CN109680578A - Prefabricated road repairs unit and road repair construction method - Google Patents

Prefabricated road repairs unit and road repair construction method Download PDF

Info

Publication number
CN109680578A
CN109680578A CN201811588735.5A CN201811588735A CN109680578A CN 109680578 A CN109680578 A CN 109680578A CN 201811588735 A CN201811588735 A CN 201811588735A CN 109680578 A CN109680578 A CN 109680578A
Authority
CN
China
Prior art keywords
road
prefabricated
reinforcement installation
concrete body
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811588735.5A
Other languages
Chinese (zh)
Inventor
张剑
唐芬
谭新明
龙坪峰
李志宏
朱换良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangtan Yuanda Residence Industry Co Ltd
Original Assignee
Xiangtan Yuanda Residence Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangtan Yuanda Residence Industry Co Ltd filed Critical Xiangtan Yuanda Residence Industry Co Ltd
Priority to CN201811588735.5A priority Critical patent/CN109680578A/en
Publication of CN109680578A publication Critical patent/CN109680578A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • E01C5/08Reinforced units with steel frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)

Abstract

The present invention relates to a kind of Prefabricated road repairing unit and road repair construction methods.Prefabricated road repairing unit is for repairing road repair hole, it includes concrete body that Prefabricated road, which repairs unit, its bottom wall is equipped with multiple reinforcement installation slots, multiple reinforcement installation slot being provided at circumferentially spaced along concrete body, and the side wall of concrete body is run through in the angled setting in edge of the extending direction of each reinforcement installation slot and the concrete body, one end of each reinforcement installation slot;The more reinforcing bars for being stretched on its side wall are equipped in road repair hole, each reinforcing bar correspondence protrudes into each reinforcement installation slot.Prefabricated road repairing unit provided by the invention and road repair construction method, installation process is simple, installation is surely leaned on, eliminate the concreting work of large area, and the wet construction of site operation is few, to reduce the time and the concrete curing work that wait concrete coagulation, and then accelerate reparation construction process.

Description

Prefabricated road repairs unit and road repair construction method
Technical field
The present invention relates to road construction technical fields, repair unit more particularly to a kind of Prefabricated road and road repair is applied Work method.
Background technique
The construction of town road is a very important content in Process of Urbanization Construction, and each department in sensible city supply Communications and transportation and pedestrian use in city, are convenient for resident living, work and cultural and recreational activity, and connect burden with road outside city Externally traffic effect.
Town road often will appear damage and cause to disable, and traditional reparation construction mode is the town road that will be damaged Position is cut, is rooted out, and then re-starts steel bar arrangement, concreting and concrete curing etc. at the position again and applies Work.
But above-mentioned reparation construction process is more very long, and the town road position cannot be open to traffic during reparation construction, easily draws Play traffic jam.
Summary of the invention
Based on this, it is necessary to be directed to conventional municipal road repair form of construction work, reparation construction process is more very long, and repairing is applied The problem of town road position of the repairing between duration cannot be open to traffic, easily cause traffic jam provide a kind of reparation construction mistake The Prefabricated road repairing unit and road repair construction method that journey is simple and reparation construction process is short.
A kind of Prefabricated road repairing unit, for repairing road repair hole, the Prefabricated road repairing unit includes mixed Solidifying soil ontology, has the bottom wall opposite with road repair hole bottom, and the bottom wall is equipped with multiple reinforcement installation slots;It is multiple Reinforcement installation slot being provided at circumferentially spaced along the concrete body, and the extending direction of each reinforcement installation slot with The angled setting in the edge of the concrete body, one end of each reinforcement installation slot through the concrete body with The adjacent side wall of the bottom wall;The more reinforcing bars for being stretched on its side wall, each reinforcing bar are equipped in the road repair hole Correspondence protrudes into each reinforcement installation slot.
Above-mentioned Prefabricated road repairs unit, when town road is damaged, can be used Prefabricated road repairing unit corresponding In installation to road repair hole, make the road multiple reinforcement installation Cao Yu of the bottom wall of the concrete body of Prefabricated road repairing unit The more reinforcing bars cooperation in hole is repaired on road, and installation process is simple, and installs reliable and stable.In addition, eliminating the mixed of large area Solidifying soil pours work, and the wet construction of site operation is few, to reduce the time for waiting concrete coagulation and concrete curing Work, and then accelerate reparation construction process, town road can quickly be come into operation, is smoothly open to traffic.
The outer dimension of the Prefabricated road repairing unit and the road repair hole in one of the embodiments, Outer dimension matches.
Multiple reinforcement installation slots include multiple first reinforcement installation slots and multiple in one of the embodiments, The second reinforcement installation slot;Multiple first reinforcement installation slots are arranged along the width direction interval of the concrete body; Multiple second reinforcement installation slots are arranged along the length direction interval of the concrete body.
The bottom wall of the concrete body is additionally provided with multiple limiting slots in one of the embodiments, each described Limiting slot runs through two side walls of the concrete body.
The limiting slot is connected to the reinforcement installation slot in one of the embodiments,.
The limiting slot runs through the concrete along the extending direction of the reinforcement installation slot in one of the embodiments, Ontology.
The cross sectional shape of the reinforcement installation slot is arc-shaped in one of the embodiments, inverted trapezoidal or U-shaped.
The concrete body is additionally provided with grouting peep hole in one of the embodiments, and the grouting peep hole is located at One end of the side wall of the reinforcement installation slot far from the concrete body, and run through along the direction perpendicular to the bottom wall The concrete body.
The Prefabricated road repairing unit further includes multiple lifting parts in one of the embodiments, and the lifting part is set It is placed in the concrete body roof opposite with the bottom wall.
A kind of road repair construction method will need the road position repaired to be cut, rooted out to obtain including step The road repair hole of preset profiles size;The more reinforcing bars for being stretched on its side wall are implanted at the road repair hole;? The structure slurry of the bottom injection preset thickness at the road repair hole;Above-mentioned Prefabricated road repairing unit is installed to described Road repair hole, wherein each reinforcing bar correspondence protrudes into each reinforcement installation slot;In the Prefabricated road unit Injecting structure is starched in gap between the road repair hole;Carry out concrete curing processing.
Detailed description of the invention
Fig. 1 is that the Prefabricated road in one embodiment of the invention is repaired unit to install to the structural representation at road repair hole Figure;
Fig. 2 is the structural schematic diagram that Prefabricated road shown in FIG. 1 repairs unit;
Fig. 3 is the structural schematic diagram at another visual angle that Prefabricated road shown in Fig. 2 repairs unit;
Fig. 4 is the structural schematic diagram at the another visual angle that Prefabricated road shown in Fig. 2 repairs unit;
Fig. 5 is the structural schematic diagram at another visual angle that Prefabricated road shown in Fig. 2 repairs unit.
Specific embodiment
To facilitate the understanding of the present invention, a more comprehensive description of the invention is given in the following sections with reference to the relevant attached drawings.In attached drawing Give preferred embodiment of the invention.But the invention can be realized in many different forms, however it is not limited to herein Described embodiment.On the contrary, purpose of providing these embodiments is keeps the understanding to the disclosure more saturating It is thorough comprehensive.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more phases Any and all combinations of the listed item of pass.
When describing positional relationship, unless otherwise defined, when an element is regarded as at another element "upper", energy Intermediary element directly in other elements or also may be present.It can also understand, when element is regarded as in two element " they Between " when, it can be the only one between two elements, or one or more intermediary elements also may be present.
Using " comprising " described herein, " having " and "comprising", unless having used specific restriction Term, such as " only ", " by ... form " etc., it otherwise can also add another component.Unless refer on the contrary, otherwise singular shape The term of formula may include plural form, and can not be interpreted as its quantity is one.
In addition, the ratio that attached drawing is not 1:1 is drawn, and the relative size of each element is in the accompanying drawings only illustratively to draw System, and not necessarily drawn according to actual proportions.
As depicted in figs. 1 and 2, the Prefabricated road in one embodiment of the invention repairs unit 100, for repairing road repair Hole 210, it includes concrete body 10 that Prefabricated road, which repairs unit 100,.
Concrete body 10 has the bottom wall 11 opposite with 210 bottom of road repair hole, and bottom wall 11 is equipped with multiple reinforcing bars Mounting groove 12, multiple being provided at circumferentially spaced along concrete body 10 of reinforcement installation slot 12, and each reinforcement installation slot 12 prolong The angled setting in edge in direction Yu concrete body 10 is stretched, one end of each reinforcement installation slot 12 is through concrete body 10 The side wall 13 adjacent with the bottom wall 11.
Road repair hole 210 is equipped with the more reinforcing bars 211 for being stretched on its side wall, and each correspondence of reinforcing bar 211 protrudes into each In reinforcement installation slot 12.
In an embodiment of the present invention, Prefabricated road repairing unit 100 can be used for the road repair hole of town road 200 210, it can be used for the road repair hole 210 of other roads, this is not restricted.
In this way, can be used the corresponding installation of Prefabricated road repairing unit 100 to road when town road 200 is damaged Repair hole 210 in, make Prefabricated road repairing unit 100 concrete body 10 bottom wall 11 multiple reinforcement installation slots 12 with More reinforcing bars 211 cooperation in road repair hole 210, installation process is simple, and installs reliable and stable.In addition, eliminating big The concreting of area works, and the wet construction of site operation is few, to reduce the time for waiting concrete coagulation and mix Solidifying soil maintenance work, and then accelerate reparation construction process, town road 200 can quickly be come into operation, is smoothly open to traffic.
In some embodiments, the shape ruler of the outer dimension at road repair hole 210 and Prefabricated road repairing unit 100 It is very little to match.Concreting area can be made to minimize, and then accelerate reparation construction process.
In some embodiments, the outer shape of concrete body 10 can be in rectangle.Rectangular shape is simple, and is easy to shape At modular size, therefore prefabricated various standard-sized Prefabricated road repairing units 100 can be shifted to an earlier date, to go out in town road 200 After existing damaged condition, the Prefabricated road repairing unit 100 for selecting suitable dimension immediately carries out reparation construction, accelerates reparation construction mistake Journey.In other embodiments, concrete body 10 can also have other outer shapes, and this is not restricted.
As shown in figure 3, in some embodiments, multiple reinforcement installation slots 12 include multiple first reinforcement installation slot, 121 Hes Multiple second reinforcement installation slots 122, multiple first reinforcement installation slots 121 are arranged along the width direction interval of concrete body 10, Multiple second reinforcement installation slots 122 are arranged along the length direction interval of concrete body 10.In this way, when the first reinforcement installation slot 121 and second reinforcement installation slot 122 cooperated with the reinforcing bar 211 in corresponding road repair hole 210 after, prefabricated road can be made Unit 100 is repaired on road and the mating connection at road repair hole 210 is more firm, and the town road 200 after repairing is not easy to damage again It is bad.
It should be pointed out that the connection type of the mating connection at Prefabricated road repairing unit 100 and road repair hole 210 It can be to squeeze into structure slurry in the gap that Prefabricated road repairs between unit 100 and road repair hole 210, structure slurry condenses After can make Prefabricated road repairing unit 100 and road repair hole 210 between form a fixed connection.
Further, the extending direction of the first reinforcement installation slot 121 is vertical with the extending direction of the second reinforcement installation slot 122 Setting in this way, being cooperatively connected with road repair hole 210, and then after completion reparation construction, can make Prefabricated road repair unit 100 stress is relatively uniform.Further, the first reinforcement installation slot 121 extends along the length direction of concrete body 10, the Two reinforcement installation slots 122 extend along the width direction of concrete body 10.
As shown in figure 4, in some embodiments, the cross sectional shape of reinforcement installation slot 12 is arc-shaped, inverted trapezoidal or U-shaped.This A little shapes are conducive to cooperate reinforcing bar 211 quickly with reinforcement installation slot 12, it is preferred that the cross sectional shape of reinforcement installation slot 12 is in It is trapezoidal.
Referring to Fig. 2 and Fig. 3, in some embodiments, the bottom wall 11 of concrete body 10 is additionally provided with multiple limits Slot 14, each limiting slot 14 run through the two side walls 13 of concrete body 10.It opens up multiple limiting slots 14 and increases Prefabricated road The connection area between unit 100 and road repair hole 210 is repaired, so that Prefabricated road repairing unit 100 and road repair Hole 210 is cooperatively connected and more surely leans on.In a specific embodiment, when in Prefabricated road repairing unit 100 and road repair After squeezing into structure slurry in gap between hole 210, structure slurry will be flowed into limiting slot 14.
Further, limiting slot 14 is connected to reinforcement installation slot 12.In this way, reinforcing bar 210 and reinforcement installation slot 12 can be improved Bonding strength.
Further, limiting slot 14 runs through concrete body 10 along the extending direction of reinforcement installation slot 12.
Specifically, the both ends of limiting slot 14 are respectively communicated with two reinforcement installation slots 12 being oppositely arranged.
In some embodiments, the depth of limiting slot 14 is less than the depth of reinforcement installation slot 12.
Referring to shown in Fig. 4 and Fig. 5, in some embodiments, concrete body 10 is additionally provided with grouting peep hole 15, Grouting peep hole 15 is located at one end of periphery wall 13 of the reinforcement installation slot 12 far from concrete body 10, and along perpendicular to bottom wall 11 Direction run through concrete body 10.It is beaten when in the gap that Prefabricated road repairs between unit 100 and road repair hole 210 After entering structure slurry, structure slurry flows into reinforcement installation slot 12 so that reinforcing bar 210 is connect with concrete body 10, passes through constructor Member's observation grouting peep hole 15 can determine whether structure slurry adequately fills up in reinforcement installation slot 12, to guarantee reinforcing bar 210 and mixed Solidifying soil ontology 10 connects reliably.
Referring to Fig. 1, in some embodiments, it further includes multiple lifting parts that Prefabricated road, which repairs unit 100, lifting Part is set to the roof 16 opposite with bottom wall 11 of concrete body 10.It is installed on when needing Prefabricated road repairing unit 100 When road is repaired in hole 210, it is connect, is made prefabricated with the lifting part of Prefabricated road repairing 100 roof 16 of unit using lifting appliance The lifting of road repair unit 100 is to being installed above road repair hole 210, the position of lifting appliance and lifting part not shadow Installation is rung, so that easy for installation.
Specifically, lifting part includes at least two, it is preferred that lifting part includes four, and four lifting parts are opposite two-by-two to be set It sets.
As shown in figure 4, being embedded with lifting part in hole for hoist 161 more specifically, roof 16 offers hole for hoist 161.
Unit 100 is repaired based on above-mentioned Prefabricated road, the present invention also provides a kind of road repair construction methods, including step It is rapid:
S10: the road position repaired will be needed to be cut, rooted out to obtain road repair hole 210;
Wherein, cutting machine can be used to cut the road position damaged, rooting out is to having damaged under cutting Road sections are removed, and the road repair hole 210 of road sections damaged removal is cleared up, flattened etc. and applied Work.
Before this step, the Prefabricated road repairing unit 100 of suitable dimension can be first selected, then to the road portion damaged It cut, root out road repair hole 210 to obtain matching with the size in position.
S20: the more reinforcing bars 211 for being stretched on its side wall are implanted at road repair hole 210;
Wherein, implantation is concretely first drilled in predeterminated position using electrical drilling machine, then reinforcing bar 211 is installed to hole It is interior.The predeterminated position is also determined by 12 position of reinforcement installation slot of Prefabricated road repairing unit 100.
S30: the structure slurry of prefabricated thickness is injected in the bottom at road repair hole 210;
Wherein, structure slurry can be concrete grout, it is preferred that structure slurry can be starched for strong concrete.
S40: by the above-mentioned corresponding installation of Prefabricated road repairing unit 100 to road repair hole 210, wherein Mei Yigang The correspondence of muscle 211 protrudes into each reinforcement installation slot 12;
Wherein, lifting appliance can be used to lift Prefabricated road repairing unit 100, when Prefabricated road is repaired unit After in 100 corresponding installations to road repair hole 210, the bottom wall 11 of Prefabricated road repairing unit 100 contacts formation with structure slurry Connection.
S50: injecting structure is starched in the gap between Prefabricated road unit 100 and road repair hole 210;
Wherein, after injecting structure slurry, structure slurry can be inserted to reinforcement installation slot 12 and limiting slot 14, pre- to reinforce Connection between roadway element 100 processed and road repair hole 210 can determine whether grouting fills by observation grouting observation panel 15 Point, judgment mode concretely, when all grouting observation panels 15 all emerge structure slurries, illustrates that injecting structure slurry is completed.
It can also include step S55 after step S50: use concrete landfill grouting observation panel 15 and hole for hoist 161.
S60: concrete curing processing is carried out.
Wherein, the sides such as watering natural curing, spray-coated film maintenance and plastic film package maintenance can be used in concrete curing Method.
Prefabricated road repairing unit 100 of the invention and road repair construction method have following excellent compared with prior art Point:
(1), unit 100 is repaired by setting and Prefabricated road, and its bottom wall 11 be equipped with multiple reinforcement installation slots 12 with More reinforcing bars 211 of road repair unit 210 cooperate, and while guaranteeing repairing stable structure, also eliminate the coagulation of large area Soil pours work, and the wet construction of site operation is few, to accelerate reparation construction process;
It (2), can be with the outer dimension phase at road repair hole 210 by the way that the outer shape of concrete body 10 is arranged Match, the area of concreting can be reduced, and prefabricated various standard-sized Prefabricated road repairing units 100 can be shifted to an earlier date, to add Fast reparation construction process;
(3), by the way that multiple limiting slots 14 are arranged, Prefabricated road repairing unit 100 and road repair hole 210 can be increased Between connection area;
(4), lifting part is arranged by the roof 16 in concrete body 10, so that Prefabricated road repairing unit 100 is installed It is convenient.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of Prefabricated road repairs unit, for repairing road repair hole, which is characterized in that the Prefabricated road repairing is single Member includes:
Concrete body, has the bottom wall opposite with road repair hole bottom, and the bottom wall is equipped with multiple reinforcement installations Slot;
Multiple reinforcement installation slot being provided at circumferentially spaced along the concrete body, and each reinforcement installation slot prolongs The angled setting in edge in direction Yu the concrete body is stretched, the concrete is run through in one end of each reinforcement installation slot The side wall adjacent with the bottom wall of ontology;
The more reinforcing bars for being stretched on its side wall are equipped in the road repair hole, each reinforcing bar correspondence protrudes into each described In reinforcement installation slot.
2. Prefabricated road according to claim 1 repairs unit, which is characterized in that outside the Prefabricated road repairing unit Shape size and the outer dimension at the road repair hole match.
3. Prefabricated road according to claim 1 repairs unit, which is characterized in that multiple reinforcement installation slots include more A first reinforcement installation slot and multiple second reinforcement installation slots;
Multiple first reinforcement installation slots are arranged along the width direction interval of the concrete body;
Multiple second reinforcement installation slots are arranged along the length direction interval of the concrete body.
4. Prefabricated road according to claim 1 repairs unit, which is characterized in that the bottom wall of the concrete body Multiple limiting slots are additionally provided with, each limiting slot runs through two side walls of the concrete body.
5. Prefabricated road according to claim 4 repairs unit, which is characterized in that the limiting slot and the reinforcement installation Slot connection.
6. Prefabricated road according to claim 5 repairs unit, which is characterized in that the limiting slot is along the reinforcement installation The extending direction of slot runs through the concrete body.
7. described in any item Prefabricated roads repair unit according to claim 1~6, which is characterized in that the reinforcement installation slot Cross sectional shape is arc-shaped, inverted trapezoidal or U-shaped.
8. described in any item Prefabricated roads repair unit according to claim 1~6, which is characterized in that the concrete body It is additionally provided with grouting peep hole, the grouting peep hole is located at the side wall of the reinforcement installation slot far from the concrete body One end, and along perpendicular to the bottom wall direction run through the concrete body.
9. described in any item Prefabricated roads repair unit according to claim 1~6, which is characterized in that the Prefabricated road is repaired Mending unit further includes multiple lifting parts, and the lifting part is set to the concrete body roof opposite with the bottom wall.
10. a kind of road repair construction method, which is characterized in that comprising steps of
The road position repaired will be needed to be cut, root out the road repair hole to obtain;
The more reinforcing bars for being stretched on its side wall are implanted at the road repair hole;
In the structure slurry of the bottom injection preset thickness at the road repair hole;
Prefabricated road according to any one of claims 1 to 9 repairing unit is installed to the road repair hole, wherein every The one reinforcing bar correspondence protrudes into each reinforcement installation slot;
Injecting structure is starched in gap between the Prefabricated road unit and the road repair hole;
Carry out concrete curing processing.
CN201811588735.5A 2018-12-25 2018-12-25 Prefabricated road repairs unit and road repair construction method Pending CN109680578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811588735.5A CN109680578A (en) 2018-12-25 2018-12-25 Prefabricated road repairs unit and road repair construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811588735.5A CN109680578A (en) 2018-12-25 2018-12-25 Prefabricated road repairs unit and road repair construction method

Publications (1)

Publication Number Publication Date
CN109680578A true CN109680578A (en) 2019-04-26

Family

ID=66189160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811588735.5A Pending CN109680578A (en) 2018-12-25 2018-12-25 Prefabricated road repairs unit and road repair construction method

Country Status (1)

Country Link
CN (1) CN109680578A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113106802A (en) * 2021-04-19 2021-07-13 交通运输部公路科学研究所 Method and equipment for rapidly recovering load transfer capacity of assembled concrete pavement slab
CN113584982A (en) * 2021-08-25 2021-11-02 中冶南方城市建设工程技术有限公司 Assembly type continuous reinforced concrete pavement and construction method thereof
CN113718577A (en) * 2021-09-24 2021-11-30 河南城建学院 Rapid repair structure for municipal road and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060104953A (en) * 2006-07-07 2006-10-09 이수봉 L style road concrete block
CN103334359A (en) * 2013-06-26 2013-10-02 中国建筑股份有限公司 Fabricated precast reinforced concrete pavement slab and pavement construction method
CN103498397A (en) * 2013-09-29 2014-01-08 华南理工大学 Prefabricated cement pavement slab for quick pavement repair
US20150267358A1 (en) * 2014-03-19 2015-09-24 Mark Sanders Pre-cast concrete road repair panel
CN108086113A (en) * 2017-11-15 2018-05-29 广东省建筑科学研究院集团股份有限公司 A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area
CN209555690U (en) * 2018-12-25 2019-10-29 湘潭远大住宅工业有限公司 Prefabricated road repairs unit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060104953A (en) * 2006-07-07 2006-10-09 이수봉 L style road concrete block
CN103334359A (en) * 2013-06-26 2013-10-02 中国建筑股份有限公司 Fabricated precast reinforced concrete pavement slab and pavement construction method
CN103498397A (en) * 2013-09-29 2014-01-08 华南理工大学 Prefabricated cement pavement slab for quick pavement repair
US20150267358A1 (en) * 2014-03-19 2015-09-24 Mark Sanders Pre-cast concrete road repair panel
CN108086113A (en) * 2017-11-15 2018-05-29 广东省建筑科学研究院集团股份有限公司 A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area
CN209555690U (en) * 2018-12-25 2019-10-29 湘潭远大住宅工业有限公司 Prefabricated road repairs unit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113106802A (en) * 2021-04-19 2021-07-13 交通运输部公路科学研究所 Method and equipment for rapidly recovering load transfer capacity of assembled concrete pavement slab
CN113584982A (en) * 2021-08-25 2021-11-02 中冶南方城市建设工程技术有限公司 Assembly type continuous reinforced concrete pavement and construction method thereof
CN113584982B (en) * 2021-08-25 2022-11-11 中冶南方城市建设工程技术有限公司 Assembly type continuous reinforced concrete pavement and construction method thereof
CN113718577A (en) * 2021-09-24 2021-11-30 河南城建学院 Rapid repair structure for municipal road and construction method

Similar Documents

Publication Publication Date Title
CN109680578A (en) Prefabricated road repairs unit and road repair construction method
CN102392420B (en) Vertical crack grouting and reinforcing method of prestressed concrete hollow slab bridge bottom plate
CN100529312C (en) Modular system for the construction of overhead wire support and/or supporting pile foundations
CN104532985B (en) Shear wall cast with tenon-and-mortise precast concrete blocks replacing formworks and construction method thereof
CN101906768A (en) Panel construction method of concrete faced rock-fill dam
CN103362131B (en) A kind of pattern foundation pit supporting structure compound bamboo reinforcement combined bolting and shotcrete and construction method thereof
CN111561061B (en) Assembled wallboard, wall structure and construction method of wall structure
CN106049530A (en) Urban comprehensive pipe gallery and construction method
CN205857530U (en) Joint bar positioner
CN205776345U (en) City integrated piping lane
CN209555690U (en) Prefabricated road repairs unit
CN107558633A (en) It is provided with the installation method of the prefabricated panel with distribution box
CN107227679A (en) Cement concrete pavement green transformation and upgrade construction method
CN207525566U (en) Cement concrete pavement green transformation and upgrade structure
CN210597648U (en) Prefabricated component steel bar connection structure
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN105220809A (en) The syndeton of a kind of arch top board and bracket stake and construction method thereof
CN109268019B (en) Device and method for quickly treating local diseases of high-geostress tunnel
CN204418229U (en) Poured band of outer wall of basement concrete draw-in groove
CN106320189A (en) Transverse reinforcing construction method of existing railway line T beam
CN215519687U (en) Floor tile laying structure
CN204343486U (en) The shear wall that a kind of mortise and tenon type precast concrete segment replaces template to build
CN103850163B (en) Bridge-type steel plate pavement system and construction method thereof
CN219754107U (en) Reinforced beam concrete pouring shaping device
CN206090939U (en) Brickwork wall drawknot muscle connecting tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190426

RJ01 Rejection of invention patent application after publication