CN109657953A - Grounding net of transformer substation digital management system - Google Patents

Grounding net of transformer substation digital management system Download PDF

Info

Publication number
CN109657953A
CN109657953A CN201811501634.XA CN201811501634A CN109657953A CN 109657953 A CN109657953 A CN 109657953A CN 201811501634 A CN201811501634 A CN 201811501634A CN 109657953 A CN109657953 A CN 109657953A
Authority
CN
China
Prior art keywords
grounded screen
information
management system
substation
corrosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811501634.XA
Other languages
Chinese (zh)
Inventor
明菊兰
胡家元
钱洲亥
沈晓明
祝郦伟
何毅帆
金东春
李治国
李延伟
柳森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YINENG ELECTRIC TECHNOLOGY Co Ltd HANGZHOU
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
YINENG ELECTRIC TECHNOLOGY Co Ltd HANGZHOU
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YINENG ELECTRIC TECHNOLOGY Co Ltd HANGZHOU, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical YINENG ELECTRIC TECHNOLOGY Co Ltd HANGZHOU
Priority to CN201811501634.XA priority Critical patent/CN109657953A/en
Publication of CN109657953A publication Critical patent/CN109657953A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of grounding net of transformer substation digital management systems.The present invention includes substation information management system, ground connection information management system, testing staff's information management system, corrosion diagnosis of grounding grid system and the big subsystem of Historical Monitoring information management system five, the subsystem establishes connection with remote database server, specified page is accessed by browser and uploads measurement data, and the quick calculating of corrosion diagnosis is completed by remote calculation server;The information management for realizing user to substation, grounded screen and testing staff is combined with server by client, it is grounded the corrosion diagnosis and historical data analysis of net, final information system management, digital management and the visualized management for realizing substation and grounded screen, the operating status of grounded screen is grasped comprehensively, it realizes and the duration of ground net corrosion state is tracked and predicted, provide critical data supporting and decision-making foundation for its life prediction.

Description

Grounding net of transformer substation digital management system
Technical field
The invention belongs to grounding net of transformer substation management domain, especially a kind of grounding net of transformer substation digital management system.
Background technique
Grounding net of transformer substation is maintenance power system security reliability service, ensures the root of operations staff and electrical equipment safety This guarantee and important measures.Galvanized steel ground grid is widely used in the substation in China, and the post-etching problem that puts into operation can also generate therewith. The related patents for being related to substation management in the past are most of all just for relevant device or related personnel, manage structure more It is single, it can only realize the monitoring and management of individual equipment;Remaining patent for being related to management method only only exists written again On description, can not determine and actually implement effect.Therefore the digital management of grounding net of transformer substation lies substantially in blank at present State lacks corresponding theoretical and platform and realizes scientific management, ground net corrosion condition diagnosing each time is caused to be intended only as Isolated data saves, and can not be formed to a long-term follow of grounded screen operating status and assessment, virtually result in resource Waste.This brings many inconvenience to the management of grounding net of transformer substation, while also bringing hidden danger to its safe and stable operation.
Summary of the invention
It is an object of the invention to for have a single function existing for existing grounding net of transformer substation information system management, interactivity compared with The problems such as weak, provides a kind of grounding net of transformer substation digital management system, can easily manage different zones, no by the system With the various ground connection pessimistic concurrency controls of substation, make administrator and user can be realized relevant information batch import, inquiry, modification, Increase, delete, functions, the information exchange such as export are more convenient in batches.
To achieve the above object, The technical solution adopted by the invention is as follows: grounding net of transformer substation digital management system, Including substation information management system, ground connection information management system, testing staff's information management system, corrosion diagnosis of grounding grid System and the big subsystem of Historical Monitoring information management system five, the substation information management system is for realizing substation's letter The record of breath and management, record and management of the ground connection information management system for realizing grounded screen information are described Testing staff's information management system for realizing testing staff's information management, the corrosion diagnosis of grounding grid system for realizing Corrosion diagnosis of grounding grid and result feedback, the Historical Monitoring information management system is for realizing grounded screen Historical Monitoring data Management and historical data analysis;
Substation information management system is directly managed the grounded screen of substation and testing staff's information;Grounded screen is rotten Diagnostic system is lost dependent on ground connection information management system, the ground connection pessimistic concurrency control only inputted in ground connection information management system It just can be carried out corrosion diagnosis;Historical Monitoring information management system is by grounded screen information, corrosion diagnosis information and testing staff's information Summarize, these comprehensive information carry out life prediction to grounded screen according to history detection data;
The subsystem establishes connection with remote database server, accesses specified page by browser and uploads measurement Data are completed the quick calculating of corrosion diagnosis by remote calculation server;
The information management for realizing user to substation, grounded screen and testing staff is combined with server by client, It is grounded the corrosion diagnosis and historical data analysis of net, the final information system management for realizing substation and grounded screen, digitlization Management and visualized management, provide support for the tracking and prediction of grounded screen state.
The novelty of the present invention is the relevant informations such as high integration substation, grounded screen, operating personnel, and by they Close connects, and provides the management system and management platform of a set of science, finally realizes to grounded screen operating status A long-term follow and assessment, greatly saved resource, improved work efficiency.
Supplement as above-mentioned technical proposal, each subsystem be subdivided into client application module, user log-in block, Server processing module and remote communication module, user log-in block realizes the verifying of user login information, according to different verifyings Information assigns different administrative staff's difference administration authorities;Remote communication module mainly realizes instant messaging;Client application module Realize user to the management of various information and ground terminal corrosion diagnosis and life prediction;Server processing module is mainly realized and is examined The online cloud computing of disconnected information and the management and storage of each database.
Supplement as above-mentioned technical proposal, the substation information management system include:
1) substation's specifying information includes power transformation station name, building time, site, voltage class, area type, affiliated list Position, remarks and drawing;
2) operation object is divided into domestic consumer's group and management user group, and management user group assigns whole permissions, ordinary user Group assigning unit fraction limit;
3) substation's relevant information is with importing in batches, inquiry, modification, increase, deletion and batch the Export Option;
The workflow of substation information management system is as follows: can be real after user enters substation information management system The inquiry and typing of existing substation information;The substation that inquiry there can be same alike result according to input information inquiry is clicked, if There is no qualified substations to be then shown as empty;Otherwise all qualified substations of display, click the power transformation of display Standing can modify to the substation information, deletes or export;Clicking typing can select to be manually entered information or fast Fast import information.
Supplement as above-mentioned technical proposal, the ground connection information management system include:
1) grounded screen specifying information includes ground connection pessimistic concurrency control, model name, lateral number of nodes, longitudinal number of nodes, total node Number, circuitry number, depth, grounding body quantity and remarks;
2) operation object is divided into domestic consumer's group and management user group, and management user group assigns whole permissions, ordinary user Group assigning unit fraction limit;
3) grounded screen relevant information have ground connection pessimistic concurrency control import, inquiry, modification, increase, delete and the Export Option;
The workflow for being grounded information management system is as follows: can look into after user enters ground connection information management system It askes and typing grounded screen information;Select input grounded screen information can then select to be automatically imported or be manually entered by prompt;Choosing All grounded screens inputted under substation can then be retrieved by selecting inquiry grounded screen information, be prompted again if search result is sky Input;Relevant grounded screen is selected, relative parameters setting can be edited, deleted and be exported or carried out to its information.
Supplement as above-mentioned technical proposal, testing staff's information management system include:
1) grounded screen testing staff specifying information includes ID number, name, gender, affiliated unit, professional level and telephone number;
2) operation object is divided into domestic consumer's group and management user group, and management user group assigns whole permissions, ordinary user Group assigning unit fraction limit;
3) there is batch to import, inquire, modification, increase, delete for grounded screen testing staff relevant information and batch exports choosing ?;
The workflow of testing staff's information management system is as follows: energy after user enters testing staff's information management system Enough realize the inquiry and addition of testing staff's information;It clicks inquiry and needs to input name or affiliated unit, meet if it does not exist The personnel of condition are then shown as empty;Otherwise all qualified testing staff of display, click the testing staff of display, can modify Or delete its information;Grounded screen testing staff's information can then be increased by clicking addition.
Supplement as above-mentioned technical proposal, the corrosion diagnosis of grounding grid system include:
1) condition diagnosing: client sends computation requests, determines computing object and calculation, and server calls a accordingly Personal data library corresponding data and calculation procedure are completed to calculate analysis;It is calculated by the grounded screen impedance inverse problem based on polymorphic approximate solution Method is made accurately diagnosis to the corrosion diagnosis state of grounded screen and is calculated, and obtained result both can be used as grounded screen single evaluation Foundation, can also store grounding net of transformer substation digital management system, and accumulation is repeatedly used as the life prediction foundation of grounded screen;
2) result is fed back: calculated result is returned to client by server, and client draws table and figure according to calculated result Shape realizes that the pictorialization of diagnostic result is shown, Real-time Feedback is calculated progress if calculating time length;Terminate basis in status assessment Ground net corrosion degree encloses corresponding diagnosis and treatment advice;
The workflow of corrosion diagnosis of grounding grid system is as follows: defeated first after user enters corrosion diagnosis of grounding grid system Enter the grounded screen that substation information selection needs to diagnose, then relevant parameter is set start diagnosis calculating, is taken if result convergence Device calling related data of being engaged in generates diagnosis report;Mistake is returned if result does not restrain and prompts to reset parameter.
Supplement as above-mentioned technical proposal, the Historical Monitoring information management system include:
1) grounded screen Historical Monitoring data include measuring station title, detection grounded screen title and its model, inspector, detection Time, the mode of connection, Injection Current, test result and remark information;
2) there is batch to import, inquiry, modify, increase, deleting for grounded screen Historical Monitoring relevant information, batch export is selected ?;
3) the grounded screen model library and its Historical Monitoring information of input management system are remembered according to corresponding algorithm and program Record carries out historical data analysis, predicts its working condition and life expectancy, generates analysis result information;
The workflow of Historical Monitoring information management system is as follows: energy after user enters Historical Monitoring information management system Enough to browse Historical Monitoring information below the page, Historical Monitoring information temporally Page sorting, what is monitored recently comes first page; In addition to this power transformation station name and testing staff can also be inputted with query history monitoring information, for clear in webpage upper end as needed The grounded screen Historical Monitoring information look at or inquired, edit-modify, which may be selected, in user to carry out big data calculating by server Analysis generates assessment report.
The specific embodiment of supplement as above-mentioned technical proposal, grounded screen life prediction is as follows:
A) overall evaluation system of grounded screen health status is established
The heavy corrosion, slight erosion and conducting situation for comprehensively considering grounded screen, form the evaluation of estimate of extent of corrosion:
H in formula1=5, h2=1.5;
B) for each grounded screen, independent health account is established
To integrate corrosion index as foundation, the corrosion tendency of grounded screen is judged, grounded screen apparent for corrosion tendency, It should reinforce carrying out corrosion diagnosis work, shorten detection cycle;Grounded screen slow for corrosion rate properly increases maintenance year Limit guarantees that grounded screen diagnostic work is shot the arrow at the target;
C) fact basis is provided for the life appraisal of grounded screen using health account
In conjunction with grounded screen performance indicator and health status, the threshold value of grounded screen health index is determined;Pass through analysis grounding net State influence factor, establish the assessment models of remaining life, predict the operation time limit of each grounded screen, instruct grounded screen detection and Retrofit work.
Supplement as above-mentioned technical proposal is grounded net corrosion diagnosis by corrosion diagnosis of grounding grid system, service Device runs corresponding program and carries out status assessment to grounded screen, under estimation flow:
User carries out fault diagnosis, the grounded screen testing number that server calls user uploads to grounded screen in client request Grounded screen state is calculated according to by corresponding program;By diagnostic result archive management after diagnostic program end of run, number is then called Status assessment is carried out to diagnosed grounded screen according to library grounded screen evaluation criterion combination diagnosis of program result, ultimately generates assessment report It accuses.
Supplement as above-mentioned technical proposal, to enable users to more intuitively understand ground connection Running State, user is optional It selects and it is as follows to be particularly shown process: server calls, which are surveyed, is shown to the grounded screen progress diagnostic result pictorialization for having diagnosed completion Data and grounded screen drawing and model are measured, according to diagnostic result, by circuitry number, design resistance value, diagnosis resistance value and corrosion journey Degree is shown in a tabular form;Grounded screen depth and topology data are called, using electrical impedance imaging algorithm for inversion, based on diagnosis knot Fruit drawing three-dimensional image carries out three-dimensional result to grounded screen branch and shows, is finally reached concrete image and understands grounded screen state Purpose.
It is may be implemented through the invention to substation information, grounded screen information, the digitlization of tester's information, visualization Management strengthens the interactivity of more aspect, understands and processing relevant information in time convenient for administrative staff, greatly reduces work Amount reduces grounded screen crash analysis, processing and feeds back the required time, reduces human resources consumption, improve working efficiency.This hair Bright that each related counties and districts kiowatt is enable quickly to receive grounded screen accident information at the first time, timely establishment officer carries out at scene Reason;City-level power supply company administrative staff can in time, quickly, easily obtain the related grounded screen accident of Digitalized management platform Information is handled, can effectively promote the completion rate of accident treatment, present system puts into operation, can promote related ground net thing Therefore processing completion rate at least 80% or more.
Compared with prior art, the device have the advantages that are as follows: (1) realize substation and grounded screen message digit Change, visualized management and immediate inquiring, editor etc.;(2) grounding net of transformer substation information is integrated, realizes substation grounding The real-time query of net information, greatly improves working efficiency;(3) it realizes online query and edits the function of patrol record, Grasp grounded screen situation immediately convenient for administrative staff to formulate optimal patrol plan;(4) it is assigned using the mode of debarkation authentication The corresponding permission of different personnel is given, system is safer;(5) by server combined with client in the way of, Ke Yishi Present line corrosion diagnosis of grounding grid calculates, and Real-time Feedback calculated result;(6) grounded screen history detection recording integrating is got up, The functions such as grounded screen life prediction and prediction of working condition may be implemented by corresponding algorithm.
Detailed description of the invention
Fig. 1 is grounding net of transformer substation digital management system of the present invention composition figure;
Fig. 2 is the work flow diagram of substation information management system of the present invention;
Fig. 3 is the work flow diagram of present invention ground connection information management system;
Fig. 4 is the work flow diagram of testing staff's information management system of the present invention;
Fig. 5 is the work flow diagram of corrosion diagnosis of grounding grid system of the present invention;
Fig. 6 is the work flow diagram of Historical Monitoring information management system of the present invention;
Fig. 7 is the big subsystem connection figure of the present invention five;
Fig. 8 is grounded screen state estimation flow figure of the present invention;
Fig. 9 is diagnostic result pictorialization flow for displaying figure of the present invention;
Figure 10 is use case map of the present invention.
Specific embodiment
To make those of ordinary skill in the art fully understand technical solution of the present invention and beneficial effect, below in conjunction with specific Examples and drawings are further described, but following implementations do not constitute any restriction to the present invention.
In order to which the etch state to grounded screen is effectively diagnosed, while long-term tracking is carried out to the performance of grounded screen And effective assessment prediction, the present invention propose the three-dimensional imaging and digital management assessment system of a set of grounding net of transformer substation, this hair Bright innovation is substation information, grounded screen information and operating personnel's information high integration strengthening substation's phase Close the close ties of information.And the management system, management method and management platform of a set of science are provided for these information, make They are progressive and interrelated, and staff is made to be able to achieve the overall monitor to substation information, timely feedback problem, pole It is big to improve working efficiency.The system can intuitively reflect the etch state of grounded screen;Simultaneously by grounded screen information and its corruption It loses diagnostic message and carries out digital management, grasp the operating status of grounded screen comprehensively, realization continues ground net corrosion state Property tracking and prediction, provide critical data supporting and decision-making foundation for its life prediction.
A kind of grounding net of transformer substation digital management system as shown in Figure 1, including substation information management system, ground connection Information management system, testing staff's information management system, corrosion diagnosis of grounding grid system and Historical Monitoring information management system Deng five big subsystems.
Substation information management system mainly realizes record and the management of substation information, and particular content is as follows:
1) substation's specifying information includes power transformation station name, building time, site, voltage class, and area type is described Office, remarks and drawing etc.;
2) operation object is divided into domestic consumer's group and management user group, and management user group assigns whole permissions, ordinary user Group assigning unit fraction limit;
3) options such as substation's relevant information should have batch to import, inquire, modification, increases, deletes, batch exports.
The workflow of substation information management system such as Fig. 2, can after user enters substation information management system Realize the inquiry and typing of substation information.The substation that inquiry there can be same alike result according to input information inquiry is clicked, Qualified substation is then shown as empty if it does not exist;Otherwise all qualified substations of display, click the change of display Power station can modify to the substation information, delete or export;Click typing can select to be manually entered information or Quickly introduce information.
Ground connection information management system is mainly grounded record and the management of net information, and particular content is as follows:
1) grounded screen specifying information includes ground connection pessimistic concurrency control, model name, lateral number of nodes, longitudinal number of nodes, total node Number, circuitry number, depth, grounding body quantity, remarks etc.;
2) operation object is divided into domestic consumer's group and management user group, and management user group assigns whole permissions, ordinary user Group assigning unit fraction limit;
3) grounded screen relevant information should have ground connection pessimistic concurrency control import, inquiry, modification, increase, delete, export etc. options.
It is grounded workflow such as Fig. 3 of information management system, it can after user enters ground connection information management system Inquiry and typing grounded screen information.Select input grounded screen information can then select to be automatically imported or be manually entered by prompt; Selection inquiry grounded screen information can then retrieve all grounded screens under input substation, prompt weight if search result is sky New input;Relevant grounded screen is selected, relative parameters setting can be edited, deleted and be exported or carried out to its information.
Testing staff's information management system mainly realizes the information management of testing staff's information, and particular content is as follows:
1) grounded screen testing staff specifying information includes ID number, name, gender, affiliated unit, professional level and telephone number;
2) operation object is divided into domestic consumer's group and management user group, and management user group assigns whole permissions, ordinary user Group assigning unit fraction limit;
3) choosings such as there is batch to import, inquire, modification, increase, delete for grounded screen testing staff relevant information, batch exports ?.
Workflow such as Fig. 4 of grounded screen testing staff's information management system, when user enters testing staff's information management It can be realized the inquiry and addition of testing staff's information after system.It clicks inquiry and needs to input name or affiliated unit, if not There are qualified personnel to be then shown as empty;Otherwise all qualified testing staff of display, click the detection people of display Member, can modify or delete its information;Grounded screen testing staff's information can then be increased by clicking addition, wherein name, unit and electricity Words are Mandatory fields.
Corrosion diagnosis of grounding grid system mainly realizes that particular content is such as to corrosion diagnosis and the result feedback of grounded screen Under:
1) condition diagnosing: client sends computation requests, determines computing object and calculation, and server calls a accordingly Personal data library corresponding data and calculation procedure are completed to calculate analysis.Diagnosis calculating is the core function of whole system, it is connection The bridge of system and device data and system software result.It is docked by the grounded screen impedance inverse problem algorithm based on polymorphic approximate solution The corrosion diagnosis state of earth mat is made accurately diagnosis and is calculated, and obtained result both can be used as the foundation of grounded screen single evaluation, Grounded screen digital management system can also be stored, accumulation is repeatedly used as the life prediction foundation of grounded screen.
2) result is fed back: calculated result is returned to client by cloud computing by server, and client is drawn according to calculated result The pictorialization of tabulation lattice and image hotpoint diagnostic result is shown, Real-time Feedback is calculated progress if calculating time length.It is commented in state End is estimated according to ground net corrosion degree, encloses corresponding diagnosis and treatment advice.
The workflow of corrosion diagnosis of grounding grid system such as Fig. 5, after user enters corrosion diagnosis of grounding grid system first The grounded screen that input substation information selection needs to diagnose, then setting relevant parameter starts to diagnose and calculate, if result convergence Server calls related data generates diagnosis report.Mistake is returned if result does not restrain and prompts to reset parameter.
Grounded screen Historical Monitoring information management system is mainly grounded the data management of net Historical Monitoring and historical data point Analysis, particular content are as follows:
1) grounded screen monitoring data specifically include detection station name, detect grounded screen title and its model, inspector, detection Time, the mode of connection, Injection Current, test result and remark information etc.;
2) choosings such as there is batch to import, inquire, modification, increase, delete for grounded screen Historical Monitoring relevant information, batch exports ?;
3) the grounded screen model library and its Historical Monitoring information of input management system are remembered according to corresponding algorithm and program Record carries out historical data analysis, predicts its working condition and life expectancy, generates analysis result information.
Grounded screen life prediction specific embodiment is as follows:
A) overall evaluation system of grounded screen health status is established.
The heavy corrosion, slight erosion and conducting situation for comprehensively considering grounded screen, form the evaluation of estimate of extent of corrosion:
H1=5 in formula, h2=1.5.
B) for each grounded screen, independent health account is established.
To integrate corrosion index as foundation, the corrosion tendency of grounded screen is judged, to be significantly grounded for corrosion tendency Net should be reinforced carrying out corrosion diagnosis work, shorten detection cycle;Grounded screen slow for corrosion rate, can suitably mention The height maintenance time limit, guarantees that grounded screen diagnostic work is shot the arrow at the target.
C) fact basis can be provided for the life appraisal of grounded screen using health account.
In conjunction with grounded screen performance indicator and health status, the threshold value of grounded screen health index is determined.Pass through analysis grounding net State influence factor, establish the assessment models of remaining life, predict the operation time limit of each grounded screen, instruct grounded screen detection and Retrofit work.
Historical Monitoring information management system specific workflow such as Fig. 6, when user enters Historical Monitoring information management system After can browse Historical Monitoring information below the page, Historical Monitoring information temporally Page sorting, that detects recently comes One page;Power transformation station name and testing staff can also be inputted in webpage upper end as needed with query history monitoring information in addition to this, For the grounded screen Historical Monitoring information for browsing or inquiring, edit-modify, which may be selected, in user can also carry out counting greatly by server It is analyzed according to calculating, generates assessment report.
The big subsystem of the five of grounding net of transformer substation Digitalized management platform is to interdepend, complementary.Their pass System such as Fig. 7.The management of grounded screen and testing staff is divided by substation, i.e., can be straight from substation information management system It connects and the grounded screen and testing staff's information of the substation is managed.And corrosion diagnosis of grounding grid system is believed dependent on grounded screen Management system is ceased, the ground connection pessimistic concurrency control only inputted in ground connection information management system could carry out corrosion diagnosis.Final Grounded screen Historical Monitoring information management system is then that grounded screen information, corrosion diagnosis information, testing staff's information summarize, comprehensive These information can carry out life prediction to grounded screen according to history detection data.
User can by substation information management system inquire power transformation station name, building time, site, voltage class, Area type, the office, remarks and drawing etc., and the differences such as editor, importing, export can be achieved according to the difference for being endowed permission Operation;By be grounded information management system can inquire and editing authority in ground connection pessimistic concurrency control and grounded screen drawing;Pass through Testing staff's information management system can assign its corresponding management permission with typing and modification testing staff's information, administrator;It is logical It crosses corrosion diagnosis of grounding grid system and is grounded net corrosion diagnosis, server runs corresponding program and comments grounded screen progress state Estimate, estimation flow such as Fig. 8.
User carries out fault diagnosis, the grounded screen testing number that server calls user uploads to grounded screen in client request Grounded screen state is calculated according to by corresponding program.By diagnostic result archive management after diagnostic program end of run, number is then called Status assessment is carried out to diagnosed grounded screen according to library grounded screen evaluation criterion combination diagnosis of program result, ultimately generates assessment report It accuses.In order to enable users to be understood more intuitively ground connection Running State, user may be selected to diagnosed the grounded screen of completion into Row diagnostic result pictorialization is shown, is particularly shown process such as Fig. 9.Server calls measurement data (electric current, voltage, resistance etc.) and Circuitry number is designed resistance value according to diagnostic result, diagnoses resistance value, extent of corrosion is with table shape by grounded screen drawing and model Formula is shown;Grounded screen depth and topology data are called, using electrical impedance imaging algorithm for inversion, is based on diagnostic result drawing three-dimensional Image carries out three-dimensional result to grounded screen branch and shows, is finally reached the purpose that concrete image understands grounded screen state.
Each subsystem can be subdivided into client application module, user log-in block again, and server processing module remotely leads to Interrogate module etc..User log-in block can be realized the verifying of user login information, assign different management according to different verification informations Personnel's difference administration authority, remote communication module mainly realize instant messaging.Client application module assigns user to various letters Breath is managed and ground terminal corrosion diagnosis and the function of life prediction.Last server processing module is then mainly realized and is examined The online cloud computing of disconnected information and the management and storage of each database.
Grounding net of transformer substation digital management system operating method is discussed in detail with the use case map of Figure 10 below.It uses When, operator, which passes through login authentication module first and enters mobile terminal, (may be designed as password, fingerprint, face, password identification etc. Login mode), then user can carry out the behaviour such as data acquisition, data management, data analysis, communication management and status assessment Make.Acquired by data, user acquire corresponding data, increase newly ground connection pessimistic concurrency control, and grounded screen information can be imported, on It passes, editor's preview;By data management, user can be to grounded screen information, testing staff's information and history in individual database Monitoring information such as is inquired and is edited at the operation;It is analyzed by data, user can analyze the generation of grounded screen history detection data Analysis report predicts the grounded screen service life;By status assessment, user can submit ground connection pessimistic concurrency control and related test parameters and survey Information upload server is tried, server operation dependent diagnostic and appraisal procedure carry out working state evaluation to grounded screen and ultimately generate Corresponding assessment report provides corresponding suggestion according to ground net corrosion degree.

Claims (10)

1. grounding net of transformer substation digital management system, which is characterized in that including substation information management system, grounded screen information The big son of management system, testing staff's information management system, corrosion diagnosis of grounding grid system and Historical Monitoring information management system five System, record and management of the substation information management system for realizing substation information, the grounded screen information Record and management of the management system for realizing grounded screen information, testing staff's information management system is for realizing detection Personnel information management, the corrosion diagnosis of grounding grid system is fed back for realizing corrosion diagnosis of grounding grid and result, described Historical Monitoring information management system is for realizing the data management of grounded screen Historical Monitoring and historical data analysis;
Substation information management system is directly managed the grounded screen of substation and testing staff's information;Ground net corrosion is examined Disconnected system is dependent on ground connection information management system, the ground connection pessimistic concurrency control ability only inputted in being grounded information management system Carry out corrosion diagnosis;Historical Monitoring information management system summarizes grounded screen information, corrosion diagnosis information and testing staff's information, These comprehensive information carry out life prediction to grounded screen according to history detection data;
The subsystem establishes connection with remote database server, accesses specified page by browser and uploads measurement number According to by the quick calculating of remote calculation server completion corrosion diagnosis;
The information management for realizing user to substation, grounded screen and testing staff is combined with server by client, is realized The corrosion diagnosis and historical data analysis of grounded screen, final information system management, the digital management for realizing substation and grounded screen And visualized management, support is provided for the tracking and prediction of grounded screen state.
2. grounding net of transformer substation digital management system according to claim 1, which is characterized in that each subsystem is again thin It is divided into client application module, user log-in block, server processing module and remote communication module, user log-in block is realized The verifying of user login information assigns different administrative staff's difference administration authorities according to different verification informations;Remote communication module It is main to realize instant messaging;Client application module realizes user to the management of various information and ground terminal corrosion diagnosis and longevity Life prediction;Server processing module mainly realizes the online cloud computing of diagnostic message and the management and storage of each database.
3. grounding net of transformer substation digital management system according to claim 1 or 2, which is characterized in that the power transformation Information management system of standing includes:
1) substation's specifying information include power transformation station name, building time, site, voltage class, area type, affiliated unit, Remarks and drawing;
2) operation object is divided into domestic consumer's group and management user group, and management user group assigns whole permissions, and domestic consumer's group is assigned Give part permission;
3) substation's relevant information is with importing in batches, inquiry, modification, increase, deletion and batch the Export Option;
The workflow of substation information management system is as follows: can be realized change after user enters substation information management system The inquiry and typing of power station information;The substation that inquiry there can be same alike result according to input information inquiry is clicked, if not depositing Then it is shown as empty in qualified substation;Otherwise all qualified substations of display, click substation's energy of display It is enough that the substation information is modified, deletes or exported;Clicking typing can select to be manually entered information or quickly lead Enter information.
4. grounding net of transformer substation digital management system according to claim 1 or 2, which is characterized in that the ground connection Information management system includes:
1) grounded screen specifying information includes ground connection pessimistic concurrency control, model name, lateral number of nodes, longitudinal number of nodes, total node number, branch Number, depth, grounding body quantity and remarks;
2) operation object is divided into domestic consumer's group and management user group, and management user group assigns whole permissions, and domestic consumer's group is assigned Give part permission;
3) grounded screen relevant information have ground connection pessimistic concurrency control import, inquiry, modification, increase, delete and the Export Option;
Be grounded information management system workflow it is as follows: when user enter ground connection information management system after can inquire and Typing grounded screen information;Select input grounded screen information can then select to be automatically imported or be manually entered by prompt;Selection is looked into All grounded screens inputted under substation can then be retrieved by asking grounded screen information, be prompted again if search result is sky defeated Enter;Relevant grounded screen is selected, relative parameters setting can be edited, deleted and be exported or carried out to its information.
5. grounding net of transformer substation digital management system according to claim 1 or 2, which is characterized in that the detection Personnel information management system includes:
1) grounded screen testing staff specifying information includes ID number, name, gender, affiliated unit, professional level and telephone number;
2) operation object is divided into domestic consumer's group and management user group, and management user group assigns whole permissions, and domestic consumer's group is assigned Give part permission;
3) grounded screen testing staff relevant information is with importing in batches, inquiry, modification, increase, deletion and batch the Export Option;
The workflow of testing staff's information management system is as follows: can be real after user enters testing staff's information management system The inquiry and addition of existing testing staff's information;It clicks inquiry and needs to input name or affiliated unit, it is eligible if it does not exist Personnel be then shown as empty;Otherwise all qualified testing staff of display, click the testing staff of display, can modify or delete Except its information;Grounded screen testing staff's information can then be increased by clicking addition.
6. grounding net of transformer substation digital management system according to claim 1 or 2, which is characterized in that the ground connection Net corrosion diagnosis system includes:
1) condition diagnosing: client sends computation requests, determines computing object and calculation, and server calls a number accordingly It completes to calculate analysis according to library corresponding data and calculation procedure;Pass through the grounded screen impedance inverse problem algorithm pair based on polymorphic approximate solution The corrosion diagnosis state of grounded screen make accurately diagnosis calculate, obtained result both can be used as grounded screen single evaluation according to According to grounding net of transformer substation digital management system can also be stored, accumulation is repeatedly used as the life prediction foundation of grounded screen;
2) result is fed back: calculated result is returned to client by server, and client draws table according to calculated result and figure is real The pictorialization of existing diagnostic result is shown, Real-time Feedback is calculated progress if calculating time length;Terminate in status assessment according to ground connection Net extent of corrosion encloses corresponding diagnosis and treatment advice;
The workflow of corrosion diagnosis of grounding grid system is as follows: input becomes first after user enters corrosion diagnosis of grounding grid system Then the grounded screen that power station information selection needs to diagnose is arranged relevant parameter and starts diagnosis calculating, the server if result convergence Related data is called to generate diagnosis report;Mistake is returned if result does not restrain and prompts to reset parameter.
7. grounding net of transformer substation digital management system according to claim 1 or 2, which is characterized in that the history Monitoring information management system includes:
1) when grounded screen Historical Monitoring data include measuring station title, detection grounded screen title and its model, inspector, detection Between, the mode of connection, Injection Current, test result and remark information;
2) there is batch to import, inquiry, modification, increase, delete, batch the Export Option for grounded screen Historical Monitoring relevant information;
3) according to corresponding algorithm and program grounded screen model library and its Historical Monitoring information to input management system record into Row historical data analysis predicts its working condition and life expectancy, generates analysis result information;
The workflow of Historical Monitoring information management system is as follows: can be after user enters Historical Monitoring information management system Browse Historical Monitoring information below the page, Historical Monitoring information temporally Page sorting, what is monitored recently comes first page;Except this Power transformation station name and testing staff can also be inputted in webpage upper end as needed with query history monitoring information outside, for browsing or The grounded screen Historical Monitoring information of person's inquiry, edit-modify may be selected in user can also carry out big data calculating point by server Analysis generates assessment report.
8. grounding net of transformer substation digital management system according to claim 7, which is characterized in that grounded screen life prediction Specific embodiment it is as follows:
A) overall evaluation system of grounded screen health status is established
The heavy corrosion, slight erosion and conducting situation for comprehensively considering grounded screen, form the evaluation of estimate of extent of corrosion:
H in formula1=5, h2=1.5;
B) for each grounded screen, independent health account is established
To integrate corrosion index as foundation, the corrosion tendency of grounded screen is judged, grounded screen apparent for corrosion tendency should Reinforce carrying out corrosion diagnosis work, shortens detection cycle;Grounded screen slow for corrosion rate, properly increases the maintenance time limit, Guarantee that grounded screen diagnostic work is shot the arrow at the target;
C) fact basis is provided for the life appraisal of grounded screen using health account
In conjunction with grounded screen performance indicator and health status, the threshold value of grounded screen health index is determined;Pass through the shape of analysis grounding net State influence factor establishes the assessment models of remaining life, predicts the operation time limit of each grounded screen, and grounded screen is instructed to detect and be transformed Work.
9. grounding net of transformer substation digital management system according to claim 6, which is characterized in that pass through ground net corrosion Realizing of the diagnosis system corrosion diagnosis of grounding grid, server runs corresponding program and carries out status assessment to grounded screen, under estimation flow: User carries out fault diagnosis to grounded screen in client request, and the grounded screen detection data that server calls user uploads passes through phase Program is answered to calculate grounded screen state;By diagnostic result archive management after diagnostic program end of run, database ground connection is then called Net evaluation criterion combination diagnosis of program result carries out status assessment to diagnosed grounded screen, ultimately generates assessment report.
10. grounding net of transformer substation digital management system according to claim 6, which is characterized in that enable users to more Ground connection Running State is intuitively understood, user may be selected aobvious to the grounded screen progress diagnostic result pictorialization for having diagnosed completion Show, it is as follows to be particularly shown process: server calls measurement data and grounded screen drawing and model, according to diagnostic result, by branch Number, design resistance value, diagnosis resistance value and extent of corrosion are shown in a tabular form;Call grounded screen depth and topological structure number According to, using electrical impedance imaging algorithm for inversion, it is based on diagnostic result drawing three-dimensional image, it is aobvious to grounded screen branch progress three-dimensional result Show, is finally reached the purpose that concrete image understands grounded screen state.
CN201811501634.XA 2018-12-10 2018-12-10 Grounding net of transformer substation digital management system Pending CN109657953A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811501634.XA CN109657953A (en) 2018-12-10 2018-12-10 Grounding net of transformer substation digital management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811501634.XA CN109657953A (en) 2018-12-10 2018-12-10 Grounding net of transformer substation digital management system

Publications (1)

Publication Number Publication Date
CN109657953A true CN109657953A (en) 2019-04-19

Family

ID=66113501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811501634.XA Pending CN109657953A (en) 2018-12-10 2018-12-10 Grounding net of transformer substation digital management system

Country Status (1)

Country Link
CN (1) CN109657953A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110930052A (en) * 2019-12-02 2020-03-27 国网山东省电力公司高密市供电公司 Method, system, equipment and readable storage medium for predicting failure rate of power transformation equipment
CN111400640A (en) * 2020-04-10 2020-07-10 中国铁塔股份有限公司 Station address holographic information management system, construction method and construction device
CN111597572A (en) * 2020-05-20 2020-08-28 贵州电网有限责任公司 Method and system for managing and consulting transformer substation drawing files
CN111983512A (en) * 2020-08-18 2020-11-24 广东电网有限责任公司梅州供电局 Line grounding device monitoring system and method
CN112415334A (en) * 2020-11-16 2021-02-26 国网上海市电力公司 Digital twin system of all-in-one station grounding system and modeling method
CN114880922A (en) * 2022-04-15 2022-08-09 大连理工大学 Civil aviation-oriented flight data analysis and performance trend prediction system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2391757C1 (en) * 2009-03-03 2010-06-10 Открытое акционерное общество "Инженерный центр энергетики Урала-УРАЛВНИПИЭНЕРГОПРОМ, Уралсельэнергопроект, УралТЭП, УралОРГРЭС, УралВТИ, Уралэнергосетьпроект, Челябэнергосетьпроект" Two-level grounding device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2391757C1 (en) * 2009-03-03 2010-06-10 Открытое акционерное общество "Инженерный центр энергетики Урала-УРАЛВНИПИЭНЕРГОПРОМ, Уралсельэнергопроект, УралТЭП, УралОРГРЭС, УралВТИ, Уралэнергосетьпроект, Челябэнергосетьпроект" Two-level grounding device

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴雄: "中大型变电站接地网故障智能诊断系统的研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
李小娟 等: "输电线路接地网地理信息管理系统设计", 《测绘与空间地理信息》 *
杨畅: "变电站接地网运行与管理系统的研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110930052A (en) * 2019-12-02 2020-03-27 国网山东省电力公司高密市供电公司 Method, system, equipment and readable storage medium for predicting failure rate of power transformation equipment
CN111400640A (en) * 2020-04-10 2020-07-10 中国铁塔股份有限公司 Station address holographic information management system, construction method and construction device
CN111400640B (en) * 2020-04-10 2023-09-22 中国铁塔股份有限公司 Site holographic information management system, construction method and construction device
CN111597572A (en) * 2020-05-20 2020-08-28 贵州电网有限责任公司 Method and system for managing and consulting transformer substation drawing files
CN111597572B (en) * 2020-05-20 2023-08-29 贵州电网有限责任公司 Substation drawing file data management and reference method and system
CN111983512A (en) * 2020-08-18 2020-11-24 广东电网有限责任公司梅州供电局 Line grounding device monitoring system and method
CN112415334A (en) * 2020-11-16 2021-02-26 国网上海市电力公司 Digital twin system of all-in-one station grounding system and modeling method
CN112415334B (en) * 2020-11-16 2023-01-31 国网上海市电力公司 Digital twin system of all-in-one station grounding system and modeling method
CN114880922A (en) * 2022-04-15 2022-08-09 大连理工大学 Civil aviation-oriented flight data analysis and performance trend prediction system

Similar Documents

Publication Publication Date Title
CN109657953A (en) Grounding net of transformer substation digital management system
CN112487046B (en) Power consumption information analysis method, device, system, computer equipment and storage medium
CN105629136B (en) Cable insulation status online auto monitoring and diagnostic system
CN207354333U (en) Instrument share management system based on cloud platform
CN105956672A (en) Power line inspection real-time monitoring management system
CN105337575B (en) Photovoltaic plant status predication and method for diagnosing faults and system
CN103198139B (en) The energy analysis method of custom power data
CN210222990U (en) On-line monitoring system for windproof stay wire of power transmission line
US20030078800A1 (en) Method and apparatus for the selection of a service provider
CN107256442B (en) Line loss calculation method based on mobile client
CN107622589A (en) A kind of instrument share management system and its implementation
CN207472305U (en) Power plant experimental monitor
CN106251034A (en) Wisdom energy saving electric meter monitoring system based on cloud computing technology
CN106022664A (en) Big data analysis based network intelligent power saving monitoring method
CN109962527B (en) Power distribution terminal fault recording system
CN113792963A (en) Farmland soil heavy metal pollution analysis early warning system
CN109670637A (en) Building energy consumption prediction technique, storage medium, device and system
CN114881808A (en) Electric power electricity stealing accurate identification method based on big data and electricity stealing prevention system
CN108767984A (en) A kind of traction institute earth mat intelligent monitoring device
CN108471165A (en) A kind of Electrical Safety for rail traffic station monitors system and method
CN109522615B (en) Method and device for evaluating zero-sequence inrush current tolerance of relay protection of power system
CN116777179A (en) Visual wisdom management system in laboratory
CN113052417A (en) Resource allocation method and device
CN207481674U (en) A kind of multifunctional intellectual charging pile and charging system
CN101950324A (en) River-health intelligent diagnosis method and equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419

RJ01 Rejection of invention patent application after publication