CN109654380A - A kind of line leakage system solar electric power supply system fission imbededd case - Google Patents

A kind of line leakage system solar electric power supply system fission imbededd case Download PDF

Info

Publication number
CN109654380A
CN109654380A CN201910117923.8A CN201910117923A CN109654380A CN 109654380 A CN109654380 A CN 109654380A CN 201910117923 A CN201910117923 A CN 201910117923A CN 109654380 A CN109654380 A CN 109654380A
Authority
CN
China
Prior art keywords
fixedly installed
battery case
photovoltaic panel
power supply
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910117923.8A
Other languages
Chinese (zh)
Inventor
孙建国
段文宇
史朝旭
田蕊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Langfang Huayu Tianchuang Energy Equipment Co Ltd
Original Assignee
Langfang Huayu Tianchuang Energy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Langfang Huayu Tianchuang Energy Equipment Co Ltd filed Critical Langfang Huayu Tianchuang Energy Equipment Co Ltd
Priority to CN201910117923.8A priority Critical patent/CN109654380A/en
Publication of CN109654380A publication Critical patent/CN109654380A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D5/00Protection or supervision of installations
    • F17D5/02Preventing, monitoring, or locating loss

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Photovoltaic Devices (AREA)

Abstract

The present invention relates to new energy equipment technical fields, and disclose a kind of line leakage system solar electric power supply system fission imbededd case, including lower battery case, the inside of the lower battery case is fixedly installed with battery, it is fixedly installed with battery case at the top of the lower battery case, is fixedly installed with photovoltaic panel pedestal at the top of the upper battery case.Pass through lower battery case and upper battery case, a protection capsul is provided for battery, ensure that battery can be buried in the earth formation, photovoltaic panel is sealingly mounted inside mounting groove by photovoltaic panel pedestal and sunlight board, ensure that photovoltaic panel can be buried in the earth formation, make the place that cannot or be inconvenient to install solar energy upright bar that solar charging device can be installed by the way of imbededd case, applicability is good, it is flushed by the top surface of sunlight board with ground, may be mounted at the imbededd case on the road surfaces such as pavement, pedestrian is not influenced to pass through at all, it is convenient and reliable, further improve the applicability of the imbededd case.

Description

A kind of line leakage system solar electric power supply system fission imbededd case
Technical field
The present invention relates to new energy equipment technical field, the solar powered systems of specially a kind of line leakage system The seperated imbededd case of system.
Background technique
Heating system is the temperature for keeping indoor holding certain by artificial means to indoor supply heat, is suitable for create The facility of living condition or operating condition is mainly made of three heat source, heat circulating system and heat dissipation equipment major parts, and heat is followed Loop system is the grid being spliced by conveyance conduit, and system of laying mainly has aerial laying and buried-pipe laying, buried to apply If relatively common, the pipe network of buried-pipe laying is inconvenient to hunt leak, and pipe laying leakage monitoring system is needed to carry out leakage inspection to pipeline It surveys.
Existing line leakage system is powered using solar charging device, and solar charging device is needed using too Positive energy upright bar bracket installs solar panel, needs to occupy very large space, there are some places during installing and using Solar energy upright bar and device cannot be installed, are also inconvenient to that solar energy upright bar and solar charging device are installed, such as the pipe in roadbed Road monitors system, at high cost if installation dry cell requires manual replacement dry cell to line leakage system power supply, does The battery altering time is short, very inconvenient, poor for applicability, and solar energy upright bar bracket is all whole welding type structure, volume compared with Greatly, it has not been convenient to be installed, the personnel of working at the same time can not can only monitor at any time pipeline, no in fixed area monitoring pipeline Leakage detection is facilitated to repair, it is therefore desirable to design a kind of line leakage system solar electric power supply system fission imbededd case and solve State problem.
Summary of the invention
The present invention provides a kind of line leakage system solar electric power supply system fission imbededd cases, have applicability Advantage that is good, facilitating installation and transport, detection range big, solves existing line leakage system and utilizes solar recharging Device power supply, solar charging device need to install solar panel using solar energy upright bar bracket, need to occupy very big Space, there are some places cannot install solar energy upright bar and device during installing and using, and is also inconvenient to install solar energy Upright bar and solar charging device, such as the pepe monitoring system in roadbed, if installation dry cell is to line leakage system Power supply, requires manual replacement dry cell, and at high cost, dry cell replacing construction is short, very inconvenient, poor for applicability, and solar energy Upright bar bracket is all whole welding type structure, and volume is larger, it has not been convenient to be installed, while working at the same time personnel can only be in fixation Area monitoring pipeline, pipeline can not be monitored at any time, it has not been convenient to leakage detection repair the problem of.
The invention provides the following technical scheme: a kind of line leakage system is buried with solar electric power supply system fission Case, including lower battery case, the inside of the lower battery case are fixedly installed with battery, and the top of the lower battery case is fixedly mounted There is upper battery case, photovoltaic panel pedestal is fixedly installed at the top of the upper battery case, the top surface of the photovoltaic panel pedestal offers Mounting groove, the inside of the mounting groove are fixedly installed with photovoltaic panel, and the top surface of the photovoltaic panel pedestal is fixedly installed with sunlight board, The bottom surface of the photovoltaic panel pedestal is fixedly installed with equipment box, and the bottom surface of the equipment box cavity is fixedly installed with electric mounting Plate, the top surface of the appliance mounting panel are fixedly installed with antenna holder, transmitting-receiving day are fixedly installed at the top of the antenna holder Line, the top surface of the appliance mounting panel are fixedly installed with detection cartridge module, and the top surface of the appliance mounting panel is fixedly installed with position Voltage stabilizing module on the right side of detection cartridge module, the top surface of the appliance mounting panel is fixedly installed with positioned at the distant of the Voltage stabilizing module back side Control switch, the top surface of the appliance mounting panel is fixedly installed with the solar controller positioned at the remote control switch back side, the equipment The back side fixation of case is communicated with fairlead, and the left and right sides of the equipment box are fixedly installed with fixed wing plate, described to power on The right side fixation of pond box is communicated with penetration pipe.
Preferably, the section configuration of the lower battery case and upper battery case is trapezoidal, the lower battery case and upper battery The width value of box junction is greater than the width value of lower battery case bottom surface, the width value of the upper battery case and lower battery case junction Greater than the width value of upper battery box top.
Preferably, the inner wall of the lower battery case is fixedly installed with support plate, and the battery side is fixedly installed with company Fishplate bar, the support plate are bolted with connecting plate.
Preferably, the sunlight board is fixedly connected by dormant bolt with photovoltaic panel pedestal, and the top surface of the sunlight board is opened Equipped with fixation hole compatible with dormant bolt.
Preferably, the top surface of the photovoltaic panel pedestal offers seal groove, and the inside of the seal groove is fixedly installed with close Seal, there are two the seal grooves, and the seal groove is opened up around mounting groove.
Preferably, the shape of the fixed wing plate be right angled triangle, two right-angle sides of the fixed wing plate respectively with The bottom surface of photovoltaic panel pedestal and the side of equipment box are fixedly welded.
Preferably, the depth value of the mounting groove is equal to the thickness value of photovoltaic panel.
Preferably, the bottom surface of the equipment box cavity, which is fixedly installed with, is fixedly connected with column, the top for being fixedly connected with column Threaded hole is offered, the top surface of the appliance mounting panel offers mounting hole compatible with threaded hole, lives in the mounting hole Dynamic to be equipped with connection bolt, the bottom end of the connection bolt and threaded hole screw thread are socketed.
Preferably, the connection bolt is hexagon socket head cap screw, and the specification for connecting bolt is M8*12.
Preferably, the top surface bolt of the appliance mounting panel is equipped with the connecting terminal block on the left of remote control switch.
The present invention have it is following the utility model has the advantages that
1, by lower battery case and upper battery case, a protection capsul is provided for battery, it is ensured that battery can It buries in the earth formation, photovoltaic panel is sealingly mounted inside mounting groove by photovoltaic panel pedestal and sunlight board, it is ensured that photovoltaic panel energy It is enough to bury in the earth formation, the place that cannot or be inconvenient to install solar energy upright bar be installed can by the way of imbededd case too Positive energy charging unit, applicability is good, is flushed by the top surface of sunlight board with ground, and the imbededd case is made to may be mounted at pavement etc. On road surface, does not influence pedestrian at all and pass through, it is convenient and reliable, further improve the applicability of the imbededd case.
2, the line leakage system is adopted a split structure with solar electric power supply system fission imbededd case, is allowed one to It is enough that very easily the imbededd case is transported, it is bolted to connection between each accessory inside the imbededd case, facilitates people Assemble the imbededd case at the construction field (site), installed by buried mode, mounting means is more convenient.
3, it is fixedly installed with remote control switch inside line leakage system solar electric power supply system fission imbededd case, By remote control switch, far distance control detection cartridge module is enabled people to, by detection cartridge module real-time monitoring periphery for return water Leak point in the 3000m of front and back enables pipe leakage point to be found in time, and the energy is greatly saved, and guarantees institute for hot-zone The heating temperature of domain resident, the generation for being conducive to prevent larger security risk leakage enable people to having by dual-mode antenna Monitored at any time on the computer or smart phone of network pipeline leakage and and alarm, facilitate leakage detection to repair.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the front view of Fig. 1;
Fig. 4 is the schematic diagram of the section structure in Fig. 2 at A-A;
Fig. 5 is the schematic diagram of the section structure in Fig. 3 at B-B.
In figure: 1, lower battery case;2, battery;3, upper battery case;4, photovoltaic panel pedestal;5, mounting groove;6, photovoltaic panel;7, Sunlight board;8, equipment box;9, it is fixedly connected with column;10, appliance mounting panel;11, bolt is connected;12, antenna holder;13, day is received and dispatched Line;14, cartridge module is detected;15, Voltage stabilizing module;16, remote control switch;17, solar controller;18, fairlead;19, fixed-wing Plate;20, penetration pipe.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-5, a kind of line leakage system solar electric power supply system fission imbededd case, including lower battery Box 1, the inner wall of lower battery case 1 are fixedly installed with support plate, and 2 side of battery is fixedly installed with connecting plate, support plate with connect Plate is bolted, and makes battery 2 in vacant state, is conducive to 2 internal heat of battery and scatters and disappears, and lower battery case 1 and powers on The section configuration of pond box 3 be it is trapezoidal, lower battery case 1 and the width value of upper 3 junction of battery case are greater than lower 1 bottom surface of battery case Width value, upper battery case 3 are greater than the width value of upper 3 top surface of battery case with the width value of lower 1 junction of battery case, increase lower battery The resistance that box 1 and upper battery case 3 move in the earth formation, makes the imbededd case not sink in the earth formation, and the inside of lower battery case 1 is solid Dingan County is equipped with battery 2, and the top of lower battery case 1 is fixedly installed with battery case 3, and the top of upper battery case 3 is fixedly installed with Photovoltaic panel pedestal 4, the top surface of photovoltaic panel pedestal 4 offer seal groove, and the inside of seal groove is fixedly installed with sealing ring, seal groove There are two, seal groove is opened up around mounting groove 5, is carried out to the gap between sunlight board 7 and photovoltaic panel pedestal 4 close Envelope makes water not enter mounting groove 5, avoids the problem that the short circuit of intaking of photovoltaic panel 6 is burnt, the top surface of photovoltaic panel pedestal 4 offers Mounting groove 5, the depth value of mounting groove 5 are equal to the thickness value of photovoltaic panel 6, and the bottom surface of the top surface and sunlight board 7 that make photovoltaic panel 6 connects It connects, provides support force for sunlight board 7, avoid the problem that 7 middle part stress of sunlight board is recessed, the inside of mounting groove 5 is fixedly installed with Photovoltaic panel 6, the top surface of photovoltaic panel pedestal 4 are fixedly installed with sunlight board 7, and sunlight board 7 is solid by dormant bolt and photovoltaic panel pedestal 4 Fixed connection, the top surface of sunlight board 7 offers fixation hole compatible with dormant bolt, flushes the top surface of sunlight board 7, do not have Protrusion interferes pedestrian, and the bottom surface of photovoltaic panel pedestal 4 is fixedly installed with equipment box 8, and the bottom surface of 8 inner cavity of equipment box is fixedly installed with Determine connecting column 9, the top for being fixedly connected with column 9 offers threaded hole, and the top surface of appliance mounting panel 10 is offered mutually fits with threaded hole The mounting hole matched, is movably installed with connection bolt 11 in mounting hole, and connection bolt 11 is hexagon socket head cap screw, and connection bolt 11 Specification is M8*12, and the bottom end and threaded hole screw thread for connecting bolt 11 are socketed, and keep appliance mounting panel 10 hanging, is conducive to electric appliance peace Various instruments heat dissipation on 10 top surface of loading board, the bottom surface of 8 inner cavity of equipment box is fixedly installed with appliance mounting panel 10, appliance mounting panel 10 top surface bolt is equipped with the connecting terminal block positioned at 16 left side of remote control switch, facilitates people's conducting wire, appliance mounting panel 10 top surface is fixedly installed with antenna holder 12, and the top of antenna holder 12 is fixedly installed with dual-mode antenna 13, appliance mounting panel 10 top surface is fixedly installed with detection cartridge module 14, and the top surface of appliance mounting panel 10, which is fixedly installed with, is located at 14 right side of detection cartridge module The Voltage stabilizing module 15 of side, the top surface of appliance mounting panel 10 are fixedly installed with the remote control switch 16 positioned at 15 back side of Voltage stabilizing module, electricity The top surface of device mounting plate 10 is fixedly installed with the solar controller 17 positioned at 16 back side of remote control switch, and the back side of equipment box 8 is solid Surely it is communicated with fairlead 18, the left and right sides of equipment box 8 are fixedly installed with fixed wing plate 19, and the shape of fixed wing plate 19 is Right angled triangle, two right-angle sides of fixed wing plate 19 are fixed with the bottom surface of photovoltaic panel pedestal 4 and the side of equipment box 8 weld respectively It connects, increases the intensity of photovoltaic panel pedestal 4, be bent photovoltaic panel pedestal 4 will not, fixed be communicated in the right side of upper battery case 3 is worn Spool 20.
When assembling, then battery 2 is fixedly mounted on inside lower battery case 1, then by upper battery case 3 and lower battery case 1 is installed together by bolt, and equipment box 8 is laid flat to the mounting hole for making to open up on appliance mounting panel 10 on the ground later and is consolidated The threaded hole alignment for determining 9 top of connecting column, is then inserted into mounting hole for the bottom end for connecting bolt 11 and rotates, and makes to connect bolt 11 With threaded hole screw thread noose, appliance mounting panel 10 is fixed, then successively will test cartridge module 14, Voltage stabilizing module using bolt 15, remote control switch 16, solar controller 17, antenna holder 12 and connecting terminal block are fixedly mounted on the top of appliance mounting panel 10 Photovoltaic panel 6 is then fixedly mounted on inside mounting groove 5 by face, is later aligned sunlight board 7 with photovoltaic panel pedestal 4, installs sunlight The bolt at plate 7 top surface front and rear sides edge and 7 right edge of sunlight board, makes sunlight board 7 be fixed together with photovoltaic panel pedestal 4, Then photovoltaic panel pedestal 4 is lifted, the left end of photovoltaic panel pedestal 4 is placed on to the top of upper battery case 3, using bolt by sunlight board 7, photovoltaic panel pedestal 4 and upper battery case 3 are fixed together, and complete assembling.
In use, photovoltaic panel 6 receives solar energy, electric energy is converted solar energy into, electric energy passes through at solar controller 17 Enter in battery 2 after reason and keep in, then the electric energy in battery 2 enters Voltage stabilizing module 15, at 15 pressure stabilizing of Voltage stabilizing module It is dual-mode antenna 13 after reason, detects cartridge module 14 and the power supply of remote control switch 16, then passes through the control detection box mould of remote control switch 16 Block 14 works, and detection 14 real-time monitoring periphery of cartridge module is for the leak point in 3000m before and after return water, and the data that will test are logical It crosses dual-mode antenna 13 to be sent on the computer or smart phone for being connected with network, leakage detection is facilitated to repair.
It should be noted that, in this document, relational terms such as first and second and the like are only used to an entity Or operation is distinguished with another entity or operation, is existed without necessarily requiring or implying between these entities or operation Any actual relationship or order.Moreover, the terms "include", "comprise" or its any other variant be intended to it is non- It is exclusive to include, so that the process, method, article or equipment for including a series of elements not only includes those elements, It but also including other elements that are not explicitly listed, or further include solid by this process, method, article or equipment Some elements.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (10)

1. a kind of line leakage system solar electric power supply system fission imbededd case, including lower battery case (1), feature exists In: the inside of the lower battery case (1) is fixedly installed with battery (2), is fixedly installed at the top of the lower battery case (1) Battery case (3) is fixedly installed with photovoltaic panel pedestal (4) at the top of the upper battery case (3), the top of the photovoltaic panel pedestal (4) Face offers mounting groove (5), and the inside of the mounting groove (5) is fixedly installed with photovoltaic panel (6), the photovoltaic panel pedestal (4) Top surface is fixedly installed with sunlight board (7), and the bottom surface of the photovoltaic panel pedestal (4) is fixedly installed with equipment box (8), the equipment box (8) bottom surface of inner cavity is fixedly installed with appliance mounting panel (10), and the top surface of the appliance mounting panel (10) is fixedly installed with antenna Bracket (12) is fixedly installed with dual-mode antenna (13) at the top of the antenna holder (12), the top of the appliance mounting panel (10) Face is fixedly installed with detection cartridge module (14), and the top surface of the appliance mounting panel (10), which is fixedly installed with, is located at detection cartridge module (14) Voltage stabilizing module (15) on the right side of, the top surface of the appliance mounting panel (10) are fixedly installed with positioned at Voltage stabilizing module (15) back side Remote control switch (16), the top surface of the appliance mounting panel (10) is fixedly installed with the solar energy positioned at remote control switch (16) back side The back side fixation of controller (17), the equipment box (8) is communicated with fairlead (18), the left and right sides of the equipment box (8) It is fixedly installed with fixed wing plate (19), the right side fixation of the upper battery case (3) is communicated with penetration pipe (20).
2. a kind of line leakage system solar electric power supply system fission imbededd case according to claim 1, special Sign is: the section configuration of the lower battery case (1) and upper battery case (3) is trapezoidal, the lower battery case (1) and upper battery The width value of box (3) junction is greater than the width value of lower battery case (1) bottom surface, and the upper battery case (3) and lower battery case (1) are even The width value for meeting place is greater than the width value of upper battery case (3) top surface.
3. a kind of line leakage system solar electric power supply system fission imbededd case according to claim 1, special Sign is: the inner wall of the lower battery case (1) is fixedly installed with support plate, and battery (2) side is fixedly installed with connection Plate, the support plate are bolted with connecting plate.
4. a kind of line leakage system solar electric power supply system fission imbededd case according to claim 1, special Sign is: the sunlight board (7) is fixedly connected by dormant bolt with photovoltaic panel pedestal (4), and the top surface of the sunlight board (7) is opened Equipped with fixation hole compatible with dormant bolt.
5. a kind of line leakage system solar electric power supply system fission imbededd case according to claim 1, special Sign is: the top surface of the photovoltaic panel pedestal (4) offers seal groove, and the inside of the seal groove is fixedly installed with sealing ring, There are two the seal grooves, and the seal groove is opened up around mounting groove (5).
6. a kind of line leakage system solar electric power supply system fission imbededd case according to claim 1, special Sign is: the shape of the fixed wing plate (19) be right angled triangle, two right-angle sides of the fixed wing plate (19) respectively with The bottom surface of photovoltaic panel pedestal (4) and the side of equipment box (8) are fixedly welded.
7. a kind of line leakage system solar electric power supply system fission imbededd case according to claim 1, special Sign is: the depth value of the mounting groove (5) is equal to the thickness value of photovoltaic panel (6).
8. a kind of line leakage system solar electric power supply system fission imbededd case according to claim 1, special Sign is: the bottom surface of equipment box (8) inner cavity, which is fixedly installed with, to be fixedly connected column (9), the top for being fixedly connected with column (9) Threaded hole is offered, the top surface of the appliance mounting panel (10) offers mounting hole compatible with threaded hole, the mounting hole It is inside movably installed with connection bolt (11), the bottom end of connection bolt (11) and threaded hole screw thread are socketed.
9. a kind of line leakage system solar electric power supply system fission imbededd case according to claim 8, special Sign is: the connection bolt (11) is hexagon socket head cap screw, and the specification for connecting bolt (11) is M8*12.
10. a kind of line leakage system solar electric power supply system fission imbededd case according to claim 8, special Sign is: the top surface bolt of the appliance mounting panel (10) is equipped with the connecting terminal block on the left of remote control switch (16).
CN201910117923.8A 2019-02-15 2019-02-15 A kind of line leakage system solar electric power supply system fission imbededd case Pending CN109654380A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910117923.8A CN109654380A (en) 2019-02-15 2019-02-15 A kind of line leakage system solar electric power supply system fission imbededd case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910117923.8A CN109654380A (en) 2019-02-15 2019-02-15 A kind of line leakage system solar electric power supply system fission imbededd case

Publications (1)

Publication Number Publication Date
CN109654380A true CN109654380A (en) 2019-04-19

Family

ID=66122751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910117923.8A Pending CN109654380A (en) 2019-02-15 2019-02-15 A kind of line leakage system solar electric power supply system fission imbededd case

Country Status (1)

Country Link
CN (1) CN109654380A (en)

Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004350431A (en) * 2003-05-23 2004-12-09 Mirai Ind Co Ltd Ground buried box and supporting structure for wiring/piping material in ground buried box, and supporting device
JP2006101575A (en) * 2004-09-28 2006-04-13 Kita Kanto Kogyo:Kk Structure of subterranean embedding box
CN201188433Y (en) * 2008-04-01 2009-01-28 陈保朝 Groud-imbededd case for solar storage battery
CN300920277S (en) * 2008-04-03 2009-05-06 陈保朝 Buried box for photovoltaic battery
CN201448719U (en) * 2009-06-25 2010-05-05 中电电气集团有限公司 Underground solar indicator light
CN201804934U (en) * 2010-10-09 2011-04-20 株洲联诚集团有限责任公司 Stainless steel accumulator power supply box of high-speed locomotive
CN102444854A (en) * 2010-09-30 2012-05-09 常州锦旸太阳能科技有限公司 Solar underground lamp
KR101173170B1 (en) * 2012-02-24 2012-08-10 (주)대양이티엔씨 Underground box having sensors
CN103017069A (en) * 2012-12-23 2013-04-03 昆山市圣光新能源科技有限公司 High-efficiency underground energy-saving lamp with guiding function
CN103185201A (en) * 2011-12-30 2013-07-03 中国石油天然气股份有限公司 Integrated leakage monitoring terminal for manual valve chamber of oil-gas pipeline
CN204083821U (en) * 2014-07-22 2015-01-07 祁麟 A kind of pipe leakage early warning system
CN105090757A (en) * 2015-09-17 2015-11-25 成都千易信息技术有限公司 Oil and gas pipeline leakage monitoring system
CN205319198U (en) * 2015-12-02 2016-06-15 泸州卓峰新能源科技有限公司 Bury case solar battery
CN205402546U (en) * 2016-03-07 2016-07-27 翔派(厦门)电子商务有限公司 Bury formula LED lawn lamp solar energy
CN106007147A (en) * 2016-07-20 2016-10-12 江苏展宏环保科技有限公司 Buried photovoltaic heating sewage treatment device
CN106864294A (en) * 2017-03-21 2017-06-20 刘金凤 A kind of buried solar recharging automobile knee
CN206478582U (en) * 2016-12-29 2017-09-08 广州亮点灯饰有限公司 One kind indicates underground lamp
CN107830477A (en) * 2017-09-18 2018-03-23 扬州市泽龙塑业有限公司 A kind of band automatically turns on button solar cell imbededd case
CN207162388U (en) * 2017-09-18 2018-03-30 扬州市泽龙塑业有限公司 A kind of band automatically turns on button solar cell imbededd case
CN207246799U (en) * 2017-05-12 2018-04-17 光蓝科技有限公司 A kind of pipe leakage fibre-optical temperature sensing monitor
CN207247063U (en) * 2017-09-01 2018-04-17 陈旭东 A kind of buried landscape lamp structures of LED
CN108263785A (en) * 2018-01-16 2018-07-10 湖南望隆企业管理咨询有限公司 A kind of buried environment-friendly trash can
CN108631251A (en) * 2018-06-14 2018-10-09 深圳市国电投资有限公司 A kind of photovoltaic solar cover board
CN209688531U (en) * 2019-02-15 2019-11-26 廊坊华宇天创能源设备有限公司 A kind of line leakage system solar electric power supply system fission imbededd case

Patent Citations (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004350431A (en) * 2003-05-23 2004-12-09 Mirai Ind Co Ltd Ground buried box and supporting structure for wiring/piping material in ground buried box, and supporting device
JP2006101575A (en) * 2004-09-28 2006-04-13 Kita Kanto Kogyo:Kk Structure of subterranean embedding box
CN201188433Y (en) * 2008-04-01 2009-01-28 陈保朝 Groud-imbededd case for solar storage battery
CN300920277S (en) * 2008-04-03 2009-05-06 陈保朝 Buried box for photovoltaic battery
CN201448719U (en) * 2009-06-25 2010-05-05 中电电气集团有限公司 Underground solar indicator light
CN102444854A (en) * 2010-09-30 2012-05-09 常州锦旸太阳能科技有限公司 Solar underground lamp
CN201804934U (en) * 2010-10-09 2011-04-20 株洲联诚集团有限责任公司 Stainless steel accumulator power supply box of high-speed locomotive
CN103185201A (en) * 2011-12-30 2013-07-03 中国石油天然气股份有限公司 Integrated leakage monitoring terminal for manual valve chamber of oil-gas pipeline
KR101173170B1 (en) * 2012-02-24 2012-08-10 (주)대양이티엔씨 Underground box having sensors
CN103017069A (en) * 2012-12-23 2013-04-03 昆山市圣光新能源科技有限公司 High-efficiency underground energy-saving lamp with guiding function
CN204083821U (en) * 2014-07-22 2015-01-07 祁麟 A kind of pipe leakage early warning system
CN105090757A (en) * 2015-09-17 2015-11-25 成都千易信息技术有限公司 Oil and gas pipeline leakage monitoring system
CN205319198U (en) * 2015-12-02 2016-06-15 泸州卓峰新能源科技有限公司 Bury case solar battery
CN205402546U (en) * 2016-03-07 2016-07-27 翔派(厦门)电子商务有限公司 Bury formula LED lawn lamp solar energy
CN106007147A (en) * 2016-07-20 2016-10-12 江苏展宏环保科技有限公司 Buried photovoltaic heating sewage treatment device
CN206478582U (en) * 2016-12-29 2017-09-08 广州亮点灯饰有限公司 One kind indicates underground lamp
CN106864294A (en) * 2017-03-21 2017-06-20 刘金凤 A kind of buried solar recharging automobile knee
CN207246799U (en) * 2017-05-12 2018-04-17 光蓝科技有限公司 A kind of pipe leakage fibre-optical temperature sensing monitor
CN207247063U (en) * 2017-09-01 2018-04-17 陈旭东 A kind of buried landscape lamp structures of LED
CN107830477A (en) * 2017-09-18 2018-03-23 扬州市泽龙塑业有限公司 A kind of band automatically turns on button solar cell imbededd case
CN207162388U (en) * 2017-09-18 2018-03-30 扬州市泽龙塑业有限公司 A kind of band automatically turns on button solar cell imbededd case
CN108263785A (en) * 2018-01-16 2018-07-10 湖南望隆企业管理咨询有限公司 A kind of buried environment-friendly trash can
CN108631251A (en) * 2018-06-14 2018-10-09 深圳市国电投资有限公司 A kind of photovoltaic solar cover board
CN209688531U (en) * 2019-02-15 2019-11-26 廊坊华宇天创能源设备有限公司 A kind of line leakage system solar electric power supply system fission imbededd case

Similar Documents

Publication Publication Date Title
CN209688531U (en) A kind of line leakage system solar electric power supply system fission imbededd case
CN106054773A (en) Intelligent building control system
CN109654380A (en) A kind of line leakage system solar electric power supply system fission imbededd case
CN209013975U (en) A kind of communication iron tower inclination monitoring system
CN204611354U (en) A kind of pipe network detection device
CN116434493A (en) Ground intelligent warning pile system and use method thereof
CN209688532U (en) A kind of line leakage system solar electric power supply system multi-stage power source imbededd case
CN206258547U (en) A kind of remote monitoring electric anti-theft device
CN212540549U (en) Portable thunder and lightning early warning device and thunder and lightning early warning system
CN213482483U (en) Gas well lid of solar energy power supply shelters from detection device
CN210684525U (en) Novel intelligent traffic road condition information acquisition device
CN210839046U (en) Power supply device of overflow early warning system
CN205566344U (en) Solar energy wireless router
CN209569434U (en) Flange reveals automatic alarm equipotential crossover assembly
CN112682750A (en) Multifunctional street lamp based on new energy and power supply system
CN210237787U (en) Solar energy cathodic protection test stake
CN215894893U (en) Photovoltaic protection device easy to assemble
CN211502179U (en) Camera support
CN218181647U (en) Intelligent cable warning pile
CN216903736U (en) Device for collecting hanging and dismounting states of ground wire in real time
CN211822129U (en) Urbanization intelligent street lamp pole
CN214363041U (en) Warning device for municipal building construction
CN217441518U (en) A integrated lamp for wisdom building site
CN107727821B (en) Rural pipe network quality of water on-line monitoring device
CN212871149U (en) Deep level displacement monitoring devices

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination