CN109677565A - LNG ship oceangoing ship conveying refrigeration system and its freezing material delivery method - Google Patents

LNG ship oceangoing ship conveying refrigeration system and its freezing material delivery method Download PDF

Info

Publication number
CN109677565A
CN109677565A CN201910011589.8A CN201910011589A CN109677565A CN 109677565 A CN109677565 A CN 109677565A CN 201910011589 A CN201910011589 A CN 201910011589A CN 109677565 A CN109677565 A CN 109677565A
Authority
CN
China
Prior art keywords
lng
storage tank
bog
nitrogen
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910011589.8A
Other languages
Chinese (zh)
Other versions
CN109677565B (en
Inventor
杨德成
邓佳佳
郑中棒
徐荣伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Hui Ge Environmental Technology Co.,Ltd.
Original Assignee
Zhoushan Bo Rui Ship Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhoushan Bo Rui Ship Science And Technology Development Co Ltd filed Critical Zhoushan Bo Rui Ship Science And Technology Development Co Ltd
Priority to CN201910011589.8A priority Critical patent/CN109677565B/en
Publication of CN109677565A publication Critical patent/CN109677565A/en
Application granted granted Critical
Publication of CN109677565B publication Critical patent/CN109677565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • B63B25/12Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid closed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/26Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for frozen goods

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

LNG ship oceangoing ship conveying refrigeration system; including LNG storage tank, marine internal combustion engine and nitrogen storage tank; internal combustion engine air vent is connected on the marine internal combustion engine; the LNG storage tank (is laid on LNG ship oceangoing ship; it is characterized by: LNG storage tank is connected with LNG conveying inner tube; the periphery of the LNG conveying inner tube is also enclosed with outside protective pipe, and BOG efferent duct is also connected between LNG storage tank and BOG holding vessel, is equipped with liquid nitrogen storage tank below nitrogen storage tank;Beneficial effects of the present invention, this present invention can freeze the pipeline of conveying in LNG transfer process, make to form cryosphere in pipeline, avoid the heat volatilization in the transfer process of LNG, reduce loss, are suitble to promote the use of.

Description

LNG ship oceangoing ship conveying refrigeration system and its freezing material delivery method
Technical field
The present invention relates to LNG ship oceangoing ship transport field more particularly to a kind of LNG ship oceangoing ship BOG recovery system and its operation methods.
Background technique
LNG (Liquefied Natural Gas), the i.e. english abbreviation of liquefied natural gas.Natural gas be in gas field from So mined fuel gas, is mainly made of methane.LNG is to be cooled to -162 by gaseous natural gas under normal pressure DEG C, it is allowed to condense into liquid.Storage and transportation space can be greatlyd save after natural gas liquefaction, and there are the spies such as calorific value is big, performance is high Point.
LNG be it is a kind of cleaning, the efficient energy.Realize that energy supply is polynary since imported L NG facilitates energy-consuming state Change, ensure energy security, and exporting LNG facilitates natural gas producing nation effective exploitation natural gas resource, increases foreign exchange earnings, promotees Into the national economic development, thus LNG trade is just becoming the new hot spot of global energy markets.BOG:Boil Off Gas flashed vapour, Boil-off gas.The source of BOG: low-temperature condition LNG from liquefaction plant take on come after, generally by LNG tank car mode transport, due to Durings storage, transport etc., the inevitable energy can carry out heat exchange with extraneous, so as to cause the LNG temperature inside tank car Degree increases, therefore operative liquid evaporation generates BOG (Boil off Gas) flashed vapour.BOG is increased back up after being formed plus storage container Pressure can wash safety valve open when pressure reaches certain pressure, extra natural gas discharge into atmosphere, with alleviate storage Pressure inside tank avoids explosion dangerous situation.
In the transfer process of LNG, meeting during the dedicated conveying trough tank car of LNG is transferred to by LNG ships that transport Heat is touched, therefore will cause volatilization seriously, it is more to the loss of LNG.
Summary of the invention
In view of the above deficiencies, the present invention provides a kind of LNG ship oceangoing ship conveying refrigeration system and its freezing material delivery method, this hairs It is bright the pipeline of conveying to be freezed in LNG transfer process, make to form cryosphere in pipeline, avoids the transfer of LNG Heat volatilization in the process, reduces loss.
The technical solution adopted in the present invention is as follows:
LNG ship oceangoing ship conveying refrigeration system, including LNG storage tank, marine internal combustion engine and nitrogen storage tank, the ship internal combustion Internal combustion engine air vent is connected on machine, the LNG storage tank (is laid on LNG ship oceangoing ship, it is characterised in that: LNG storage tank connection There is LNG to convey inner tube, the periphery of the LNG conveying inner tube is also enclosed with outside protective pipe, between LNG storage tank and BOG holding vessel It is also connected with BOG efferent duct, liquid nitrogen storage tank is installed below nitrogen storage tank;
Belt wheel one, belt wheel two, secondary pulley and spindle rod are separately installed on the marine internal combustion engine, in which: ship internal combustion Machine driving pulley two rotates, and cogged V-belt, the cogged V-belt and subband are connected between the belt wheel one, belt wheel two and spindle rod Wheel engagement, the belt wheel one are also connected with the other side that transmission shaft extends to marine internal combustion engine across marine internal combustion engine;Transmission shaft On cam two is uniformly installed, the lower section of the cam two is equipped with BOG Piston Air Compressor and is mounted on BOG holding vessel, cam two Side be equipped with piston pump one, in which: piston pump one and nitrogen storage tank are connected with nitrogen input pipe one, and the piston pump one is also Nitrogen supply pipe is connected between LNG conveying inner tube;Liquid is connected between BOG Piston Air Compressor and liquid BOG storage tank BOG efferent duct is connected with liquid BOG supply pipe between BOG storage tank and marine internal combustion engine;
Upper be uniformly equipped with of the spindle rod drives the piston pump two moved back and forth by cam one;The piston pump two It is connected with liquid nitrogen supply pipe to be connected between outside protective pipe and LNG conveying inner tube, be connected between liquid nitrogen storage tank and piston pump two Liquid nitrogen input pipe, the end of outside protective pipe are connected with liquid nitrogen recovery tube, and control valve one is equipped on liquid nitrogen recovery tube, and liquid nitrogen returns Closed tube is also connected with recovery pump, and the recovery pump is connected with the liquid nitrogen reflux pipe connecting with liquid nitrogen storage tank;It is set in LNG conveying inner tube There is outlet, control valve two is installed on outlet, nitrogen reflux pipe, nitrogen are connected between outlet and nitrogen storage tank Aspiration pump is also equipped on return pipe, outlet is laid on carriage.
Another embodiment party of the invention further includes multiple shafts laid up and down, between the shaft on pass through gear Intermeshing transmission, in which: conveyer belt is connected between the shaft and secondary pulley of top, the shaft of bottommost is connected with electricity Machine.
Based on above-mentioned apparatus, the present invention also proposes a kind of freezing material delivery method of LNG ship oceangoing ship conveying refrigeration system, feature It is, comprising the following steps:
1) during transportation, the marine internal combustion engine of ship is operating LNG ship oceangoing ship, and the BOG that LNG storage tank transport generates is in Steam state directly passes through BOG efferent duct and is admitted in BOG holding vessel, and marine internal combustion engine passes through tooth by the rotation of driving pulley two later The shape V band band rotation of movable belt pulley one rotates transmission shaft;
2) transmission shaft band moving cam two, which rotates, simultaneously acts on piston pump one and BOG Piston Air Compressor, makes BOG piston Air compressor machine carries out pressurization to the steam state BOG in BOG holding vessel and becomes liquid and by liquid BOG efferent duct feeding BOG storage tank Interior, LNG is transported in marine internal combustion engine by liquid BOG supply pipe and is used by BOG storage tank;
3) when LNG storage tank is unloaded, the nitrogen in nitrogen storage tank is carried out by piston pump one first Then nitrogen is pressed into nitrogen in extraction by the way that under the action of cam two, piston pump one constantly moves reciprocatingly by extraction It is sent into supply pipe in LNG conveying inner tube and is cooled down in advance in pipe;
4) it drives spindle rod rotation to make cam one that piston pump two be driven to move reciprocatingly in the driving of cogged V-belt to store up liquid nitrogen Tank is defeated with LNG by being sent to outside protective pipe by liquid nitrogen supply pipe again after piston pump two after being retracted in liquid nitrogen input pipe It send and forms cryosphere between inner tube, cooling is completed at this time;
5) nitrogen reflux pipe is connected into outlet, opens control valve two, starting aspiration pump starts LNG conveying inner tube Nitrogen is withdrawn into nitrogen storage tank, later separates nitrogen reflux pipe with outlet, later by outlet and LNG groove tank car Feed pipe connection;
6) start conveying, the LNG in LNG storage tank is transferred in LNG groove tank car, in the process, outside protective pipe with The cryosphere formed between LNG conveying inner tube makes always LNG conveying inner tube keep low temperature environment, and such LNG is during the material conveying process Loss will not be evaporated;
7) after LNG is transmitted, open control valve one, by recovery pump by outside protective pipe and LNG convey inner tube it Between liquid nitrogen recycled, sent back in liquid nitrogen storage tank by liquid nitrogen reflux pipe.
Beneficial effects of the present invention, this present invention can freeze the pipeline of conveying in LNG transfer process, make pipe Cryosphere is formed in road, is avoided the heat volatilization in the transfer process of LNG, is reduced loss, is suitble to promote the use of.
Detailed description of the invention
Fig. 1 is the overall structure diagram of LNG ship oceangoing ship conveying refrigeration system of the present invention;
Fig. 2 is the further disassemblying structure schematic diagram of Fig. 1 of the present invention;
Fig. 3 is the structural schematic diagram of another view direction of Fig. 2 of the present invention;
Fig. 4 is the structural schematic diagram of another view direction of Fig. 1 of the present invention;
Fig. 5 is the positive structure diagram of Fig. 2 of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Embodiment 1
As shown, LNG ship oceangoing ship conveying refrigeration system, including LNG storage tank 28, marine internal combustion engine 13 and nitrogen storage tank 23, internal combustion engine air vent 4 is connected on the marine internal combustion engine 13, and the LNG storage tank 28 is laid on LNG ship oceangoing ship, LNG storage It deposits tank 28 and is connected with LNG conveying inner tube 40, the periphery of the LNG conveying inner tube 40 is also enclosed with outside protective pipe 19, both formd Furthermore bimetallic tube is also equipped with insulating layer, is also connected with BOG between LNG storage tank 28 and BOG holding vessel 10 on outside protective pipe 19 Efferent duct 27, the lower section of nitrogen storage tank 23 are equipped with liquid nitrogen storage tank 24;
Belt wheel 1, belt wheel 2 31, secondary pulley 35 and spindle rod 41 are separately installed on the marine internal combustion engine 13, In: the rotation of 13 driving pulley 2 31 of marine internal combustion engine is connected with tooth form between the belt wheel 1, belt wheel 2 31 and spindle rod 41 V band 32, the cogged V-belt 32 are engaged with secondary pulley 35, and the belt wheel 1 is also connected with transmission shaft 11 across marine internal combustion engine 13 extend to the other side of marine internal combustion engine 13;Cam 28 is uniformly installed, the lower section of the cam 28 is set on transmission shaft 11 There is BOG Piston Air Compressor 9 to be mounted on BOG holding vessel 10, the side of cam 28 is equipped with piston pump 1, in which: piston pump 1 It is connected with nitrogen input pipe 1 with nitrogen storage tank 23, the piston pump 1 is also connected with nitrogen between LNG conveying inner tube 40 Gas supply pipe 15;Liquid BOG efferent duct 26, BOG storage tank are connected between BOG Piston Air Compressor 9 and liquid BOG storage tank 25 Liquid BOG supply pipe 14 is connected between 25 and marine internal combustion engine 13.
