CN109680692A - A kind of mixing material anchor cable that can be partially recycled - Google Patents

A kind of mixing material anchor cable that can be partially recycled Download PDF

Info

Publication number
CN109680692A
CN109680692A CN201910131264.3A CN201910131264A CN109680692A CN 109680692 A CN109680692 A CN 109680692A CN 201910131264 A CN201910131264 A CN 201910131264A CN 109680692 A CN109680692 A CN 109680692A
Authority
CN
China
Prior art keywords
section
anchor cable
cable
anchor
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910131264.3A
Other languages
Chinese (zh)
Inventor
胡熠
陈继彬
纪智超
郑立宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southwest Architectural Design and Research Institute Co Ltd
Original Assignee
China Southwest Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southwest Architectural Design and Research Institute Co Ltd filed Critical China Southwest Architectural Design and Research Institute Co Ltd
Priority to CN201910131264.3A priority Critical patent/CN109680692A/en
Publication of CN109680692A publication Critical patent/CN109680692A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of mixing material anchor cables that can be partially recycled, it is related to geotechnical engineering supporting file and anchorage technology field, solves traditional anchor cable, it be easy to cause the development obstacles of the adjacent underground space, the problem of to increase difficulty of construction, its key points of the technical solution are that: anchor head is locked including anchorage cable anchoring section, free section of anchor cable and anchor cable, anchorage cable anchoring section in conjunction with injecting cement paste by forming the anchoring body combined closely with periphery ground;The anchor cable body of anchorage cable anchoring section is to stay section to periphery place future construction setting without influence;Free section of anchor cable is not slip casting anchoring;Free section of anchor cable, which is equipped with, meets the exhausting section of anchorage cable stretching requirement, and exhausting section and setting stays between section by being detached from connector connection, is detached from intersection of the connector between free section of anchor cable and anchorage cable anchoring section.It is extensive with construction application, carry out that partially recycled recycling short time limit, at low cost, the rate of recovery is high and recovery method is easy to anchor cable, to have the effect of apparent economic advantages.

Description

A kind of mixing material anchor cable that can be partially recycled
Technical field
The present invention relates to geotechnical engineering supporting files and anchorage technology field, more specifically, it relates to which one kind can be partially recycled Mixing material anchor cable.
Background technique
As city is high-rise, a large amount of construction of super high-rise building, building foundation multiple material handling method of deep foundation pit considers as emphasis Engineering technology.Anchor cable is a kind of economic and common excavation slope anchoring support structure, usually using the branch nurse to foundation pit Cheng Zhong.
Currently, there is a situation where that steel strand wires are invaded and are retained in the place of periphery when using cable bolting, to periphery place Following construction infection is very big.Especially in shield-tunneling construction, steel strand wires can wind shield cutter, therefore subway planning place week Side does not allow to carry out pattern foundation pit supporting structure using common anchor cable, and inner support, removable anchor etc. can only be selected to substitute supporting scheme.
In the prior art, when substituting supporting scheme using inner support, removable anchor etc., inner support supporting scheme cost High, long in time limit and consumptive material is more, and pole does not meet energy-saving and environment-friendly engineering construction theory;Its rate of recovery of existing removable anchor It is then unable to reach 100%, there are still influences on future construction.Using traditional disposable prestress anchorage cable, not only make At the waste of material, the development obstacles of the adjacent underground space are also increased, to increase difficulty of construction.
Summary of the invention
The object of the present invention is to provide a kind of mixing material anchor cables that can be partially recycled, have construction application extensive, to anchor Suo Jinhang partially recycled recycling short time limit, at low cost, the rate of recovery is high and recovery method is easy, to have apparent economical excellent The effect of gesture.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of mixing that can be partially recycled Material anchor cable, including anchorage cable anchoring section, free section of anchor cable and anchor cable lock anchor head, the anchorage cable anchoring section by with injecting cement paste knot Close the anchoring body for being formed and being combined closely with periphery ground;The anchor cable body of the anchorage cable anchoring section is nothing of constructing to periphery place future Can set after influence and engineering stays setting in stratum to stay section;The free section of anchor cable is not slip casting anchoring;The anchor cable is free Section, which is equipped with, meets the exhausting section of anchorage cable stretching requirement, and the exhausting section and setting is stayed by being detached from connector connection between section, described de- From intersection of the connector between free section of anchor cable and anchorage cable anchoring section.
By using above-mentioned technical proposal, by can be partially recycled mixing material anchor cable be used for engineering when, pass through anchor The anchoring body that rope anchoring section is formed in conjunction with injecting cement paste can provide withdrawal resistance for anchor cable;Free section of anchor cable uses not slip casting anchor Gu sufficient tension deformation amount can be provided when anchor cable applies prestressing force for anchor cable;It will by locking anchor head after anchorage cable stretching The end lock of free section of anchor cable is in slope surface, so that side slope is in compaction, controls slope deforming;Using to periphery The anchor cable body of anchorage cable anchoring section is made in material of the ground future construction without influence, so that the anchor cable body of anchorage cable anchoring section remains in place In the construction of place from now on will not be impacted, as set and stay section;By anchorage cable anchoring section material (set and stay section) and meet anchor The mixing material anchor cable that the material (exhausting section) of the free section of anchor cable of cable stretching demand is bonded, so that anchor cable meets engineering need It asks, so that the construction application of anchor cable is extensive.Meanwhile exhausting section and setting is stayed by being detached from connector connection between section, so that right The partially recycled recycling short time limit of anchor cable, at low cost, the rate of recovery is high and recovery method is easy, to have apparent economical excellent Gesture.
The present invention is further arranged to: described to set the fiber-reinforced composite for staying section by reusing no influence on the following plot Material rib is constituted.
By using above-mentioned technical proposal, section is stayed using setting for fiber-reinforced composite material rib composition, so that anchorage cable anchoring Section can provide withdrawal resistance for anchor cable;Meanwhile section is stayed using setting for fiber-reinforced composite material rib composition, so that fiber reinforcement is multiple Condensation material muscle, which remains in construct from now on to place in place, to be impacted.
The present invention is further arranged to: the exhausting section is made of the steel strand wires for meeting anchorage cable stretching requirement.
By using above-mentioned technical proposal, by meeting the steel strand wires of anchorage cable stretching requirement, applied convenient for exhausting section in anchor cable Sufficient tension deformation amount is provided when Prestressing for anchor cable.
The present invention is further arranged to: the disengaging connector is controllably disengaging connector, and the disengaging side for being detached from connector Formula is hot melten type, mechanics formula or mechanical.
It by way of disengaging is hot melten type, mechanics formula or the controllable disengaging such as mechanical by using above-mentioned technical proposal Connector stays the operation being detached between section and exhausting section convenient for opposed after construction, consequently facilitating using draw-off gear Recovery section extraction will be needed to recycle.
The present invention is further arranged to: the free section of anchor cable is equipped with alternative disengaging configuration point, the disengaging position Set a little includes the first disengaging configuration point in disengaging connector and the intersection positioned at anchorage cable anchoring section and free section of anchor cable Second disengaging configuration point.
By using above-mentioned technical proposal, by alternative first disengaging configuration point and the second disengaging configuration point, just It is recycled according to exhausting section of the operating condition to anchor cable.
The present invention is further arranged to: it is bonding by way of being detached from connector connection that the exhausting section and setting, which stays between section, Or mechanical connection.
By using above-mentioned technical proposal, by way of being bonded or being mechanically connected by exhausting section, set and section and disengaging stayed to connect It is attached between head, enables to exhausting section and set the stable connection stayed between section.
The present invention is further arranged to: the disengaging connector is sleeve made of fibre reinforced composites or steel.
By using above-mentioned technical proposal, it is used as using sleeve made of fibre reinforced composites or steel and is detached from connector, So that exhausting section with set stay section to connect by being detached from connector after do not influence the tensile strength and tension deformation amount of anchor cable.
In conclusion the invention has the following advantages: the anchoring formed in conjunction with injecting cement paste using anchorage cable anchoring section Body can provide withdrawal resistance for anchor cable;Free section of anchor cable is anchored using not slip casting, can be anchor cable when anchor cable applies prestressing force Sufficient tension deformation amount is provided;By locking anchor head for the end lock of free section of anchor cable in slope surface after anchorage cable stretching, thus So that side slope is in compaction, slope deforming is controlled;Anchor cable is made using on material of the periphery place future construction without influence The anchor cable body of anchoring section, so that the anchor cable body of anchorage cable anchoring section, which remains in place, to cause shadow to the construction of place from now on It rings, as sets and stay section;Pass through the material of anchorage cable anchoring section material (set and stay section) and the free section of anchor cable for meeting anchorage cable stretching demand The mixing material anchor cable that (exhausting section) is bonded, so that anchor cable meets engineering demand, so that the construction application of anchor cable is wide It is general.Meanwhile exhausting section and setting is stayed by being detached from connector connection between section so that the recycling short time limit partially recycled to anchor cable, at This is low, the rate of recovery is high and recovery method is easy, to have apparent economic advantages.
Detailed description of the invention
Fig. 1 is the structural schematic diagram in the embodiment of the present invention;
Fig. 2 is the structural schematic diagram that connector is detached from the embodiment of the present invention.
In figure: 1, anchorage cable anchoring section;2, free section of anchor cable;3, anchor cable locks anchor head;4, injecting cement paste;5, it sets and stays section;6, it returns Receive section;7, it is detached from connector;8, the first disengaging configuration point;9, the second disengaging configuration point.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to 1-2 pairs of embodiment and attached drawing Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made For limitation of the invention.
Embodiment: a kind of mixing material anchor cable that can be partially recycled, as depicted in figs. 1 and 2, including anchorage cable anchoring section 1, anchor Rope free segment 2 and anchor cable lock anchor head 3, and anchorage cable anchoring section 1 with injecting cement paste 4 by being combined formation to combine closely with periphery ground Anchoring body.The anchor cable body of anchorage cable anchoring section 1 is that can set to stay in stratum after constructing without influence and engineering on periphery place future Set and stay section 5.Free section of anchor cable 2 is not slip casting anchoring.Free section of anchor cable 2 is equipped with the exhausting section 6 for meeting anchorage cable stretching requirement, returns Receive section 6 with set stay between section 5 by be detached from connector 7 be fixedly connected, be detached from connector 7 close to free section of anchor cable 2 and anchorage cable anchoring section 1 Between intersection.
In the present embodiment, mixing material anchor cable that can be partially recycled stays section 5 to constitute with setting by exhausting section 6.Can portion The mixing material anchor cable of point recycling for engineering when, the anchoring body of formation is combined with injecting cement paste 4 using anchorage cable anchoring section 1, from And withdrawal resistance can be provided for anchor cable.Free section of anchor cable 2 is anchored using not slip casting, convenient for being anchor cable when anchor cable applies prestressing force Sufficient tension deformation amount is provided.By locking anchor head for the end lock of free section of anchor cable 2 in slope surface after anchorage cable stretching, thus So that side slope is in compaction, slope deforming is controlled.Anchor cable is made using on material of the periphery place future construction without influence The anchor cable body (as set and stay section 5) of anchoring section 1, so that remain in place will not be to place the present for the anchor cable body of anchorage cable anchoring section 1 Construction afterwards impacts.Pass through the material (set and stay section 5) of anchorage cable anchoring section 1 and the free section of anchor cable for meeting anchorage cable stretching demand The mixing material anchor cable of 2 material (exhausting section 6) being bonded, so that anchor cable can satisfy engineering demand, so that anchor The construction application of rope is extensive.Meanwhile exhausting section 6 and setting is stayed and is connected between section 5 by being detached from connector 7, so that being returned to anchor cable part The recycling short time limit of receipts, at low cost, the rate of recovery is high and recovery method is easy, to have apparent economic advantages.
It sets and section 5 is stayed to be made of the fiber-reinforced composite material rib for reusing no influence to the following plot.
In the present embodiment, fiber-reinforced composite material rib is Basalt fiber composite rib, glass fibre composite reinforcing etc..Benefit Section 5 is stayed with setting for fiber-reinforced composite material rib composition, withdrawal resistance can be provided for anchor cable.Meanwhile using fiber-reinforced composite Material rib stays section 5 as setting, and after engineering, fiber-reinforced composite material rib sets that stay in place will not be to place from now on Construction impacts.
Exhausting section 6 is made of the steel strand wires for meeting anchorage cable stretching requirement.
In the present embodiment, by meeting the steel strand wires of anchorage cable stretching requirement, apply prestressing force in anchor cable convenient for exhausting section 6 When sufficient tension deformation amount is provided for anchor cable.
Being detached from connector 7 is controllable disengaging connector 7, and the disengaging mode for being detached from connector 7 is hot melten type, mechanics formula or machinery Formula.
It in the present embodiment, is hot melten type by way of disengaging, mechanics formula or the controllable disengaging connector 7 such as mechanical, just In after engineering, setting the operation stayed and be detached between section 5 and exhausting section 6, consequently facilitating will be recycled using draw-off gear Section 6 is extracted and is recycled.
Free section of anchor cable 2 is equipped with alternative disengaging configuration point, and disengaging configuration point includes positioned at the be detached from connector Disengaging configuration point 8 and the second disengaging configuration point 9 positioned at anchorage cable anchoring section 1 and the intersection of free section of anchor cable 2.
In the present embodiment, the first disengaging configuration point to be detached from connector 7 to be to disconnect that joint style disengaging can be detached from.Pass through Alternative first disengaging configuration point 8 and the second disengaging configuration point 9, convenient for being returned according to exhausting section 6 of the operating condition to anchor cable It receives.
It is bonding or mechanical connection by way of being detached from connector 7 and connecting that exhausting section 6 and setting, which stays between section 5,.
In the present embodiment, by bonding or mechanical connection in the way of by exhausting section 6, set stay section 5 and be detached from connector between It is attached, enables to exhausting section 6 and sets the stable connection stayed between section 5.
Being detached from connector 7 is sleeve made of fibre reinforced composites or steel.
In the present embodiment, using sleeve made of fibre reinforced composites or steel as connector 7 is detached from, so that recycling Section 6 with set stay section 5 to connect by disengaging connector 7 after do not influence the tensile strength and tension deformation amount of anchor cable.
Working principle: by can be partially recycled mixing material anchor cable be used for engineering when, pass through anchorage cable anchoring section 1 and note Slurry 4 combines the anchoring body formed, can provide withdrawal resistance for anchor cable.Free section of anchor cable 2 is anchored using not slip casting, can be in anchor Sufficient tension deformation amount is provided when rope applies Prestressing for anchor cable.By locking anchor head for free section of anchor cable 2 after anchorage cable stretching End lock in slope surface so that side slope is in compaction, control slope deforming.It constructs using to periphery place future The anchor cable body of anchorage cable anchoring section 1 is made in the material of no influence, so that remain in place will not be right for the anchor cable body of anchorage cable anchoring section 1 The construction of place from now on impacts, and as sets and stays section 5.By 1 material of anchorage cable anchoring section (set and stay section 5) and meet anchorage cable stretching The mixing material anchor cable that the material (exhausting section 6) of the free section of anchor cable 2 of demand is bonded, so that anchor cable meets engineering demand, So that the construction application of anchor cable is extensive.Meanwhile exhausting section 6 and setting is stayed and is connected between section 5 by being detached from connector 7, so that right The partially recycled recycling short time limit of anchor cable, at low cost, the rate of recovery is high and recovery method is easy, to have apparent economical excellent Gesture.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (7)

1. the mixing material anchor cable that one kind can be partially recycled, including anchorage cable anchoring section (1), free section of anchor cable (2) and anchor cable locking Anchor head (3), it is characterized in that: the anchorage cable anchoring section (1) with injecting cement paste (4) by combining formation to combine closely with periphery ground Anchoring body;The anchor cable body of the anchorage cable anchoring section (1) is to stay section (5) to periphery place future construction setting without influence;The anchor Rope free segment (2) is not slip casting anchoring;The free section of anchor cable (2) is equipped with the exhausting section (6) for meeting anchorage cable stretching requirement, described Exhausting section (6) connect with setting to stay by being detached from connector (7) between section (5), and the disengaging connector (7) is close free section of anchor cable (2) With the intersection between anchorage cable anchoring section (1).
2. the mixing material anchor cable that one kind according to claim 1 can be partially recycled, it is characterized in that: described set stays section (5) It is made of the fiber-reinforced composite material rib for reusing no influence to the following plot.
3. the mixing material anchor cable that one kind according to claim 1 can be partially recycled, it is characterized in that: the exhausting section (6) Steel strand wires by meeting anchorage cable stretching requirement are constituted.
4. the mixing material anchor cable that one kind according to claim 1 can be partially recycled, it is characterized in that: the disengaging connector (7) connector (7) are detached to be controllable, and the disengaging mode for being detached from connector (7) is hot melten type, mechanics formula or mechanical.
5. the mixing material anchor cable that one kind according to claim 1 can be partially recycled, it is characterized in that: the free section of anchor cable (2) it is equipped with alternative disengaging configuration point, the disengaging configuration point includes positioned at the first disengaging configuration point being detached from connector (8) the second disengaging configuration point (9) of the intersection and positioned at anchorage cable anchoring section (1) and free section of anchor cable (2).
6. the mixing material anchor cable that one kind according to claim 3 can be partially recycled, it is characterized in that: the exhausting section (6) And set stay between section (5) be detached from connector (7) connection by way of for bonding or mechanical connection.
7. the mixing material anchor cable that one kind according to claim 1 can be partially recycled, it is characterized in that: the disengaging connector It (7) is sleeve made of fibre reinforced composites or steel.
CN201910131264.3A 2019-02-22 2019-02-22 A kind of mixing material anchor cable that can be partially recycled Pending CN109680692A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910131264.3A CN109680692A (en) 2019-02-22 2019-02-22 A kind of mixing material anchor cable that can be partially recycled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910131264.3A CN109680692A (en) 2019-02-22 2019-02-22 A kind of mixing material anchor cable that can be partially recycled

Publications (1)

Publication Number Publication Date
CN109680692A true CN109680692A (en) 2019-04-26

Family

ID=66196829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910131264.3A Pending CN109680692A (en) 2019-02-22 2019-02-22 A kind of mixing material anchor cable that can be partially recycled

Country Status (1)

Country Link
CN (1) CN109680692A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424700A (en) * 2020-04-21 2020-07-17 中铁西北科学研究院有限公司 BFRP-spiral sleeve valve type composite anchoring system for high-intensity seismic area and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070017166A1 (en) * 2003-09-26 2007-01-25 Andre Nicolet System for fixing an object in the ground by means of a peg
CN203855962U (en) * 2014-04-21 2014-10-01 江苏鼎达建筑新技术有限公司 Recyclable prestress anchoring device
CN108914934A (en) * 2018-09-03 2018-11-30 湖北中复能新型材料有限公司 One kind is exempted to recycle prestressed anchor and preparation method thereof
CN209854733U (en) * 2019-02-22 2019-12-27 中国建筑西南勘察设计研究院有限公司 Mixed material anchor cable capable of being partially recycled

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070017166A1 (en) * 2003-09-26 2007-01-25 Andre Nicolet System for fixing an object in the ground by means of a peg
CN203855962U (en) * 2014-04-21 2014-10-01 江苏鼎达建筑新技术有限公司 Recyclable prestress anchoring device
CN108914934A (en) * 2018-09-03 2018-11-30 湖北中复能新型材料有限公司 One kind is exempted to recycle prestressed anchor and preparation method thereof
CN209854733U (en) * 2019-02-22 2019-12-27 中国建筑西南勘察设计研究院有限公司 Mixed material anchor cable capable of being partially recycled

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424700A (en) * 2020-04-21 2020-07-17 中铁西北科学研究院有限公司 BFRP-spiral sleeve valve type composite anchoring system for high-intensity seismic area and construction method thereof
CN111424700B (en) * 2020-04-21 2024-04-23 中铁西北科学研究院有限公司 BFRP-spiral sleeve valve type composite anchoring system for high-intensity earthquake region and construction method thereof

Similar Documents

Publication Publication Date Title
CN101852083B (en) Quick supporting method for large-deformation roadway easy to fall, break and loosen and apparatus thereof
CN101994316A (en) Recyclable composite anchor rod and construction method thereof
CN100577986C (en) Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN102226407A (en) Four-line large-span tunnel cable-arch combined primary support structure
CN106013432B (en) A kind of high ductility prefabricated integral frame interior joint connection structure and construction method
CN203049591U (en) Reinforced structure of fractured rock mass and high oriented side slope
CN102127911A (en) Recoverable composite anchor rod and construction method thereof
CN201746840U (en) Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling
CN205663447U (en) Novel anchor net spouts compound supporting construction
CN210562157U (en) Post-grouting composite pile
CN109989757A (en) Super-span tunnel is in V grade of engineering method conversion construction method to IV grade of country rock section
CN108316941A (en) A kind of breaking surrounding rock and soft-rock tunnel U-shaped steel cover canopy method for protecting support
CN111577339B (en) High-ground-stress soft rock tunnel supporting structure system and construction method thereof
CN103397633A (en) Self-drilling RCA (recycling composite anchor) rod and construction method thereof
CN109680692A (en) A kind of mixing material anchor cable that can be partially recycled
CN102392444A (en) Easily-recycled anchor rod device and recycling method
CN101949151A (en) Recyclable locking anchor rod and construction method thereof
CN109024875A (en) A kind of assembled integral concrete component and construction method
CN102877473A (en) Skirt pile and soil coupled slid-resistant structure
CN107100322A (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN106948495A (en) The prestressing force integral node and its construction method of steel core concrete column and beams of concrete
CN110387833A (en) A kind of beam body erection method
CN106759266B (en) Combine reinforcement diaphragm wall and its construction method
CN209854733U (en) Mixed material anchor cable capable of being partially recycled
CN109487710A (en) A kind of Arch Bridges Strengthening method based on prefabrication and assembly construction principle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination