CN109670701A - A kind of excitation regulator control system based on the control of block chain network the whole network construction cost - Google Patents

A kind of excitation regulator control system based on the control of block chain network the whole network construction cost Download PDF

Info

Publication number
CN109670701A
CN109670701A CN201811539167.XA CN201811539167A CN109670701A CN 109670701 A CN109670701 A CN 109670701A CN 201811539167 A CN201811539167 A CN 201811539167A CN 109670701 A CN109670701 A CN 109670701A
Authority
CN
China
Prior art keywords
cost
block chain
equivalent
construction cost
chain network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811539167.XA
Other languages
Chinese (zh)
Inventor
林锑杭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Putian City Fire Information Technology Co Ltd
Original Assignee
Putian City Fire Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Putian City Fire Information Technology Co Ltd filed Critical Putian City Fire Information Technology Co Ltd
Priority to CN201811539167.XA priority Critical patent/CN109670701A/en
Publication of CN109670701A publication Critical patent/CN109670701A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/04Payment circuits
    • G06Q20/06Private payment circuits, e.g. involving electronic currency used among participants of a common payment scheme
    • G06Q20/065Private payment circuits, e.g. involving electronic currency used among participants of a common payment scheme using e-cash

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Accounting & Taxation (AREA)
  • Game Theory and Decision Science (AREA)
  • Marketing (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Finance (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of excitation regulator control systems based on the control of block chain network the whole network construction cost, are related to block chain field, comprising: calculate power and obtain module, for obtaining the current calculation force value of this block chain network;Equivalent cost obtains module, for obtaining the equivalent cost of investment of described block chain network according to the current calculation force value;And cost comparison module, for equivalent cost will to be put into compared with default network construction cost value;If the equivalent cost of investment and the default network construction cost value mismatch, the stimulation level of described block chain network is adjusted so that the equivalent cost of investment matches with default network construction cost value.The present invention avoids idle work as a swarm of bees by the macro adjustments and controls of stimulation level, avoids expending excessive social resources, improves unit and calculates power profit;It is effectively relieved in the prior art, block chain mine machine blindly follows the wind investment, causes to calculate power malice between mine machine competing, and it is excessively high to avoid calculating the power competition social cost that causes to keep accounts.

Description

A kind of excitation regulator control system based on the control of block chain network the whole network construction cost
Technical field
The present invention relates to block chain field, in particular to a kind of excitation based on the control of block chain network the whole network construction cost Regulator control system.
Background technique
Block chain is the novel of the computer technologies such as Distributed Storage, point-to-point transmission, common recognition mechanism, Encryption Algorithm Application model.
For narrow sense, block chain is a kind of be sequentially in time combined into data block in such a way that sequence is connected one Kind linked data structure, and the distributed account book that can not be distorted He can not forge guaranteed in a manner of cryptography.Broadly, area Block chain technology is to verify to know together algorithm with storing data, using distributed node to generate and more using block linked data structure New data, utilizes the intelligence being made of automatized script code at the safety for guaranteeing data transmission and access in the way of cryptography Can contract program the completely new distributed basis framework and calculation of one kind with operation data.
In the prior art, block chain technology is disadvantageous in that: expending society based on the block chain network for calculating power common recognition Power resource can be calculated, absence from work without reason is blindly added malice and competes, and the input-output efficiency of whole society is low, and mine machine transition is set up.
Summary of the invention
In view of a part of defect of the prior art, technical problem to be solved by the invention is to provide one kind to be based on block The excitation regulator control system of chain network the whole network construction cost control, it is intended to which, by macro adjustments and controls stimulation level, guidance absence from work without reason optimization is calculated Power infrastructure construction scale avoids calculating power surplus.
To achieve the above object, a kind of excitation based on the control of block chain network the whole network construction cost of the present invention regulates and controls system System, the system comprises:
It calculates power and obtains module, for obtaining the current calculation force value of this block chain network;
Equivalent cost obtains module, for obtaining the investment etc. of described block chain network according to the current calculation force value Imitate cost;Wherein, cost needed for the equivalent cost of investment refers to the block chain network of current time node establishment same size;
Cost comparison module, for putting into equivalent cost compared with default network construction cost value for described;If the throwing Enter equivalent cost and the default network construction cost value mismatch, then adjust the stimulation level of described block chain network so that The equivalent cost of investment matches with the default network construction cost value.
In a specific embodiment, the equivalent cost acquisition module includes:
Data capture unit obtains the specific equivalent cost that current one calculates force value for obtaining the current calculation force value;
Equivalent cost acquiring unit, for obtaining according to the current product for calculating force value and the specific equivalent cost The equivalent cost of the investment of described block chain network.
In a specific embodiment, the equivalent cost of investment includes that equivalent infrastructure device cost and/or the whole network are equivalent Power consumption cost.
In a specific embodiment, the default network construction cost value is preset value.
In a specific embodiment, the cost comparison module, further includes:
First exciting unit, for improving when the equivalent cost of investment is less than the default network construction cost value The stimulation level;
Second exciting unit, for reducing when the equivalent cost of investment is greater than the default network construction cost value The stimulation level.
In a specific embodiment, the stimulation level includes: reference excitation, positive incentive, negative incentive;It is described just It is higher than the reference excitation to excitation, the negative incentive is lower than the reference excitation;The cost comparison module, further includes:
Third exciting unit, when the equivalent cost of investment matches with the default network construction cost value, setting It is motivated on the basis of the stimulation level;
4th exciting unit, when the equivalent cost of investment is less than the default network construction cost value, described in setting Stimulation level is positive incentive;
5th exciting unit, when the equivalent cost of investment is greater than the default network construction cost value, described in setting Stimulation level is negative incentive.
In a specific embodiment, the system also includes:
Module is provided in excitation, for sending this block link network of the first quantity to absence from work without reason node according to the stimulation level Network token.
In a specific embodiment, the system also includes:
Excitation regulation starting module generates excitation regulation and control instruction for arriving in response to the scheduled excitation regulation time;Institute Excitation regulation and control instruction is stated for initiating this excitation regulation operation.
In a specific embodiment, the default network construction cost value and this block chain network defend third party attack Calculation power intrusion scene match.
In a specific embodiment, the system also includes:
It calculates power and attacks monitoring module, in response to this block chain network, by power attack is calculated, power attack hair will to be calculated It send to network management monitor node.
The beneficial effects of the present invention are: the present invention pass through according to it is current calculate force value obtain block chain network investment it is equivalent at This, and compared with default network construction cost, when the equivalent cost of investment is larger, it is believed that block chain network infrastructure rule Mould is excessive, needs to reduce mine machine investment enthusiasm, and reduces the stimulation level for digging mine, and power infrastructure construction is calculated in guidance absence from work without reason optimization If scale, avoid calculating power surplus, so that whole power of calculating avoids mine machine from excessively pouring in, social resources is caused to waste in proper level; When the equivalent cost of investment is smaller, it is insufficient that block chain network calculates power, it should improve stimulation level, improve the product for calculating power infrastructure Polarity, to enhance calculation power.
Detailed description of the invention
Fig. 1 is the excitation that one of embodiment of the invention is controlled based on block chain network the whole network construction cost The flow diagram of regulation method;
Fig. 2 is the excitation that one of embodiment of the invention is controlled based on block chain network the whole network construction cost The structural block diagram of regulator control system.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples:
As shown in Figs. 1-2, in the first embodiment of the invention, it provides a kind of based on the construction cost control of block chain network the whole network The excitation of system regulates and controls method, which comprises
Obtain the current calculation force value of this block chain network;
According to the current calculation force value, the equivalent cost of investment of described block chain network is obtained;Wherein, described investment etc. Cost needed for effect cost refers to the block chain network of current time node establishment same size;
By the equivalent cost of investment compared with default network construction cost value;If the equivalent cost of the investment with it is described pre- If network construction cost value mismatches, then adjust the stimulation level of described block chain network so that the equivalent cost of the investment with The default network construction cost value matches.
The present invention passes through according to the current equivalent cost of investment calculated force value and obtain block chain network, and with default network construction Cost compares, when the equivalent cost of investment is larger, it is believed that block chain network infrastructure scale is excessive, needs to reduce mine machine Enthusiasm is put into, and reduces the stimulation level for digging mine, power infrastructure construction scale is calculated in guidance absence from work without reason optimization, avoids calculating power mistake It is surplus, so that whole power of calculating avoids mine machine from excessively pouring in, social resources is caused to waste in proper level;When put into equivalent cost compared with Hour, it is insufficient that block chain network calculates power, it should improve stimulation level, improve the enthusiasm for calculating power infrastructure, calculate to enhance Power.
The present invention avoids idle work as a swarm of bees by the macro adjustments and controls of stimulation level, avoids expending excessive society's money Source improves unit and calculates power profit;It is effectively relieved in the prior art, block chain mine machine blindly follows the wind investment, causes to calculate between mine machine Power malice competition substitutes artificial book keeping operation using block chain, gives full play to the convenient advantage of computer book keeping operation, and calculation power competition is avoided to make It is excessively high at book keeping operation social cost, it benefits the society.
It is noted that currently calculating force value can be actual value, or discreet value;The current acquisition side for calculating force value Formula can use the prior art, without limiting specific acquisition modes.Optionally, competing according to absence from work without reason book keeping operation power in the nearest period Spent time and book keeping operation difficulty are striven, estimates current calculation force value;Optionally, all mine machines in this block chain network are detected Calculation power, obtain the current calculation force value of whole block chain network;Optionally, the mine machine number and model of this block chain network are obtained, It estimates mine machine and averagely calculates force value, then estimate the current calculation force value of overall network.Optionally, when currently calculation force value is one section of the past Interior calculation power average value.
It is noted that calculating force value according to current, the equivalent cost of investment of block chain network is obtained;The investment it is equivalent at It originally can be actual value, or discreet value.In fact, block chain network input cost and block can be obtained by experiment Relationship between the calculation force value of chain network;It is current calculate that force value is higher can be bigger with the investment of the entire block chain network in surface.It is optional , there are Science of Economics personnel or the personnel of block chain industrial field to calculate force value by the way that analysis is current, can be obtained to obtain The calculation force value of the scale, the required input cost paid.
Optionally, in the present embodiment, described according to the current calculation force value, obtain the investment of described block chain network Equivalent cost, comprising:
The current calculation force value is obtained, the specific equivalent cost that current one calculates force value is obtained;
According to the current product for calculating force value and the specific equivalent cost, the described of described block chain network is obtained Put into equivalent cost.
Optionally, the specific equivalent cost is obtained by experiment statistics.
Optionally, the equivalent cost of investment includes equivalent infrastructure device cost and/or the equivalent power consumption cost of the whole network.
It is worth mentioning, optionally, putting into equivalent cost can only consider the equipment input cost of mine machine without to daily Ore deposit consumption electricity cost is dug to be considered.Optionally, equivalent cost is put into only to consider to dig ore deposit consumption electricity cost.Optionally, put into it is equivalent at This considers ore machine apparatus investment simultaneously and digs the power consumption during mine.It is worth mentioning, digs ore deposit consumption electricity cost and ore machine apparatus When both investments comprehensively consider, the product that power power consumption and mine machine service duration can be calculated by unit calculates power mine machine with unit again The sum of equipment cost, the unit obtained in mine machine service duration calculate power cost.
Optionally, the default network construction cost value is preset value.
It is noted that optional, the default network construction cost value of input node input is to be manually entered;It is optional , input node is based on big data and calculates the default network construction cost value of solution acquisition;Optionally, input node is default to provide The particular server of network construction cost value.
In fact, as the raising of mine machine production capacity, mine machine unit calculate the reduction of power cost or the raising of mine machine performance, unit The equipment cost and power consumption cost for calculating power mine machine will all reduce, correspondingly, in the case where default network construction cost is constant, In fact, it is the correspondingly benign promotion with technology development that the whole network, which calculates power,.Simultaneously as the depreciation of mine machine is consumed, can also make It obtains the whole network miners and the replacement spontaneously is updated to mine machine.Correspondingly, the reasonability performance boost of mine machine and being set in the whole network Standby quantity increases, as long as whole corresponding default network construction cost and current force value of calculating match, stimulation level is kept It is constant.
Optionally, in the present embodiment, the stimulation level of described block chain network of the adjustment is so that described investment etc. Effect cost matches with the default network construction cost value, further includes:
If the equivalent cost of investment is less than the default network construction cost value, the stimulation level is improved;
If the equivalent cost of investment is greater than the default network construction cost value, the stimulation level is reduced.
Optionally, in another embodiment, the stimulation level includes: reference excitation, positive incentive, negative incentive;Institute Positive incentive is stated higher than the reference excitation, the negative incentive is lower than the reference excitation;The method, further includes:
If the equivalent cost of the investment matches with the default network construction cost value, set the stimulation level as Reference excitation;
If the equivalent cost of investment is less than the default network construction cost value, the stimulation level is set as forward direction Excitation;
If the equivalent cost of investment is greater than the default network construction cost value, the stimulation level is set as negative sense Excitation.
It is noted that reference excitation, positive incentive, negative incentive also can according to need and set.
It is noted that stimulation level has intelligent contract to write completion, and block chain network can in optional case The adjustment rule for running the stimulation level in intelligent contract is adjusted stimulation level;And the modification of intelligent contract needs block A certain number of node agreements can just modify in chain network.For example, block chain network can will be motivated according to intelligent contract The numerical value of excitation, positive incentive, negative incentive, and three are write such as intelligent contract on the basis of level modulation;And for The modification of three's data then needs the one third or half or 2/3rds in block chain network or more node that could modify.
Optionally, in the present embodiment, the method also includes: according to the stimulation level, send the to absence from work without reason node This block chain network token of one quantity.
Optionally, energisation mode includes but is not limited to: token, voucher token, franc.It is noted that in this implementation In, it is to calculate power common recognition based on the block chain network for calculating power common recognition and need payment incentive to absence from work without reason, it is specific to calculate power common recognition method simultaneously It does not limit.
It is noted that the present invention does not limit the execution period of this method, number;Optionally, this method can determine Phase executes;Optionally, this method can be executed irregularly;Optionally, this method can execute in real time;Optionally, this method can To be executed using day, week, the moon, year as the period.Preferably, the period for executing this method is three months.
Optionally, in the present embodiment, before the current calculation force value for obtaining this block chain network, further includes:
It arrives in response to the scheduled excitation regulation time, generates excitation regulation and control instruction;The excitation regulation and control instruction is for sending out Play this excitation regulation operation.
Optionally, this block chain network defends other people attacks can be by controlling the calculation power scale of this block chain network come pre- It is anti-;Optionally, this block chain network defends other people to attack, and can be punished by legislation.
Optionally, the default network construction cost value and this block chain network defence third party attack calculation power attack at Originally match.
Optionally, the method also includes: in response to this block chain network by calculate power attack, by calculate power attack hair It send to network management monitor node.
Optionally, correlation is calculated into power attack time and transfers judicial authority, to punish related criminal.
As shown in Figs. 1-2, it in second embodiment of the invention, provides a kind of based on the construction cost control of block chain network the whole network The excitation regulator control system of system, the system comprises:
It calculates power and obtains module 200, for obtaining the current calculation force value of this block chain network;
Equivalent cost obtains module 300, for obtaining the investment of described block chain network according to the current calculation force value Equivalent cost;Wherein, the equivalent cost of the investment refer to current time node set up needed for the block chain network of same size at This;
Cost comparison module 400, for putting into equivalent cost compared with default network construction cost value for described;If described Put into equivalent cost and the default network construction cost value mismatch, then adjust the stimulation level of described block chain network with The equivalent cost of investment is set to match with the default network construction cost value.
The present invention passes through according to the current equivalent cost of investment calculated force value and obtain block chain network, and with default network construction Cost compares, when the equivalent cost of investment is larger, it is believed that block chain network infrastructure scale is excessive, needs to reduce mine machine Enthusiasm is put into, and reduces the stimulation level for digging mine, power infrastructure construction scale is calculated in guidance absence from work without reason optimization, avoids calculating power mistake It is surplus, so that whole power of calculating avoids mine machine from excessively pouring in, social resources is caused to waste in proper level;When put into equivalent cost compared with Hour, it is insufficient that block chain network calculates power, it should improve stimulation level, improve the enthusiasm for calculating power infrastructure, calculate to enhance Power.
The present invention avoids idle work as a swarm of bees by the macro adjustments and controls of stimulation level, avoids expending excessive society's money Source improves unit and calculates power profit;It is effectively relieved in the prior art, block chain mine machine blindly follows the wind investment, causes to calculate between mine machine Power malice competition substitutes artificial book keeping operation using block chain, gives full play to the convenient advantage of computer book keeping operation, and calculation power competition is avoided to make It is excessively high at book keeping operation social cost, it benefits the society.
It is noted that currently calculating force value can be actual value, or discreet value;The current acquisition side for calculating force value Formula can use the prior art, without limiting specific acquisition modes.Optionally, competing according to absence from work without reason book keeping operation power in the nearest period Spent time and book keeping operation difficulty are striven, estimates current calculation force value;Optionally, all mine machines in this block chain network are detected Calculation power, obtain the current calculation force value of whole block chain network;Optionally, the mine machine number and model of this block chain network are obtained, It estimates mine machine and averagely calculates force value, then estimate the current calculation force value of overall network.Optionally, when currently calculation force value is one section of the past Interior calculation power average value.
It is noted that calculating force value according to current, the equivalent cost of investment of block chain network is obtained;The investment it is equivalent at It originally can be actual value, or discreet value.In fact, block chain network input cost and block can be obtained by experiment Relationship between the calculation force value of chain network;It is current calculate that force value is higher can be bigger with the investment of the entire block chain network in surface.It is optional , there are Science of Economics personnel or the personnel of block chain industrial field to calculate force value by the way that analysis is current, can be obtained to obtain The calculation force value of the scale, the required input cost paid.
Optionally, in the present embodiment, the equivalent cost acquisition module 300 includes:
Data capture unit obtains the specific equivalent cost that current one calculates force value for obtaining the current calculation force value;
Equivalent cost acquiring unit, for obtaining according to the current product for calculating force value and the specific equivalent cost The equivalent cost of the investment of described block chain network.
Optionally, the specific equivalent cost is obtained by experiment statistics.
Optionally, the equivalent cost of investment includes equivalent infrastructure device cost and/or the equivalent power consumption cost of the whole network.
It is worth mentioning, optionally, putting into equivalent cost can only consider the equipment input cost of mine machine without to daily Ore deposit consumption electricity cost is dug to be considered.Optionally, equivalent cost is put into only to consider to dig ore deposit consumption electricity cost.Optionally, put into it is equivalent at This considers ore machine apparatus investment simultaneously and digs the power consumption during mine.It is worth mentioning, digs ore deposit consumption electricity cost and ore machine apparatus When both investments comprehensively consider, the product that power power consumption and mine machine service duration can be calculated by unit calculates power mine machine with unit again The sum of equipment cost, the unit obtained in mine machine service duration calculate power cost.
Optionally, the default network construction cost value is preset value.
It is noted that optional, the default network construction cost value of input node input is to be manually entered;It is optional , input node is based on big data and calculates the default network construction cost value of solution acquisition;Optionally, input node is default to provide The particular server of network construction cost value.
In fact, as the raising of mine machine production capacity, mine machine unit calculate the reduction of power cost or the raising of mine machine performance, unit The equipment cost and power consumption cost for calculating power mine machine will all reduce, correspondingly, in the case where default network construction cost is constant, In fact, it is the correspondingly benign promotion with technology development that the whole network, which calculates power,.Simultaneously as the depreciation of mine machine is consumed, can also make It obtains the whole network miners and the replacement spontaneously is updated to mine machine.Correspondingly, the reasonability performance boost of mine machine and being set in the whole network Standby quantity increases, as long as whole corresponding default network construction cost and current force value of calculating match, stimulation level is kept It is constant.
Optionally, in the present embodiment, the cost comparison module 400, further includes:
First exciting unit, for improving when the equivalent cost of investment is less than the default network construction cost value The stimulation level;
Second exciting unit, for reducing when the equivalent cost of investment is greater than the default network construction cost value The stimulation level.
Optionally, in another embodiment, the stimulation level includes: reference excitation, positive incentive, negative incentive;Institute Positive incentive is stated higher than the reference excitation, the negative incentive is lower than the reference excitation;The cost comparison module 400, Further include:
Third exciting unit, when the equivalent cost of investment matches with the default network construction cost value, setting It is motivated on the basis of the stimulation level;
4th exciting unit, when the equivalent cost of investment is less than the default network construction cost value, described in setting Stimulation level is positive incentive;
5th exciting unit, when the equivalent cost of investment is greater than the default network construction cost value, described in setting Stimulation level is negative incentive.
It is noted that reference excitation, positive incentive, negative incentive also can according to need and set.
It is noted that stimulation level has intelligent contract to write completion, and block chain network can in optional case The adjustment rule for running the stimulation level in intelligent contract is adjusted stimulation level;And the modification of intelligent contract needs block A certain number of node agreements can just modify in chain network.For example, block chain network can will be motivated according to intelligent contract The numerical value of excitation, positive incentive, negative incentive, and three are write such as intelligent contract on the basis of level modulation;And for The modification of three's data then needs the one third or half or 2/3rds in block chain network or more node that could modify.
Optionally, the system also includes: module 500 is provided in excitation, for according to the stimulation level, to absence from work without reason node Send this block chain network token of the first quantity.
Optionally, energisation mode includes but is not limited to: token, voucher token, franc.It is noted that in this implementation In, it is to calculate power common recognition based on the block chain network for calculating power common recognition and need payment incentive to absence from work without reason, it is specific to calculate power common recognition method simultaneously It does not limit.
It is noted that the present invention does not limit the execution period of this method, number;Optionally, this method can determine Phase executes;Optionally, this method can be executed irregularly;Optionally, this method can execute in real time;Optionally, this method can To be executed using day, week, the moon, year as the period.Preferably, the period for executing this method is three months.
Optionally, the system also includes: excitation regulation starting module 100, in response to scheduled excitation regulation when Between arrive, generate excitation regulation and control instruction;The excitation regulation and control instruction is for initiating this excitation regulation operation.
Optionally, this block chain network defends other people attacks can be by controlling the calculation power scale of this block chain network come pre- It is anti-;Optionally, this block chain network defends other people to attack, and can be punished by legislation.
Optionally, the default network construction cost value and this block chain network defence third party attack calculation power attack at Originally match.
Optionally, the system also includes:
It calculates power and attacks monitoring module, in response to this block chain network, by power attack is calculated, power attack hair will to be calculated It send to network management monitor node.
Optionally, correlation is calculated into power attack time and transfers judicial authority, to punish related criminal.
The preferred embodiment of the present invention has been described in detail above.It should be appreciated that those skilled in the art without It needs creative work according to the present invention can conceive and makes many modifications and variations.Therefore, all technologies in the art Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea Technical solution, all should be within the scope of protection determined by the claims.

Claims (10)

1. a kind of excitation regulator control system based on the control of block chain network the whole network construction cost, which is characterized in that the system packet It includes:
It calculates power and obtains module, for obtaining the current calculation force value of this block chain network;
Equivalent cost obtains module, the investment for according to the current calculation force value, obtaining described block chain network it is equivalent at This;Wherein, cost needed for the equivalent cost of investment refers to the block chain network of current time node establishment same size;
Cost comparison module, for putting into equivalent cost compared with default network construction cost value for described;If described investment etc. It imitates cost and the default network construction cost value mismatches, then adjust the stimulation level of described block chain network so that described Equivalent cost is put into match with the default network construction cost value.
2. a kind of excitation regulator control system based on the control of block chain network the whole network construction cost as described in claim 1, special Sign is that the equivalent cost obtains module and includes:
Data capture unit obtains the specific equivalent cost that current one calculates force value for obtaining the current calculation force value;
Equivalent cost acquiring unit, for according to the current product for calculating force value and the specific equivalent cost, described in acquisition The equivalent cost of the investment of this block chain network.
3. a kind of excitation regulator control system based on the control of block chain network the whole network construction cost as described in claim 1, special Sign is that the equivalent cost of investment includes equivalent infrastructure device cost and/or the equivalent power consumption cost of the whole network.
4. a kind of excitation regulator control system based on the control of block chain network the whole network construction cost as described in claim 1, special Sign is that the default network construction cost value is preset value.
5. a kind of excitation regulator control system based on the control of block chain network the whole network construction cost as described in claim 1, special Sign is, the cost comparison module, further includes:
First exciting unit is used for when the equivalent cost of investment is less than the default network construction cost value, described in raising Stimulation level;
Second exciting unit is used for when the equivalent cost of investment is greater than the default network construction cost value, described in reduction Stimulation level.
6. a kind of excitation regulator control system based on the control of block chain network the whole network construction cost as described in claim 1, special Sign is that the stimulation level includes: reference excitation, positive incentive, negative incentive;The positive incentive swashs higher than the benchmark It encourages, the negative incentive is lower than the reference excitation;The cost comparison module, further includes:
Third exciting unit, when the equivalent cost of investment matches with the default network construction cost value, described in setting It is motivated on the basis of stimulation level;
4th exciting unit sets the excitation when the equivalent cost of investment is less than the default network construction cost value Level is positive incentive;
5th exciting unit sets the excitation when the equivalent cost of investment is greater than the default network construction cost value Level is negative incentive.
7. a kind of excitation regulator control system based on the control of block chain network the whole network construction cost as described in claim 1, special Sign is, the system also includes:
Module is provided in excitation, for sending this block chain network of the first quantity to absence from work without reason node according to the stimulation level token。
8. a kind of excitation regulator control system based on the control of block chain network the whole network construction cost as described in claim 1, special Sign is, the system also includes:
Excitation regulation starting module generates excitation regulation and control instruction for arriving in response to the scheduled excitation regulation time;It is described to swash Regulation and control instruction is encouraged for initiating this excitation regulation operation.
9. a kind of excitation regulator control system based on the control of block chain network the whole network construction cost as described in claim 1, special Sign is, the calculation power intrusion scene phase of the default network construction cost value and this block chain network defence third party attack Match.
10. a kind of excitation regulator control system based on the control of block chain network the whole network construction cost as described in claim 1, special Sign is, the system also includes:
It calculates power and attacks monitoring module, in response to this block chain network, by power attack is calculated, power attack will be calculated and be sent to Network management monitor node.
CN201811539167.XA 2018-12-17 2018-12-17 A kind of excitation regulator control system based on the control of block chain network the whole network construction cost Withdrawn CN109670701A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811539167.XA CN109670701A (en) 2018-12-17 2018-12-17 A kind of excitation regulator control system based on the control of block chain network the whole network construction cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811539167.XA CN109670701A (en) 2018-12-17 2018-12-17 A kind of excitation regulator control system based on the control of block chain network the whole network construction cost

Publications (1)

Publication Number Publication Date
CN109670701A true CN109670701A (en) 2019-04-23

Family

ID=66144478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811539167.XA Withdrawn CN109670701A (en) 2018-12-17 2018-12-17 A kind of excitation regulator control system based on the control of block chain network the whole network construction cost

Country Status (1)

Country Link
CN (1) CN109670701A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109687971A (en) * 2018-12-17 2019-04-26 莆田市烛火信息技术有限公司 A kind of excitation regulation method based on the control of block chain network the whole network construction cost
CN110191132A (en) * 2019-06-03 2019-08-30 陈迦琳 A kind of block chain finance big data processing system and method
CN111641617A (en) * 2020-05-19 2020-09-08 全链通有限公司 Processing method, device and storage medium for accounting right in block chain network
CN111654492A (en) * 2020-06-01 2020-09-11 中国联合网络通信集团有限公司 Method and device for preventing block chain attack

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109687971A (en) * 2018-12-17 2019-04-26 莆田市烛火信息技术有限公司 A kind of excitation regulation method based on the control of block chain network the whole network construction cost

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109687971A (en) * 2018-12-17 2019-04-26 莆田市烛火信息技术有限公司 A kind of excitation regulation method based on the control of block chain network the whole network construction cost

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109687971A (en) * 2018-12-17 2019-04-26 莆田市烛火信息技术有限公司 A kind of excitation regulation method based on the control of block chain network the whole network construction cost
CN110191132A (en) * 2019-06-03 2019-08-30 陈迦琳 A kind of block chain finance big data processing system and method
CN110191132B (en) * 2019-06-03 2020-09-08 链博(成都)科技有限公司 Block chain financial big data processing system and method
CN111641617A (en) * 2020-05-19 2020-09-08 全链通有限公司 Processing method, device and storage medium for accounting right in block chain network
CN111641617B (en) * 2020-05-19 2022-10-21 全链通有限公司 Processing method, device and storage medium for accounting right in block chain network
CN111654492A (en) * 2020-06-01 2020-09-11 中国联合网络通信集团有限公司 Method and device for preventing block chain attack
CN111654492B (en) * 2020-06-01 2022-04-26 中国联合网络通信集团有限公司 Method and device for preventing block chain attack

Similar Documents

Publication Publication Date Title
CN109670701A (en) A kind of excitation regulator control system based on the control of block chain network the whole network construction cost
Lin et al. Optimal charging control of energy storage and electric vehicle of an individual in the internet of energy with energy trading
Exizidis et al. Incentive-compatibility in a two-stage stochastic electricity market with high wind power penetration
Arroyo et al. Modeling of start-up and shut-down power trajectories of thermal units
US12015275B2 (en) Hybrid power plant
Salah et al. Portfolio design of a demand response aggregator with satisficing consumers
JP2021106027A (en) Power management device, power system, user device, power management method, and power management program
CN113609439B (en) Spot market clearing method and device considering clearing of power generation side with quotation proportion
CN112632842A (en) Trading harmony based power grid and building energy consumption trading matching method and system
CN112769641A (en) Block chaining computing power optimization scheduling method for intelligent data processing
Doorman et al. Analysis of generation investment under different market designs
Helseth et al. Nonconvex environmental constraints in hydropower scheduling
CN114498638A (en) Source network load storage coordination planning method and system considering source load bilateral uncertainty
CN114036825A (en) Collaborative optimization scheduling method, device, equipment and storage medium for multiple virtual power plants
CN109687971A (en) A kind of excitation regulation method based on the control of block chain network the whole network construction cost
CN109658076A (en) A kind of excitation regulator control system based on the block chain network for calculating power common recognition
CN109658077A (en) A kind of excitation regulation method based on the block chain network for calculating power common recognition
Montanari et al. Prosumers as aggregators in the dezent context of regenerative power production
CN109784533A (en) A kind of Regional Energy internet Optimal Configuration Method and system
CN112909932B (en) Peak-regulating type virtual power plant optimization method and terminal
Feng et al. Retail market pricing design in smart distribution networks considering wholesale market price uncertainty
Qin et al. Distributed storage investment in power networks
Anil et al. Credit Rating-Based Transactive Energy System With Uncertainties in Energy Behavior
Silvente et al. Reactive scheduling for the coordination of energy supply and demand management in microgrids
CN117217497B (en) Comprehensive energy management platform and comprehensive energy management method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190423

WW01 Invention patent application withdrawn after publication