CN109638721A - A kind of power supply through line cable tie device - Google Patents
A kind of power supply through line cable tie device Download PDFInfo
- Publication number
- CN109638721A CN109638721A CN201811517473.3A CN201811517473A CN109638721A CN 109638721 A CN109638721 A CN 109638721A CN 201811517473 A CN201811517473 A CN 201811517473A CN 109638721 A CN109638721 A CN 109638721A
- Authority
- CN
- China
- Prior art keywords
- binding strap
- cable tie
- power supply
- thrust block
- binding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000003825 pressing Methods 0.000 claims abstract description 6
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 2
- 239000007787 solid Substances 0.000 claims 1
- 230000009471 action Effects 0.000 abstract description 3
- 239000010935 stainless steel Substances 0.000 description 17
- 229910001220 stainless steel Inorganic materials 0.000 description 9
- 229910000838 Al alloy Inorganic materials 0.000 description 8
- 239000000956 alloy Substances 0.000 description 8
- 229910001256 stainless steel alloy Inorganic materials 0.000 description 8
- 239000000463 material Substances 0.000 description 5
- 230000005611 electricity Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- RNFJDJUURJAICM-UHFFFAOYSA-N 2,2,4,4,6,6-hexaphenoxy-1,3,5-triaza-2$l^{5},4$l^{5},6$l^{5}-triphosphacyclohexa-1,3,5-triene Chemical compound N=1P(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP=1(OC=1C=CC=CC=1)OC1=CC=CC=C1 RNFJDJUURJAICM-UHFFFAOYSA-N 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 230000009970 fire resistant effect Effects 0.000 description 2
- 239000003063 flame retardant Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007728 cost analysis Methods 0.000 description 1
- 229910001095 light aluminium alloy Inorganic materials 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000010187 selection method Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/02—Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
Landscapes
- Basic Packing Technique (AREA)
- Electric Cable Installation (AREA)
Abstract
The present invention provides a kind of power supply through line cable tie device, including lower pressure bar and positioning device, the positioning device is fixedly mounted in support base, the bottom guide groove for being fixedly installed with the movement sliding slot for facilitating top binding strap to move in the support base and lower part binding strap being facilitated to move, it is equipped in movement sliding slot and binding strap edge in top is pushed to move the top thrust block pad that sliding slot slides to binding point, the lower thrust block for pushing lower part binding strap to slide to binding point along bottom guide groove is installed in the guide groove of bottom, cable is across top binding strap and lower part binding strap, top thrust block pad and lower thrust block push top binding strap and lower part binding strap to reach binding point respectively, lower pressure bar pushes, down-pressed pole pushes lower lock block to push top binding strap with the realization connection of lower part binding strap to complete cable tie.The binding that cable is directly completed by hand push and pressing action greatly accelerates working efficiency, saves a large amount of artificial and times.
Description
Technical field
The present invention relates to power supply through line construction field, specially a kind of power supply through line cable tie device.
Background technique
Increasing with country to investment of railway construction, high-speed railway increasingly meet the needs of people are to convenient trip.
High-speed Railway Power System is railway communication, signal, station power and lighting provide electric power energy, and railway power through track is generally
3 (1 × 50), 3 (1 × 70), 3 (1 × 95) three kinds of specifications high pressure 10kV power cable, our the most commonly used specifications are 3 (1
× 70), the entire high-speed railway main line of railway power through track cable penetration, along railway two sides lay, it be connected to along electricity
Power transformer and distribution station, related interval power equipment are the maximum high-tension electricities of usage amount in railway high speed railway power power supply system
Cable is 6 times or more milimeter numbers of route length.
High pressure through track three are one group, are arranged in the two sides power cable ditch of high-speed railway, usually yellow, green, red
Three kinds of colors represent tri- high-voltage electricity of A, B, C.High pressure through track will carry out route arrangement, binding, fixation after the completion of laying
Device is fixed, and is then carried out " S " type and is put.
Common 10kV high pressure through track cable is bound after cable completes laying as following methods:
Using manpower craft, the high-tension electricity through track long cable section of ingoing line that often one group of three people carries out laying completion is bound, and two
People carries out front and back end and lifts cable, and bolt is tightened in fixation after clip installation is carried out among a people.Such improving bud grafting, worker
Large labor intensity, needs a large amount of manpower and time, is not able to satisfy the requirement efficiently constructed.
Summary of the invention
The object of the present invention is to provide a kind of power supply through line cable tie devices, it is only necessary to which a people carries out, and saves manpower, greatly
It is easy to operate that working efficiency, saving a large amount of artificial and time, long service life are accelerated greatly.
Technical solution proposed by the present invention
A kind of power supply through line cable tie device, including lower pressure bar and positioning device, the positioning device are fixedly mounted on
In support base, fixed link is set between positioning device and support base, is equipped with from bottom to top in fixed link along fixed link
Down-pressed pole is installed in the lower lock block and movable block of up and down motion, the lower section of the lower pressure bar, the lower end of down-pressed pole pass through movable block with
Lower lock block is connected, and the lower end of the fixed link is cased with vertical constant force spring, and the vertical constant force spring is mounted on lower lock block
The lower section at both ends is fixedly installed with to the reset after lower lock block completes cable tie, in the support base facilitates top to tie up
The movement sliding slot of band movement and the bottom guide groove for facilitating lower part binding strap to move, move and are equipped with the binding of promotion top in sliding slot
The top thrust block pad that sliding slot slides to binding point is moved with edge, is equipped in the guide groove of bottom and pushes lower part binding strap sliding along bottom guide groove
To the lower thrust block of binding point, cable is across top binding strap and lower part binding strap, top thrust block pad and lower thrust
Block pushes top binding strap and lower part binding strap to reach binding point respectively, and lower pressure bar pushes, and down-pressed pole pushes lower lock block by top
Binding strap is pushed realizes connection to complete cable tie with lower part binding strap.
The support base is mounted in placement plate, and the moving wheel for facilitating movement, institute are equipped with below the placement plate
State the hand handle being equipped with above placement plate to push placement plate to move.
The two sides that the movement sliding slot is fixedly mounted on support base by connecting bolt.
The top thrust block pad is mounted on the binding strap guide rod of top and moves along top binding strap guide rod, and the top is tied up
One end of band guide rod is fixed on the end fixed point of movement sliding slot, and the other end is fixedly connected in fixing seat, the fixing seat
It is fixedly mounted in support base.
The top binding strap guide rod is provided with two, and two top binding strap guide rods are placed in the inside of movement sliding slot simultaneously
It is connected with the both ends of top thrust block pad, the tail end of the top binding strap guide rod is cased with for pushing top thrust block pad to advancing slip
Dynamic upper lateral constant force spring.
The lower thrust block is mounted on the binding strap guide rod of lower part and moves along lower part binding strap guide rod, lower part binding strap
Guide rod is mounted on the centre of bottom guide groove, and the both ends of the lower part binding strap guide rod are respectively and fixedly installed on pedestal, under described
The tail portion of portion's binding strap guide rod is cased with the lower, transverse constant force spring to push lower thrust block forward slip.
The lower lock block is arranged to the π font to match with top binding strap, opens up in the lower leg pressing in the left and right two of lower lock block
The groove for thering is the connection convex body for facilitating lower part binding strap to pass through.
The top thrust block pad is arranged to Ω shape identical with top binding belt shape.
The positioning device is arranged to herringbone, and the fixed link and support rod of lambdoid positioning device are respectively placed in support
The both ends of pedestal.
The moving wheel is set as one, in order to move in power cable ditch.
Compared with prior art, the present invention has the advantages that being acted on by lateral constant force spring by cable tie
Position up and down push to fixed position, the push of the position up and down of binding strap is fixed on one by the active force being pressed downward by people
It rises, helps the included buckle in the lower part of band, top carries hole, and vertical constant force spring again returns position, and crossed strip continues
Say that next group of side band is delivered to fixed position, similar to the principle of stapler.It avoids manually every a distance inlet wire one
Secondary manually squat down bends over to complete, and the binding of cable is directly completed by hand push and pressing action.It only needs a people to carry out, saves people
Power.It greatly accelerates working efficiency, save a large amount of artificial and times.Long service life, it is easy to operate.Binding strap uses more at present
Fixing hoop can more reduce expenses.When binding strap can save a large amount of relative to screw clip when cable is needed replacing
Between.More original binding strap may be reused.
Detailed description of the invention
Fig. 1 is overall structure of the present invention.
Fig. 2 is tied part structural schematic diagram of the present invention.
Fig. 3 is the partial structural diagram of Fig. 2.
Fig. 4 is guide barrel construction schematic diagram in bottom of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
As shown in Figs 1-4, a kind of power supply through line cable tie device, including lower pressure bar 1 and positioning device 2, the positioning
Device 2 is fixedly mounted in support base 12, fixed link 3 is arranged between positioning device 2 and support base 12, in fixed link 3
The lower lock block 6 and movable block 5 to move up and down along fixed link 3 is installed from bottom to top, down-pressed pole is installed in the lower section of the lower pressure bar 1
4, the lower end of down-pressed pole 4 passes through movable block 5 and is connected with lower lock block 6, and the lower end of the fixed link 3 is cased with vertical constant force spring 7,
The vertical constant force spring 7 is mounted on the lower section at 6 both ends of lower lock block to the reset after lower lock block 6 completes cable tie,
It is fixedly installed with the movement sliding slot 10 for facilitating top binding strap to move in the support base 12 and lower part binding strap is facilitated to move
Bottom guide groove 23, move to be equipped in sliding slot 10 top binding strap 8 pushed to be pushed away to the top of binding point along moving sliding slot sliding 10
Power block 14 is equipped with the lower thrust block 18 for pushing lower part binding strap 9 to slide to binding point along bottom guide groove 23 in bottom guide groove 23,
For cable across top binding strap 8 and lower part binding strap 9, top thrust block pad 14 and lower thrust block 18 push top to tie up respectively
Band 8 and lower part binding strap 9 reach binding point, and lower pressure bar 1 pushes, and down-pressed pole 4 pushes lower lock block 6 to push top binding strap 8
Realize connection to complete cable tie with lower part binding strap 9.
The support base 12 is mounted in placement plate 200, and the lower section of the placement plate 200 is equipped with the fortune for facilitating movement
Driving wheel 300, the top of the placement plate 200 are equipped with the hand handle 100 to push placement plate to move.
The two sides that the movement sliding slot 10 is fixedly mounted on support base 12 by connecting bolt 11.
The top thrust block pad 14 is mounted on top binding strap guide rod 21 and moves along top binding strap guide rod 21, described
One end of top binding strap guide rod 21 is fixed on the end fixed point 19 of movement sliding slot, and the other end is fixedly connected on fixing seat 20
On, the fixing seat 20 is fixedly mounted in support base 12.
The top binding strap guide rod 21 is provided with two, and two top binding strap guide rods 21 are placed in movement sliding slot 10
Inside is simultaneously connected with the both ends of top thrust block pad 14, and the tail end of the top binding strap guide rod 21 is cased with for pushing top to push away
The upper lateral constant force spring 22 of power block forward slip.
The lower thrust block 18 is mounted on lower part binding strap guide rod 15 and moves along lower part binding strap guide rod 15, lower part
Binding strap guide rod 15 is mounted on the centre of bottom guide groove 23, and the both ends of the lower part binding strap guide rod 15 are respectively and fixedly installed to base
On seat 17, the tail portion of the lower part binding strap guide rod 15 is cased with to push the lower, transverse of 18 forward slip of lower thrust block permanent
Power spring 16.
The lower lock block 6 is arranged to the π font to match with top binding strap, opens in the lower leg pressing in the left and right two of lower lock block 6
Equipped with the groove for facilitating the connection convex body of lower part binding strap to pass through.
The top thrust block pad 14 is arranged to Ω shape identical with 8 shape of top binding strap.
The positioning device 2 is arranged to herringbone, and the fixed link and support rod of lambdoid positioning device are respectively placed in branch
Support the both ends of pedestal.
The moving wheel 300 is set as one, in order to move in power cable ditch.
The selection and processing method of material:
Lower pressure bar: using high-quality stainless steel material or other light aluminum alloys, is mainly used for downwards using the power pushed.
Positioning device: using high-quality stainless steel material, is mainly used for accepting lower pressure, fixed relative position.
Fixed link: high-quality stainless steel, the smooth reduction frictional force in surface are used.
Down-pressed pole: high-quality stainless steel material.
Moving mass: using high-quality stainless steel or aluminum alloy materials, and each two hole machined in both sides forms.
Lower lock block: using high-quality stainless steel or aluminum alloy materials, and both sides respectively process a hole, and there is hollow recess in lower end.
Vertical constant force spring: high-quality stainless steel constant force spring.
Top binding strap: non magnetic fire resistant flame retardant plastic cement.
Lower part binding strap: non magnetic fire resistant flame retardant plastic cement.
Sliding slot: workpiece is moved, using high-quality stainless steel or aluminum alloy materials.
Connect bolt: the buckle screw conveniently tightened by hand.
Support base: it is processed using high-quality stainless steel or aluminum alloy materials.
Top thrust block pad: high-quality stainless steel or aluminum alloy materials are used.
Lower thrust block: high-quality stainless steel or aluminum alloy materials are used
Lateral constant force spring: high-quality stainless steel constant force spring.
Top binding strap guide rod and lower part binding strap guide rod: high-quality stainless steel or aluminum alloy materials are used
Fixed point: high-quality stainless steel or aluminum alloy materials are used
Hand handle: high-quality stainless steel workpiece is integrally formed with placement plate.
Placement plate: high-quality stainless steel workpiece is integrally formed with hand handle.
Moving wheel: diameter 25cm, top-quality rubber material, middle brace rod are high-quality stainless steel.
(1) it working principle: is acted on by lateral constant force spring and the position up and down of cable tie is pushed into fixed bit
It sets, the push of position up and down of binding strap is fixed together by the active force being pressed downward by people, the included buckle in the lower part of band is helped,
Top carries hole, and vertical constant force spring again returns position, and crossed strip continues to say that next group of side band is delivered to fixation
Position, similar to the principle of stapler.
(2) make main points: telecontrol equipment main body framework is integral type, avoids the unstability of secondary assembling;Side band is wanted
It is placed on portion in the device in advance, when lower lock block pushes binding strap (top), hole needs prefabricated completion in advance.
Technical characterstic:
It avoids manually once manually to squat down every a distance inlet wire and bends over to complete, directly pass through hand push and pressing action
Complete the binding of cable.It only needs a people to carry out, saves manpower.It greatly accelerates working efficiency, save a large amount of artificial and times.
Long service life, it is easy to operate.Binding strap fixing hoop more used at present can more reduce expenses.Binding strap is needed in cable
The plenty of time can be saved relative to screw clip when replacing.More original binding strap may be reused.
Efficiency and cost analysis:
We are referred to the binding of one section of normal 3 kilometers length through track cable:
By the comparison of both the above method, go out 6 times or more efficiency fastly than traditional artificial binding using tool binding, to work
Make the healthy and beneficial of personnel.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (10)
1. a kind of power supply through line cable tie device, it is characterised in that: including lower pressure bar and positioning device, the positioning device is solid
Dingan County is arranged fixed link, is equipped with from bottom to top in fixed link in support base between positioning device and support base
Down-pressed pole is installed in the lower section of the lower lock block and movable block to move up and down along fixed link, the lower pressure bar, and the lower end of down-pressed pole passes through
Movable block is connected with lower lock block, and the lower end of the fixed link is cased with vertical constant force spring, and the vertical constant force spring is mounted on
The lower section at the both ends of lower lock block is to the reset after lower lock block completes cable tie, the side of being fixedly installed in the support base
Just the movement sliding slot of top binding strap movement and the bottom guide groove for facilitating lower part binding strap to move, move in sliding slot and are equipped with promotion
Top binding strap slides to the top thrust block pad of binding point along sliding slot is moved, and is equipped in the guide groove of bottom and pushes lower part binding strap the bottom of along
Portion's guide groove slide to binding point lower thrust block, cable across top binding strap and lower part binding strap, top thrust block pad with
Lower thrust block pushes top binding strap and lower part binding strap to reach binding point respectively, and lower pressure bar pushes, and down-pressed pole, which pushes, to be pushed
Block pushes top binding strap realizes connection to complete cable tie with lower part binding strap.
2. a kind of power supply through line cable tie device according to claim 1, it is characterised in that: the support base installation
In placement plate, the moving wheel for facilitating movement is installed below the placement plate, be equipped with above the placement plate to
Push the hand handle of placement plate movement.
3. a kind of power supply through line cable tie device according to claim 1, it is characterised in that: the movement sliding slot passes through
Connection bolt is fixedly mounted on the two sides of support base.
4. a kind of power supply through line cable tie device according to claim 1, it is characterised in that: the top thrust block pad peace
It is moved on the binding strap guide rod of top and along top binding strap guide rod, one end of the top binding strap guide rod is fixed on movement
The end fixed point of sliding slot, the other end are fixedly connected in fixing seat, and the fixing seat is fixedly mounted in support base.
5. a kind of power supply through line cable tie device according to claim 4, it is characterised in that: the top binding strap is led
Bar is provided with two, and two top binding strap guide rods are placed in the inside of movement sliding slot and are connected with the both ends of top thrust block pad
It connects, the tail end of the top binding strap guide rod is cased with the upper lateral constant force spring for pushing top thrust block pad forward slip.
6. a kind of power supply through line cable tie device according to claim 1, it is characterised in that: the lower thrust block peace
It is moved on the binding strap guide rod of lower part and along lower part binding strap guide rod, lower part binding strap guide rod is mounted in the guide groove of bottom
Between, the both ends of the lower part binding strap guide rod are respectively and fixedly installed on pedestal, and the tail portion of the lower part binding strap guide rod is cased with
To push the lower, transverse constant force spring of lower thrust block forward slip.
7. a kind of power supply through line cable tie device according to claim 1, it is characterised in that: the lower lock block is arranged to
The π font to match with top binding strap, the left and right two of lower lock block, which is descended in leg pressing to offer, facilitates the connection of lower part binding strap convex
The groove that body passes through.
8. a kind of power supply through line cable tie device according to claim 1, it is characterised in that: the top thrust block pad is set
It is set to Ω shape identical with top binding belt shape.
9. a kind of power supply through line cable tie device according to claim 1, it is characterised in that: the positioning device setting
At herringbone, the fixed link and support rod of lambdoid positioning device are respectively placed in the both ends of support base.
10. a kind of power supply through line cable tie device according to claim 2, it is characterised in that: the moving wheel setting
It is one, in order to be moved in power cable ditch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811517473.3A CN109638721B (en) | 2018-12-12 | 2018-12-12 | Electric power through line cable ligature ware |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811517473.3A CN109638721B (en) | 2018-12-12 | 2018-12-12 | Electric power through line cable ligature ware |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109638721A true CN109638721A (en) | 2019-04-16 |
CN109638721B CN109638721B (en) | 2024-01-02 |
Family
ID=66073234
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811517473.3A Active CN109638721B (en) | 2018-12-12 | 2018-12-12 | Electric power through line cable ligature ware |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109638721B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2090362U (en) * | 1991-01-03 | 1991-12-11 | 北京市消防科学研究所 | Bundling device |
CN104260917A (en) * | 2014-07-30 | 2015-01-07 | 桂林电子科技大学 | Equipment utilizing plastic ties to automatically bind wire harnesses |
KR101493405B1 (en) * | 2014-07-24 | 2015-02-16 | 주식회사 카스글로벌 | Lashing belt tightening apparatus having improved binding structure |
CN206156064U (en) * | 2016-10-21 | 2017-05-10 | 李秋池 | Ribbon lashing assembly |
CN206842731U (en) * | 2017-06-28 | 2018-01-05 | 山东电力建设第三工程公司 | A kind of Wound-rotor type cable tie line producing device |
CN207859436U (en) * | 2018-01-30 | 2018-09-14 | 江苏省苏中建设集团股份有限公司 | A kind of Wound-rotor type cable tie line producing device |
CN209016569U (en) * | 2018-12-12 | 2019-06-21 | 中铁建电气化局集团南方工程有限公司 | A kind of power supply through line cable tie device |
-
2018
- 2018-12-12 CN CN201811517473.3A patent/CN109638721B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2090362U (en) * | 1991-01-03 | 1991-12-11 | 北京市消防科学研究所 | Bundling device |
KR101493405B1 (en) * | 2014-07-24 | 2015-02-16 | 주식회사 카스글로벌 | Lashing belt tightening apparatus having improved binding structure |
CN104260917A (en) * | 2014-07-30 | 2015-01-07 | 桂林电子科技大学 | Equipment utilizing plastic ties to automatically bind wire harnesses |
CN206156064U (en) * | 2016-10-21 | 2017-05-10 | 李秋池 | Ribbon lashing assembly |
CN206842731U (en) * | 2017-06-28 | 2018-01-05 | 山东电力建设第三工程公司 | A kind of Wound-rotor type cable tie line producing device |
CN207859436U (en) * | 2018-01-30 | 2018-09-14 | 江苏省苏中建设集团股份有限公司 | A kind of Wound-rotor type cable tie line producing device |
CN209016569U (en) * | 2018-12-12 | 2019-06-21 | 中铁建电气化局集团南方工程有限公司 | A kind of power supply through line cable tie device |
Also Published As
Publication number | Publication date |
---|---|
CN109638721B (en) | 2024-01-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209016569U (en) | A kind of power supply through line cable tie device | |
CN104993421B (en) | A kind of portable pay-off crossing frame | |
CN205615777U (en) | Full -automatic reinforcing steel bar binding machine | |
CN107139530A (en) | A kind of forging press with shock-absorbing function | |
CN109638721A (en) | A kind of power supply through line cable tie device | |
CN202037208U (en) | Anchor pole straightener | |
CN208777061U (en) | A kind of foot-operated Simple steel cord is spliced machine device | |
CN209016568U (en) | A kind of Chinese character pin-shaped reorganizer of novel electric power through track cable | |
CN109650179B (en) | Electric power through wire cable arrangement, drawing in and ligature device | |
CN108462101B (en) | Six-connection three-hanging-point tension string replacement method for +/-800 kV extra-high voltage direct-current line | |
CN203813313U (en) | Mobile workbench for check and repair of strain insulator string | |
CN212202073U (en) | Tunnel secondary lining steel bar mounting trolley | |
CN202239098U (en) | Z-shaped bender | |
CN204068021U (en) | Line of power wedge line arc device | |
CN204588453U (en) | A kind of support class converter module hoisting clamp | |
CN210963634U (en) | Safety belt fixing device for electric power overhaul | |
CN204470434U (en) | A kind of riveting tool | |
CN211247097U (en) | Telescopic operation tool for spraying tank | |
CN211163763U (en) | Dismounting device of high-speed railway terminal anchoring wire clamp taper sleeve and wedge | |
CN104110126A (en) | Architectural engineering aerial work platform | |
CN209159469U (en) | A kind of Chinese character pin-shaped gathering device of novel electric power through track cable | |
CN206811810U (en) | A kind of elastic clamping mechanism of tool tong gum cover kludge | |
CN205466054U (en) | Workbench | |
CN206225200U (en) | A kind of common mode coil winding machine | |
CN204789699U (en) | Experimental output termination of big current generator eminence |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |