- CN109639460A CN109639460A CN201811377841.9A CN201811377841A CN109639460A CN 109639460 A CN109639460 A CN 109639460A CN 201811377841 A CN201811377841 A CN 201811377841A CN 109639460 A CN109639460 A CN 109639460A
- Authority
- CN
- China
- Prior art keywords
- resource
- virtual
- virtual resource
- nfvo
- nfv
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
- G06F9/5077—Logical partitioning of resources; Management or configuration of virtualized resources
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0803—Configuration setting
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0893—Assignment of logical groups to network elements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L47/00—Traffic control in data switching networks
- H04L47/70—Admission control; Resource allocation
- H04L47/78—Architectures of resource allocation
- H04L47/783—Distributed allocation of resources, e.g. bandwidth brokers
Abstract
The application provides a kind of method and apparatus of NFV resource management, is related to field of communication technology, the scheduling to virtual resource can be reduced, to reduce the time delay of system operatio in NFV resource management.This method comprises: NFVO determines that virtual VNF management operates corresponding at least one schedule virtual resources operation;If the schedule virtual resources operation is creation virtual resource, the NFVO is determining in the virtual resource in buffer status to operate matched destination virtual resource with the schedule virtual resources;The NFVO activates the destination virtual resource.
Description
Technical field
This application involves field of communication technology more particularly to a kind of method and apparatus of NFV resource management.
Background technique
Network function virtualization (Network Function Virtualisation, NFV) core concept is network from biography
Develop into the cloud communication network of software and hardware separation based on the private network device of the soft or hard combination of system, to accelerate business
Development deployment speed, is effectively reduced operation cost.
NFV system is mainly made of three parts: multiple virtual network function (Virtualised Network
Function, VNF), network function virtualized infrastructure (NFV Infrastructure, NFVI) and NFV management and layout
(Management and Orchestration, MANO).Wherein, MANO virtualizes composer (Network by network function
Function Virtualisation Orchestrator, NFVO), virtualization network function manager (Virtual
Network Function Manager, VNFM), virtualized infrastructure manager (Virtual Infrastructure
Manager, VIM) three parts composition.About VNF resource management scheme, European Communication Standard association (European Telecom
Standard Institution, ETSI) propose two kinds of mode standards:
Direct Model: operation that VNFM proposes to be managed from VNF to NFVO (such as the instantiation of VNF, dilatation, capacity reducing,
Termination, software upgrading etc.) request, NFVO is according to operation requests and whole resource situation return authorization.VNFM is obtaining NFVO's
After authorization, schedule virtual resources (such as distribution, modification, authorization of virtual resource etc.) directly is carried out with VIM.VNFM is anti-to NFVO
Present virtual resource alteration.
Indirect pattern: authorization stages are identical as Direct Model, and unlike Direct Model, VNFM is obtaining awarding for NFVO
Quan Hou, VNFM propose the relevant schedule virtual resources request of VNF to NFVO according to Authorization result, by NFVO according to the net of virtualization
Network functional module descriptor (Virtualised Network Function Descriptor, VNFD) is by schedule virtual resources
Request is decomposed into one or more schedule virtual resources and operates and interact completion realization scheduling of resource with VIM.NFVO is anti-to VNFM
The case where presenting virtual resource change.
Except two kinds of mode standards of ETSI, there are also a kind of simplification indirect patterns of VNF resource management at present: i.e. straight
On the basis of connecing mode, NFVO is forwarded processing as agency, by schedule virtual resources request between VNFM and VIM.Specifically
It is as follows:
Simplify indirect pattern: NFVO is that each VIM configures resource management agent.The step of authorization stages same Direct Model,
Unlike Direct Model, schedule virtual resources stage after authorizing successfully, VNFM directly with the resource management generation of NFVO
Reason interaction realizes schedule virtual resources by NFVO and VIM.VNFM feeds back virtual resource alteration to NFVO.
The shortcomings that three of the above mode, is: during to VNF resource management, when schedule virtual resources failure,
The virtual resource for participating in schedule virtual resources can be rolled back, to return to the original state before schedule virtual resources.When system again
When secondary trial carries out VNF management operation, need to be scheduled operation to virtual resource again, to bring unnecessary time delay.
Summary of the invention
The application provides a kind of method and apparatus of NFV resource management, and VNF management operation can be executed in NFV system
When, it avoids again being scheduled virtual resource, to reduce Time Delay of Systems.
In order to achieve the above objectives, the application adopts the following technical scheme that
In a first aspect, the application provides a kind of method of NFV resource management, this method may include:
Network function virtualization composer NFVO determines virtual network function VNF management operation, and corresponding at least one is virtual
Scheduling of resource operation;If the schedule virtual resources operation is creation virtual resource, the NFVO is being in buffer status
It is determining in virtual resource to operate matched destination virtual resource with the schedule virtual resources;The NFVO activates the target empty
Quasi- resource.
Second aspect, the application provide a kind of device, which comprises determining that module and processing module.Wherein it is determined that mould
Block, for determining that virtual network function VNF management operates corresponding at least one schedule virtual resources operation;Processing module is used
If in the schedule virtual resources operation for creation virtual resource, in buffer status virtual resource in determine with it is described
Schedule virtual resources operate matched destination virtual resource;Activate the destination virtual resource.
The third aspect, the application provide a kind of device, which includes: processor, transceiver and memory.Wherein, it deposits
Reservoir is for storing one or more programs.The one or more program includes computer executed instructions, when the apparatus is operative,
Processor executes the computer executed instructions of memory storage, so that the device executes first aspect and its various optional
In implementation it is one of any described in NFV resource management method.
Fourth aspect, the application provide a kind of computer readable storage medium, are stored in computer readable storage medium
Instruction, when computer executes the instruction, which, which executes in above-mentioned first aspect and its various optional implementations, appoints
The method of NFV resource management described in one of meaning.
The method of NFV resource management provided by the present application, when executing the operation of creation virtual resource in NFV system,
It can be determined from the virtual resource in buffer status and operate matched destination virtual resource with the schedule virtual resources and swash
Destination virtual resource that it serves somebody right, can complete the operation of creation virtual resource.The target void of buffer status is in by calling directly
Quasi- resource, it is no longer necessary to create new virtual resource, avoid and virtual resource is scheduled again, to reduce VNF management
The time delay of operation.
Detailed description of the invention
Fig. 1 is NFV system structure diagram provided by the embodiments of the present application;
Fig. 2 is the method schematic diagram of NFV resource management provided by the embodiments of the present application;
Fig. 3 is the structural schematic diagram one of the device of NFV resource management provided by the embodiments of the present application;
Fig. 4 is the structural schematic diagram two of the device of NFV resource management provided by the embodiments of the present application.
Specific embodiment
The method and apparatus of NFV resource management provided by the embodiments of the present application are retouched in detail with reference to the accompanying drawing
It states.
The terms "and/or", only a kind of incidence relation for describing affiliated partner, indicates that there may be three kinds of passes
System, for example, A and/or B, can indicate: individualism A exists simultaneously A and B, these three situations of individualism B.
In addition, the term " includes " being previously mentioned in the description of the present application and " having " and their any deformation, it is intended that
It is to cover and non-exclusive includes.Such as the process, method, system, product or equipment for containing a series of steps or units do not have
It is defined in listed step or unit, but optionally further comprising the step of other are not listed or unit, or optionally
It further include the other step or units intrinsic for these process, methods, product or equipment.
It should be noted that in the embodiment of the present application, " illustrative " or " such as " etc. words make example, example for indicating
Card or explanation.Be described as in the embodiment of the present application " illustrative " or " such as " any embodiment or design scheme do not answer
It is interpreted than other embodiments or design scheme more preferably or more advantage.Specifically, " illustrative " or " example are used
Such as " word is intended to that related notion is presented in specific ways.
In the description of the present application, unless otherwise indicated, the meaning of " plurality " is refer to two or more.
The method of NFV resource management provided by the embodiments of the present application can be applied in NFV system shown in FIG. 1, be somebody's turn to do
NFV system includes: OSS/BSS 101, VNF 102, NFVI 103, MANO 104.
Wherein, OSS/BSS 101 is the support system of the integrations of telecom operators, information resources share, it mainly by
The part such as network management, system administration, charging, business, account and customer service forms.
VNF 102 is the network function of virtualization, i.e., does not operate on physical hardware, is operated in by virtualization
Network function on virtual machine.For example, virtualization routing function, the virtualization routing function, which refers to, does not need setting hardware road
Routing function is realized by device or interchanger, but runs software program realizes routing function on a virtual machine.
NFVI 103 includes hardware resource and virtualization layer.Virtualization layer can be abstracted hardware resource and decoupling VNF 102,
To provide virtualization resource to VNF 102.Virtual resource layer includes virtual computing, virtual memory and virtual network.Virtually
Calculating and virtual memory can be supplied to VNF 102 in the form of virtual machine, and/or other virtual containers.
MANO 104 is used to execute the monitoring and management to VNF 102 and NFVI 103.Include: in MANO NFVO 105,
VNFM 106、VIM 107。
Wherein, the network service on NFVI 103 may be implemented in NFVO 105, can also execute from one or more
The resource association requests of VNFM 106 send configuration information to VNFM 106, and collect the status information of VNF 102.In addition,
NFVO 105 can be communicated with VIM 107, to realize the distribution of resource and/or reserve and exchange matching for virtualization hardware resource
It sets and status information.
VNFM 106 can manage one or more VNF 102.VNFM 106 can execute various management functions, such as example
Change, update, inquire, scale and/or terminate VNF 102 etc..
VIM 107 can execute the function of resource management, such as the distribution of management infrastructure resource (such as increases resource
To virtual container) and operating function (as collected 103 fault message of NFVI).The VNFM 106 and VIM 107 can phase intercommunication
Letter carries out resource allocation and exchanges the configuration and status information of virtualization hardware resource.
The embodiment of the present application provides a kind of method of NFV resource management, as shown in Fig. 2, this method may include S201-
S203:
S201, NFVO determine that VNF management operates corresponding at least one schedule virtual resources operation.
Wherein, VNF management operation includes instantiation, dilatation, capacity reducing, termination, the update etc. to VNF.Virtual resource includes
Virtual computing, virtual memory in NFVI virtualization layer, virtual network.
Schedule virtual resources operation is the scheduling operation that carries out to virtual resource in order to complete NFV resource management action.
Compared to VNF resource management action, it is to virtual resource most granule that schedule virtual resources operation, which is more refinement, more basic operation,
The scheduling operation of degree, can the VIM in NFV system as shown in Figure 1 execute.Schedule virtual resources operation specifically includes virtual
The operation such as computing resource, virtual storage resource, the creation of virtual network resource, deletion.
Optionally, under NFV indirect pattern, this step is specifically as follows: VNFM sends VNF management operation to NFVO.
NFVO receives the VNF that VNFM is sent and manages operation, and VNF management operation is then decomposed into several schedule virtual resources according to VNFD
Operation.
Wherein, VNFD is the deployment for describing VNF and the configuration template of operation behavior.VNF management operation is described in VNFD
With the corresponding relationship between schedule virtual resources operation.Because a VNF management operation may need multiple schedule virtual resources
It is just able to achieve, so needing that VNF management operation is refined as more refinement according to VNFD, more basic schedule virtual resources operate.
Optionally, in the case where NFV simplifies indirect pattern, this step is specifically as follows: NFVO receives the VNF management that VNFM is sent
Operate corresponding at least one schedule virtual resources operation.Determine that VNF management operates that corresponding at least one is virtual by VNFM
Scheduling of resource operation, then the operation of these schedule virtual resources is sent to NFVO.For example, NFVO receives the wound that VNFM is sent
The VNF management operation of firewall is built, then it is empty for creation to determine that the creation both firewall operations correspond to schedule virtual resources operation by VNFM
Quasi- machine, distribution network interface etc., then VNFM will create the schedule virtual resources operations such as virtual machine, distribution network interface and be sent to
NFVO。
Optionally, in the case where NFV simplifies indirect pattern, resource pipe is configured with for each VIM on the NFVO in the present embodiment
Reason agency.Resource management agent is used to forward the communication information between VNFM and VIM, and VNFM is allowed to require no NFVO master
Body can be managed VIM.Meanwhile in the present embodiment, resource management agent can also provide VNFM pipe to NFVO main body
Manage the scheduling operation information of VIM.
If the operation of S202, schedule virtual resources is creation virtual resource, NFVO is in the virtual resource for being in buffer status
Middle determination and schedule virtual resources operate matched destination virtual resource.
Specifically, NFVO is in the void for being in buffer status if schedule virtual resources operation is VNF creation virtual resource
The virtual resource type and the identical virtual resource of configuration found in quasi- resource and created needed for schedule virtual resources operation, this
The virtual resource that sample is found is destination virtual resource.
For example, when schedule virtual resources operation is the operation of one 100MB virtual memory of creation, then NFVO searching is
It is no to there is the 100MB virtual storage resource for being in buffer status.A 100MB virtual memory in buffer status provides if it exists
Source, then the virtual storage resources are destination virtual resource.Similarly, if schedule virtual resources operation is virtual for one double-core of creation
The operation of core is calculated, then NFVO looks for whether the double-core virtual computing core for having in buffer status.If it exists at one
In the double-core virtual computing core of buffer status, then the double-core virtual computing core is destination virtual resource.If virtual resource
Scheduling operation is the operation for creating a 100M Microsoft Loopback Adapter, then NFVO looks for whether virtual in the presence of the 100M in buffer status
Network interface card.A 100M Microsoft Loopback Adapter in buffer status if it exists, then the 100M Microsoft Loopback Adapter is destination virtual resource.
In the embodiment of the present application, the virtual resource in buffer status mentioned above refers in rolling back action, needs
Deletion but creation virtual resource that is not deleted but being retained.It is executed back after any VNF manages operation failure
Rolling operation, if the rolling back action includes the operation for deleting virtual resource, virtual resource to be deleted is arranged the NFVO
For buffer status.
Specifically, NFVO determines the mark for the virtual resource deleted needed for the operation for deleting virtual resource in the present embodiment.
Mark of the NFVO according to these virtual resources, the virtual resource deleted needed for finding, and be the label of its setting buffer status.Together
When, schedule virtual resources operation is not issued VIM by NFVO, i.e. VIM is for being provided with the virtual resource of buffer status without deleting
Except operation.In this way, the virtual resource deleted is needed to be retained them temporarily by being provided with buffer status originally, so as to
Operation is managed for subsequent VNF to utilize.
Optionally, the process that virtual resource to be deleted is set buffer status by above-mentioned NFVO can also be slow by establishing
State set is rushed, the mode that the buffer status set is added in the mark of virtual resource to be deleted is realized.
S203, NFVO activate destination virtual resource.
Specifically, above-mentioned activation are as follows: NFVO cancels the label of the buffer status of destination virtual resource, so that target is empty
Quasi- resource can be managed in operation in VNF and be used.By activating destination virtual resource, destination virtual resource is directly used
This creation virtual resource operation is completed, without creating a new virtual resource again.
It is worth noting that after S203 is finished, showing that the operation of this schedule virtual resources is complete in the present embodiment
At then NFVO directly sends the feedback information that this schedule virtual resources operates to VNFM, without sending virtual resource tune to VIM
Degree operation.
Optionally, after S201, if NFVO can not be determined in the virtual resource in buffer status and virtual resource
Schedule virtual resources operation is then sent to VIM by the matched destination virtual resource of scheduling operation.VIM is receiving virtual resource tune
After degree operation, is operated according to schedule virtual resources, execute corresponding schedule virtual resources.For example, schedule virtual resources operation is
2GB virtual memory is created, and does not have the virtual memory of 2GB in the virtual resource under buffer status, then NFVO is by the virtual money
Source scheduling operation is sent to VIM.VIM can create the virtual memory of a 2GB according to the schedule virtual resources.
Furthermore, it is contemplated that will cause the waste of system resource if the virtual resource of buffer status is not used by for a long time,
The present embodiment increases following steps in above-mentioned steps to solve this problem:
It is after buffer status is arranged in virtual resource in NFVO, NFVO is that timing is arranged in the virtual resource in buffer status
Device, the timer is used for after by preset time, by the virtual resource rollback in buffer status.NFVO for
After virtual resource setting timer in buffer status, the timer state of virtual resource can be monitored.If some virtual resource
The preset time of timer be already expired, then NFVO notifies VIM by the virtual resource rollback, to discharge the virtual resource.
It is corresponding, in step S203, determined and the virtual money in the virtual resource in buffer status in NFVO
After the matched destination virtual resource of source scheduling operation, further includes: NFVO deletes the corresponding timer of the destination virtual resource.
Meanwhile it being based on the above method, and in S202, NFVO determining and virtual money in the virtual resource in buffer status
When the matched destination virtual resource of source scheduling operation, if occurring multiple to operate the virtual moneys that match with schedule virtual resources
When source, a timer remaining time the smallest virtual resource can be selected according to the time of the corresponding timer of virtual resource
As destination virtual resource.
The method of NFV resource management provided by the present application, when executing the operation of creation virtual resource in NFV system,
It can be determined from the virtual resource in buffer status and operate matched destination virtual resource with the schedule virtual resources and swash
Destination virtual resource that it serves somebody right, can complete the operation of creation virtual resource.The target void of buffer status is in by calling directly
Quasi- resource, it is no longer necessary to create new virtual resource, avoid and virtual resource is scheduled again, to reduce VNF management
The time delay of operation.
The embodiment of the present application can be carried out according to device of the above method example to the method for executing above-mentioned NFV resource management
The division of functional module perhaps functional unit for example, each functional module of each function division or functional unit can be corresponded to,
Two or more functions can also be integrated in a processing module.Above-mentioned integrated module can both use hardware
Form realize, can also be realized in the form of software function module or functional unit.Wherein, right in the embodiment of the present application
The division of module or unit is schematical, only a kind of logical function partition, can there is other draw in actual implementation
The mode of dividing.
Fig. 3 shows a kind of possible structural schematic diagram of device involved in above-described embodiment.The device includes true
Cover half block 301, processing module 302.
Wherein, the determining module 301, for determining that VNF management operates corresponding at least one schedule virtual resources behaviour
Make.
The processing module 302, if being creation virtual resource for schedule virtual resources operation, in buffering
It is determining in the virtual resource of state to operate matched destination virtual resource with the schedule virtual resources;Activate the destination virtual
Resource.
Optionally, the processing module 302 operates to be created virtual specifically for the determination schedule virtual resources
The type and attribute of resource;It is true in the virtual resource in buffer status according to the type of virtual resource to be created and attribute
Fixed destination virtual resource identical with the type of the virtual resource to be created and attribute.
Optionally, the processing module 302 is also used to execute rolling back action after any VNF manages operation failure, if institute
Stating rolling back action includes the operation for deleting virtual resource, sets buffer status for virtual resource to be deleted.
Optionally, the processing module 302 is also used to that timer is arranged for the virtual resource in buffer status, described
Timer is used for after by preset time, by the virtual resource rollback in buffer status.
Optionally, the processing module 302 is also used to determining and described virtual in the virtual resource in buffer status
After scheduling of resource operates matched destination virtual resource, the corresponding timer of the destination virtual resource is deleted.
The device of NFV resource management provided by the present application, when executing the operation of creation virtual resource in NFV system,
It can be determined from the virtual resource in buffer status and operate matched destination virtual resource with the schedule virtual resources and swash
Destination virtual resource that it serves somebody right, can complete the operation of creation virtual resource.The target void of buffer status is in by calling directly
Quasi- resource, it is no longer necessary to create new virtual resource, avoid and virtual resource is scheduled again, to reduce VNF management
The time delay of operation
Fig. 4 shows another possible structural schematic diagram of device involved in above-described embodiment.The device includes:
Processor 401 and communication interface 402.Processor 401 is for carrying out control management to the movement of device, for example, executing above-mentioned true
The step of cover half block 301, processing module 302 execute, and/or other processes for executing techniques described herein.Communication
Interface 402 is used to support the communication of device Yu other network entities.Device can also include memory 403 and bus 404, storage
Device 403 is used for the program code and data of storage device.
Wherein, above-mentioned processor 401 (or being described as controller), which may be implemented or execute, combines present disclosure
Described various illustrative logic blocks, module and circuit.The processor or controller can be central processing unit, general
Processor, digital signal processor, specific integrated circuit, field programmable gate array or other programmable logic device, crystalline substance
Body pipe logical device, hardware component or any combination thereof.It, which may be implemented or executes, combines described by present disclosure
Various illustrative logic blocks, module and circuit.The processor is also possible to realize the combination of computing function, such as wraps
It is combined containing one or more microprocessors, DSP and the combination of microprocessor etc..
Communication interface 402 can be transmission circuit.
Memory 403 may include volatile memory, such as random access memory;The memory also may include non-
Volatile memory, such as read-only memory, flash memory, hard disk or solid state hard disk;The memory can also include above-mentioned
The combination of the memory of type.
Bus 404 can be expanding the industrial standard structure (Extended Industry Standard
Architecture, EISA) bus etc..Bus 404 can be divided into address bus, data/address bus, control bus etc..For convenient for table
Show, only indicated with a thick line in Fig. 4, it is not intended that an only bus or a type of bus.
Through the above description of the embodiments, it is apparent to those skilled in the art that, for description
It is convenienct and succinct, only the example of the division of the above functional modules, in practical application, can according to need and will be upper
It states function distribution to be completed by different functional modules, i.e., the internal structure of device is divided into different functional modules, to complete
All or part of function described above.The specific work process of the system, apparatus, and unit of foregoing description, before can referring to
The corresponding process in embodiment of the method is stated, details are not described herein.
The embodiment of the present application also provides a kind of computer readable storage medium, and finger is stored in computer readable storage medium
It enables, when computer executes the instruction, which executes what NFVO in method flow shown in above method embodiment was executed
Each step.
Wherein, computer readable storage medium, such as electricity, magnetic, optical, electromagnetic, infrared ray can be but not limited to or partly led
System, device or the device of body, or any above combination.The more specific example of computer readable storage medium is (non-poor
The list of act) it include: the electrical connection with one or more conducting wires, portable computer diskette, hard disk, random access memory
(Random Access Memory, RAM), read-only memory (Read-Only Memory, ROM), erasable type may be programmed read-only
It is memory (Erasable Programmable Read Only Memory, EPROM), register, hard disk, optical fiber, portable
Compact disc read-only memory (Compact Disc Read-Only Memory, CD-ROM), light storage device, magnetic memory
The computer readable storage medium of part or above-mentioned any appropriate combination or any other form well known in the art.
A kind of illustrative storage medium is coupled to processor, to enable a processor to from the read information, and can be to
Information is written in the storage medium.Certainly, storage medium is also possible to the component part of processor.Pocessor and storage media can be with
In application-specific IC (Application Specific Integrated Circuit, ASIC).In the application
In embodiment, computer readable storage medium can be any tangible medium for including or store program, which can be referred to
Enable execution system, device or device use or in connection.
The above, the only specific embodiment of the application, but the protection scope of the application is not limited thereto, it is any
Change or replacement within the technical scope of the present application should all be covered within the scope of protection of this application.Therefore, this Shen
Protection scope please should be subject to the protection scope in claims.
Claims (13)
1. a kind of method of NFV resource management characterized by comprising
Network function virtualization composer NFVO determines that virtual network function VNF management operates at least one corresponding virtual resource
Scheduling operation;
If the schedule virtual resources operation is creation virtual resource, the NFVO is in the virtual resource in buffer status
It is determining to operate matched destination virtual resource with the schedule virtual resources;
The NFVO activates the destination virtual resource.
2. the method for NFV resource management according to claim 1, which is characterized in that the method also includes:
Rolling back action is executed after any VNF manages operation failure;
If the rolling back action includes the operation for deleting virtual resource, the NFVO sets slow for virtual resource to be deleted
Rush state.
3. the method for NFV resource management according to claim 1, which is characterized in that the NFVO is being in buffer status
Virtual resource in it is determining operate matched destination virtual resource with the schedule virtual resources, include:
The NFVO determines that the schedule virtual resources operate the type and attribute of virtual resource to be created;
The NFVO according to the type of virtual resource to be created and attribute determined in the virtual resource in buffer status with
The identical destination virtual resource of type and attribute of the virtual resource to be created.
4. the method for NFV resource management according to claim 1 to 3, which is characterized in that the method also includes:
The NFVO is that virtual resource in buffer status is arranged timer, the timer be used for by preset time it
Afterwards, by the virtual resource rollback in buffer status.
5. the method for NFV resource management according to claim 4, which is characterized in that in the NFVO in buffering shape
In the virtual resource of state after the determining matched destination virtual resource with schedule virtual resources operation, further includes:
The NFVO deletes the corresponding timer of the destination virtual resource.
6. a kind of device of NFV resource management characterized by comprising
Determining module, for determining that virtual network function VNF management operates corresponding at least one schedule virtual resources operation;
Processing module, if being creation virtual resource for schedule virtual resources operation, virtual in buffer status
It is determining in resource to operate matched destination virtual resource with the schedule virtual resources;Activate the destination virtual resource.
7. the device of NFV resource management according to claim 6, which is characterized in that
The processing module is also used to execute rolling back action after any VNF manages operation failure, if the rolling back action includes
The operation of virtual resource is deleted, then the processing module is also used to set buffer status for the virtual resource to be deleted.
8. the device of NFV resource management according to claim 6, which is characterized in that
The processing module is also used to, and determines that the schedule virtual resources operate the type and category of virtual resource to be created
Property;Determined in the virtual resource in buffer status according to the type of virtual resource to be created and attribute with it is described to be created
Virtual resource type and the identical destination virtual resource of attribute.
9. according to the device of NFV resource management as claimed in claim 6 to 8, which is characterized in that
The processing module is also used to, and timer is arranged for the virtual resource in buffer status, the timer is for passing through
It crosses after preset time, by the virtual resource rollback in buffer status.
10. the device of NFV resource management according to claim 9, which is characterized in that
The processing module is also used to, the determining and schedule virtual resources operation in the virtual resource in buffer status
The corresponding timer of the destination virtual resource is deleted after the destination virtual resource matched.
11. a kind of device, which is characterized in that described device includes: processor and memory;Wherein, memory is for storing one
A or multiple programs;The one or more program includes computer executed instructions, and when the apparatus is operative, processor executes this and deposits
Computer executed instructions of reservoir storage, so that the NFV resource described in one of any in device perform claim requirement 1 to 5
The method of management.
12. a kind of computer readable storage medium, which is characterized in that be stored with instruction in computer readable storage medium, work as meter
When calculation machine executes the instruction, the computer execute it is one of any in the claims 1 to 5 described in NFV resource management side
Method.
13. a kind of computer program product comprising instruction, which is characterized in that when the computer program product on computers
When operation, the computer execute it is one of any in the claims 1 to 5 described in NFV resource management method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811377841.9A CN109639460B (en) | 2018-11-19 | 2018-11-19 | NFV resource management method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811377841.9A CN109639460B (en) | 2018-11-19 | 2018-11-19 | NFV resource management method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109639460A true CN109639460A (en) | 2019-04-16 |
CN109639460B CN109639460B (en) | 2021-12-07 |
Family
ID=66068687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811377841.9A Active CN109639460B (en) | 2018-11-19 | 2018-11-19 | NFV resource management method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109639460B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110166362A (en) * | 2019-05-22 | 2019-08-23 | 电子科技大学 | A kind of service function figure low time delay mapping method based on node screening |
CN111949364A (en) * | 2019-05-16 | 2020-11-17 | 华为技术有限公司 | Deployment method of containerized VNF and related equipment |
CN113099467A (en) * | 2021-02-24 | 2021-07-09 | 深圳震有科技股份有限公司 | Modification method and system for network configuration of virtual network element in 5G communication |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8745614B2 (en) * | 2011-05-13 | 2014-06-03 | Lsi Corporation | Method and system for firmware upgrade of a storage subsystem hosted in a storage virtualization environment |
KR101543735B1 (en) * | 2014-03-12 | 2015-08-11 | (주)엔키아 | System and method for processing packets for nfv |
CN105407060A (en) * | 2015-10-23 | 2016-03-16 | 南京理工大学 | Multiple-access multi-unit distributed resource distribution method based on heterogeneous wireless network |
CN105812171A (en) * | 2014-12-31 | 2016-07-27 | 华为技术有限公司 | Virtualized network function VNF control method and device |
CN106302210A (en) * | 2015-06-23 | 2017-01-04 | 中兴通讯股份有限公司 | A kind of elastic expansion method, Apparatus and system |
CN106506186A (en) * | 2015-09-08 | 2017-03-15 | 中兴通讯股份有限公司 | The method and apparatus for rebuilding virtual network function |
US20170214608A1 (en) * | 2016-01-21 | 2017-07-27 | Ciena Corporation | Flow based virtual network function orchestration |
CN107306203A (en) * | 2016-04-25 | 2017-10-31 | 中兴通讯股份有限公司 | A kind of method and device of the scheduling of resource based on virtual network |
WO2018000239A1 (en) * | 2016-06-29 | 2018-01-04 | Orange | Assurance of end-to-end quality-of-service over networks that implement network function virtualization |
CN107995269A (en) * | 2017-11-24 | 2018-05-04 | 合肥博焱智能科技有限公司 | A kind of resource dynamic distributing method based on cloud computing platform |
US10063453B1 (en) * | 2014-08-07 | 2018-08-28 | Amdocs Development Limited | System, method, and computer program for tag based testing of virtual services |
-
2018
- 2018-11-19 CN CN201811377841.9A patent/CN109639460B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8745614B2 (en) * | 2011-05-13 | 2014-06-03 | Lsi Corporation | Method and system for firmware upgrade of a storage subsystem hosted in a storage virtualization environment |
KR101543735B1 (en) * | 2014-03-12 | 2015-08-11 | (주)엔키아 | System and method for processing packets for nfv |
US10063453B1 (en) * | 2014-08-07 | 2018-08-28 | Amdocs Development Limited | System, method, and computer program for tag based testing of virtual services |
CN105812171A (en) * | 2014-12-31 | 2016-07-27 | 华为技术有限公司 | Virtualized network function VNF control method and device |
CN106302210A (en) * | 2015-06-23 | 2017-01-04 | 中兴通讯股份有限公司 | A kind of elastic expansion method, Apparatus and system |
CN106506186A (en) * | 2015-09-08 | 2017-03-15 | 中兴通讯股份有限公司 | The method and apparatus for rebuilding virtual network function |
CN105407060A (en) * | 2015-10-23 | 2016-03-16 | 南京理工大学 | Multiple-access multi-unit distributed resource distribution method based on heterogeneous wireless network |
US20170214608A1 (en) * | 2016-01-21 | 2017-07-27 | Ciena Corporation | Flow based virtual network function orchestration |
CN107306203A (en) * | 2016-04-25 | 2017-10-31 | 中兴通讯股份有限公司 | A kind of method and device of the scheduling of resource based on virtual network |
WO2018000239A1 (en) * | 2016-06-29 | 2018-01-04 | Orange | Assurance of end-to-end quality-of-service over networks that implement network function virtualization |
CN107995269A (en) * | 2017-11-24 | 2018-05-04 | 合肥博焱智能科技有限公司 | A kind of resource dynamic distributing method based on cloud computing platform |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111949364A (en) * | 2019-05-16 | 2020-11-17 | 华为技术有限公司 | Deployment method of containerized VNF and related equipment |
WO2020228838A1 (en) * | 2019-05-16 | 2020-11-19 | 华为技术有限公司 | Containerized vnf deployment method and related device |
US11928522B2 (en) | 2019-05-16 | 2024-03-12 | Huawei Technologies Co., Ltd. | Containerized VNF deployment method and related device |
CN110166362A (en) * | 2019-05-22 | 2019-08-23 | 电子科技大学 | A kind of service function figure low time delay mapping method based on node screening |
CN110166362B (en) * | 2019-05-22 | 2021-04-30 | 电子科技大学 | Service function graph low-delay mapping method based on node screening |
CN113099467A (en) * | 2021-02-24 | 2021-07-09 | 深圳震有科技股份有限公司 | Modification method and system for network configuration of virtual network element in 5G communication |
CN113099467B (en) * | 2021-02-24 | 2022-11-15 | 深圳震有科技股份有限公司 | Modification method and system for network configuration of virtual network element in 5G communication |
Also Published As
Publication number | Publication date |
---|---|
CN109639460B (en) | 2021-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105808328B (en) | The methods, devices and systems of task schedule | |
CN105531688B (en) | The service of resource as other services is provided | |
CN109639460A (en) | The method and apparatus of NFV resource management | |
JPH10283210A (en) | Virtual machine movement control system between virtual machine systems | |
CN103780655A (en) | Message transmission interface task and resource scheduling system and method | |
CN105988874A (en) | Resource processing method and device | |
CN110427284A (en) | Data processing method, distributed system, computer system and medium | |
CN114416352A (en) | Computing resource allocation method and device, electronic equipment and storage medium | |
CN109522090A (en) | Resource regulating method and device | |
CN109240825A (en) | Elastic method for scheduling task, device, equipment and computer readable storage medium | |
CN103885811B (en) | Method, system and device that dummy machine system total system is migrated online | |
CN111399970A (en) | Reserved resource management method, device and storage medium | |
CN109800067A (en) | Database connection optimization method, device and relevant device based on cloud monitoring | |
CN115543615A (en) | Resource allocation method and device, electronic equipment and storage medium | |
CN109739640A (en) | A kind of container resource management system based on Shen prestige framework | |
CN113672240A (en) | Container-based multi-machine-room batch automatic deployment application method and system | |
CN112579692A (en) | Data synchronization method, device, system, equipment and storage medium | |
CN113674131A (en) | Hardware accelerator equipment management method and device, electronic equipment and storage medium | |
CN106385330A (en) | Network function virtualization composer realization method and device | |
CN109471725A (en) | Resource allocation methods, device and server | |
CN105677481B (en) | A kind of data processing method, system and electronic equipment | |
CN110162396A (en) | Method for recovering internal storage, device, system and storage medium | |
CN107528871A (en) | Data analysis in storage system | |
US10680890B2 (en) | Non-disruptively splitting a coordinated timing network | |
CN115834600B (en) | Multi-cloud nanotube data synchronization method and device, electronic equipment and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |