CN109653765A - The warehouse separated type lining cutting pressure relief support structure and method of one kind of multiple fillers - Google Patents

The warehouse separated type lining cutting pressure relief support structure and method of one kind of multiple fillers Download PDF

Info

Publication number
CN109653765A
CN109653765A CN201910111530.6A CN201910111530A CN109653765A CN 109653765 A CN109653765 A CN 109653765A CN 201910111530 A CN201910111530 A CN 201910111530A CN 109653765 A CN109653765 A CN 109653765A
Authority
CN
China
Prior art keywords
warehouse
carcass
country rock
rock
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910111530.6A
Other languages
Chinese (zh)
Other versions
CN109653765B (en
Inventor
刘杰
高素芳
郑斯源
卢获
谢晓康
黎照
孙涛
兰俊
周雨舟
林轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201910111530.6A priority Critical patent/CN109653765B/en
Publication of CN109653765A publication Critical patent/CN109653765A/en
Application granted granted Critical
Publication of CN109653765B publication Critical patent/CN109653765B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches

Abstract

The present invention provides the warehouse separated type lining cutting pressure relief support structures and construction method of one kind of multiple fillers, it includes complete country rock, it is mingled with plastic zone of surrounding rock between the complete country rock, the inner sidewall of the complete country rock and plastic zone of surrounding rock is provided with two linings, and is provided with gap therebetween;The inner space is provided with clast warehouse on the inner sidewall of complete country rock and plastic zone of surrounding rock, and the clast warehouse is internally provided with liquid crumb layer, and the gap setting between the clast warehouse and two linings has haydite warehouse and water-filling carcass.According to the stress condition and rock mass deformation of tunnel different location, supporting is carried out by stack manner before and after such as top to bottom, left and right, front and rear with the warehouse equipped with different fillings, while supporting country rock, if rock mass deformation, which occurs, to carry out discharge degree using the mobility of warehouse inner stuffing, the advantage of different materials is combined and is utilized to the maximum extent.

Description

The warehouse separated type lining cutting pressure relief support structure and method of one kind of multiple fillers
Technical field
Present invention is generally directed to the liner supporting of tunnel and deformation release and construction methods, realize while supporting tunnel It can be suitable for all kinds of tunnels and canal according to the stress condition of tunnel different location and rock mass deformation with carrying out safety economy release Road etc. needs the structure of supporting.
Background technique
Traditional lining cutting is the permanent supporting construction built in materials such as tunnel trunk periphery armored concrete.In order to It prevents surrouding rock deformation from can collapse, generallys use the measure of gunning concrete and steel reinforcement support, once rock mass deforms, power is just passed It is delivered to hole wall, increases the risk that hole wall destroys, may cause huge loss and danger, and reinforcing bar etc. if having subtle destruction just Material price is higher, to put into more costs using steel reinforcement support on a large scale.
Summary of the invention
Technical problem to be solved by the invention is to provide the warehouse separated type lining cutting pressure relief support structures of one kind of multiple fillers And construction method, liner supporting and deformation release of the structure mainly for tunnel, according to the stress condition of tunnel different location And rock mass deformation, supporting is carried out by stack manner before and after such as top to bottom, left and right, front and rear with the warehouse equipped with different fillings, is being supported It, can be using the mobility of warehouse inner stuffing progress discharge degree, to greatest extent if rock mass deformation occurs while country rock Ground combines and is utilized the advantage of different materials, even if warehouse destruction in part nor affects on overall effect, filler is full of warehouse Between gap can reinforce the supporting effect of lining cutting again, not only improved safety coefficient but also reduced input cost.
In order to realize above-mentioned technical characteristic, the object of the present invention is achieved like this: one kind of multiple fillers divide storehouse Formula lining cutting pressure relief support structure, it includes complete country rock, and plastic zone of surrounding rock is mingled between the complete country rock, described completely to enclose Rock and the inner sidewall of plastic zone of surrounding rock are provided with two linings, and are provided with gap therebetween;The inner space is close to complete Clast warehouse is provided on country rock and the inner sidewall of plastic zone of surrounding rock, the clast warehouse is internally provided with liquid clast Layer, the gap setting between the clast warehouse and two linings have haydite warehouse and water-filling carcass.
The clast warehouse includes parcel bag, and the parcel bag forms closed parcel bag using flexible utricule sewing; The outer cover of the parcel bag is equipped with geotechnological cloth bag, and it is broken to be filled with the discarded liquid generated by tunnel excavation inside the parcel bag Leftover.
The water-filling carcass is made of rubber tyre body flexible, and fluid in carcass, institute are filled inside the rubber tyre body The one end for stating water-filling carcass is connected with automatic relief valve, and the other end is equipped with pressure gauge.
The surface layer of the water-filling carcass is cased with one layer of carcass protective layer, is connected with drainpipe on the water-filling carcass.
Prearrangement of deformation amount cavity, the reserved change are provided between the complete country rock and plastic zone of surrounding rock and the gap of two linings It is provided with several liquid wrappage warehouses in shape cavity, and forms a laminar flow matter buffer layer.
Release/injected hole/drainpipe often is opened up away from a distance on two lining structure of each wrappage warehouse periphery.
Multiple pressure sensors are provided between two lining and liquid buffer layer.
The construction method of the warehouse separated type lining cutting pressure relief support structure of a variety of fillers described in any one, it includes following step It is rapid:
Step1: material prepares: preparing pressure sensor, automatic relief valve, pressure gauge, rubber tyre body, steel arch-shelf, discarded liquid Fluid in clast, haydite and carcass;
Step2: production filling package: selected discarded liquid clast is fitted into flexible parcel bag, and wraps up geotextiles outside Bag completes clast warehouse;One layer of carcass protective layer is wrapped outside water-filling carcass, and filling tire is filled with from carcass fluid input port Internal fluid, and guarantee that air-tightness is good;After water-filling carcass is connect with automatic relief valve and drainpipe, automatically unloading is set The threshold value of valve, into rubber tyre body, water-filling carcass is completed in water filling;Selected haydite is put into geotechnological cloth bag and is fastened, haydite storehouse is completed Body;
Step3: according to Rock Nature, carrying out numerical simulation and determine country rock long-term creep deflection, and country rock excavation is carried out to it and is unloaded Tunnel force simulation is analyzed after lotus, is obtained plastic zone of surrounding rock and complete country rock distribution situation after tunnel excavation, is determined each warehouse Installation site;
Step4: according to the actual situation, suitable digging mode is selected to carry out tunnel excavation;The point being greater than at 3cm is cleared up on country rock Angle;
Step5: after the completion of tunnel excavation, different warehouse disposing ways is selected according to the concrete condition in tunnel, for country rock Plastic zone distorting load large area, i.e., short anchor is squeezed into the designated position that need to install wrappage warehouse, for clast to be fixedly mounted Object warehouse and haydite warehouse lay the lesser water-filling carcass of itself bearing capacity in the lesser complete country rock of stress;
Step6: all liquid wrappage warehouses are fixed in advance at the top of two lining structures, warehouse and two lined steel arches are pacified simultaneously Dress after steel arch-shelf is installed, monitors steel arch-shelf ess-strain situation;Steel arch-shelf lower end sets up lock foot anchoring stock using buried, To be weldingly connected;Steel arch-shelf and lining cutting liquid inclusion enclave support naturally, carry out supporting to country rock, pour coagulation using high-pressure slip-casting Soil forms secondary lining;
Step7: pressure change in monitoring water-filling carcass, when carcass Compression is greater than P3, wherein P3 is automatic relief valve threshold value, Automatic release water body removal pressure, until load is stablized in P3.
The method have the advantages that:
1, the present invention innovatively proposes that the warehouse separated type lining cutting pressure relief support structure of one kind of multiple fillers, the structure are to consider At deformation allowance between tunnel surrounding and two linings, several different types of warehouses are filled, form the slow of liquid filler Protective layer is rushed, uniform supporting construction stress can be made, so that two lining uniform forces, it is significant to solve liner structure discontinuity Problem.
2, the proposed by the invention specified support reaction for dividing storehouse supporting construction that can provide to country rock, and its size can be by Automatic relief valve is adjusted according to Practical Project situation.
3, the supporting power for dividing storehouse supporting construction that can specify during Rock Creep to rock mass offer proposed by the invention, To significantly reduce the expansion of its plastic zone, so that the final creep compliance of country rock is greatly reduced;
4, the present invention can be mounted directly two lining of liquid filling layer application after tunnel excavation, cancel and just serve as a contrast suspension roof support, and reduction is just The disturbance to the country rock of tunnel is served as a contrast, free face displacement is can inhibit and plastic zone is developed to country rock deep.
5, the present invention can reduce tunnel support construction technology, greatly save the construction period, reduce just lined steel muscle, concrete and use Amount and arch area of section can save 30% ~ 40% related rolled steel dosage, reduce whole construction cost.
6, the present invention is arranged using the warehouse of a variety of fillers by different stack manners, can be according to country rock in tunnel The stress condition of different location is flexibly arranged in pairs or groups, and safety coefficient is improved.
7, the present invention is independently arranged using the warehouse of a variety of fillers, if there is a situation where individual warehouses to destroy, to it He has little effect warehouse, and overall stability is strong, improves Stability of Tunnels safety coefficient.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is that the present invention relates to a kind of warehouse stacked on top schematic diagrams of technology.
Fig. 2 is a kind of warehouse of technology involved in the present invention or so stack manner schematic diagram.
Fig. 3 is a kind of warehouse front and back stack manner schematic diagram of technology involved in the present invention.
Fig. 4 is clast warehouse schematic diagram according to the present invention.
Fig. 5 is haydite warehouse schematic diagram according to the present invention.
Fig. 6 is water-filling carcass schematic diagram according to the present invention.
In figure: complete country rock 1, plastic zone of surrounding rock 2, liquid crumb layer 3, clast warehouse 4, water-filling carcass 5, automatically unloading Valve 6, pressure gauge 7, drainpipe 8, carcass protective layer 9, haydite warehouse 10, release/injected hole/drainpipe 11, two linings 12, pressure pass Sensor 13, liquid buffer layer 14, parcel bag 15, geotechnological cloth bag 16, rubber tyre body 17, fluid 18 in carcass, conducting wire 19, haydite 20。
Specific embodiment
Embodiments of the present invention are described further with reference to the accompanying drawing.
Embodiment 1:
Referring to Fig. 1-6, the warehouse separated type lining cutting pressure relief support structure of one kind of multiple fillers, it includes complete country rock 1, described complete It is mingled with plastic zone of surrounding rock 2 between country rock 1, the inner sidewall of the complete country rock 1 and plastic zone of surrounding rock 2 is provided with two linings 12, and It is provided with gap therebetween;The inner space is provided with broken on the inner sidewall of complete country rock 1 and plastic zone of surrounding rock 2 Leftover warehouse 4, the clast warehouse 4 is internally provided with liquid crumb layer 3, between the clast warehouse 4 and two linings 12 Gap setting has haydite warehouse 10 and water-filling carcass 5.By using above-mentioned lining cutting pressure relief support structure, can to specific region into The targeted supporting of row, liquid crumb layer 3 mutually independent can provide specified branch instead to corresponding region in surrouding rock deformation early period Power, when surrouding rock deformation load is larger, each warehouse can removal country rock load in several ways, pass through liquid in warehouse first Charges squeeze flowing to two sides and consume a part of country rock load;Furthermore pressure is unloaded by automatic pressure relief valve discharge water body in carcass It removes.
Further, each clast warehouse 4, haydite warehouse 10 and water-filling carcass 5 each can work independently and be independent of each other, If there is a situation where individual 5 warehouses of water-filling carcass to destroy, other warehouse supporting effects are had little effect, overall stability By force, Stability of Tunnels safety coefficient is improved.
Further, the engineering waste material that the clast warehouse 4 filling is excavated, its object is to it with some strength Support action can be provided for tunnel.
Further, the clast warehouse 4 includes parcel bag 15, and the parcel bag 15 is sewed using flexible utricule Closed parcel bag;The outer cover of the parcel bag 15 is equipped with geotechnological cloth bag 16, is filled with inside the parcel bag 15 by tunnel Excavate the discarded liquid clast generated.The warehouse using a variety of fillers, is arranged by different stack manners, It can flexibly be arranged in pairs or groups according to the stress condition of country rock different location in tunnel, improve safety coefficient.The clast warehouse Outermost layer is wrapped up with geotechnological cloth bag 16, and its object is to prevent in country rock, there are sharp objects to puncture flexible pouch.
Further, point storehouse supporting construction proposed can give country rock to provide specified support reaction, and its size can be by Automatic relief valve is adjusted according to Practical Project situation.
Further, the preset automatic relief valve, its object is to work as water-filling carcass pressure, when reaching threshold value A part of water being automatically drained out in carcass, thus removal load.
Further, the water-filling carcass 5 is made of rubber tyre body 17 flexible, is filled inside the rubber tyre body 17 Fluid 18 in carcass, one end of the water-filling carcass 5 are connected with automatic relief valve 6, and the other end is equipped with pressure gauge 7.Its purpose It is to transmit package load to other positions of tunnel, avoids Local Loads excessive.
Further, the surface layer of the water-filling carcass 5 is cased with one layer of carcass protective layer 9, is connected on the water-filling carcass 5 Drainpipe 8.
Further, prearrangement of deformation amount chamber is provided between the complete country rock 1 and plastic zone of surrounding rock 2 and the gap of two linings 12 Body is provided with several liquid wrappage warehouses in the prearrangement of deformation amount cavity, and forms a laminar flow matter buffer layer 14.
Further, on two lining structure of each wrappage warehouse periphery often away from a distance open up release/injected hole/ Drainpipe 11.
Further, multiple pressure sensors 13 are provided between two lining 12 and liquid buffer layer 14.By described Pressure sensor 13.Pass through
Further, in later period monitoring process, if it find that carcass supporting power is too small, filler can be supplemented to carcass, improved Pressure in tire, and adjust the threshold value of pressure-relief valve.
Further, described to use haydite warehouse, its object is to haydites to have some strength, can provide branch for tunnel Shield effect, when load is excessive, haydite can be crushed, and haydite forces while being also the process of removal load, and haydite quality Gently, easy to carry.
Further, release/injected hole/drainpipe 11 of the setting, its object is to connect water-filling carcass for allowing Drainpipe draining, and the later period pass through the hole high-pressure slip-casting.
Embodiment 2:
The construction method of the warehouse separated type lining cutting pressure relief support structure of a variety of fillers described in any one, it the following steps are included:
Step1: material prepares: preparing pressure sensor 13, automatic relief valve 6, pressure gauge 7, rubber tyre body 17, steel arch-shelf, gives up Fluid 18 in abandoned stream matter clast, haydite and carcass;
Step2: production filling package: selected discarded liquid clast is fitted into flexible parcel bag 15, and package geotechnique outside Cloth bag 16 completes clast warehouse 4;One layer of carcass protective layer 9 is wrapped outside water-filling carcass 5, is filled from carcass fluid input port Enter and fill fluid 18 in carcass, and guarantees that air-tightness is good;After water-filling carcass 5 is connect with automatic relief valve 6 and drainpipe 8, The threshold value for setting automatic relief valve 6, into rubber tyre body 17, water-filling carcass is completed in water filling;Selected haydite is put into geotechnological cloth bag It is fastened in 16, completes haydite warehouse 10;
Step3: according to Rock Nature, carrying out numerical simulation and determine country rock long-term creep deflection, and country rock excavation is carried out to it and is unloaded Tunnel force simulation is analyzed after lotus, is obtained 1 distribution situation of plastic zone of surrounding rock 2 and complete country rock after tunnel excavation, is determined each storehouse The installation site of body;
Step4: according to the actual situation, suitable digging mode is selected to carry out tunnel excavation;The point being greater than at 3cm is cleared up on country rock Angle;
Step5: after the completion of tunnel excavation, different warehouse disposing ways is selected according to the concrete condition in tunnel, for country rock 2 distorting load large area of plastic zone, i.e., short anchor is squeezed into the designated position that need to install wrappage warehouse, for clast to be fixedly mounted Object warehouse 4 and haydite warehouse lay the lesser water-filling carcass 5 of itself bearing capacity in the lesser complete country rock of stress;
Step6: all liquid wrappage warehouses are fixed in advance at the top of two lining structures, warehouse and two lined steel arches are pacified simultaneously Dress after steel arch-shelf is installed, monitors steel arch-shelf ess-strain situation;Steel arch-shelf lower end sets up lock foot anchoring stock using buried, To be weldingly connected;Steel arch-shelf and lining cutting liquid inclusion enclave support naturally, carry out supporting to country rock, pour coagulation using high-pressure slip-casting Soil forms secondary lining;
Step7: pressure change in monitoring water-filling carcass 5, when carcass Compression is greater than P3, wherein P3 is automatic relief valve threshold Value, it is automatic to discharge water body removal pressure, until load is stablized in P3.
The operation principle of the present invention is that:
Technology is that several liquid wrappage warehouses, shape is arranged at the deformation allowance considered between tunnel surrounding and two linings At a laminar flow matter buffer layer, this is special using the preferable mobility of liquid charges, compressibility, antidetonation and good isolation sexual function Point, in the deformation process of country rock, clast warehouse and haydite warehouse primarily serve support action, and water-filling carcass is played country rock The effect of pressure equalization prevents excessive two lining of damage of local pressure.When country rock, which wraps up clast, to be squeezed and deformed, power is transferred to Water-filling carcass, when water-filling carcass receiving pressure reaches threshold value, water can be discharged automatically for relief valve, achieve the purpose that release.Haydite Warehouse initial stage plays support action, and haydite destroys when pressure is excessive, while also functioning to release purpose.
The above embodiments are only the preferred technical solution of the present invention, and are not construed as limitation of the invention, this hair Bright protection scope should be with the technical solution of claim record, technical characteristic in the technical solution recorded including claim Equivalents are protection scope.Equivalent replacement i.e. within this range is improved, also within protection scope of the present invention.

Claims (8)

1. the warehouse separated type lining cutting pressure relief support structure of one kind of multiple fillers, it is characterised in that: it includes complete country rock (1), institute It states and is mingled between complete country rock (1) plastic zone of surrounding rock (2), the inner sidewall of the complete country rock (1) and plastic zone of surrounding rock (2) is set Two linings (12) are equipped with, and are provided with gap therebetween;The inner space is close to complete country rock (1) and plastic zone of surrounding rock (2) it is provided on inner sidewall clast warehouse (4), the clast warehouse (4) is internally provided with liquid crumb layer (3), institute The gap setting stated between clast warehouse (4) and two linings (12) has haydite warehouse (10) and water-filling carcass (5).
2. the warehouse separated type lining cutting pressure relief support structure of one kind of multiple fillers according to claim 1, it is characterised in that: described Clast warehouse (4) includes parcel bag (15), and the parcel bag (15) forms closed parcel bag using flexible utricule sewing;Institute The outer cover for stating parcel bag (15) is equipped with geotechnological cloth bag (16), filled with being generated by tunnel excavation inside the parcel bag (15) Discarded liquid clast.
3. the warehouse separated type lining cutting pressure relief support structure of one kind of multiple fillers according to claim 1, it is characterised in that: described Water-filling carcass (5) is made of rubber tyre body flexible (17), fluid (18) in filling carcass inside the rubber tyre body (17), One end of the water-filling carcass (5) is connected with automatic relief valve (6), and the other end is equipped with pressure gauge (7).
4. according to claim 1 or the warehouse separated type lining cutting pressure relief support structure of 3 one kind of multiple fillers, it is characterised in that: The surface layer of the water-filling carcass (5) is cased with one layer of carcass protective layer (9), is connected with drainpipe (8) on the water-filling carcass (5).
5. the warehouse separated type lining cutting pressure relief support structure of one kind of multiple fillers according to claim 1, it is characterised in that: described Prearrangement of deformation amount cavity, the prearrangement of deformation amount are provided between complete country rock (1) and plastic zone of surrounding rock (2) and the gap of two linings (12) It is provided with several liquid wrappage warehouses in cavity, and forms a laminar flow matter buffer layer (14).
6. the warehouse separated type lining cutting pressure relief support structure of one kind of multiple fillers according to claim 5, it is characterised in that: described Release/injected hole/drainpipe (11) often is opened up away from a distance on two lining structure of each wrappage warehouse periphery.
7. the warehouse separated type lining cutting pressure relief support structure of one kind of multiple fillers according to claim 5, it is characterised in that: described Multiple pressure sensors (13) are provided between two linings (12) and liquid buffer layer (14).
8. the construction method of the warehouse separated type lining cutting pressure relief support structure of a variety of fillers described in claim 1-7 any one, Be characterized in that, it the following steps are included:
Step1: material prepares: preparing pressure sensor (13), automatic relief valve (6), pressure gauge (7), rubber tyre body (17), steel Fluid (18) in arch, discarded liquid clast, haydite and carcass;
Step2: production filling package: selected discarded liquid clast is fitted into flexible parcel bag (15), and package soil outside Work cloth bag (16) is completed clast warehouse (4);One layer of carcass protective layer (9) is wrapped outside water-filling carcass (5), from carcass fluid It is filled with fluid (18) in filling carcass at input port, and guarantees that air-tightness is good;By water-filling carcass (5) and automatic relief valve (6) After drainpipe (8) connection, the threshold value of automatic relief valve (6) is set, water-filling carcass is completed in water filling into rubber tyre body (17); Selected haydite is put into geotechnological cloth bag (16) and is fastened, is completed haydite warehouse (10);
Step3: according to Rock Nature, carrying out numerical simulation and determine country rock long-term creep deflection, and country rock excavation is carried out to it and is unloaded Tunnel force simulation is analyzed after lotus, obtains plastic zone of surrounding rock (2) and complete country rock (1) distribution situation after tunnel excavation, is determined every The installation site of a warehouse;
Step4: according to the actual situation, suitable digging mode is selected to carry out tunnel excavation;The point being greater than at 3cm is cleared up on country rock Angle;
Step5: after the completion of tunnel excavation, different warehouse disposing ways is selected according to the concrete condition in tunnel, for country rock Plastic zone (2) distorting load large area, i.e., short anchor is squeezed into the designated position that need to install wrappage warehouse, broken for being fixedly mounted Leftover warehouse (4) and haydite warehouse lay the lesser water-filling carcass (5) of itself bearing capacity in the lesser complete country rock of stress;
Step6: all liquid wrappage warehouses are fixed in advance at the top of two lining structures, warehouse and two lined steel arches are pacified simultaneously Dress after steel arch-shelf is installed, monitors steel arch-shelf ess-strain situation;Steel arch-shelf lower end sets up lock foot anchoring stock using buried, To be weldingly connected;Steel arch-shelf and lining cutting liquid inclusion enclave support naturally, carry out supporting to country rock, pour coagulation using high-pressure slip-casting Soil forms secondary lining;
Step7: monitoring water-filling carcass (5) interior pressure change, when carcass Compression is greater than P3, wherein P3 is automatic relief valve threshold Value, it is automatic to discharge water body removal pressure, until load is stablized in P3.
CN201910111530.6A 2019-02-12 2019-02-12 Warehouse-separated lining pressure relief supporting structure and method for various fillers Active CN109653765B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910111530.6A CN109653765B (en) 2019-02-12 2019-02-12 Warehouse-separated lining pressure relief supporting structure and method for various fillers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910111530.6A CN109653765B (en) 2019-02-12 2019-02-12 Warehouse-separated lining pressure relief supporting structure and method for various fillers

Publications (2)

Publication Number Publication Date
CN109653765A true CN109653765A (en) 2019-04-19
CN109653765B CN109653765B (en) 2020-10-09

Family

ID=66122244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910111530.6A Active CN109653765B (en) 2019-02-12 2019-02-12 Warehouse-separated lining pressure relief supporting structure and method for various fillers

Country Status (1)

Country Link
CN (1) CN109653765B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110094215A (en) * 2019-05-30 2019-08-06 三峡大学 Non-newtonian fluid liner supporting structure and construction method
CN110231115A (en) * 2019-06-20 2019-09-13 三峡大学 Simulate the device and method of plastic zone of surrounding rock development and liquid liner structure mechanical response under different supporting power
CN110318773A (en) * 2019-06-21 2019-10-11 三峡大学 The gate-type liquid lining cutting country rock pressure relief device and construction method of regulatable magnetic force
CN110359954A (en) * 2019-08-02 2019-10-22 西南交通大学 One kind passing through creep faults tunnel particle-filled layers error resilience structure and its construction method
CN111022077A (en) * 2019-12-25 2020-04-17 三峡大学 Impact-resistant fluid filling lining supporting structure and construction method
CN112647970A (en) * 2020-12-28 2021-04-13 中国科学院武汉岩土力学研究所 Polyurethane large-deformation numerical simulation method for tunnel buffer support
CN112963169A (en) * 2021-02-25 2021-06-15 西华大学 Tunnel excavation large deformation strong support device
CN113982631A (en) * 2021-10-29 2022-01-28 成都未来智隧科技有限公司 Tunnel supporting structure and tunnel supporting method
CN113982627A (en) * 2021-10-29 2022-01-28 成都未来智隧科技有限公司 Tunnel supporting method and tunnel supporting structure

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4095433A (en) * 1975-10-09 1978-06-20 Kubota, Ltd. Tunnel support structure using built-up pipe support set, and unit pipe support member therefor
CN1710252A (en) * 2005-06-27 2005-12-21 水利部交通部电力工业部南京水利科学研究院 Composite lining suitable for surrounding rock after-deformation
CN103321654A (en) * 2013-07-04 2013-09-25 中国矿业大学 Method for managing roof collapse of coal mine roadway by aid of flexible air bags
CN103912292A (en) * 2014-04-23 2014-07-09 辽宁工程技术大学 Fault-passing roadway waterproof damping and shock-resisting coupling support method
CN104727829A (en) * 2015-03-09 2015-06-24 三峡大学 Tunnel lining structure with detachable lining tire and construction installation method thereof
CN205117355U (en) * 2015-10-12 2016-03-30 三峡大学 Branch storehouse formula sand gas that replaces tunnel just to serve as a contrast closes and fills lining cutting structure
CN206092007U (en) * 2016-10-18 2017-04-12 三峡大学 Child formula tunnel lining structure
CN206111201U (en) * 2016-10-27 2017-04-19 三峡大学 Construction improvement's child formula lining cutting structure
CN106837372A (en) * 2017-03-16 2017-06-13 中铁二院工程集团有限责任公司 It is a kind of quickly repaired suitable for tunnel and large deformation tunnel flexible support system
CN107269301A (en) * 2017-08-17 2017-10-20 中铁局集团有限公司 A kind of Tunnel Second Lining Construction air bag termination device and end-blocking construction method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4095433A (en) * 1975-10-09 1978-06-20 Kubota, Ltd. Tunnel support structure using built-up pipe support set, and unit pipe support member therefor
CN1710252A (en) * 2005-06-27 2005-12-21 水利部交通部电力工业部南京水利科学研究院 Composite lining suitable for surrounding rock after-deformation
CN103321654A (en) * 2013-07-04 2013-09-25 中国矿业大学 Method for managing roof collapse of coal mine roadway by aid of flexible air bags
CN103912292A (en) * 2014-04-23 2014-07-09 辽宁工程技术大学 Fault-passing roadway waterproof damping and shock-resisting coupling support method
CN104727829A (en) * 2015-03-09 2015-06-24 三峡大学 Tunnel lining structure with detachable lining tire and construction installation method thereof
CN205117355U (en) * 2015-10-12 2016-03-30 三峡大学 Branch storehouse formula sand gas that replaces tunnel just to serve as a contrast closes and fills lining cutting structure
CN206092007U (en) * 2016-10-18 2017-04-12 三峡大学 Child formula tunnel lining structure
CN206111201U (en) * 2016-10-27 2017-04-19 三峡大学 Construction improvement's child formula lining cutting structure
CN106837372A (en) * 2017-03-16 2017-06-13 中铁二院工程集团有限责任公司 It is a kind of quickly repaired suitable for tunnel and large deformation tunnel flexible support system
CN107269301A (en) * 2017-08-17 2017-10-20 中铁局集团有限公司 A kind of Tunnel Second Lining Construction air bag termination device and end-blocking construction method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110094215A (en) * 2019-05-30 2019-08-06 三峡大学 Non-newtonian fluid liner supporting structure and construction method
CN110231115A (en) * 2019-06-20 2019-09-13 三峡大学 Simulate the device and method of plastic zone of surrounding rock development and liquid liner structure mechanical response under different supporting power
CN110318773A (en) * 2019-06-21 2019-10-11 三峡大学 The gate-type liquid lining cutting country rock pressure relief device and construction method of regulatable magnetic force
CN110359954A (en) * 2019-08-02 2019-10-22 西南交通大学 One kind passing through creep faults tunnel particle-filled layers error resilience structure and its construction method
CN111022077A (en) * 2019-12-25 2020-04-17 三峡大学 Impact-resistant fluid filling lining supporting structure and construction method
CN112647970A (en) * 2020-12-28 2021-04-13 中国科学院武汉岩土力学研究所 Polyurethane large-deformation numerical simulation method for tunnel buffer support
CN112647970B (en) * 2020-12-28 2022-04-26 中国科学院武汉岩土力学研究所 Polyurethane large-deformation numerical simulation method for tunnel buffer support
CN112963169A (en) * 2021-02-25 2021-06-15 西华大学 Tunnel excavation large deformation strong support device
CN113982631A (en) * 2021-10-29 2022-01-28 成都未来智隧科技有限公司 Tunnel supporting structure and tunnel supporting method
CN113982627A (en) * 2021-10-29 2022-01-28 成都未来智隧科技有限公司 Tunnel supporting method and tunnel supporting structure
CN113982627B (en) * 2021-10-29 2024-04-05 成都未来智隧科技有限公司 Tunnel supporting method and tunnel supporting structure
CN113982631B (en) * 2021-10-29 2024-04-05 成都未来智隧科技有限公司 Tunnel supporting structure and tunnel supporting method

Also Published As

Publication number Publication date
CN109653765B (en) 2020-10-09

Similar Documents

Publication Publication Date Title
CN109653765A (en) The warehouse separated type lining cutting pressure relief support structure and method of one kind of multiple fillers
CN108412542B (en) A kind of wide lane digging gangue paste body filling of high seam is at lane method
CN110110489A (en) A kind of lithostratigraphy shield tunnel pressure from surrounding rock calculation method
CN107965349B (en) Water consolidates mixed slurry load precompressed process for dewatering and coagulating
CN105937407B (en) A kind of construction method of gob-side entry retaining concrete filling wall annular air-pocket
CN107605507A (en) Service channel shield-tunneling construction receives structure and construction method
CN110094215A (en) Non-newtonian fluid liner supporting structure and construction method
CN103741683A (en) Bag bottom expanding rigid-flexible combined pile and construction method thereof
CN106761918B (en) A kind of tunnel solution cavity and Groundwater Comprehensive administer construction and construction method
CN110067573A (en) A kind of quick improvement and the construction method for passing through the crushed zone that caved in
CN101082216B (en) Soft soil foundation pipe-embedded vacuum drainage method
CN110397451B (en) Construction method for pre-reinforcing excavation cavern by utilizing deep soft rock to form cavity
CN107740700A (en) A kind of novel subway tunnel fill-type liner structure
CN107503754A (en) A kind of construction method of VI grade of country rock rich water Shallow tunnel with large cross-section
CN113638398A (en) Active dynamic control method for stress of bag type grouting soil body
CN105756702A (en) Roadway-side mesh cage filling supporting gob-side entry retaining method
CN106437782A (en) Support and protection structure for large-section railroad tunnel in V class surrounding rock and construction method of structure
CN109505653A (en) A kind of stifled arrange of convertible type of rich water tunnel combines supporting construction
CN107178077B (en) karst area karst cave overburden grouting reinforcement structure and design method thereof
CN208089328U (en) A kind of W steel band of model anchor pole composite entity support structures reinforced for tunnel-liner
CN105888697B (en) A kind of Cross-fault leveling tunnel deformation cooperative type supporting construction and its construction method
CN107587882A (en) A kind of double-shielded TBM section of jurisdiction form sack grouting quick supporting structure and construction method
CN1963038A (en) 'Short-distance overload vacuum precompression and dynamic water-drainage consolidation united method' soft foundation processing method
CN105625302A (en) Variable-cross-section stiffening core reinforcing active material composite pile structure and construction method
CN107034905A (en) Control the combination retaining structure and its construction method of biased deformation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20190419

Assignee: Hubei Hongzhuo Architectural Design Co.,Ltd.

Assignor: CHINA THREE GORGES University

Contract record no.: X2023980043461

Denomination of invention: A segmented lining pressure relief support structure and method with multiple fillers

Granted publication date: 20201009

License type: Exclusive License

Record date: 20231019

EC01 Cancellation of recordation of patent licensing contract

Assignee: Hubei Hongzhuo Architectural Design Co.,Ltd.

Assignor: CHINA THREE GORGES University

Contract record no.: X2023980043461

Date of cancellation: 20240402