CN109680983A - 一种组合式建筑物托换装置及方法 - Google Patents
一种组合式建筑物托换装置及方法 Download PDFInfo
- Publication number
- CN109680983A CN109680983A CN201910069922.0A CN201910069922A CN109680983A CN 109680983 A CN109680983 A CN 109680983A CN 201910069922 A CN201910069922 A CN 201910069922A CN 109680983 A CN109680983 A CN 109680983A
- Authority
- CN
- China
- Prior art keywords
- disk
- supporting element
- girder construction
- underpinning
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/06—Separating, lifting, removing of buildings; Making a new sub-structure
Abstract
本发明公开了一种组合式建筑物托换装置,包括:托换装置本体,其包括盘梁结构、支撑件以及连接装置;所述盘梁结构用于支撑建筑物,所述支撑件设置在所述盘梁结构的下方,所述连接装置用于连接所述盘梁结构并将所述盘梁结构固定在所述支撑件上;所述支撑件的下方设置有用于移动所述托换装置本体的可动部件。本发明所述的组合式托换结构可以提供较大的强度及刚度,尤其适用基础埋深浅、上部结构荷载大的建筑物移位工程,以及跨度较大的SPMT平板托车移位工程。本发明所述的组合式建筑物托换装置可以重复利用,减小工程造价。
Description
技术领域
本发明涉及托换装置技术领域,更具体地说,本发明涉及一种组合式建筑物托换装置及方法。
背景技术
在建筑物整体移位工程中托换结构是关键环节之一,现有的托换结构主要采用混凝土托盘梁。如果上部结构荷载较大且下部支撑点与上部荷载不对应或下部支撑点跨度较大时,以及建筑物基础埋深较浅时,换盘梁结构需要高出地坪±0.00以满足受力要求。由于在建筑物整体平移工程中托换结构为临时构件,平移结束后需要将高出部分上托换梁切割或凿除。凿除托盘梁上半部分会破坏托盘梁的整体性,而且产生凿除产生的振动会扰动原有结构。因此,本领域技术人员提供了一种组合式建筑物托换装置及方法,以解决上述背景技术中提出的问题。
发明内容
针对现有技术存在的上述缺点,本发明的目的是提供一种组合式建筑物托换装置,与建筑物托换界面接触面范围采用砼结构,上部分尤其是高出±0.00部分采用钢结构形式,到位后直接拆除钢结构,保证砼托盘梁结构的完整性。
为了实现上述目的,本发明提供了一种组合式建筑物托换装置,包括:
托换装置本体,其包括盘梁结构、支撑件以及连接装置;
所述盘梁结构用于支撑建筑物,所述支撑件设置在所述盘梁结构的下方,所述连接装置用于连接所述盘梁结构并将所述盘梁结构固定在所述支撑件上;
所述支撑件的下方设置有用于移动所述托换装置本体的可动部件。
优选的是,所述的组合式建筑物托换装置中,所述盘梁结构设为砼托盘梁结构。
优选的是,所述的组合式建筑物托换装置中,所述支撑件为钢结构的,可设为钢梁或钢桁架梁,可以为直线形式也可以为折线形式。
优选的是,所述的组合式建筑物托换装置中,所述可动部件设为下滑道梁或移动拖车。
实现所述的组合式建筑物托换装置,其使用方法包括以下步骤:
S1.盘梁结构施工;
S2.支撑件制作;
S3.支撑件安装并通过连接装置与盘梁结构连接;
S4.建筑物上部结构荷载托换至可动部件上;
S5.建筑物整体移位;
S6.平移到位后就位连接;
S7.拆除支撑件。
本发明至少包括以下有益效果:
1、本发明所述的组合式托装置为钢结构与混凝土结构组合式的托换装置,可以提供较大的强度及刚度,尤其适用基础埋深浅、上部结构荷载大的建筑物移位工程,以及跨度较大的SPMT平板托车移位工程。
2、本发明所述的组合式建筑物托换装置可以重复利用,减小工程造价。
本发明所述的组合式建筑物托换装置,本发明的其它优点、目标和特征将部分通过下面的说明体现,部分还将通过对本发明的研究和实践而为本领域的技术人员所理解。
附图说明
图1为本发明所述的组合式建筑物托换装置在支撑件为直线形式的钢梁时的结构示意图。
图2为本发明所述的组合式建筑物托换装置在支撑件为折线形式的钢梁时的结构示意图。
图3为本发明所述的组合式建筑物托换装置在支撑件为直线形式的钢桁架梁的结构示意图。
图4为本发明所述的组合式建筑物托换装置在支撑件为折线形式的钢桁架梁的结构示意图。
图中标记:1-盘梁结构;2-支撑件;3-连接装置;4-建筑物;5-下滑道梁;6-移动拖车。
具体实施方式
下面结合附图以及实施例对本发明做进一步的详细说明,以令本领域技术人员参照说明书文字能够据以实施。
应当理解,本文所使用的诸如“具有”、“包含”以及“包括”术语并不排除一个或多个其它元件或其组合的存在或添加。
如图1~图4所示,本发明提供了一种组合式建筑物托换装置,包括:
托换装置本体,其包括盘梁结构1、支撑件2以及连接装置3;
所述盘梁结构1用于支撑建筑物4,所述支撑件2设置在所述盘梁结构1的下方,所述连接装置3用于连接所述盘梁结构1并将所述盘梁结构1固定在所述支撑件2上;
所述支撑件2的下方设置有用于移动所述托换装置本体的可动部件。
进一步地,所述盘梁结构1设为砼托盘梁结构,砼托盘梁结构主要作用于与建筑物托换界面接触面范围,以保证托换界面的可靠。
进一步地,所述支撑件2主要作用为提高整体托换装置的刚度及强度,满足整体托换装置的受力要求,形式可以为钢梁或者钢桁架梁等形式,可以为直线形式也可以为折线形式。
进一步地,所述可动部件设为下滑道梁5或移动拖车6。
连接装置3主为作用为将砼托盘梁结构与钢梁或钢桁架梁连接为整体以共同承担上部结构荷载。
本发明提供的组合式建筑物托换装置的使用方法包括以下步骤:
S1.盘梁结构1施工;
S2.支撑件2制作;
S3.支撑件2安装并通过连接装置3与盘梁结构1连接;
S4.建筑物4上部结构荷载托换至可动部件上;
S5.建筑物4整体移位;
S6.平移到位后就位连接;
S7.拆除支撑件2。
尽管本发明的实施方案已公开如上,但其并不仅仅限于说明书和实施方式中所列运用,它完全可以被适用于各种适合本发明的领域,对于熟悉本领域的人员而言,可容易地实现另外的修改,因此在不背离权利要求及等同范围所限定的一般概念下,本发明并不限于特定的细节与这里示出与描述的实施例。
Claims (5)
1.一种组合式建筑物托换装置,其特征在于,包括:
托换装置本体,其包括盘梁结构(1)、支撑件(2)以及连接装置(3);
所述盘梁结构(1)用于支撑建筑物(4),所述支撑件(2)设置在所述盘梁结构(1)的下方,所述连接装置(3)用于连接所述盘梁结构(1)并将所述盘梁结构(1)固定在所述支撑件(2)上;
所述支撑件(2)的下方设置有用于移动所述托换装置本体的可动部件。
2.根据权利要求1所述的一种组合式建筑物托换装置,其特征在于,所述盘梁结构(1)设为砼托盘梁结构。
3.根据权利要求1所述的一种组合式建筑物托换装置,其特征在于,所述支撑件(2)为钢结构的,可设为钢梁或钢桁架梁,可以为直线形式也可以为折线形式。
4.根据权利要求1所述的一种组合式建筑物托换装置,其特征在于,所述可动部件设为下滑道梁(5)或移动拖车(6)。
5.实现权利要求1-4任一项所述的一种组合式建筑物托换装置,其使用方法包括以下步骤:
S1.盘梁结构(1)施工;
S2.支撑件(2)制作;
S3.支撑件(2)安装并通过连接装置(3)与盘梁结构(1)连接;
S4.建筑物(4)上部结构荷载托换至可动部件上;
S5.建筑物(4)整体移位;
S6.平移到位后就位连接;
S7.拆除支撑件(2)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910069922.0A CN109680983A (zh) | 2019-01-24 | 2019-01-24 | 一种组合式建筑物托换装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910069922.0A CN109680983A (zh) | 2019-01-24 | 2019-01-24 | 一种组合式建筑物托换装置及方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109680983A true CN109680983A (zh) | 2019-04-26 |
Family
ID=66194514
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910069922.0A Withdrawn CN109680983A (zh) | 2019-01-24 | 2019-01-24 | 一种组合式建筑物托换装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109680983A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110005220A (zh) * | 2019-04-28 | 2019-07-12 | 上海天演建筑物移位工程股份有限公司 | 一种模块化组合式平移用钢滑道梁装置及其施工方法 |
CN110080556A (zh) * | 2019-05-09 | 2019-08-02 | 上海天演建筑物移位工程股份有限公司 | 一种建筑物移位逆作式施工结构及施工方法 |
CN111608424A (zh) * | 2020-05-29 | 2020-09-01 | 福建省闽鑫建设工程有限公司 | 一种利用拼装拖车对建筑物进行整体移位的方法 |
CN113882711A (zh) * | 2021-09-10 | 2022-01-04 | 上海天演建筑物移位工程股份有限公司 | 一种spmt拖车与轨道梁组合式整体平移施工方法及系统 |
-
2019
- 2019-01-24 CN CN201910069922.0A patent/CN109680983A/zh not_active Withdrawn
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110005220A (zh) * | 2019-04-28 | 2019-07-12 | 上海天演建筑物移位工程股份有限公司 | 一种模块化组合式平移用钢滑道梁装置及其施工方法 |
CN110080556A (zh) * | 2019-05-09 | 2019-08-02 | 上海天演建筑物移位工程股份有限公司 | 一种建筑物移位逆作式施工结构及施工方法 |
CN111608424A (zh) * | 2020-05-29 | 2020-09-01 | 福建省闽鑫建设工程有限公司 | 一种利用拼装拖车对建筑物进行整体移位的方法 |
CN113882711A (zh) * | 2021-09-10 | 2022-01-04 | 上海天演建筑物移位工程股份有限公司 | 一种spmt拖车与轨道梁组合式整体平移施工方法及系统 |
CN113882711B (zh) * | 2021-09-10 | 2022-11-18 | 上海天演建筑物移位工程股份有限公司 | 一种spmt拖车与轨道梁组合式整体平移施工方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109680983A (zh) | 一种组合式建筑物托换装置及方法 | |
CN103437300A (zh) | 墩顶钢梁无墩旁托架架设双悬臂的施工方法 | |
JP2007191912A (ja) | せん断パネル型制震ストッパー | |
Shafieifar et al. | Alternative ABC connection utilizing UHPC | |
KR101712140B1 (ko) | 거더 구조물 | |
KR20160033561A (ko) | 기설 교량에 방음벽을 설치하기 위한 교량 하부구조 | |
KR101562603B1 (ko) | Pc보도육교 및 그 시공방법 | |
CN210858093U (zh) | 一种组合式建筑物托换装置 | |
CN104452973A (zh) | 一种由钢构件组成的滑动支座及其施工方法 | |
CN108222287B (zh) | 一种工字形型钢混凝土转换梁抬柱的节点 | |
KR101834867B1 (ko) | 고강성 하이브리드 메가 거더 및 이를 시공하는 방법 | |
CN110306425A (zh) | 可大幅度减小承受弯矩的矮墩刚构桥的墩底构造 | |
JP2007231583A (ja) | 鋼製主桁と下部工との接合構造 | |
KR102242105B1 (ko) | 십자경사형 전단강재 및 이를 이용한 강합성 구조물 | |
CN217079321U (zh) | 一种免拆底模钢筋桁架楼承板 | |
JP5594209B2 (ja) | 桁構造とコンクリート床版の接合部構造、コンクリート床版、桁橋および橋梁 | |
JP2013194354A (ja) | 既設構造物の補強構造及び補強方法 | |
CN211369156U (zh) | 一种装配式钢混凝土剪力墙 | |
CN104818799A (zh) | 一种圆环腹梁及其制备方法 | |
KR101940879B1 (ko) | 교량용 거더 | |
Chen et al. | Top lateral bracing of steel U-shaped girders | |
Manbeck et al. | Weldable Shear Connector for Glulam Decks on Existing Bridge Girders | |
Klaiber et al. | EXPERIENCES IN BRIDGE STRENGTHENING BY POST-TENSIONING | |
DesRoches et al. | Design procedure for intermediate hinge restrainers for multiple frame bridges | |
McGlade | Carrick-a-Rede rope bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190426 |