CN109657948A - Plot sponge urban construction performance comprehensive estimation method - Google Patents
Plot sponge urban construction performance comprehensive estimation method Download PDFInfo
- Publication number
- CN109657948A CN109657948A CN201811493460.7A CN201811493460A CN109657948A CN 109657948 A CN109657948 A CN 109657948A CN 201811493460 A CN201811493460 A CN 201811493460A CN 109657948 A CN109657948 A CN 109657948A
- Authority
- CN
- China
- Prior art keywords
- sponge
- plot
- facility
- item
- urban construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 122
- 238000000034 method Methods 0.000 title claims abstract description 29
- 230000033228 biological regulation Effects 0.000 claims abstract description 45
- 238000011156 evaluation Methods 0.000 claims abstract description 41
- 239000003344 environmental pollutant Substances 0.000 claims abstract description 13
- 231100000719 pollutant Toxicity 0.000 claims abstract description 13
- 238000013461 design Methods 0.000 claims description 52
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 48
- 238000007689 inspection Methods 0.000 claims description 42
- 238000004458 analytical method Methods 0.000 claims description 22
- 230000000694 effects Effects 0.000 claims description 21
- 238000005516 engineering process Methods 0.000 claims description 16
- 239000000463 material Substances 0.000 claims description 15
- 239000000178 monomer Substances 0.000 claims description 13
- 239000002689 soil Substances 0.000 claims description 10
- 241000196324 Embryophyta Species 0.000 claims description 9
- 238000012360 testing method Methods 0.000 claims description 9
- 238000012795 verification Methods 0.000 claims description 8
- 238000007726 management method Methods 0.000 claims description 7
- 238000013507 mapping Methods 0.000 claims description 7
- 238000012544 monitoring process Methods 0.000 claims description 7
- 238000005457 optimization Methods 0.000 claims description 7
- 244000025254 Cannabis sativa Species 0.000 claims description 6
- 238000001704 evaporation Methods 0.000 claims description 6
- 230000008020 evaporation Effects 0.000 claims description 6
- 230000008859 change Effects 0.000 claims description 5
- 230000008901 benefit Effects 0.000 claims description 4
- 230000001105 regulatory effect Effects 0.000 claims description 4
- 238000004088 simulation Methods 0.000 claims description 4
- 230000002411 adverse Effects 0.000 claims description 3
- 238000004364 calculation method Methods 0.000 claims description 3
- 230000001427 coherent effect Effects 0.000 claims description 3
- 230000001276 controlling effect Effects 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 3
- 230000003628 erosive effect Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 238000011835 investigation Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 230000014759 maintenance of location Effects 0.000 claims description 3
- 238000012806 monitoring device Methods 0.000 claims description 3
- 238000005192 partition Methods 0.000 claims description 3
- 230000000737 periodic effect Effects 0.000 claims description 3
- 230000002265 prevention Effects 0.000 claims description 3
- 238000012797 qualification Methods 0.000 claims description 3
- 238000013441 quality evaluation Methods 0.000 claims description 3
- 241000894007 species Species 0.000 claims description 3
- 238000006467 substitution reaction Methods 0.000 claims description 3
- 238000012546 transfer Methods 0.000 claims description 3
- 230000007704 transition Effects 0.000 claims description 3
- 238000013316 zoning Methods 0.000 claims description 3
- 238000012384 transportation and delivery Methods 0.000 claims description 2
- 230000004927 fusion Effects 0.000 claims 1
- 230000006872 improvement Effects 0.000 description 9
- 230000015572 biosynthetic process Effects 0.000 description 5
- 238000011161 development Methods 0.000 description 3
- 238000003786 synthesis reaction Methods 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 230000003204 osmotic effect Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 238000000746 purification Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Educational Administration (AREA)
- Economics (AREA)
- Development Economics (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of plot sponge urban construction performance comprehensive estimation methods, after this method determines evaluation item, comprehensive assessment system is established according to plot sponge urban construction target and intension, with basic item, provide item and bonus point item as assessment element, under the premise of regulation item is met the requirements, the preliminary grade of performance evaluation is determined with respect to the increase rate index value of plot location a reference value according to the annual flow overall control rate of basic item and year area source pollutants total amount removal rate, in conjunction with bonus point item scoring event comprehensive division plot sponge urban construction performance evaluation grade, the present invention forms comprehensive assessment system, improve plot sponge urban construction performance evaluation accuracy, meet the performance evaluation requirement of sponge urban construction intension and target.
Description
Technical field
The present invention relates to sponge urban construction technical field, in particular to a kind of plot sponge urban construction performance synthesis is commented
Estimate method.
Background technique
In recent years, people increasingly pay attention to the rapport of urban construction and ecological environment during social development, maintain
The sustainable development of social construction is particularly important.Sponge urban construction is a kind of low influence development mode, is conducive to protect
Natural ecology pattern is maintained the Echtheit of the hydrological characteristics such as infiltration, stagnant storage, evaporation (rising), the runoff of ecology background, is protected and extensive
The natural accumulation of multiple rainfall runoff, naturally osmotic, self-purification, improve the natural repair ability of aquatic ecosystem.Sponge city
Construction is planned according to the theory system of " source emission reduction, process control, Systematic control ", adaptation to local conditions, grayish green combination, using " seep,
It is stagnant, store, be net, with, row " the methods of carry out synthesis and apply plan.
The urban construction of China sponge is still in planning and designing and construction stage at present, for plot sponge urban construction
The performance evaluation of effect, appraisal procedure leading at present only to " annual flow overall control rate " and " area source pollutants removal rate " this
Two indices carry out calculating assessment, relatively unilateral although assessment result is directly, enough could not clearly be holistically based on sponge city
Construction intension and target assess plot sponge relative close degree, more without specific comprehensive reaction plot sponge urban construction
Actual implementation situation.
The comprehensive performance evaluation for carrying out plot sponge urban construction effect helps to push sponge urban construction, ensures sea
Continuous municipal construction quality, implements sponge city system theory, constructs the benign water circulation system in city, improve urban ecological environment,
Enhance masses' the sense of access and happiness, there is great social value and realistic meaning.
Summary of the invention
In order to make up the above deficiency, the present invention provides a kind of plot sponge urban construction performance comprehensive estimation methods, should
Plot sponge urban construction performance comprehensive estimation method can integrate comprehensive assessment plot sponge urban construction performance, meet sea
Continuous urban construction intension and target call.
The present invention is to solve technical solution used by its technical problem: a kind of plot sponge urban construction performance is comprehensive
Appraisal procedure is closed, is included the following steps:
Step 1: it determines evaluation item, and basic document is collected according to evaluation item, obtained by the arrangement to basic document
Essential information is obtained, and the construction overview of the project is summarized;
Step 2: comprehensive assessment system is established according to plot sponge urban construction target and intension:
(1) it establishes with " annual flow overall control rate " and " area source pollutants removal rate " two core Con trolling index formation
Basic item;
(2) establish with " facility layout and scale ", " place is vertically arranged and rainwash ", " monomer sponge facility " and
The regulation item that " drainage system " four examination items are formed;
(3) the bonus point item formed with the additional performance indicator encouraged and guided is established;
Above-mentioned basis item, regulation item and bonus point item collectively constitute the assessment element of comprehensive assessment system;
Step 3: assessing the regulation item of plot sponge urban construction and collects the number for calculating basic item modeling input
According to, including area many years continuous rainfall and evaporation data, effective catchment area, permeable regional soil characteristic, sponge facility structure
It makes and planar dimension, sponge facility filter layer material property and rainwater control path, based on examination plot sponge urban construction mesh
Mark realizes situation and actual implementation effect, it is specified that item must satisfy the binding indicator regulation of design requirement;
Step 4: assessment acquisition " annual flow overall control rate " and " face are carried out to the basic item of plot sponge urban construction
Source pollutants removal rate " data;
Step 5: the annual flow overall control rate and year area source pollutants total amount removal rate for calculating basic item are with respect to plot institute
In increase rate (η) index value of regional a reference value, η=[(basic item index value/zonal basis value) -1] * 100;
Step 6: bonus point item score value is calculated according to site inspection situation, inspection of documents result comprehensive analysis;
Step 7: under the premise of basic item and regulation item meet design requirement, according to the relatively regional a reference value of basic item
Increase rate (η) index value, in conjunction with bonus point item scoring event comprehensive division plot sponge urban construction performance evaluation grade, and write
Performance evaluation report is write, the then project qualified for performance evaluation report does not conform to performance evaluation report by performance evaluation
Lattice, then plot sponge City Construction Project is rectified and improved, is assessed again at the beginning from step again after rectification.
As a further improvement of the present invention, the grade classification of plot sponge urban construction performance evaluation is as follows:
As a further improvement of the present invention, the side basic item of plot sponge urban construction assessed in step 3
Method are as follows: plot sponge urban construction scene is surveyed, is checked, and associated documents are examined, in conjunction with local hydrology gas
Image data, calculate analysis using storm water model simulation softward and obtain basic item index value: annual flow overall control rate, year face source are dirty
Contaminate object total amount removal rate.
Data needed for basic item software evaluation calculates should obtain as follows:
(1) hydrologic condition is according to city of Kunshan's existing many years continuous rainfall and evaporation data.
(2) plot place is vertically arranged according to the mapping drawing that is completed, and failing offer completion mapping drawing can provide live survey
Draw report.
(3) permeable regional soil characteristic is according to green soil census report, and when no correlation report takes empirical value.
(4) sponge facility construction and planar dimension are according to as-constructed drawing or construction drawing and examining report.
(5) sponge facility filter layer material property is according to examining report.
(6) rainwater control path is determined by on-site verification result.
As a further improvement of the present invention, storm water model simulation softward includes following function:
(1) input and setting of plot sponge urban construction modeling and underlying surface, sponge infrastructure modules parameter;
(2) hydrometeorological data input;
(3) topological relation between charge for remittance subregion, sponge facility and draining node is established;
(4) basic item calculates, result exports.
As a further improvement of the present invention, the journey regulation item of plot sponge urban construction assessed in step 5
Sequence are as follows:
(1) facility layout and scale are verified: verifying the city zoning of plot sponge and each subregion tune according to site inspection result
Situations such as storing volume, place is examined whether to combine subregion site condition and pipeline layout reasonable Arrangement sponge facility, and meet
It is claimed below:
1., sponge facility finished surface be lower than periphery gathering ground;
2., sponge facility the area ratio (%) meet design requirement;
(2) place is vertically arranged and rainwash is verified: it is vertical to verify place according to site inspection and inspection of documents result
Whether reasonable, whether catchment area effectively controls than (%) lower than 80%, road surface kerbstone aperture position amount of size construction if arranging
Whether be vertically consistent with place, linear drainage ditch position, road slope aspect be connected with sponge facility whether meet place vertically require,
Hard place is whether there is or not seeping phenomenon after whether surface runoff smooth after rainfall and moderate rain or heavy rain, linear drainage ditch and sponge facility
Seam should also be equipped with anti-clogging facility, and rainwash is smooth in rainfall, and hard place ponding point is not after moderate rain or heavy rain rain
At 3, road must not have seeping phenomenon in place;
(3) monomer sponge facility is verified: different assessments are set according to different facility types and are itemized, and are itemized as follows:
Note: ●: facility participates in evaluation and electing item;Zero: facility participates in evaluation and electing, does not otherwise participate in evaluation and electing as being related to;
Wherein the corresponding requirement of aforementioned number is as follows:
Number 1: facility structure should be complete, must not lack water inlet (protection against erosion), overflow well lid, observation panel (backwash);
Number 2: vertical construction should meet the regulation of design requirement or relevant criterion, and must not lead to periphery place or facility
Adverse effect is generated, each vertical techonosphere of monomer facility should meet following table regulation:
Monomer sponge facility vertically constructs
Super High | Retention layer | Filter layer | Transition zone | Drainage blanket | |
Biological delaying basin | √ | √ | √ | √ | √ |
Concave herbaceous field | √ | √ | |||
Dry type grass planting ditch | √ | √ | |||
Green Roof | √ | √ |
Number 3: sectional dimension (cross-section of river form and size, head fall, turning radius) should meet design requirement or
The regulation of relevant criterion;
Number 4: meet the rule of design requirement or relevant criterion with periphery place natural sparse model, slope stability and the gradient
It is fixed;
Number 5: should be arranged overflow well or overflow water outlet, and energy-dissipating installation should be arranged in overflow water outlet, and meets design and want
It asks or the regulation of relevant criterion;
Number 6: water inlet, which should be arranged, blocks dirty facility, and meets design requirement;
Number 7: filter layer material property should meet the regulation of design requirement or relevant criterion;
Number 8: perforated drain pipe aperture, percent opening should meet the regulation of design requirement or relevant criterion;
Number 9: plants landscape effect includes claimed below:
The type selecting of a plant is reasonable;
Rationally, species should be no less than 3 kinds for b collocation;
C planting density is reasonable, change fill out medium must not be exposed;
D vegetation height is reasonable;
Number 10: periodic maintenance surfacing no-sundries;
Number 11: the regulation of relevant criterion should be met with road, sponge facility, being connected for rainwater down pipe disconnecting, can be ensured
Rainwater path is smooth;
Number 12: length is more than that 30m transfers type grass planting ditch, and overfall facility should meet the rule of design requirement or other standards
It is fixed;
Number 13: the performance of seepy material and permeable pavement should meet the requirement of relevant criterion or specification;
Number 14: water storage volume of (regulating and storing) should meet design requirement;
Number 15: security protection and warning mark should be set;
(4) arrangement of Drainage and drainability examination: according to site inspection and documentation verify overflow well quantity,
Whether position, size meet the requirements;Whether overflow port is inscribed correct;Whether overflow well drains bore, slope aspect, drainability full
The emission request of sufficient design storm;Whether rain water on roof takes the modes such as rainwater down pipe disconnecting or setting sump to carry out disconnecting.
As a further improvement of the present invention, additional according to being generated after plot sponge urban construction intension and realization of goal
Benefit determines that bonus point item includes " permeable pavement rate ", " roof greening rate ", " water resource utilization ", " optimization design ", " monitoring is real
Apply ", " operation management ", " landscape effect investigation " and " sponge technological innovation ".
As a further improvement of the present invention, bonus point is calculated according to site inspection situation and inspection of documents result comprehensive analysis
Item score value:
(1) permeable pavement technology is rationally used in plot, reduces hardened ground ratio, and permeable pavement rate should add 5 up to 10%
Point, 10 points should be added more than 30%;
(2) according to construction conditions, using roof greening, Green Roof rate should add 2 points up to 10%, should add 5 points up to 20%, reach
30% should add 10 points;
(3) the plot sponge construction plan design phase implement optimization design, using modeling to sponge construction object into
Row, which decomposes, should add 5 points;
(4) construction condition is made full use of, rain water collecting system is set, annual rainwater substitution water supply ratio is not less than 10%,
10 points should be added;
(5) rational position installs flow water monitoring device in plot, can be used for the examination of sponge relative close degree, Ying Jia 15
Point.Sponge facility construction is optimized and adds 10 points;
(6) the control analysis of runoff peak value is carried out, under draining and waterlogging prevention and treatment Designed recurrence period, peak flow runoff coefficient
Add 5 points when should be no more than the peak flow runoff coefficient before developing;
(7) it has formulated reasonable sponge facility operation management method and that implements adds 10 points
(8) sponge City Construction Project appearance has good landscape effect, a, rainwater down pipe disconnecting, kerbstone opening, overflow
Facility, rain perforaled strainer appearance are good;B, the handsome in appearance of sponge facility is merged with the preferable of external place, is covered inside facility
It is smooth to cover tightly reality, planting soil;C, plant collocation rationally, type be no less than 3 kinds, plantation posture is graceful, grows fine, green with periphery
Change landscape and preferably merges satisfaction above three Xiang Zhongyi plus 5 points, two plus 10 points, three plus 15 points;
(9) when using other new materials and novel sponge technology, and under while providing relevant art analysis report should meet
Column regulation:
1. each bonus point is no more than 5, total score is no more than 10 points;
2. the sponge effect of each technology is not less than the other technologies of same type.
As a further improvement of the present invention, inspection of documents is to the legitimacy of file, integrality, science and timeliness
It is examined;Site inspection is designed accordance inspection, the method for calculating analysis meets country by the way of the verification of scene
And local sponge urban construction relevant criterion and defined requirement, by the examining report for thering is qualification testing agency to provide and construction
Effective inspection data in the course of receiving are for calculating analysis.
As a further improvement of the present invention, the basic document includes following file:
(1) it approves and initiate a project, program examination and approval file;
(2) sponge Shop Drawing Design Document IT Application, the examination quality certification and examination reports;
(3) road and rainwater pipeline construction drawing and the relevant technologies file;
(4) relevant speciality as-constructed drawing (sponge engineering, rainwater pipeline, road, afforestation project, mapping specialty) electronic edition;
(5) has the facility coherent detection report that qualified testing agency provides;
(6) the project hydrology, water quality monitoring report (if any needing to provide);
(7) sponge urban construction target, index are from careful from core table;
(8) sponge urban construction controls volumetric partition from core table;
(9) sponge hidden project inspection record of acceptance;
(10) sponge subitem, partitioned project inspection of quality record;
(11) outdoor drainage pipeline pour water/water test record;
(12) partitioned project safety and functional check information verification and major function selective examination record;
(13) acceptance of engineering quality evaluation record;
(14) other associated documents.
As a further improvement of the present invention, annual flow overall control rate calculation method, specific as follows:
ηRunoff=VYear control/VAnnual rainfall×100 (A-1)
In formula: ηRunoffFor annual flow overall control rate, %;
VYear controlAmount of rainfall, m3/a are controlled for year;
VAnnual rainfallFor full total rainfall per year, m3/a;
Year, SS total amount removal rate calculated, and calculating side is specific as follows:
ηSS=ηRunoff×ηFacility SS×100 (A-2)
In formula: ηSSFor year SS total amount removal rate, %;
ηFacility SSFor facility year SS total amount removal rate, %.
The method have the benefit that: when the present invention assesses plot sponge urban construction performance, by by
Basic item that " annual flow overall control rate " and " area source pollutants removal rate " is formed, by " facility layout and scale ", " place is perpendicular
To arrangement and rainwash ", the regulation item that is formed of " monomer sponge facility " and " drainage system " and by " permeable pavement rate ", " room
Top green percentage ", " water resource utilization ", " optimization design ", " monitoring is implemented ", " operation management ", " landscape effect investigation " and " sponge
The bonus point item that technological innovation " is formed carries out comprehensive assessment, improves plot sponge urban construction performance evaluation accuracy, meets sea
The performance evaluation requirement of continuous urban construction intension and target.
Detailed description of the invention
Fig. 1 is flow diagram of the invention.
Specific embodiment
Embodiment: a kind of plot sponge urban construction performance comprehensive estimation method includes the following steps:
Step 1: it determines evaluation item, and basic document is collected according to evaluation item, obtained by the arrangement to basic document
Essential information is obtained, and the construction overview of the project is summarized;
Step 2: comprehensive assessment system is established according to plot sponge urban construction target and intension:
(1) it establishes with " annual flow overall control rate " and " area source pollutants removal rate " two core Con trolling index formation
Basic item;
(2) establish with " facility layout and scale ", " place is vertically arranged and rainwash ", " monomer sponge facility " and
The regulation item that " drainage system " four examination items are formed;
(3) the bonus point item formed with the additional performance indicator encouraged and guided is established;
Above-mentioned basis item, regulation item and bonus point item collectively constitute the assessment element of comprehensive assessment system;
Step 3: assessing the regulation item of plot sponge urban construction and collects the number for calculating basic item modeling input
According to, including area many years continuous rainfall and evaporation data, effective catchment area, permeable regional soil characteristic, sponge facility structure
It makes and planar dimension, sponge facility filter layer material property and rainwater control path, based on examination plot sponge urban construction mesh
Mark realizes situation and actual implementation effect, it is specified that item must satisfy the binding indicator regulation of design requirement;
Step 4: assessment acquisition " annual flow overall control rate " and " face are carried out to the basic item of plot sponge urban construction
Source pollutants removal rate " data;
Step 5: the annual flow overall control rate and year area source pollutants total amount removal rate for calculating basic item are with respect to plot institute
In increase rate (η) index value of regional a reference value, η=[(basic item index value/zonal basis value) -1] * 100;
Step 6: bonus point item score value is calculated according to site inspection situation, inspection of documents result comprehensive analysis;
Step 7: under the premise of basic item and regulation item meet design requirement, according to the relatively regional a reference value of basic item
Increase rate (η) index value, in conjunction with bonus point item scoring event comprehensive division plot sponge urban construction performance evaluation grade, and write
Performance evaluation report is write, the then project qualified for performance evaluation report does not conform to performance evaluation report by performance evaluation
Lattice, then plot sponge City Construction Project is rectified and improved, is assessed again at the beginning from step again after rectification.
The grade classification of plot sponge urban construction performance evaluation is as follows:
The method that the basic item of plot sponge urban construction is assessed in step 3 are as follows: to plot sponge urban construction
Scene is surveyed, is checked, and examines associated documents, in conjunction with local hydrometeorological data, is simulated using storm water model
Software calculates analysis and obtains basic item index value: annual flow overall control rate, year area source pollutants total amount removal rate.
Data needed for basic item software evaluation calculates should obtain as follows:
(1) hydrologic condition is according to city of Kunshan's existing many years continuous rainfall and evaporation data.
(2) plot place is vertically arranged according to the mapping drawing that is completed, and failing offer completion mapping drawing can provide live survey
Draw report.
(3) permeable regional soil characteristic is according to green soil census report, and when no correlation report takes empirical value.
(4) sponge facility construction and planar dimension are according to as-constructed drawing or construction drawing and examining report.
(5) sponge facility filter layer material property is according to examining report.
(6) rainwater control path is determined by on-site verification result.
Storm water model simulation softward includes following function:
(1) input and setting of plot sponge urban construction modeling and underlying surface, sponge infrastructure modules parameter;
(2) hydrometeorological data input;
(3) topological relation between charge for remittance subregion, sponge facility and draining node is established;
(4) basic item calculates, result exports.
The program that the regulation item of plot sponge urban construction is assessed in step 5 are as follows:
(1) facility layout and scale are verified: verifying the city zoning of plot sponge and each subregion tune according to site inspection result
Situations such as storing volume, place is examined whether to combine subregion site condition and pipeline layout reasonable Arrangement sponge facility, and meet
It is claimed below:
1., sponge facility finished surface be lower than periphery gathering ground;
2., sponge facility the area ratio (%) meet design requirement;
(2) place is vertically arranged and rainwash is verified: it is vertical to verify place according to site inspection and inspection of documents result
Whether reasonable, whether catchment area effectively controls than (%) lower than 80%, road surface kerbstone aperture position amount of size construction if arranging
Whether be vertically consistent with place, linear drainage ditch position, road slope aspect be connected with sponge facility whether meet place vertically require,
Hard place is whether there is or not seeping phenomenon after whether surface runoff smooth after rainfall and moderate rain or heavy rain, linear drainage ditch and sponge facility
Seam should also be equipped with anti-clogging facility, and rainwash is smooth in rainfall, and hard place ponding point is not after moderate rain or heavy rain rain
At 3, road must not have seeping phenomenon in place;
(3) monomer sponge facility is verified: different assessments are set according to different facility types and are itemized, and are itemized as follows:
Note: ●: facility participates in evaluation and electing item;Zero: facility participates in evaluation and electing, does not otherwise participate in evaluation and electing as being related to;
Wherein the corresponding requirement of aforementioned number is as follows:
Number 1: facility structure should be complete, must not lack water inlet (protection against erosion), overflow well lid, observation panel (backwash);
Number 2: vertical construction should meet the regulation of design requirement or relevant criterion, and must not lead to periphery place or facility
Adverse effect is generated, each vertical techonosphere of monomer facility should meet following table regulation:
Monomer sponge facility vertically constructs
Super High | Retention layer | Filter layer | Transition zone | Drainage blanket | |
Biological delaying basin | √ | √ | √ | √ | √ |
Concave herbaceous field | √ | √ | |||
Dry type grass planting ditch | √ | √ | |||
Green Roof | √ | √ |
Number 3: sectional dimension (cross-section of river form and size, head fall, turning radius) should meet design requirement or
The regulation of relevant criterion;
Number 4: meet the rule of design requirement or relevant criterion with periphery place natural sparse model, slope stability and the gradient
It is fixed;
Number 5: should be arranged overflow well or overflow water outlet, and energy-dissipating installation should be arranged in overflow water outlet, and meets design and want
It asks or the regulation of relevant criterion;
Number 6: water inlet, which should be arranged, blocks dirty facility, and meets design requirement;
Number 7: filter layer material property should meet the regulation of design requirement or relevant criterion;
Number 8: perforated drain pipe aperture, percent opening should meet the regulation of design requirement or relevant criterion;
Number 9: plants landscape effect includes claimed below:
The type selecting of a plant is reasonable;
Rationally, species should be no less than 3 kinds for b collocation;
C planting density is reasonable, change fill out medium must not be exposed;
D vegetation height is reasonable;
Number 10: periodic maintenance surfacing no-sundries;
Number 11: the regulation of relevant criterion should be met with road, sponge facility, being connected for rainwater down pipe disconnecting, can be ensured
Rainwater path is smooth;
Number 12: length is more than that 30m transfers type grass planting ditch, and overfall facility should meet the rule of design requirement or other standards
It is fixed;
Number 13: the performance of seepy material and permeable pavement should meet the requirement of relevant criterion or specification;
Number 14: water storage volume of (regulating and storing) should meet design requirement;
Number 15: security protection and warning mark should be set;
(4) arrangement of Drainage and drainability examination: according to site inspection and documentation verify overflow well quantity,
Whether position, size meet the requirements;Whether overflow port is inscribed correct;Whether overflow well drains bore, slope aspect, drainability full
The emission request of sufficient design storm;Whether rain water on roof takes the modes such as rainwater down pipe disconnecting or setting sump to carry out disconnecting.
According to the additional benefit generated after plot sponge urban construction intension and realization of goal, determine that bonus point item includes " thoroughly
Water is mated formation rate ", " roof greening rate ", " water resource utilization ", " optimization design ", " monitoring is implemented ", " operation management ", " landscape effect
Fruit is investigated " and " sponge technological innovation ".
Bonus point item score value is calculated according to site inspection situation and inspection of documents result comprehensive analysis:
(1) permeable pavement technology is rationally used in plot, reduces hardened ground ratio, and permeable pavement rate should add 5 up to 10%
Point, 10 points should be added more than 30%;
(2) according to construction conditions, using roof greening, Green Roof rate should add 2 points up to 10%, should add 5 points up to 20%, reach
30% should add 10 points;
(3) the plot sponge construction plan design phase implement optimization design, using modeling to sponge construction object into
Row, which decomposes, should add 5 points;
(4) construction condition is made full use of, rain water collecting system is set, annual rainwater substitution water supply ratio is not less than 10%,
10 points should be added;
(5) rational position installs flow water monitoring device in plot, can be used for the examination of sponge relative close degree, Ying Jia 15
Point.Sponge facility construction is optimized and adds 10 points;
(6) the control analysis of runoff peak value is carried out, under draining and waterlogging prevention and treatment Designed recurrence period, peak flow runoff coefficient
Add 5 points when should be no more than the peak flow runoff coefficient before developing;
(7) it has formulated reasonable sponge facility operation management method and that implements adds 10 points
(8) sponge City Construction Project appearance has good landscape effect, a, rainwater down pipe disconnecting, kerbstone opening, overflow
Facility, rain perforaled strainer appearance are good;B, the handsome in appearance of sponge facility is merged with the preferable of external place, is covered inside facility
It is smooth to cover tightly reality, planting soil;C, plant collocation rationally, type be no less than 3 kinds, plantation posture is graceful, grows fine, green with periphery
Change landscape and preferably merges satisfaction above three Xiang Zhongyi plus 5 points, two plus 10 points, three plus 15 points;
(9) when using other new materials and novel sponge technology, and under while providing relevant art analysis report should meet
Column regulation:
1. each bonus point is no more than 5, total score is no more than 10 points;
2. the sponge effect of each technology is not less than the other technologies of same type.
Inspection of documents is to examine the legitimacy of file, integrality, science and timeliness;Site inspection is using existing
The mode of field verification, is designed accordance inspection, and the method for calculating analysis meets country and local sponge urban construction is related
Standard and defined requirement, by effective inspection number during the examining report and delivery receiving acceptance that there is qualification testing agency to provide
According to for calculating analysis.
The basic document includes following file:
(1) it approves and initiate a project, program examination and approval file;
(2) sponge Shop Drawing Design Document IT Application, the examination quality certification and examination reports;
(3) road and rainwater pipeline construction drawing and the relevant technologies file;
(4) relevant speciality as-constructed drawing (sponge engineering, rainwater pipeline, road, afforestation project, mapping specialty) electronic edition;
(5) has the facility coherent detection report that qualified testing agency provides;
(6) the project hydrology, water quality monitoring report (if any needing to provide);
(7) sponge urban construction target, index are from careful from core table;
(8) sponge urban construction controls volumetric partition from core table;
(9) sponge hidden project inspection record of acceptance;
(10) sponge subitem, partitioned project inspection of quality record;
(11) outdoor drainage pipeline pour water/water test record;
(12) partitioned project safety and functional check information verification and major function selective examination record;
(13) acceptance of engineering quality evaluation record;
(14) other associated documents.
Annual flow overall control rate calculation method, specific as follows:
ηRunoff=VYear control/VAnnual rainfall×100 (A-1)
In formula: ηRunoffFor annual flow overall control rate, %;
VYear controlAmount of rainfall, m3/a are controlled for year;
VAnnual rainfallFor full total rainfall per year, m3/a;
Year, SS total amount removal rate calculated, and calculating side is specific as follows:
ηSS=ηRunoff×ηFacility SS×100 (A-2)
In formula: ηSSFor year SS total amount removal rate, %;
ηFacility SSFor facility year SS total amount removal rate, %.
Embodiment 1: using the sponge urban construction of city of Kunshan newly-built community plot as embodiment, the step that provides according to the present invention
Suddenly comprehensive assessment is carried out to its performance, assessment situation is as follows:
Final analysis assessment is as follows:
Claims (10)
1. a kind of plot sponge urban construction performance comprehensive estimation method, it is characterized in that: include the following steps:
Step 1: it determines evaluation item, and basic document is collected according to evaluation item, base is obtained by the arrangement to basic document
This information, and the construction overview of the project is summarized;
Step 2: comprehensive assessment system is established according to plot sponge urban construction target and intension:
(1) basis formed with " annual flow overall control rate " and " area source pollutants removal rate " two core Con trolling index is established
?;
(2) it establishes with " facility layout and scale ", " place is vertically arranged and rainwash ", " monomer sponge facility " and " draining
The regulation item that system " four examination items are formed;
(3) the bonus point item formed with the additional performance indicator encouraged and guided is established;
Above-mentioned basis item, regulation item and bonus point item collectively constitute the assessment element of comprehensive assessment system;
Step 3: assessing the regulation item of plot sponge urban construction and collects the data for calculating basic item modeling input,
Including regional rainfall continuous for many years and evaporation data, effective catchment area, permeable regional soil characteristic, sponge facility construction and
Planar dimension, sponge facility filter layer material property and rainwater control path, it is real based on examination plot sponge urban construction target
Existing situation and actual implementation effect are, it is specified that item must satisfy the binding indicator regulation of design requirement;
Step 4: assessment acquisition " annual flow overall control rate " is carried out to the basic item of plot sponge urban construction and " face source is dirty
Contaminate object removal rate " data;
Step 5: the annual flow overall control rate and year area source pollutants total amount removal rate for calculating basic item are with respect to plot location
Increase rate (η) index value of area's a reference value, η=[(basic item index value/zonal basis value) -1] * 100;
Step 6: bonus point item score value is calculated according to site inspection situation, inspection of documents result comprehensive analysis;
Step 7: under the premise of basic item and regulation item meet design requirement, according to mentioning for basic item regional a reference value relatively
High rate (η) index value in conjunction with bonus point item scoring event comprehensive division plot sponge urban construction performance evaluation grade, and writes achievement
Assessment report is imitated, the then project qualified for performance evaluation report passes through performance evaluation, and it is underproof for performance evaluation report,
Then plot sponge City Construction Project is rectified and improved, is assessed again at the beginning from step again after rectification.
2. plot sponge urban construction performance comprehensive estimation method according to claim 1, it is characterized in that: to plot sponge
The grade classification of urban construction performance evaluation is as follows:
3. plot sponge urban construction performance comprehensive estimation method according to claim 1, it is characterized in that: it is right in step 3
The method that the basic item of plot sponge urban construction is assessed are as follows: plot sponge urban construction scene is surveyed, is checked,
And associated documents are examined, in conjunction with local hydrometeorological data, analysis is calculated using storm water model simulation softward and obtains base
Plinth item index value: annual flow overall control rate, year area source pollutants total amount removal rate.
4. plot sponge urban construction performance comprehensive estimation method according to claim 3, it is characterized in that: storm water model mould
Quasi- software includes following function:
(1) input and setting of plot sponge urban construction modeling and underlying surface, sponge infrastructure modules parameter;
(2) hydrometeorological data input;
(3) topological relation between charge for remittance subregion, sponge facility and draining node is established;
(4) basic item calculates, result exports.
5. plot sponge urban construction performance comprehensive estimation method according to claim 1, it is characterized in that: it is right in step 5
The program that the regulation item of plot sponge urban construction is assessed are as follows:
(1) facility layout and scale are verified: verifying the city zoning of plot sponge according to site inspection result and each subregion is regulated and stored appearance
Situations such as accumulating, place is examined whether to combine subregion site condition and pipeline layout reasonable Arrangement sponge facility, and meet following
It is required that:
1., sponge facility finished surface be lower than periphery gathering ground;
2., sponge facility the area ratio (%) meet design requirement;
(2) place is vertically arranged and rainwash is verified: being verified place according to site inspection and inspection of documents result and is vertically arranged
Rationally whether, whether catchment area effectively controls than (%) lower than 80%, and whether road surface kerbstone aperture position amount of size construction
Vertically be consistent with place, linear drainage ditch position, road slope aspect be connected with sponge facility whether meet place vertically require, rainfall
Whether there is or not seeping phenomenons in hard place after whether surface runoff smooth afterwards and moderate rain or heavy rain;
(3) monomer sponge facility is verified: different assessments are set according to different facility types and are itemized, and are itemized as follows:
Note: ●: facility participates in evaluation and electing item;Zero: facility participates in evaluation and electing, does not otherwise participate in evaluation and electing as being related to;
Wherein the corresponding requirement of aforementioned number is as follows:
Number 1: facility structure should be complete, must not lack water inlet (protection against erosion), overflow well lid, observation panel (backwash);
Number 2: vertical construction should meet the regulation of design requirement or relevant criterion, and periphery place or facility must not be caused to generate
Adverse effect, each vertical techonosphere of monomer facility should meet following table regulation:
Monomer sponge facility vertically constructs
Number 3: sectional dimension (cross-section of river form to size, head fall, turning radius) should meet design requirement or related
The regulation of standard;
Number 4: meet the regulation of design requirement or relevant criterion with periphery place natural sparse model, slope stability and the gradient;
Number 5: should be arranged overflow well or overflow water outlet, and energy-dissipating installation should be arranged in overflow water outlet, and meet design requirement or
The regulation of relevant criterion;
Number 6: water inlet, which should be arranged, blocks dirty facility, and meets design requirement;
Number 7: filter layer material property should meet the regulation of design requirement or relevant criterion;
Number 8: perforated drain pipe aperture, percent opening should meet the regulation of design requirement or relevant criterion;
Number 9: plants landscape effect includes claimed below:
The type selecting of a plant is reasonable;
Rationally, species should be no less than 3 kinds for b collocation;
C planting density is reasonable, change fill out medium must not be exposed;
D vegetation height is reasonable;
Number 10: periodic maintenance surfacing no-sundries;
Number 11: the regulation of relevant criterion should be met with road, sponge facility, being connected for rainwater down pipe disconnecting, can ensure rainwater
Path is smooth;
Number 12: length is more than that 30m transfers type grass planting ditch, and overfall facility should meet the regulation of design requirement or other standards;
Number 13: the performance of seepy material and permeable pavement should meet the requirement of relevant criterion or specification;
Number 14: water storage volume of (regulating and storing) should meet design requirement;
Number 15: security protection and warning mark should be set;
(4) quantity of overflow well, position arrangement of Drainage and drainability examination: are verified according to site inspection and documentation
It sets, whether size meets the requirements;Whether overflow port is inscribed correct;Whether overflow well draining bore, slope aspect, drainability meet
The emission request of design storm;Whether rain water on roof takes the modes such as rainwater down pipe disconnecting or setting sump to carry out disconnecting.
6. plot sponge urban construction performance comprehensive estimation method according to claim 1, it is characterized in that: according to plot sea
The additional benefit generated after continuous urban construction intension and realization of goal determines that bonus point item includes " permeable pavement rate ", " roof greening
Rate ", " water resource utilization ", " optimization design ", " monitoring is implemented ", " operation management ", " landscape effect investigation " and " sponge technology wound
Newly ".
7. plot sponge urban construction performance comprehensive estimation method according to claim 6, it is characterized in that: according to scene inspection
It looks into situation and inspection of documents result comprehensive analysis calculates bonus point item score value:
(1) permeable pavement technology is rationally used in plot, reduces hardened ground ratio, and permeable pavement rate should add 5 points up to 10%, surpass
Should be added by crossing 30% by 10 points;
(2) according to construction conditions, using roof greening, Green Roof rate should add 2 points up to 10%, should add 5 points up to 20%, up to 30%
10 points should be added;
(3) the plot sponge construction plan design phase implements optimization design, is divided using modeling sponge construction object
Xie Yingjia 5 divides;
(4) construction condition is made full use of, rain water collecting system is set, annual rainwater substitution water supply ratio is not less than 10%, Ying Jia
10 points;
(5) rational position installs flow water monitoring device in plot, can be used for the examination of sponge relative close degree, and Ying Jia 15 divides.It is right
Sponge facility construction, which optimizes, adds 10 points;
(6) the control analysis of runoff peak value is carried out, under draining and waterlogging prevention and treatment Designed recurrence period, peak flow runoff coefficient should not
Add 5 points when more than peak flow runoff coefficient before exploitation;
(7) it has formulated reasonable sponge facility operation management method and that implements adds 10 points
(8) sponge City Construction Project appearance have good landscape effect, a, rainwater down pipe disconnecting, kerbstone opening, overfall facility,
Rain perforaled strainer appearance is good;B, the handsome in appearance of sponge facility is merged with the preferable of external place, and covering is tight inside facility
In fact, planting soil is smooth;C, plant collocation rationally, type be no less than 3 kinds, plantation posture is graceful, grows fine, and afforests scape with periphery
It sees preferably fusion and meets above three Xiang Zhongyi plus 5 points, two plus 10 points, three plus 15 points;
(9) when using other new materials and novel sponge technology, and while providing relevant art analysis report, should meet following rule
It is fixed:
1. each bonus point of is no more than 5, total score is no more than 10 points;
2. the sponge effect of each technology is not less than the other technologies of same type.
8. plot sponge urban construction performance comprehensive estimation method according to claim 1, it is characterized in that: inspection of documents is
The legitimacy of file, integrality, science and timeliness are examined;Site inspection is carried out by the way of the verification of scene
Accordance inspection is designed, the method for calculating analysis meets country and local sponge urban construction relevant criterion and defined requirement,
Effective inspection data during the examining report and delivery receiving acceptance that have qualification testing agency to provide are used to calculate analysis.
9. plot sponge urban construction performance comprehensive estimation method according to claim 1, it is characterized in that: the basic money
Material includes following file:
(1) it approves and initiate a project, program examination and approval file;
(2) sponge Shop Drawing Design Document IT Application, the examination quality certification and examination reports;
(3) road and rainwater pipeline construction drawing and the relevant technologies file;
(4) relevant speciality as-constructed drawing (sponge engineering, rainwater pipeline, road, afforestation project, mapping specialty) electronic edition;
(5) has the facility coherent detection report that qualified testing agency provides;
(6) the project hydrology, water quality monitoring report (if any needing to provide);
(7) sponge urban construction target, index are from careful from core table;
(8) sponge urban construction controls volumetric partition from core table;
(9) sponge hidden project inspection record of acceptance;
(10) sponge subitem, partitioned project inspection of quality record;
(11) outdoor drainage pipeline pour water/water test record;
(12) partitioned project safety and functional check information verification and major function selective examination record;
(13) acceptance of engineering quality evaluation record;
(14) other associated documents.
10. plot sponge urban construction performance comprehensive estimation method according to claim 1, it is characterized in that:
Annual flow overall control rate calculation method, specific as follows:
ηRunoff=VYear control/VAnnual rainfall×100 (A-1)
In formula: ηRunoffFor annual flow overall control rate, %;
VYear controlAmount of rainfall, m3/a are controlled for year;
VAnnual rainfallFor full total rainfall per year, m3/a;
Year, SS total amount removal rate calculated, and calculating side is specific as follows:
ηSS=ηRunoff×ηFacility SS×100 (A-2)
In formula: ηSSFor year SS total amount removal rate, %;
ηFacility SSFor facility year SS total amount removal rate, %.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811493460.7A CN109657948A (en) | 2018-12-04 | 2018-12-04 | Plot sponge urban construction performance comprehensive estimation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811493460.7A CN109657948A (en) | 2018-12-04 | 2018-12-04 | Plot sponge urban construction performance comprehensive estimation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109657948A true CN109657948A (en) | 2019-04-19 |
Family
ID=66112867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811493460.7A Pending CN109657948A (en) | 2018-12-04 | 2018-12-04 | Plot sponge urban construction performance comprehensive estimation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109657948A (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110378611A (en) * | 2019-07-25 | 2019-10-25 | 泰华智慧产业集团股份有限公司 | Sponge control index based on GIS examines and appraisal procedure and system |
CN110378620A (en) * | 2019-07-29 | 2019-10-25 | 四川省建筑设计研究院 | The low influence exploitation design of one kind and appraisal procedure and system |
CN111141539A (en) * | 2020-01-14 | 2020-05-12 | 北京清控人居环境研究院有限公司 | Wisdom evaluation system of sponge facility effect under artificial rainfall situation |
CN111275283A (en) * | 2019-12-20 | 2020-06-12 | 北京林业大学 | On-line computing platform for landscape performance |
CN111881537A (en) * | 2020-08-10 | 2020-11-03 | 哈尔滨工业大学 | Sponge construction effect evaluation method based on gray-green fusion |
CN112016179A (en) * | 2020-09-04 | 2020-12-01 | 中国水利水电科学研究院 | Coupling method of sponge urban facility evaluation model and urban rainfall flood model |
CN112288127A (en) * | 2020-09-10 | 2021-01-29 | 中国市政工程华北设计研究总院有限公司 | Drainage system matching evaluation method and platform |
CN112836985A (en) * | 2021-02-26 | 2021-05-25 | 澜途集思生态科技集团有限公司 | Sponge city comprehensive evaluation method |
CN112907047A (en) * | 2021-02-03 | 2021-06-04 | 深圳市创环环保科技有限公司 | Sponge city performance evaluation system |
CN112905721A (en) * | 2019-12-03 | 2021-06-04 | 中国电建集团西北勘测设计研究院有限公司 | Database system for sponge city construction projects |
CN112906950A (en) * | 2021-02-03 | 2021-06-04 | 深圳市创环环保科技有限公司 | Sponge city planning and designing system |
CN113379299A (en) * | 2021-06-28 | 2021-09-10 | 哈尔滨工业大学 | Model-based method for evaluating combined overflow pollution condition |
CN113947301A (en) * | 2021-10-13 | 2022-01-18 | 广东巍智科技有限公司 | Sponge city project evaluation method and device, terminal equipment and storage medium |
CN114118842A (en) * | 2021-12-01 | 2022-03-01 | 悉地(苏州)勘察设计顾问有限公司 | Sponge city construction engineering design examination system |
CN114662921A (en) * | 2022-03-24 | 2022-06-24 | 深圳市深水水务咨询有限公司 | Sponge city construction method and system based on basin management |
CN115270525A (en) * | 2022-09-27 | 2022-11-01 | 武汉市规划研究院 | Method and system for constructing dual EXP function runoff coefficient design model |
CN115796633A (en) * | 2022-09-30 | 2023-03-14 | 北京大学深圳研究生院 | Urban rural land utilization comprehensive improvement performance assessment method and system |
CN116109206A (en) * | 2023-03-30 | 2023-05-12 | 珠海市清创生态环境有限公司 | Construction effect evaluation method and device for sponge facility, terminal and storage medium |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130311145A1 (en) * | 2004-07-28 | 2013-11-21 | Blueridge Analytics, Inc. | Computer-implemented land planning system and method designed to generate at least one conceptual fit solution to a user-defined land development problem |
-
2018
- 2018-12-04 CN CN201811493460.7A patent/CN109657948A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130311145A1 (en) * | 2004-07-28 | 2013-11-21 | Blueridge Analytics, Inc. | Computer-implemented land planning system and method designed to generate at least one conceptual fit solution to a user-defined land development problem |
Non-Patent Citations (2)
Title |
---|
贺文彦等: "海绵城市试点区域内面源污染发生过程及其对水体污染负荷贡献评估", 《环境科学学报》 * |
閤超成: "海绵城市评价体系构建及应用", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110378611A (en) * | 2019-07-25 | 2019-10-25 | 泰华智慧产业集团股份有限公司 | Sponge control index based on GIS examines and appraisal procedure and system |
CN110378620A (en) * | 2019-07-29 | 2019-10-25 | 四川省建筑设计研究院 | The low influence exploitation design of one kind and appraisal procedure and system |
CN110378620B (en) * | 2019-07-29 | 2022-06-03 | 四川省建筑设计研究院有限公司 | Low-impact development design and evaluation method and system |
CN112905721A (en) * | 2019-12-03 | 2021-06-04 | 中国电建集团西北勘测设计研究院有限公司 | Database system for sponge city construction projects |
CN111275283A (en) * | 2019-12-20 | 2020-06-12 | 北京林业大学 | On-line computing platform for landscape performance |
CN111141539A (en) * | 2020-01-14 | 2020-05-12 | 北京清控人居环境研究院有限公司 | Wisdom evaluation system of sponge facility effect under artificial rainfall situation |
CN111881537A (en) * | 2020-08-10 | 2020-11-03 | 哈尔滨工业大学 | Sponge construction effect evaluation method based on gray-green fusion |
CN111881537B (en) * | 2020-08-10 | 2024-02-20 | 哈尔滨工业大学 | Sponge construction effect evaluation method based on gray-green fusion |
CN112016179A (en) * | 2020-09-04 | 2020-12-01 | 中国水利水电科学研究院 | Coupling method of sponge urban facility evaluation model and urban rainfall flood model |
CN112288127A (en) * | 2020-09-10 | 2021-01-29 | 中国市政工程华北设计研究总院有限公司 | Drainage system matching evaluation method and platform |
CN112288127B (en) * | 2020-09-10 | 2023-09-19 | 中国市政工程华北设计研究总院有限公司 | Drainage system matching evaluation method and platform |
CN112907047A (en) * | 2021-02-03 | 2021-06-04 | 深圳市创环环保科技有限公司 | Sponge city performance evaluation system |
CN112906950A (en) * | 2021-02-03 | 2021-06-04 | 深圳市创环环保科技有限公司 | Sponge city planning and designing system |
CN112906950B (en) * | 2021-02-03 | 2023-06-27 | 深圳市创环环保科技有限公司 | Sponge city planning and designing system |
CN112836985A (en) * | 2021-02-26 | 2021-05-25 | 澜途集思生态科技集团有限公司 | Sponge city comprehensive evaluation method |
CN113379299B (en) * | 2021-06-28 | 2022-11-11 | 哈尔滨工业大学 | Model-based method for evaluating combined overflow pollution condition |
CN113379299A (en) * | 2021-06-28 | 2021-09-10 | 哈尔滨工业大学 | Model-based method for evaluating combined overflow pollution condition |
CN113947301B (en) * | 2021-10-13 | 2022-09-13 | 广东巍智科技有限公司 | Sponge city project evaluation method and device, terminal equipment and storage medium |
CN113947301A (en) * | 2021-10-13 | 2022-01-18 | 广东巍智科技有限公司 | Sponge city project evaluation method and device, terminal equipment and storage medium |
CN114118842A (en) * | 2021-12-01 | 2022-03-01 | 悉地(苏州)勘察设计顾问有限公司 | Sponge city construction engineering design examination system |
CN114662921A (en) * | 2022-03-24 | 2022-06-24 | 深圳市深水水务咨询有限公司 | Sponge city construction method and system based on basin management |
CN115270525A (en) * | 2022-09-27 | 2022-11-01 | 武汉市规划研究院 | Method and system for constructing dual EXP function runoff coefficient design model |
CN115796633A (en) * | 2022-09-30 | 2023-03-14 | 北京大学深圳研究生院 | Urban rural land utilization comprehensive improvement performance assessment method and system |
CN115796633B (en) * | 2022-09-30 | 2023-08-08 | 北京大学深圳研究生院 | Urban village land utilization comprehensive renovation performance evaluation method and system |
CN116109206A (en) * | 2023-03-30 | 2023-05-12 | 珠海市清创生态环境有限公司 | Construction effect evaluation method and device for sponge facility, terminal and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109657948A (en) | Plot sponge urban construction performance comprehensive estimation method | |
CN110378611A (en) | Sponge control index based on GIS examines and appraisal procedure and system | |
Chikhi et al. | Review of Sponge City implementation in China: Performance and policy | |
Mockler et al. | Pathways project final report volume 4: catchment modelling tool | |
Jayasooriya et al. | Development of a framework for the valuation of Eco-System Services of Green Infrastructure | |
Coville et al. | Loss of street trees predicted to cause 6000 L/tree increase in leaf-on stormwater runoff for Great Lakes urban sewershed | |
Farzana et al. | Application of swat model for assessing water availability in Surma River basin | |
Kolekar et al. | Site selection of water conservation measures by using RS and GIS: a review | |
CN113449435B (en) | Multi-objective optimization method for sponge city engineering design | |
Myers et al. | Implementing Water Sensitive Urban Design in Stormwater Management Plans | |
Desta | Reservoir siltation in Ethiopia: Causes, source areas, and management options | |
Yu | Assessment of the physical, socioeconomic and climatic constraints on green infrastructure | |
Imteaz et al. | Experimental and mathematical modelling study on clogging behaviour of bioretention systems | |
Abubakar | Sustainable Management of Storm Water Generation in a Fast Urbanizing Residential Area: A Case Study of Malete, Nigeria | |
Chen et al. | Impact of Urbanization on Hydrological Processes: A Case Study of Xinji River in Southern China | |
Chikhi et al. | corrected Proof | |
Molla et al. | Assessment of and Solutions to the Stormwater Management System of Auburn University Campus in Auburn, Alabama | |
Water | Green infrastructure stormwater retention performance | |
Chowdhury | Effects of Land Use, Its Management and Rainfall Variability on Stormwater Runoff in Urban, Agricultural and Mixed-Use Watersheds | |
Xu et al. | Exploring the Hydrological Benefits of a Lid-Based Stormwater Park at the Block-Level: A Case Study in Nanjing, China | |
AL-Samawi | The impacts of land-use change on Runoff characteristics from the IWRM perspective: A case study in Wadi Al-Mulaikhy Sub-watershed in | |
Castle | Geodatabases in design: a floodplain analysis of Little Kitten Creek | |
Shadeed et al. | Management Options of Wadi Faria Baseflow | |
Zulal | ASSESSMENT OF LAND USE CHANGE IMPACTS ON HYDROLOGICAL PARAMETERS IN PORSUK RIVER BASIN TURKEY | |
Aimino | The Effect of Record Length and Duration on Continuous Modeling to Design Stormwater Control Measures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |