CN109653264A - A kind of shallow foundation rectifying of leaned building ruggedized construction - Google Patents
A kind of shallow foundation rectifying of leaned building ruggedized construction Download PDFInfo
- Publication number
- CN109653264A CN109653264A CN201811584698.0A CN201811584698A CN109653264A CN 109653264 A CN109653264 A CN 109653264A CN 201811584698 A CN201811584698 A CN 201811584698A CN 109653264 A CN109653264 A CN 109653264A
- Authority
- CN
- China
- Prior art keywords
- semi
- nut
- toughened
- downside
- adjusting screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D35/00—Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
- E02D35/005—Lowering or lifting of foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of shallow foundation rectifying of leaned building ruggedized constructions, including reinforce pedestal, earth anchor, pre- retention nut one, fixing screws one, groove, protrusion one, semi-toughened body one, notch one, pouring hole one, lower adjusting screw one, lower locking nut one, pull rod one, upper adjusting screw one, upper locking nut one, adjusting nut one, connecting pin one, connecting shaft one and snap-gauge one;Invention have it is structurally reasonable it is simple, production cost is low, easy for installation, multiple functional, by concreting reinforcing pedestal in building pile body surrounding basis, to improve the effect of reinforcing;The pull rod one and pull rod two being arranged in the present invention then can be such that building pile body moves on the whole, to improve the effect of correction by tightening adjusting nut;The lower adjusting screw and upper adjusting screw being arranged in the present invention then can carry out correction adjusting to the tilt angle of building pile body entirety by its interaction, also just further improve the effect of correction.
Description
Technical field
The present invention relates to building ruggedized equipment technical field, in particular to a kind of shallow foundation rectifying of leaned building ruggedized constructions.
Background technique
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object
Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle, some run-off the straights
Building, often exist simultaneously foundation bearing capacity and be unsatisfactory for the problem of requiring.Rectifying of leaned building method generally comprises soil digging
Rectifying method, precipitation facture, pressing Ioad rectifying method and cut-off pillar and jacking method etc., above-mentioned method has one in construction usage
Fixed deficiency cannot effectively be fixed since the shape of pile framing is different according to the shape of pile framing, and existing shallow foundation
The fairly simple rectifying effect of plinth rectifying of leaned building ruggedized construction function is poor, and in addition long-term consolidation effect is also poor.
Summary of the invention
The object of the invention is that a kind of shallow foundation rectifying of leaned building ruggedized construction is provided to solve the above-mentioned problems,
It is poor to solve the fairly simple rectifying effect of existing shallow foundation rectifying of leaned building ruggedized construction function, in addition long-term consolidation effect
Also poor problem.
To solve the above-mentioned problems, the present invention provides a kind of technical solutions: a kind of shallow foundation rectifying of leaned building reinforcing knot
Structure, including building pile body, innovative point are: further including reinforcing pedestal, earth anchor, pre- retention nut one, fixing screws one, recessed
Slot, raised one, semi-toughened body one, notch one, pouring hole one, lower adjusting screw one, lower locking nut one, pull rod one, upper adjusting
Screw one, upper locking nut one, adjusting nut one, connecting pin one, connecting shaft one and snap-gauge one;The reinforcing pedestal is located at building
On the downside of object pile body in surrounding shallow foundation, several pre- retention nuts one, the reinforcing base end face are equipped in the reinforcing chassis left side
On be uniformly provided with several earth anchors, groove is equipped in reinforcing pedestal upper side edge;The semi-toughened body one is located at building
On the left of object pile body, one bottom of semi-toughened body is fixedly connected on reinforcing pedestal by several fixing screws one and pre- retention nut one
Upper left side of face, one bottom of semi-toughened body is equipped with protrusion one, and is connected on the left of protrusion one and groove;The notch one, which is located at, to be added
Gu in chassis interior upper left side;The pouring hole one is located at the positive upside of notch one, and the pouring hole one is located at semi-toughened body once
In side;The lower adjusting screw one is movably connected in one downside lateral threaded holes of semi-toughened body, outside the lower adjusting screw one
Lower locking nut one is connected on the left of screw thread;The upper adjusting screw one is movably connected in one upside of semi-toughened body laterally
In threaded hole, upper locking nut one is connected on lower one external screw thread of the adjusting screw left side;The pull rod one is vertically living
It is dynamic to be connected in the vertical hole in one right side of semi-toughened body, adjusting nut one, institute are connected on the one upside external screw thread of pull rod
It states hinged by connecting pin one and one upside of connecting shaft on the downside of pull rod one;The connecting shaft one is located at step on the downside of building pile body
In left side, it is fixedly connected on the left of building pile body bottom surface on the downside of the connecting shaft one by snap-gauge one.
Preferably, further including snap-gauge two, pre- retention nut two, semi-toughened body two, fixing screws two, notch two, pouring hole
Two, connecting shaft two, connecting pin two, lower adjusting screw two, lower locking nut two, cohesion device, upper adjusting screw two, upper locking screw
Mother two, adjusting nut two, protrusion two and pull rod two;The pre- retention nut two be it is several, the pre- retention nut two is uniformly set respectively
In reinforcing base right side;Two bottom of semi-toughened body is fixedly connected on by several fixing screws two and pre- retention nut two to be added
Gu on the right side of base top, two lower right side of semi-toughened body is equipped with protrusion two, and protrusion two is connected with internal on the right side of groove, described
By being fixedly connected on the right side of cohesion device and semi-toughened body one on the left of semi-toughened body two;The notch two is located at reinforcing chassis interior
Upper right side;The pouring hole two is located at the positive upside of notch two, and the pouring hole two is located in two downside of semi-toughened body;The downward
Section screw two is movably connected in two downside lateral threaded holes of semi-toughened body, upper activity on the right side of lower two external screw thread of adjusting screw
It is connected with lower locking nut two;The upper adjusting screw two is movably connected in two upside lateral threaded holes of semi-toughened body, described
Upper locking nut two is connected on the right side of upper two external screw thread of adjusting screw;Two vertical movable of pull rod is connected to semi-toughened
In two left side of body, it is connected with adjusting nut two on the two upside external screw thread of pull rod, passes through connection on the downside of the pull rod two
Pin two and two upside of connecting shaft are hinged;During the connecting shaft two is located on the downside of building pile body on the right side of step, the connecting shaft two
Downside is fixedly connected on the right side of building pile body bottom surface by snap-gauge two.
Preferably, upper screw one and the lower medial end for adjusting screw one of adjusting is respectively and on the left of building pile body
Top and bottom are connected.
Preferably, being equipped with card slot in one downside of connecting shaft and matching with side bayonet slot in snap-gauge one.
Preferably, upper screw two and the lower medial end for adjusting screw two of adjusting is respectively and on the right side of building pile body
Top and bottom are connected.
Preferably, being equipped with card slot in two downside of connecting shaft and matching with side bayonet slot in snap-gauge two.
Preferably, the cohesion device specific structure includes half anchor ear one, fixing bolt one, half anchor ear two and fixed spiral shell
Bolt two;Half anchor ear, one side is fixedly connected by two side of the anchor ear of fixing bolt one and half, half anchor ear, one other side
It is fixedly connected by two other side of the anchor ear of fixing bolt two and half.
Beneficial effects of the present invention:
(1) present invention have it is structurally reasonable it is simple, production cost is low, easy for installation, multiple functional, in building pile body four
Pedestal is reinforced by concreting in all bases, to improve the effect of reinforcing.
(2) pull rod one and pull rod two being arranged in the present invention, then can keep building pile body whole by tightening adjusting nut
Body moves up, to improve the effect of correction.
(3) the lower adjusting screw and upper adjusting screw being arranged in the present invention, then can be by its interaction to building
The tilt angle of pile body entirety carries out correction adjusting, also just further improves the effect of correction.
(3) pouring hole and notch that are arranged in the present invention, after the completion of adjusting then convenient for by concrete by pouring hole and
Notch is poured into building pile body bottom, to improve the effect that building pile body is reinforced for a long time.
Detailed description of the invention
Detailed description will be given by the following detailed implementation and drawings by the present invention for ease of explanation,.
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the connection schematic diagram of connecting shaft and snap-gauge.
Fig. 3 is the structural schematic diagram of cohesion device.
1- building pile body;2- reinforces pedestal;3- earth anchor;The pre- retention nut one of 4-;5- fixing screws one;6- groove;7- is convex
Play one;8- semi-toughened body one;9- notch one;10- pouring hole one;Screw one is adjusted under 11-;12- lower locking nut one;13- is drawn
Bar one;Screw one is adjusted on 14-;15- upper locking nut one;16- adjusting nut one;17- connecting pin one;18- connecting shaft one;
19- snap-gauge one;20- snap-gauge two;The pre- retention nut two of 21-;22- semi-toughened body two;23- fixing screws two;24- notch two;25- is poured
Build hole two;26- connecting shaft two;27- connecting pin two;Screw two is adjusted under 28-;29- lower locking nut two;30- cohesion device;
Screw two is adjusted on 31-;32- upper locking nut two;33- adjusting nut two;34- protrusion two;35- pull rod two;Half anchor ear of 301-
One;302- fixing bolt one;Half anchor ear two of 303-;304- fixing bolt two.
Specific embodiment
As depicted in figs. 1 and 2, present embodiment uses following technical scheme: a kind of shallow foundation rectifying of leaned building adds
Fixing structure, including building pile body 1 further include reinforcing pedestal 2, earth anchor 3, pre- retention nut 1, fixing screws 1, groove 6, convex
Rise 1, semi-toughened body 1, notch 1, pouring hole 1, lower adjusting screw 1, lower locking nut 1, pull rod 1,
Upper adjusting screw 1, upper locking nut 1, adjusting nut 1, connecting pin 1, connecting shaft 1 and snap-gauge 1;Institute
It states reinforcing pedestal 2 to be located in 1 downside surrounding shallow foundation of building pile body, is equipped with several reserved spiral shells in 2 left side of reinforcing pedestal
Mother 1, is uniformly provided with several earth anchors 3 on 2 bottom surface of reinforcings pedestal, equipped with recessed in the 2 upper side edge of reinforcing pedestal
Slot 6;The semi-toughened body 1 is located at 1 left side of building pile body, and one 8 bottom of semi-toughened body passes through several fixing screws 1
It is fixedly connected on pre- retention nut 1 and reinforces left side of face on pedestal 2, one 8 bottom of semi-toughened body is equipped with protrusion 1, and convex
Rise 1 be connected on the left of groove 6;The notch 1, which is located at, to be reinforced in 2 inside upper left side of pedestal;The pouring hole 1 is located at
The positive upside of notch 1, the pouring hole 1 are located in one 8 downside of semi-toughened body;The lower adjusting screw 1 is flexibly connected
In one 8 downside lateral threaded holes of semi-toughened body, lower locking is connected on lower one 11 external screw thread of the adjusting screw left side
Nut 1;The upper adjusting screw 1 is movably connected in one 8 upside lateral threaded holes of semi-toughened body, the lower adjusting spiral shell
It follows closely on the left of one 11 external screw threads and is connected with upper locking nut 1;One 13 vertical movable of pull rod is connected to semi-toughened body
In the one 8 vertical hole in right sides, it is connected with adjusting nut 1 on the one 13 upside external screw thread of pull rod, under the pull rod 1
Side is hinged by connecting pin 1 and one 18 upside of connecting shaft;It is left that the connecting shaft 1 is located at 1 downside step of building pile body
In side, one 18 downside of connecting shaft is fixedly connected on the left of 1 bottom surface of building pile body by snap-gauge 1.
Wherein, further include snap-gauge 2 20, pre- retention nut 2 21, semi-toughened body 2 22, fixing screws 2 23, notch 2 24,
Pouring hole 2 25, connecting shaft 2 26, connecting pin 2 27, lower adjusting screw 2 28, lower locking nut 2 29, cohesion device 30, on
Adjust screw 2 31, upper locking nut 2 32, adjusting nut 2 33, protrusion 2 34 and pull rod 2 35;The pre- retention nut 2 21
To be several, the pre- retention nut 2 21 is uniformly located at respectively to be reinforced in 2 right side of pedestal;2 22 bottom of semi-toughened body passes through number
A fixing screws 2 23 and pre- retention nut 2 21, which are fixedly connected on, reinforces 2 top right side of pedestal, 2 22 bottom right of semi-toughened body
Side is equipped with protrusion 2 34, and protrusion 2 34 is connected with 6 right side inside of groove, and 2 22 left side of semi-toughened body passes through cohesion device
30 are fixedly connected with one 8 right side of semi-toughened body;The notch 2 24, which is located at, reinforces 2 inside upper right side of pedestal;The pouring hole two
25 are located at the positive upside of notch 2 24, and the pouring hole 2 25 is located in 2 22 downside of semi-toughened body;The lower adjusting screw 2 28
It is movably connected in 2 22 downside lateral threaded holes of semi-toughened body, is flexibly connected on lower 2 28 external screw thread of the adjusting screw right side
There is lower locking nut 2 29;The upper adjusting screw 2 31 is movably connected in 2 22 upside lateral threaded holes of semi-toughened body, institute
It states to adjust on the right side of 2 31 external screw thread of screw and is connected with upper locking nut 2 32;2 35 vertical movable of the pull rod connection
In 2 22 left side of semi-toughened body, adjusting nut 2 33, the pull rod are connected on the 2 35 upside external screw thread of pull rod
2 35 downsides are hinged by connecting pin 2 27 and 2 26 upside of connecting shaft;The connecting shaft 2 26 is located at 1 downside of building pile body
In on the right side of step, 2 26 downside of connecting shaft is fixedly connected on the right side of 1 bottom surface of building pile body by snap-gauge 2 20.
Wherein, the upper adjusting screw 1 and the lower medial end for adjusting screw 1 are left with building pile body 1 respectively
Side top and bottom are connected;Card slot is equipped in one 18 downside of connecting shaft and is matched with side bayonet slot in snap-gauge 1;The up-regulation
Section screw 2 31 and the lower medial end for adjusting screw 2 28 are connected with 1 right side top and bottom of building pile body respectively;The connection
Card slot is equipped in 2 26 downside of axis and is matched with side bayonet slot in snap-gauge 2 20.
As shown in figure 3,30 specific structure of cohesion device includes half anchor ear 1, fixing bolt 1, half anchor ear
2 303 and fixing bolt 2 304;Half anchor ear, one 301 side is solid by fixing bolt 1 and half anchor ear, 2 303 side
Fixed connection, half anchor ear, one 301 other side is fixedly connected by fixing bolt 2 304 with half anchor ear, 2 303 other side.
Use state of the invention are as follows: the present invention have it is structurally reasonable it is simple, production cost is low, easy for installation, function is neat
Entirely, when reinforcing, connecting shaft 1 and 2 26 downside of connecting shaft are clamped on and are built by snap-gauge 1 and snap-gauge 2 20 respectively first
1 bottom of object pile body is built, pedestal 2 is then reinforced by concreting in 1 surrounding of building pile body basis, then will partly be added again
Solid 1 and semi-toughened body 2 22 are fixed on by fixing screws and pre- retention nut to be reinforced above pedestal 2, is arranged here
Pull rod 1 and pull rod 2 35 then can be such that building pile body 1 integrally moves up, to improve correction by tightening adjusting nut
Effect, lower adjusting screw set in addition and upper adjusting screw then can be whole to building pile body 1 by its interaction
The tilt angle of body carries out correction adjusting, also just further improves the effect of correction, pouring hole and notch set in addition, when
Then convenient for concrete is poured into 1 bottom of building pile body by pouring hole and notch after the completion of adjusting, to improve building
The effect that object pile body 1 is reinforced for a long time.
In the description of the present invention, it is to be understood that, term " coaxial ", " bottom ", " one end ", " top ", " middle part ",
The orientation or positional relationship of the instructions such as " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends " is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark
Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair
Limitation of the invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " fixation ",
Terms such as " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be with
It is mechanical connection, is also possible to be electrically connected;It can be directly connected, two can also be can be indirectly connected through an intermediary
The interaction relationship of connection or two elements inside a element, unless otherwise restricted clearly, for the common of this field
For technical staff, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention, the technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention, the claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (7)
1. a kind of shallow foundation rectifying of leaned building ruggedized construction, including building pile body (1), it is characterised in that: further include reinforcing bottom
Seat (2), pre- retention nut one (4), fixing screws one (5), groove (6), raised one (7), semi-toughened body one (8), lacks earth anchor (3)
Mouth one (9), pouring hole one (10), lower adjusting screw one (11), lower locking nut one (12), pull rod one (13), upper adjusting screw
One (14), upper locking nut one (15), adjusting nut one (16), connecting pin one (17), connecting shaft one (18) and snap-gauge one (19);
The reinforcing pedestal (2) is located on the downside of building pile body (1) in surrounding shallow foundation, sets in reinforcing pedestal (2) left side
There are several pre- retention nuts one (4), is uniformly provided with several earth anchors (3) on reinforcing pedestal (2) bottom surface, the reinforcing pedestal (2)
Groove (6) are equipped in upper side edge;
The semi-toughened body one (8) is located on the left of building pile body (1), and semi-toughened body one (8) bottom passes through several fixations
Screw one (5) and pre- retention nut one (4), which are fixedly connected on, reinforces left side of face on pedestal (2), and semi-toughened body one (8) bottom is set
There are raised one (7), and is connected on the left of raised one (7) and groove (6);
The notch one (9), which is located at, reinforces in pedestal (2) internal upper left side;
The pouring hole one (10) is located at the positive upside of notch one (9), and the pouring hole one (10) is located on the downside of semi-toughened body one (8)
In;
The lower adjusting screw one (11) is movably connected on the downside of semi-toughened body one (8) in lateral threaded holes, the lower adjusting spiral shell
Lower locking nut one (12) is connected on the left of one (11) external screw thread of nail;
The upper adjusting screw one (14) is movably connected on the upside of semi-toughened body one (8) in lateral threaded holes, the lower adjusting spiral shell
Upper locking nut one (15) is connected on the left of one (11) external screw thread of nail;
Pull rod one (13) vertical movable is connected on the right side of semi-toughened body one (8) in vertical hole, on the upside of the pull rod one (13)
It is connected with adjusting nut one (16) on external screw thread, passes through connecting pin one (17) and connecting shaft one on the downside of the pull rod one (13)
(18) upside is hinged;
The connecting shaft one (18) passes through on the downside of the connecting shaft one (18) in being located on the downside of building pile body (1) on the left of step
Snap-gauge one (19) is fixedly connected on the left of building pile body (1) bottom surface.
2. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 1, it is characterised in that: further include snap-gauge two
(20), pre- retention nut two (21), semi-toughened body two (22), fixing screws two (23), notch two (24), pouring hole two (25), company
Spindle two (26), connecting pin two (27), lower adjusting screw two (28), lower locking nut two (29), cohesion device (30), upper adjusting
Screw two (31), upper locking nut two (32), adjusting nut two (33), raised two (34) and pull rod two (35);
The pre- retention nut two (21) be it is several, the pre- retention nut two (21) be uniformly located at respectively reinforce pedestal (2) on the right side of in;
Semi-toughened body two (22) bottom is fixedly connected on by several fixing screws two (23) and pre- retention nut two (21) to be added
Pedestal Gu (2) top right side, semi-toughened body two (22) lower right side is equipped with raised two (34), and raised two (34) and groove
(6) right side is internal is connected, by fixed on the right side of cohesion device (30) and semi-toughened body one (8) on the left of the semi-toughened body two (22)
Connection;
The notch two (24), which is located at, reinforces pedestal (2) internal upper right side;
The pouring hole two (25) is located at the positive upside of notch two (24), and the pouring hole two (25) is located under semi-toughened body two (22)
In side;
The lower adjusting screw two (28) is movably connected on the downside of semi-toughened body two (22) in lateral threaded holes, the lower adjusting spiral shell
Lower locking nut two (29) is connected on the right side of two (28) external screw threads of nail;
The upper adjusting screw two (31) is movably connected on the upside of semi-toughened body two (22) in lateral threaded holes, the upper adjusting spiral shell
Upper locking nut two (32) is connected on the right side of two (31) external screw threads of nail;
During pull rod two (35) vertical movable is connected on the left of semi-toughened body two (22), external screw thread on the upside of the pull rod two (35)
On be connected with adjusting nut two (33), by connecting pin two (27) and connecting shaft two (26) on the downside of the pull rod two (35)
Side is hinged;
The connecting shaft two (26) passes through on the downside of the connecting shaft two (26) in being located on the downside of building pile body (1) on the right side of step
Snap-gauge two (20) is fixedly connected on the right side of building pile body (1) bottom surface.
3. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 1, it is characterised in that: the upper adjusting spiral shell
One (14) of nail and the lower medial end for adjusting screw one (11) are connected with top and bottom on the left of building pile body (1) respectively.
4. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 1, it is characterised in that: the connecting shaft one
(18) it is equipped with card slot in downside and matches with the interior side bayonet slot of snap-gauge one (19).
5. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 2, it is characterised in that: the upper adjusting spiral shell
Two (31) of nail and the lower medial end for adjusting screw two (28) are connected with top and bottom on the right side of building pile body (1) respectively.
6. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 2, it is characterised in that: the connecting shaft two
(26) it is equipped with card slot in downside and matches with the interior side bayonet slot of snap-gauge two (20).
7. a kind of shallow foundation rectifying of leaned building ruggedized construction according to claim 2, it is characterised in that: the cohesion device
(30) specific structure includes half anchor ear one (301), fixing bolt one (302), half anchor ear two (303) and fixing bolt two (304);
Half anchor ear one (301) side is fixedly connected by fixing bolt one (302) with half anchor ear two (303) side, described
Half anchor ear one (301) other side is fixedly connected by fixing bolt two (304) with half anchor ear two (303) other side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811584698.0A CN109653264A (en) | 2018-12-24 | 2018-12-24 | A kind of shallow foundation rectifying of leaned building ruggedized construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811584698.0A CN109653264A (en) | 2018-12-24 | 2018-12-24 | A kind of shallow foundation rectifying of leaned building ruggedized construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109653264A true CN109653264A (en) | 2019-04-19 |
Family
ID=66116567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811584698.0A Pending CN109653264A (en) | 2018-12-24 | 2018-12-24 | A kind of shallow foundation rectifying of leaned building ruggedized construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109653264A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114908820A (en) * | 2021-12-29 | 2022-08-16 | 中国化学工程第四建设有限公司 | Rectifying and correcting method for tower frame |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT9020759A1 (en) * | 1989-06-26 | 1991-12-22 | Joseph Aurelien Francois Amouroux | UNDERWALL PROCESS |
EP0474204A1 (en) * | 1990-09-06 | 1992-03-11 | Günther Karl | Process for the compensation of the inclination of slanting towers |
CN1182818A (en) * | 1997-07-23 | 1998-05-27 | 夏强 | Pre-applied reverse-force closing-pile construction method and load-applying device |
CN106120881A (en) * | 2016-08-23 | 2016-11-16 | 上海长凯岩土工程有限公司 | A kind of high-rise correcting and then reinforcing device |
CN107090860A (en) * | 2017-05-09 | 2017-08-25 | 广东省建筑科学研究院集团股份有限公司 | A kind of shallow foundation rectifying of leaned building ruggedized construction and its construction method |
CN207749549U (en) * | 2018-01-12 | 2018-08-21 | 胡凌 | A kind of rectifying of leaned building ruggedized construction |
CN208136979U (en) * | 2018-03-27 | 2018-11-23 | 海南中厦建设工程有限公司 | A kind of shallow foundation rectifying of leaned building ruggedized construction |
-
2018
- 2018-12-24 CN CN201811584698.0A patent/CN109653264A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT9020759A1 (en) * | 1989-06-26 | 1991-12-22 | Joseph Aurelien Francois Amouroux | UNDERWALL PROCESS |
EP0474204A1 (en) * | 1990-09-06 | 1992-03-11 | Günther Karl | Process for the compensation of the inclination of slanting towers |
CN1182818A (en) * | 1997-07-23 | 1998-05-27 | 夏强 | Pre-applied reverse-force closing-pile construction method and load-applying device |
CN106120881A (en) * | 2016-08-23 | 2016-11-16 | 上海长凯岩土工程有限公司 | A kind of high-rise correcting and then reinforcing device |
CN107090860A (en) * | 2017-05-09 | 2017-08-25 | 广东省建筑科学研究院集团股份有限公司 | A kind of shallow foundation rectifying of leaned building ruggedized construction and its construction method |
CN207749549U (en) * | 2018-01-12 | 2018-08-21 | 胡凌 | A kind of rectifying of leaned building ruggedized construction |
CN208136979U (en) * | 2018-03-27 | 2018-11-23 | 海南中厦建设工程有限公司 | A kind of shallow foundation rectifying of leaned building ruggedized construction |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114908820A (en) * | 2021-12-29 | 2022-08-16 | 中国化学工程第四建设有限公司 | Rectifying and correcting method for tower frame |
CN114908820B (en) * | 2021-12-29 | 2023-07-14 | 中国化学工程第四建设有限公司 | Tower deviation correcting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109653264A (en) | A kind of shallow foundation rectifying of leaned building ruggedized construction | |
CN202718261U (en) | Curtain wall stand column installing structure | |
CN209585435U (en) | A kind of steel bar anchoring device of concrete construction | |
CN208900110U (en) | A kind of ditch cable duct trolley side wall mould plate supporting device | |
CN208280713U (en) | Electronics and Information Engineering communication tower fixing seat | |
CN206944436U (en) | The adjustable rack of air-conditioner outdoor unit in system is built in a kind of room | |
CN216007929U (en) | Construction frame reinforcing apparatus | |
CN209685089U (en) | A kind of novel elevator guide rail bracket convenient for adjusting | |
CN207761044U (en) | A kind of steel structure support beam firm banking | |
CN209179193U (en) | A kind of steel construction foot joint | |
CN208916457U (en) | Cable pay-off rack | |
CN208692006U (en) | A kind of semifine-wool sheep breeding house | |
CN209146611U (en) | A kind of lower margin leveling bolt | |
CN208563179U (en) | Adjustable-angle combines guardrail | |
CN208474295U (en) | A kind of fixing screws | |
CN209134035U (en) | Cable trough cover boards | |
CN209309153U (en) | A kind of positioning levelling device for granite guide rail | |
CN206454992U (en) | A kind of leader pass pass structure for rolling finish rolling deformed bar | |
CN207419850U (en) | A kind of prefabricated building structure column | |
CN220150890U (en) | Template fixing device | |
CN204754156U (en) | Construction roof beam structure | |
CN214659038U (en) | Reinforcement connecting device of architectural design structure | |
CN216616697U (en) | Playground wood floor structure | |
CN108550898A (en) | Lithium battery group assembling device | |
CN216739792U (en) | Building engineering foundation reinforcing apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190419 |
|
RJ01 | Rejection of invention patent application after publication |