Upper be uniformly equipped with of spindle rod 41 drives the piston pump 2 36 moved back and forth by cam 1;The piston pump 2 36, which are connected with liquid nitrogen supply pipe 16, is connected between outside protective pipe 19 and LNG conveying inner tube 40, liquid nitrogen storage tank 24 and piston pump It is connected with liquid nitrogen input pipe 22 between 2 36, the end of outside protective pipe 19 is connected with liquid nitrogen recovery tube 18, on liquid nitrogen recovery tube 18 Control valve 1 is installed, liquid nitrogen recovery tube 18 is also connected with recovery pump 17, and the recovery pump 17 is connected with and liquid nitrogen storage tank The liquid nitrogen reflux pipe 20 of 24 connections;LNG conveys inner tube 40 and is equipped with outlet 1, is equipped with control valve 2 46 on outlet 1, Nitrogen reflux pipe 21 is connected between outlet 1 and nitrogen storage tank 23, it is installation that nitrogen reflux pipe 21, which belongs to removable, is needed Installation connects when recycling nitrogen is, dismounting when not needing, and is also equipped with aspiration pump on nitrogen reflux pipe 21, outlet 1 is laid in On carriage 2.
Based on above-mentioned apparatus, the present invention also proposes a kind of freezing material delivery method of LNG ship oceangoing ship conveying refrigeration system, feature It is, comprising the following steps:
1) during transportation, the marine internal combustion engine 13 of ship is operating LNG ship oceangoing ship, and the transport of LNG storage tank 28 generates BOG directly passes through BOG efferent duct 27 in steam state and is admitted in BOG holding vessel 10, and marine internal combustion engine 13 passes through driving pulley later 2 31 rotations rotate transmission shaft 11 with the rotation of movable belt pulley 1 by cogged V-belt 32;
2) transmission shaft 11 is rotated with moving cam 28 and is acted on simultaneously piston pump 1 and BOG Piston Air Compressor 9, is made BOG Piston Air Compressor 9, which pressurize to the steam state BOG in BOG holding vessel 10, to be become liquid and is sent by liquid BOG efferent duct 26 Enter in BOG storage tank 25, LNG is transported in marine internal combustion engine 13 by liquid BOG supply pipe 14 and is used by BOG storage tank 25;
3) when LNG storage tank 28 is unloaded, pass through piston pump 1 first for the nitrogen in nitrogen storage tank 23 It is extracted out, is then pressed into nitrogen in extraction by the way that under the action of cam 28, piston pump 1 constantly moves reciprocatingly It is sent into nitrogen supply pipe 15 in LNG conveying inner tube 40 and is cooled down in advance in pipe;
4) rotation of spindle rod 41 is driven to make cam 1 that piston pump 2 36 be driven to move reciprocatingly in the driving of cogged V-belt 32 By being sent into again by liquid nitrogen supply pipe 16 after piston pump 2 36 after liquid nitrogen storage tank 24 is retracted in liquid nitrogen input pipe 22 Cryosphere is formed between outside protective pipe 19 and LNG conveying inner tube 40, cooling is completed at this time;
5) nitrogen reflux pipe 21 is connected into outlet 1, opens control valve 2 46, starting aspiration pump starts to convey LNG The nitrogen of inner tube 40 is withdrawn into nitrogen storage tank 23, is later separated nitrogen reflux pipe 21 with outlet 1, later by outlet 1 connect with the feed pipe of LNG groove tank car;
6) start conveying, the LNG in LNG storage tank 28 is transferred in LNG groove tank car, in the process, outside protective pipe The cryosphere formed between 19 and LNG conveying inner tube 40 makes always LNG conveying inner tube 40 keep low temperature environment, and such LNG is defeated Loss will not be evaporated during material;
7) after LNG is transmitted, control valve 1 is opened, is conveyed outside protective pipe 19 and LNG by recovery pump 17 Liquid nitrogen between inner tube 40 is recycled, and is sent back in liquid nitrogen storage tank 24 by liquid nitrogen reflux pipe 20.
Embodiment 2
As shown, LNG ship oceangoing ship conveying refrigeration system, including LNG storage tank 28, marine internal combustion engine 13 and nitrogen storage tank 23, internal combustion engine air vent 4 is connected on the marine internal combustion engine 13, and the LNG storage tank 28 is laid on LNG ship oceangoing ship, LNG storage It deposits tank 28 and is connected with LNG conveying inner tube 40, the periphery of the LNG conveying inner tube 40 is also enclosed with outside protective pipe 19, both formd Furthermore bimetallic tube is also equipped with insulating layer, is also connected with BOG between LNG storage tank 28 and BOG holding vessel 10 on outside protective pipe 19 Efferent duct 27, the lower section of nitrogen storage tank 23 are equipped with liquid nitrogen storage tank 24;
Belt wheel 1, belt wheel 2 31, secondary pulley 35 and spindle rod 41 are separately installed on the marine internal combustion engine 13, In: the rotation of 13 driving pulley 2 31 of marine internal combustion engine is connected with tooth form between the belt wheel 1, belt wheel 2 31 and spindle rod 41 V band 32, the cogged V-belt 32 are engaged with secondary pulley 35, and the belt wheel 1 is also connected with transmission shaft 11 across marine internal combustion engine 13 extend to the other side of marine internal combustion engine 13;Cam 28 is uniformly installed, the lower section of the cam 28 is set on transmission shaft 11 There is BOG Piston Air Compressor 9 to be mounted on BOG holding vessel 10, the side of cam 28 is equipped with piston pump 1, in which: piston pump 1 It is connected with nitrogen input pipe 1 with nitrogen storage tank 23, the piston pump 1 is also connected with nitrogen between LNG conveying inner tube 40 Gas supply pipe 15;Liquid BOG efferent duct 26, BOG storage tank are connected between BOG Piston Air Compressor 9 and liquid BOG storage tank 25 Liquid BOG supply pipe 14 is connected between 25 and marine internal combustion engine 13.
Upper be uniformly equipped with of spindle rod 41 drives the piston pump 2 36 moved back and forth by cam 1;The piston pump 2 36, which are connected with liquid nitrogen supply pipe 16, is connected between outside protective pipe 19 and LNG conveying inner tube 40, liquid nitrogen storage tank 24 and piston pump It is connected with liquid nitrogen input pipe 22 between 2 36, the end of outside protective pipe 19 is connected with liquid nitrogen recovery tube 18, on liquid nitrogen recovery tube 18 Control valve 1 is installed, liquid nitrogen recovery tube 18 is also connected with recovery pump 17, and the recovery pump 17 is connected with and liquid nitrogen storage tank The liquid nitrogen reflux pipe 20 of 24 connections;LNG conveys inner tube 40 and is equipped with outlet 1, is equipped with control valve 2 46 on outlet 1, Nitrogen reflux pipe 21 is connected between outlet 1 and nitrogen storage tank 23, it is installation that nitrogen reflux pipe 21, which belongs to removable, is needed Installation connects when recycling nitrogen is, dismounting when not needing, and is also equipped with aspiration pump on nitrogen reflux pipe 21, outlet 1 is laid in On carriage 2.
When ship pulls in shore in parked state, marine internal combustion engine 13 be it is idle, therefore, the present embodiment further includes more A shaft 29 laid up and down, it is upper between the shaft 29 to pass through the intermeshing transmission of gear 5, in which: the shaft of top with Conveyer belt (34) are connected between secondary pulley 35, the shaft of bottommost is connected with motor.
Based on above-mentioned apparatus, the present invention also proposes a kind of freezing material delivery method of LNG ship oceangoing ship conveying refrigeration system, feature It is, comprising the following steps:
1) when LNG ship oceangoing ship pulls in shore, marine internal combustion engine 13 does not work, and motor drives the shaft rotation of bottommost at this time, passes through The intermeshing transmission of gear 5 makes multiple shafts 29 link, and makes transmission shaft 11 with the rotation of movable belt pulley 1 by cogged V-belt 32 Rotation, the BOG that the transport of LNG storage tank 28 generates directly pass through BOG efferent duct 27 in steam state and are admitted in BOG holding vessel 10;
2) transmission shaft 11 is rotated with moving cam 28 and is acted on simultaneously piston pump 1 and BOG Piston Air Compressor 9, is made BOG Piston Air Compressor 9, which pressurize to the steam state BOG in BOG holding vessel 10, to be become liquid and is sent by liquid BOG efferent duct 26 Enter in BOG storage tank 25 and saves;
3) when LNG storage tank 28 is unloaded, pass through piston pump 1 first for the nitrogen in nitrogen storage tank 23 It is extracted out, is then pressed into nitrogen in extraction by the way that under the action of cam 28, piston pump 1 constantly moves reciprocatingly It is sent into nitrogen supply pipe 15 in LNG conveying inner tube 40 and is cooled down in advance in pipe;
4) rotation of spindle rod 41 is driven to make cam 1 that piston pump 2 36 be driven to move reciprocatingly in the driving of cogged V-belt 32 By being sent into again by liquid nitrogen supply pipe 16 after piston pump 2 36 after liquid nitrogen storage tank 24 is retracted in liquid nitrogen input pipe 22 Cryosphere is formed between outside protective pipe 19 and LNG conveying inner tube 40, cooling is completed at this time;
5) nitrogen reflux pipe 21 is connected into outlet 1, opens control valve 2 46, starting aspiration pump starts to convey LNG The nitrogen of inner tube 40 is withdrawn into nitrogen storage tank 23, is later separated nitrogen reflux pipe 21 with outlet 1, later by outlet 1 connect with the feed pipe of LNG groove tank car;
6) start conveying, the LNG in LNG storage tank 28 is transferred in LNG groove tank car, in the process, outside protective pipe The cryosphere formed between 19 and LNG conveying inner tube 40 makes always LNG conveying inner tube 40 keep low temperature environment, and such LNG is defeated Loss will not be evaporated during material;
7) after LNG is transmitted, control valve 1 is opened, is conveyed outside protective pipe 19 and LNG by recovery pump 17 Liquid nitrogen between inner tube 40 is recycled, and is sent back in liquid nitrogen storage tank 24 by liquid nitrogen reflux pipe 20.
Although the illustrative specific embodiment of the present invention is described above, in order to the technology of the art Personnel are it will be appreciated that the present invention, but the present invention is not limited only to the range of specific embodiment, to the common skill of the art For art personnel, as long as long as various change the attached claims limit and determine spirit and scope of the invention in, one The innovation and creation using present inventive concept are cut in the column of protection.

Claims (3)

1.LNG ship conveying refrigeration system, including LNG storage tank (28), marine internal combustion engine (13) and nitrogen storage tank (23), institute It states and is connected on marine internal combustion engine (13) internal combustion engine air vent (4), the LNG storage tank (28) is laid on LNG ship oceangoing ship, special Sign is: LNG storage tank (28) is connected with LNG conveying inner tube (40), and the periphery of LNG conveying inner tube (40) is also enclosed with outer Protection pipe (19) is also connected with BOG efferent duct (27), nitrogen storage tank between LNG storage tank (28) and BOG holding vessel (10) (23) liquid nitrogen storage tank (24) are installed below;
Belt wheel one (30), belt wheel two (31), secondary pulley (35) and spindle rod are separately installed on the marine internal combustion engine (13) (41), in which: marine internal combustion engine (13) driving pulley two (31) rotation, the belt wheel one (30), belt wheel two (31) and spindle rod (41) it is connected between cogged V-belt (32), the cogged V-belt (32) is engaged with secondary pulley (35), and the belt wheel one (30) also connects It is connected to the other side that transmission shaft (11) extend to marine internal combustion engine (13) across marine internal combustion engine (13);It is uniformly distributed on transmission shaft (11) Cam two (8) is installed, the lower section of the cam two (8) is equipped with BOG Piston Air Compressor (9) and is mounted on BOG holding vessel (10), The side of cam two (8) is equipped with piston pump one (7), in which: piston pump one (7) and nitrogen storage tank (23) are connected with nitrogen input Pipe one (12), the piston pump one (7) are also connected with nitrogen supply pipe (15) between LNG conveying inner tube (40);BOG piston is empty Liquid BOG efferent duct (26), BOG storage tank (25) and ship internal combustion are connected between press (9) and liquid BOG storage tank (25) Liquid BOG supply pipe (14) is connected between machine (13);
Upper be uniformly equipped with of the spindle rod (41) drives the piston pump two (36) moved back and forth by cam one (42);It is described Piston pump two (36) is connected with liquid nitrogen supply pipe (16) and is connected between outside protective pipe (19) and LNG conveying inner tube (40), liquid nitrogen It is connected between storage tank (24) and piston pump two (36) liquid nitrogen input pipe (22), the end of outside protective pipe (19) is connected with liquid nitrogen and returns Closed tube (18) is equipped with control valve one (45) on liquid nitrogen recovery tube (18), and liquid nitrogen recovery tube (18) is also connected with recovery pump (17), the recovery pump (17) is connected with the liquid nitrogen reflux pipe (20) connecting with liquid nitrogen storage tank (24);LNG is conveyed on inner tube (40) Equipped with outlet (1), control valve two (46) is installed on outlet (1), is connected between outlet (1) and nitrogen storage tank (23) It is connected to nitrogen reflux pipe (21), aspiration pump is also equipped on nitrogen reflux pipe (21), outlet (1) is laid on carriage (2).
2. LNG ship oceangoing ship conveying refrigeration system according to claim 1, it is characterised in that: further include multiple layings up and down Shaft (29), it is upper between the shaft (29) to pass through gear (5) intermeshing transmission, in which: the shaft and secondary pulley of top (35) conveyer belt (34) are connected between, the shaft of bottommost is connected with motor.
The freezing material delivery method of 3.LNG ship conveying refrigeration system, which comprises the following steps:
1) during transportation, the marine internal combustion engine (13) of ship is operating LNG ship oceangoing ship, and LNG storage tank (28) transport generates BOG directly passes through BOG efferent duct (27) in steam state and is admitted in BOG holding vessel (10), and marine internal combustion engine (13) passes through drive later Movable belt pulley two (31) rotation rotates transmission shaft (11) by cogged V-belt (32) band movable belt pulley one (30) rotation;
2) transmission shaft (11) band moving cam two (8), which rotates, simultaneously acts on piston pump one (7) and BOG Piston Air Compressor (9), Make BOG Piston Air Compressor (9) carry out pressurization to the steam state BOG in BOG holding vessel (10) to become liquid and export by liquid BOG It manages (26) to be sent into BOG storage tank (25), LNG is transported in ship by BOG storage tank (25) by liquid BOG supply pipe (14) It is used in combustion engine (13);
3) when LNG storage tank (28) is unloaded, pass through piston pump one (7) first for the nitrogen in nitrogen storage tank (23) Gas is extracted out, then by the way that under the action of cam two (8), piston pump one (7) constantly moves reciprocatingly and extracts nitrogen side out While being pressed into nitrogen supply pipe (15) and being sent into LNG conveying inner tube (40) and cooled down in advance in pipe;
4) spindle rod (41) rotation is driven to make cam one (42) that piston pump two (36) be driven to do back and forth in the driving of cogged V-belt (32) Movement is supplied by liquid nitrogen after liquid nitrogen storage tank (24) is retracted in liquid nitrogen input pipe (22) by piston pump two (36) again later It is sent between outside protective pipe (19) and LNG conveying inner tube (40) to pipe (16) and forms cryosphere, cooling is completed at this time;
5) nitrogen reflux pipe (21) are connected into outlet (1), opened control valve two (46), starting aspiration pump starts LNG is defeated It send the nitrogen of inner tube (40) to be withdrawn into nitrogen storage tank (23), later separates nitrogen reflux pipe (21) with outlet (1), it Outlet (1) is connect with the feed pipe of LNG groove tank car afterwards;
6) start conveying, the LNG in LNG storage tank (28) is transferred in LNG groove tank car, in the process, outside protective pipe (19) cryosphere formed between LNG conveying inner tube (40) makes always LNG conveying inner tube (40) keep low temperature environment, in this way LNG will not be evaporated loss during the material conveying process;
7) it after LNG is transmitted, opens control valve one (45), it is by recovery pump (17) that outside protective pipe (19) and LNG is defeated It send the liquid nitrogen between inner tube (40) to be recycled, is sent back in liquid nitrogen storage tank (24) by liquid nitrogen reflux pipe (20).
CN201910011589.8A 2019-01-07 2019-01-07 LNG ship material conveying refrigeration system and refrigeration material conveying method thereof Active CN109677565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910011589.8A CN109677565B (en) 2019-01-07 2019-01-07 LNG ship material conveying refrigeration system and refrigeration material conveying method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910011589.8A CN109677565B (en) 2019-01-07 2019-01-07 LNG ship material conveying refrigeration system and refrigeration material conveying method thereof

Publications (2)

Publication Number Publication Date
CN109677565A true CN109677565A (en) 2019-04-26
CN109677565B CN109677565B (en) 2020-02-11

Family

ID=66192797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910011589.8A Active CN109677565B (en) 2019-01-07 2019-01-07 LNG ship material conveying refrigeration system and refrigeration material conveying method thereof

Country Status (1)

Country Link
CN (1) CN109677565B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110285319A (en) * 2019-07-09 2019-09-27 上海原能细胞生物低温设备有限公司 A kind of liquid nitrogen recovery system and liquid nitrogen recovery method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103968242A (en) * 2014-05-08 2014-08-06 重庆大学 Energy-saving liquefied natural gas flash steam recovery device
CN105823301A (en) * 2016-04-01 2016-08-03 上海应用技术学院 Time control cooling device and time control cooling method
CN106122759A (en) * 2016-08-17 2016-11-16 舟山博睿船舶科技开发有限公司 A kind of LNG cargo ship self-circulating energy-saving energy supplying system
EP3225535A1 (en) * 2014-11-27 2017-10-04 Korea Institute of Ocean Science and Technology Natural gas hydrate tank container loading system enabling self-powered power generation and boil-off gas treatment
CN207374605U (en) * 2017-08-09 2018-05-18 湖南省水运建设投资集团有限公司 The unpowered fixed filling ships of LNG

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103968242A (en) * 2014-05-08 2014-08-06 重庆大学 Energy-saving liquefied natural gas flash steam recovery device
EP3225535A1 (en) * 2014-11-27 2017-10-04 Korea Institute of Ocean Science and Technology Natural gas hydrate tank container loading system enabling self-powered power generation and boil-off gas treatment
CN105823301A (en) * 2016-04-01 2016-08-03 上海应用技术学院 Time control cooling device and time control cooling method
CN106122759A (en) * 2016-08-17 2016-11-16 舟山博睿船舶科技开发有限公司 A kind of LNG cargo ship self-circulating energy-saving energy supplying system
CN207374605U (en) * 2017-08-09 2018-05-18 湖南省水运建设投资集团有限公司 The unpowered fixed filling ships of LNG

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110285319A (en) * 2019-07-09 2019-09-27 上海原能细胞生物低温设备有限公司 A kind of liquid nitrogen recovery system and liquid nitrogen recovery method
CN110285319B (en) * 2019-07-09 2024-04-26 上海原能细胞生物低温设备有限公司 Liquid nitrogen recovery system and liquid nitrogen recovery method

Also Published As

Publication number Publication date
CN109677565B (en) 2020-02-11

Similar Documents

Publication Publication Date Title
CN106029491B (en) Boil-off gas processing system
WO2017031986A1 (en) Lng fueling station employing bog energy storage and pressure differential
CN104265512B (en) High-pressure/low-pressure gas supply system of ship power plant
KR102227891B1 (en) System for treating boil-off gas
EP2808633B1 (en) Liquefied gas treatment system
KR101245644B1 (en) Pump connecting structure of a natural gas supply system for a marine structure
CN104074632B (en) Method for supplying the system of Liquefied Natural Gas fuel and operating the system
CN102084114A (en) Gas supply systems for gas engines
KR20140075595A (en) System for treating a liquefied gas of a ship
CN105324302A (en) System and method for treating boil-off gas in ship
KR101245641B1 (en) Pump cooling method of liquifyed natural gas supply system
CN101406763B (en) Reliquefaction method for evaporation gas of liquor goods on ship
CN204060975U (en) A kind of high voltage/low voltage fuel gas supply system of Ship Power Equipment
KR101748784B1 (en) Boil-off-gas treatment system of lng bunkering ship
CN103343881A (en) Technology of BOG recovery and device thereof
CN109677565A (en) LNG ship oceangoing ship conveying refrigeration system and its freezing material delivery method
CN104165103B (en) An internal combustion engine, and a method of supplying such engine with gaseous fuel
CN211204067U (en) Waste heat recovery system of natural gas incineration device for ship
KR20160128081A (en) Fuel Supply System and Method for Supplying Fuel of LPG Carrier
CN107208559A (en) The system and method supplied for the fuel for controlling ship engine
CN205299067U (en) Device that liquefied natural gas tank wagon high efficiency was unloaded
CN105090740B (en) Device and application that a kind of liquefied natural gas tank car is efficiently unloaded
CN219160127U (en) System for retrieve BOG gaseous in LNG tank wagon fast
CN108105584A (en) A kind of LNG Storage, Transport method using low-temperature storage tank
CN116293414A (en) System and method for rapidly recovering BOG gas in LNG tank car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201103

Address after: Room 1101, No. 2, Maggie Road, China (Shanghai) Free Trade Pilot Area, Pudong New Area, Shanghai 200000

Patentee after: Shanghai Hui Ge Environmental Technology Co.,Ltd.

Address before: Room 301-1274, Enterprise Service Center, Zhoushan Port Comprehensive Free Trade Zone, Dinghai District, Zhoushan City, Zhejiang Province, 316000

Patentee before: ZHOUSHAN BORUI SHIP TECHNOLOGY DEVELOPMENT Co.,Ltd.

TR01 Transfer of patent right