
The instrument number of infrared scanner is numbered as the second instrument, since each infrared scanner is relatively fixed in longitudinal position,
Therefore, numbered according to the second instrument, then can determine distance Y (b3) of the infrared scanner apart from the longitudinal axis, so determine this
The ordinate of one electric energy meter.
In the present embodiment, using the abscissa of the first electric energy meter, ordinate and asset number as positioning scanning result.According to
The above method obtains the coordinate position and asset number of each electric energy meter in the first turnover box, then corresponding with the first turnover box
Meter assets detail verification to be confirmed, searches wrong electric energy meter and its position.
In one embodiment of the invention, electric energy meter mistake assets position finding and detection method further include:
By the detection and localization of each electric energy meter in the first turnover box corresponding position in turnover box analogous diagram as the result is shown.
In the present embodiment, as shown in fig. 7, converting figure mould for the detection and localization result for the electric energy meter that scanning obtains
Formula shows detection and localization as a result, the position display of the wrong electric energy meter in turnover box analogous diagram is wrong in turnover box analogous diagram
It is mis-marked, and voice prompting is carried out, prompt asset number and the position of the mistake electric energy meter.Correct electric energy meter is imitated in turnover box
Really scheme corresponding position mark asset number and correct icon.
In one embodiment of the invention, single case scan pattern can be only selected, when selecting single case scan pattern, directly
It connected infrared scanner and detection and localization is carried out to single turnover box.Also it can choose batch scanning mode, swept in selection batch
It when retouching mode, first passes through RFID scanner and batch scanning is carried out to multiple turnover boxes, scanning the turnover in the presence of wrong assets
After case, then single case scanning is carried out to the turnover box that there is mistake, in this way, the speed of assets verification not only can be improved, but also can mentioned
The accuracy of high assets verification.
As shown in figure 8, in one embodiment of the invention, additionally providing a kind of electric energy meter mistake assets detection and localization system
System, including radio frequency door, three-segment cylinders and station;
Wherein radio frequency door include swing arm liquid crystal display, it is automatic sensing overhead door 1, the mobile swing arm 4 of automatic lifting, wired
Barcode scanner, independent industrial personal computer.
In the present embodiment, swing arm liquid crystal display can arbitrarily adjust monitoring angle, check convenient for operator
Detection and localization result.
In the present embodiment, automatic sensing overhead door 1 controls automatic rising by industrial personal computer and closes, and has enough to meet the need when sensing
Rising signals are sent to industrial personal computer when case is transported into station 2, industrial personal computer controls automatic sensing overhead door and rises, risen
Driver sweep process after finishing.Turnover box is transported out station 2 after terminating scanning process, and switch is left in triggering, and leaving switch will
Dropping signal is sent to industrial personal computer, and industrial personal computer controls the decline of automatic sensing overhead door.
It in the present embodiment, further include automatic lifting baffle 5, automatic lifting baffle 5 is raised up to behaviour when turnover box enters
Make platform, and drops to original position at the end of scanning process.
In the present embodiment, the mobile swing arm of automatic lifting is according to electric energy meter specifications parameter and scan pattern automatic adjustment scanning
Highly, signal is transmitted by serial ports realizes that automation control, infrared scanner are mounted on swing arm top.
In the present embodiment, three-segment cylinders include three sections of automatic sensing electric drums and infrared induction sensor, by red
Outer inductive pick-up determines the position of turnover box.Station includes liquid crystal display and operating console.
In the present embodiment, when scan pattern is single case scanning, mobile swing arm is fallen, by infrared scanner to turnover
The electric energy meter of case is scanned.When scan pattern is batch scanning, mobile swing arm rises, by RFID scanner to turnover box
Electric energy meter be scanned.
From above-described embodiment it is found that by electric energy meter mistake assets position finding and detection method, it can be realized and tear back table reception open in fact
When verification of assets data, improve receive data accuracy and timeliness, it is ensured that tear the consistency of old table account card object open.Improve assets
Efficiency is checked, solves artificial nucleus to complicated process and hard work amount.And it can be in real time by wrong electric energy meter with acousto-optic report
Alert mode prompts simultaneously directly to position, and directly rejects in scanning link, no longer carries out artificial searching work.When shortening verification
Between, receiving efficiency is improved, cost of labor is reduced.Dispatching outbound efficiency is improved, the increased group on the basis of scanning of single case
Function is read, dispatching outbound verification efficiency is effectively improved, so that distribution vehicle is gone out vehicle promptness rate and ensured, shorten entire dispatching
The time of requirements of process, the smooth development for meter demand and sales service provide the support of strength.Meanwhile the assets position function
It can work with RFID groups of reading functional adaptations in the links of state's network metering asset management measuring asset whole-life cycle fee
Efficiently technological means is provided.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process
Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit
It is fixed.
Embodiment 2:
As shown in figure 5, the electric energy meter mistake assets locating and detecting device 100 that one embodiment of the present of invention provides, is used for
Execute the method and step in embodiment corresponding to Fig. 1 comprising:
Assets detail obtains module 110, for obtaining the meter assets detail to be confirmed of turnover box to be scanned;The week
Turnning box is at least one;;
Scanning information obtains module 120 and obtains for being scanned by scanner to the electric energy meter in each turnover box
The meter scanning information of electric energy meter in each turnover box;
Mistake assets judgment module 130, for according to electric energy meter in each turnover box meter scanning information and each week
The corresponding meter assets detail to be confirmed of turnning box, judges whether there is the first turnover box, and first turnover box is that there are assets
The turnover box of mistake;
Mistake assets locating module 140 then obtains each electric energy meter in the first turnover box for the first turnover box if it exists
Detection and localization as a result, and determining wrong electric energy meter described according to the detection and localization result of each electric energy meter in the first turnover box
Position in first turnover box.
From above-described embodiment it is found that the embodiment of the present invention obtains the meter assets detail to be confirmed of turnover box to be scanned;
The electric energy meter in each turnover box is scanned by scanner, obtains the meter scanning letter of electric energy meter in each turnover box
Breath;According to the corresponding meter assets detail to be confirmed of the meter scanning information of electric energy meter in each turnover box and each turnover box,
The first turnover box is judged whether there is, first turnover box is that there are the turnover boxes of assets mistake;First turnover box if it exists,
The detection and localization of each electric energy meter in the first turnover box is then obtained as a result, and according to the positioning of each electric energy meter in the first turnover box
Testing result determines position of the wrong electric energy meter in first turnover box.The present embodiment realizes in automatic detection turnover box
Wrong assets and wrong electric energy meter is positioned after the turnover box for detecting to exist wrong assets, to improve equipment point
The efficiency of work is picked, shortens verification duration, reduces cost of labor.
In one embodiment of the invention, scanner includes RFID scanner, and the meter scanning information includes assets
Number, the scanning information in embodiment corresponding to Fig. 5 obtains module and is used to identify electricity in each turnover box by RFID scanner
The asset number of energy table, each turnover box are provided with multiple electric energy meters.
In one embodiment of the invention, wrong assets locating module 140 corresponding to Fig. 5 further includes for execution figure
The structure of method and step in embodiment corresponding to 2 comprising:
Bar code scanning unit, for scanning the meter bar shaped of the first electric energy meter in the first turnover box by infrared scanner
Code, obtains the first scanning information of first electric energy meter, and first electric energy meter is any electric energy in first turnover box
Table;
Coordinate position computing unit, beginning sweep time and scanning for recording the infrared scanner arrive described first
Positioning sweep time when electric energy meter, and when being scanned according to first electric energy meter corresponding beginning sweep time and the positioning
Between, calculate the coordinate position of first electric energy meter;
Detection and localization result acquiring unit, for by first scanning information of first electric energy meter and the coordinate
Detection and localization result of the position as first electric energy meter;
Mistake assets positioning unit, for obtaining the detection and localization of each electric energy meter in first turnover box as a result, simultaneously
The detection and localization result of each electric energy meter meter assets detail to be confirmed corresponding with first turnover box is compared, really
The position of wrong electric energy meter and the wrong electric energy meter in first turnover box in fixed first turnover box.
In one embodiment of the invention, each column of turnover box, which correspond to, is equipped with an infrared scanner, corresponding to Fig. 5
Coordinate position computing unit further include structure for executing the method and step in embodiment corresponding to Fig. 3 comprising:
First scanning duration obtains subelement, and infrared scanner starts to scan when for writing scan to the first electric energy meter
Time and positioning sweep time, and according to first electric energy meter corresponding beginning sweep time and positioning sweep time, it calculates
Scan the first scanning duration when first electric energy meter;
Ordinate obtains subelement, for the default scanning speed according to the first scanning duration and the infrared scanner
Degree calculates the ordinate of first electric energy meter;
First instrument number obtains subelement, for that will scan the instrument volume for arriving the infrared scanner of first electric energy meter
Number as the first instrument number;
Abscissa obtains subelement, for numbering according to first instrument, determines the abscissa of first electric energy meter.
In one embodiment of the invention, the every a line of turnover box, which corresponds to, is equipped with an infrared scanner, corresponding to Fig. 5
Coordinate position computing unit further include structure for executing the method and step in embodiment corresponding to Fig. 4 comprising:
Second scanning duration obtains subelement, and infrared scanner starts to scan when for writing scan to the first electric energy meter
Time and positioning sweep time, and according to first electric energy meter corresponding beginning sweep time and positioning sweep time, it calculates
Scan the second scanning duration when first electric energy meter;
Abscissa obtains subelement, for the default scanning speed according to the second scanning duration and the infrared scanner
Degree calculates the abscissa of first electric energy meter;
Second instrument number obtains subelement, for that will scan the instrument volume for arriving the infrared scanner of first electric energy meter
Number as the second instrument number;
Ordinate obtains subelement, for numbering according to second instrument, determines the ordinate of first electric energy meter.
In one embodiment, electric energy meter mistake assets locating and detecting device 100 further includes other function module/unit,
For realizing the method and step in each embodiment in embodiment 1.
Embodiment 3:
The embodiment of the invention also provides a kind of terminal device 9, including memory 91, processor 90 and it is stored in storage
In device 91 and the computer program 92 that can run on processor 90, the processor 90 execute real when the computer program 92
Step in each embodiment now as described in example 1 above, such as step S101 shown in FIG. 1 to step S104.Alternatively, described
Processor 90 realizes the function of each module in each Installation practice as described in example 2 above when executing the computer program 92
Can, such as the function of module 110 to 140 shown in Fig. 4.
The terminal device 9 can be the calculating such as desktop PC, notebook, palm PC and cloud server and set
It is standby.The terminal device 9 may include, but be not limited only to, processor 90, memory 91.Such as the terminal device 9 can also wrap
Include input-output equipment, network access equipment, bus etc..
Alleged processor 90 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng.
The memory 91 can be the internal storage unit of the terminal device 9, such as the hard disk or interior of terminal device 9
It deposits.The memory 91 is also possible to the External memory equipment of the terminal device 9, such as be equipped on the terminal device 9
Plug-in type hard disk, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card dodge
Deposit card (Flash Card) etc..Further, the memory 91 can also both including terminal device 9 internal storage unit or
Including External memory equipment.The memory 91 is for storing needed for the computer program 92 and the terminal device 9
Other programs and data.The memory 91 can be also used for temporarily storing the data that has exported or will export.
Embodiment 4:
The embodiment of the invention also provides a kind of computer readable storage medium, computer-readable recording medium storage has meter
Calculation machine program 92 realizes the step in each embodiment as described in example 1 above when computer program 92 is executed by processor 90,
Such as step S101 shown in FIG. 1 to step S104.Alternatively, being realized when the computer program 92 is executed by processor 90 strictly according to the facts
Apply the function of each module in each Installation practice described in example 2, such as the function of module 110 to 140 shown in Fig. 4.
The computer program 92 can be stored in a computer readable storage medium, which is being located
It manages when device 90 executes, it can be achieved that the step of above-mentioned each embodiment of the method.Wherein, the computer program 92 includes computer journey
Sequence code, the computer program code can be source code form, object identification code form, executable file or certain intermediate shapes
Formula etc..The computer-readable medium may include: any entity or device, note that can carry the computer program code
Recording medium, USB flash disk, mobile hard disk, magnetic disk, CD, computer storage, read-only memory (ROM, Read-Only Memory),
Random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium
Deng.It should be noted that the content that the computer-readable medium includes can be real according to legislation in jurisdiction and patent
The requirement trampled carries out increase and decrease appropriate, such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium
Not including is electric carrier signal and telecommunication signal.
The steps in the embodiment of the present invention can be sequentially adjusted, merged and deleted according to actual needs.
Module or unit in system of the embodiment of the present invention can be combined, divided and deleted according to actual needs.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.