CN109636662A CN201811571954.2A CN201811571954A CN109636662A CN 109636662 A CN109636662 A CN 109636662A CN 201811571954 A CN201811571954 A CN 201811571954A CN 109636662 A CN109636662 A CN 109636662A
Authority
CN
China
Prior art keywords
information
window
hardware fitting
frame structure
production process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811571954.2A
Other languages
Chinese (zh)
Other versions
CN109636662B (en
Inventor
刘碧培
邓镇源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Nanhai Weigao Software Co Ltd
Original Assignee
Foshan Nanhai Weigao Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Nanhai Weigao Software Co Ltd filed Critical Foshan Nanhai Weigao Software Co Ltd
Priority to CN201811571954.2A priority Critical patent/CN109636662B/en
Publication of CN109636662A publication Critical patent/CN109636662A/en
Application granted granted Critical
Publication of CN109636662B publication Critical patent/CN109636662B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
  • Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)

Abstract

The present invention provides a kind of window production process management method, apparatus, storage medium and terminal device, for the window production process management method the following steps are included: obtaining the order information of window to be processed, the order information carries frame structure information, glass plate layout information and the Hardware fitting layout information of the window;The first parameter information for forming each profile monomer of the frame structure is obtained according to the frame structure information and the Hardware fitting layout information;The second parameter information of each glass monolith being set in the frame structure is obtained according to the glass plate layout information and the Hardware fitting layout information;The production process process for producing the window is generated according to first parameter information and second parameter information, the production process process includes multiple production processes successively to sort.

Description

Window production process management method, apparatus, storage medium and terminal device
Technical field
This application involves field of communication technology, in particular to a kind of window production process management method, apparatus, storage medium And terminal device.
Background technique
It needs that the frame and glass plate of window are processed and then assembled respectively in window production process at present, by The standard of frame structure and the standard of glass plate monomer are not formed in window area, lead to production procedure disunity, and not Same window is often due to structure or size difference are needed using different process flows.
In the prior art, generally the window arrangement on order calculate using manual type and artificial selection produces work Sequence process, inefficiency, and be accurate to lower.
Summary of the invention
The embodiment of the present application provides a kind of window production process management method, apparatus, storage medium and terminal device, can be with Improve the selection accuracy and efficiency of production process process.
The embodiment of the present application provides a kind of window production process management method, the described method comprises the following steps:
The order information of window to be processed is obtained, the order information carries the frame structure information of the window, glass Plate layout information and Hardware fitting layout information;
The each type for forming the frame structure is obtained according to the frame structure information and the Hardware fitting layout information First parameter information of material monomer;
It is set in the frame structure according to the glass plate layout information and Hardware fitting layout information acquisition Second parameter information of each glass monolith;
The production process process for producing the window, institute are generated according to first parameter information and second parameter information Stating production process process includes multiple production processes successively to sort.
In window production process management method of the present invention, first parameter information includes each profile monomer Dimension information and each profile monomer on the first shape information of each first Hardware fitting installing mechanism, first size Information and first location information.
It is described according to the frame structure information and described in window production process management method of the present invention Hardware fitting layout information obtains the step of the first parameter information for forming each profile monomer of the frame structure and includes:
The first size information of each profile monomer of frame structure is constituted according to the frame structure acquisition of information;
According to each first on the Hardware fitting layout information and each profile monomer of the first size acquisition of information First shape information, first size information and the first location information of Hardware fitting installing mechanism.
In window production process management method of the present invention, second parameter information includes each glass plate list Second shape of each second Hardware fitting installing mechanism on the second dimension information of body and the second shape information, glass plate monomer Shape information, the second dimension information and second location information.
It is described according to the first size information, the glass in window production process management method of the present invention Glass plate layout information and the Hardware fitting layout information obtain the second of each glass monolith being set on the frame The step of parameter information includes:
According to the first size information and the glass plate layout information obtain the glass plate the second dimension information and Second shape information;
Glass is set to according to second dimension information and the second shape information and Hardware fitting layout information acquisition The second shape information, the second dimension information and the second location information of each second Hardware fitting installing mechanism on plate monomer
It is described according to first parameter information and described second in window production process management method of the present invention Parameter information generates the step of production process process for producing the window and includes:
By first parameter information and second parameter information inquiry presetting database to obtain the production window Production process process, prestore in the presetting database respectively with first parameter information and second parameter information Form multiple production process processes of mapping relations.
A kind of window production process management device, comprising:
First obtains module, and for obtaining the order information of window to be processed, the order information carries the window Frame structure information, glass plate layout information and Hardware fitting layout information;
Second obtains module, for being obtained described in composition according to the frame structure information and the Hardware fitting layout information First parameter information of each profile monomer of frame structure;
Third obtains module, for being set to according to the glass plate layout information and Hardware fitting layout information acquisition Second parameter information of each glass monolith in the frame structure;
Generation module, for generating the life for producing the window according to first parameter information and second parameter information Process flow is produced, the production process process includes multiple production processes successively to sort.
In window production process management device of the present invention, first parameter information includes each profile monomer Dimension information and each profile monomer on the first shape information of each first Hardware fitting installing mechanism, first size Information and first location information;Described second, which obtains module, is used to constitute frame structure according to the frame structure acquisition of information Each profile monomer first size information;According to the Hardware fitting layout information and the first size acquisition of information The first shape information of each first Hardware fitting installing mechanism on each profile monomer, first size information and first Confidence breath.
The embodiment of the present application also provides a kind of storage medium, computer program is stored in the storage medium, when described When computer program is run on computers, so that the computer executes the above method.
The embodiment of the present application also provides a kind of terminal device, including processor and memory, is stored in the memory Computer program, the processor is by calling the computer program stored in the memory, for executing above-mentioned side Method.
From the foregoing, it will be observed that order information of the present invention by acquisition window to be processed, the order information carry described Frame structure information, glass plate layout information and the Hardware fitting layout information of window;According to the frame structure information with And the Hardware fitting layout information obtains the first parameter information for forming each profile monomer of the frame structure;According to institute It states glass plate layout information and the Hardware fitting layout information obtains each glass list being set in the frame structure Second parameter information of body;The life for producing the window is generated according to first parameter information and second parameter information Process flow is produced, the production process process includes multiple production processes successively to sort;With intelligence degree height, and produce Process flow designs more reasonable beneficial effect.
Detailed description of the invention
In order to more clearly explain the technical solutions in the embodiments of the present application, make required in being described below to embodiment Attached drawing is briefly described.It should be evident that the drawings in the following description are only some examples of the present application, for For those skilled in the art, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is the flow diagram of window production process management method provided in an embodiment of the present invention.
Fig. 2 is the structural schematic diagram of window production process management device provided in an embodiment of the present invention.
Fig. 3 is the structural schematic diagram of terminal device provided in an embodiment of the present invention.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation description.Obviously, described embodiments are only a part of embodiments of the present application, instead of all the embodiments.It is based on Embodiment in the application, those skilled in the art's every other implementation obtained under that premise of not paying creative labor Example, belongs to the protection scope of the application.
The description and claims of this application and term " first " in above-mentioned attached drawing, " second ", " third " etc. (if present) is to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be appreciated that this The object of sample description is interchangeable under appropriate circumstances.In addition, term " includes " and " having " and their any deformation, meaning Figure, which is to cover, non-exclusive includes.For example, containing the process, method of series of steps or containing a series of modules or list The device of member, terminal device, system those of are not necessarily limited to be clearly listed step or module or unit, can also include not having The step of being clearly listed or module or unit also may include for these process, methods, device, terminal device or system Intrinsic other steps or module or unit.
With reference to Fig. 1, Fig. 1 provides a kind of flow chart of window production process management method, this method for the embodiment of the present application It can be applied in terminal device.The terminal device can be the equipment such as smart phone, tablet computer.The method includes following Step:
S101, the order information for obtaining window to be processed, the order information carry the window frame structure information, Glass plate layout information and Hardware fitting layout information.
Wherein, window is made of frame structure, glass plate monomer and Hardware fitting.The frame structure information is for describing Shape, size of the frame etc..The glass plate layout information is used to describe the shape of each glass plate monomer, size and at this Installation site in frame structure.The Hardware fitting layout information is for describing each Hardware fitting in frame structure or glass The model of installation site information and Hardware fitting on plate monomer.
S102, the composition frame structure is obtained according to the frame structure information and the Hardware fitting layout information Each profile monomer the first parameter information.
Wherein, the first parameter information includes each on the dimension information and each profile monomer of each profile monomer First shape information, first size information and the first location information of one Hardware fitting installing mechanism.First Hardware fitting peace Mounting mechanism can be mounting hole, installation slit or other structures for being commonly used for installing Hardware fitting.
In some embodiments, step S102 includes following sub-step:
S1021, according to the frame structure acquisition of information constitute frame structure each profile monomer first size information; S1022, according to each on the Hardware fitting layout information and each profile monomer of the first size acquisition of information First shape information, first size information and the first location information of one Hardware fitting installing mechanism.
S103, the frame is set to according to the glass plate layout information and Hardware fitting layout information acquisition Second parameter information of each glass monolith in structure.
Wherein, which includes the second dimension information and the second shape information, glass of each glass plate monomer The second shape information, the second dimension information and the second confidence of each second Hardware fitting installing mechanism on glass plate monomer Breath.
In some embodiments, step S103 includes following sub-step:
S1031, the second size that the glass plate is obtained according to the first size information and the glass plate layout information Information and the second shape information;S1032, according to second dimension information and the second shape information and the Hardware fitting cloth Office's acquisition of information is set to the second shape information, the second size of each second Hardware fitting installing mechanism on glass plate monomer Information and second location information.The second Hardware fitting installing mechanism can be for mounting hole, installation slit or other are common For installing the structure of Hardware fitting.
S104, the production work for producing the window is generated according to first parameter information and second parameter information Sequence process, the production process process include multiple production processes successively to sort.
Wherein, by first parameter information and second parameter information inquiry presetting database to obtain production institute State the production process process of window, prestored in the presetting database respectively with first parameter information and described second Multiple production process processes of parameter information composition mapping relations.Presetting database be previously according to these first parameter informations with And the second parameter information setting, which kind of production process process is concrete regulation use under which kind of parameter.
From the foregoing, it will be observed that order information of the present invention by acquisition window to be processed, the order information carry described Frame structure information, glass plate layout information and the Hardware fitting layout information of window;According to the frame structure information with And the Hardware fitting layout information obtains the first parameter information for forming each profile monomer of the frame structure;According to institute It states glass plate layout information and the Hardware fitting layout information obtains each glass list being set in the frame structure Second parameter information of body;The life for producing the window is generated according to first parameter information and second parameter information Process flow is produced, the production process process includes multiple production processes successively to sort;With intelligence degree height, and produce Process flow designs more reasonable beneficial effect.
Referring to figure 2., Fig. 2 is the structure chart of one of some embodiments of the invention window production process management device, The device includes: that the first acquisition module 201, second obtains module 202, third obtains module 203 and generation module 204.
Wherein, which is used to obtain the order information of window to be processed, and the order information carries There are frame structure information, glass plate layout information and the Hardware fitting layout information of the window;Wherein, window is by frame knot Structure, glass plate monomer and Hardware fitting are constituted.The frame structure information is for describing shape, size of the frame etc..The glass Glass plate layout information is used to describe the shape, size and the installation site in the frame structure of each glass plate monomer.It should Hardware fitting layout information is for describing installation site information of each Hardware fitting in frame structure or glass plate monomer And the model of Hardware fitting.
Wherein, which is used for according to the frame structure information and Hardware fitting layout letter Breath obtains the first parameter information for forming each profile monomer of the frame structure;First parameter information includes each profile list The first shape information of each first Hardware fitting installing mechanism on the dimension information of body and each profile monomer, the first ruler Very little information and first location information;Described second, which obtains module 201, is used to constitute frame according to the frame structure acquisition of information The first size information of each profile monomer of frame structure;Believed according to the Hardware fitting layout information and the first size Breath obtain the first shape information of each first Hardware fitting installing mechanism on each profile monomer, first size information and First location information.
Wherein, which obtains module 203 and is used to be laid out according to the glass plate layout information and the Hardware fitting Acquisition of information is set to the second parameter information of each glass monolith in the frame structure;Wherein, second parameter information Each second Hardware fitting on the second dimension information and the second shape information, glass plate monomer including each glass plate monomer The second shape information, the second dimension information and the second location information of installing mechanism.The third obtains module 203 and is used for basis The first size information and the glass plate layout information obtain the second dimension information and the second shape of the glass plate Information;Glass is set to according to second dimension information and the second shape information and Hardware fitting layout information acquisition The second shape information, the second dimension information and the second confidence of each second Hardware fitting installing mechanism on plate monomer Breath.The second Hardware fitting installing mechanism can for mounting hole, installation slit or other be commonly used for installation Hardware fitting Structure.
Wherein, which is used to generate life according to first parameter information and second parameter information The production process process of the window is produced, the production process process includes multiple production processes successively to sort.
Wherein, by first parameter information and second parameter information inquiry presetting database to obtain production institute State the production process process of window, prestored in the presetting database respectively with first parameter information and described second Multiple production process processes of parameter information composition mapping relations.Presetting database be previously according to these first parameter informations with And the second parameter information setting, which kind of production process process is concrete regulation use under which kind of parameter.
From the foregoing, it will be observed that order information of the present invention by acquisition window to be processed, the order information carry described Frame structure information, glass plate layout information and the Hardware fitting layout information of window;According to the frame structure information with And the Hardware fitting layout information obtains the first parameter information for forming each profile monomer of the frame structure;According to institute It states glass plate layout information and the Hardware fitting layout information obtains each glass list being set in the frame structure Second parameter information of body;The life for producing the window is generated according to first parameter information and second parameter information Process flow is produced, the production process process includes multiple production processes successively to sort;With intelligence degree height, and produce Process flow designs more reasonable beneficial effect.
The embodiment of the present application also provides a kind of terminal device.The terminal device can be smart phone, tablet computer etc. and set It is standby.As shown in figure 3, terminal device 300 includes processor 301 and memory 302.Wherein, 302 electricity of processor 301 and memory Property connection.
Processor 301 is the control centre of terminal device 300, utilizes various interfaces and the entire terminal device of connection Various pieces, by running or calling the computer program being stored in memory 302, and calling to be stored in memory 302 Interior data execute the various functions and processing data of terminal device, to carry out integral monitoring to terminal device.
In the present embodiment, processor 301 in terminal device 300 can according to following step, by one or one with On the corresponding instruction of process of computer program be loaded into memory 302, and run by processor 301 and be stored in storage Computer program in device 302, to realize various functions:
The order information of window to be processed is obtained, the order information carries the frame structure information of the window, glass Plate layout information and Hardware fitting layout information;It is obtained according to the frame structure information and the Hardware fitting layout information Take the first parameter information for forming each profile monomer of the frame structure;According to the glass plate layout information and described Hardware fitting layout information obtains the second parameter information of each glass monolith being set in the frame structure;According to described First parameter information and second parameter information generate the production process process for producing the window, the production process stream Journey includes multiple production processes successively to sort.
Memory 302 can be used for storing computer program and data.Include in the computer program that memory 302 stores The instruction that can be executed in the processor.Computer program can form various functional modules.Processor 301 is stored in by calling The computer program of memory 302, thereby executing various function application and data processing.
The embodiment of the present application also provides a kind of storage medium, is stored with computer program in the storage medium, when the calculating When machine program is run on computers, which executes method described in any of the above-described embodiment, to realize: obtaining to be added The order information of the window of work, the order information carry the frame structure information of the window, glass plate layout information with And Hardware fitting layout information;It is obtained according to the frame structure information and the Hardware fitting layout information and forms the frame First parameter information of each profile monomer of frame structure;It is laid out according to the glass plate layout information and the Hardware fitting Acquisition of information is set to the second parameter information of each glass monolith in the frame structure;According to first parameter information And second parameter information generates the production process process for producing the window, the production process process include it is multiple according to The production process of minor sort.
It should be noted that those of ordinary skill in the art will appreciate that whole in the various methods of above-described embodiment or Part steps are relevant hardware can be instructed to complete by program, which can store in computer-readable storage medium In matter, which be can include but is not limited to: read-only memory (ROM, Read Only Memory), random access memory Device (RAM, Random Access Memory), disk or CD etc..
Window production process management method, apparatus, storage medium and terminal provided by the embodiment of the present application are set above Standby to be described in detail, specific examples are used herein to illustrate the principle and implementation manner of the present application, above The explanation of embodiment is merely used to help understand the present processes and its core concept;Meanwhile for those skilled in the art Member, according to the thought of the application, there will be changes in the specific implementation manner and application range, in conclusion this explanation Book content should not be construed as the limitation to the application.

Claims (10)

1. a kind of window production process management method, which is characterized in that the described method comprises the following steps:
The order information of window to be processed is obtained, the order information carries the frame structure information of the window, glass Plate layout information and Hardware fitting layout information;
The each type for forming the frame structure is obtained according to the frame structure information and the Hardware fitting layout information First parameter information of material monomer;
It is set in the frame structure according to the glass plate layout information and Hardware fitting layout information acquisition Second parameter information of each glass monolith;
The production process process for producing the window, institute are generated according to first parameter information and second parameter information Stating production process process includes multiple production processes successively to sort.
2. window production process management method according to claim 1, which is characterized in that first parameter information includes The first shape of each first Hardware fitting installing mechanism on the dimension information of each profile monomer and each profile monomer Information, first size information and first location information.
3. window production process management method according to claim 2, which is characterized in that described according to the frame structure Information and the Hardware fitting layout information obtain the first parameter information for forming each profile monomer of the frame structure The step of include:
The first size information of each profile monomer of frame structure is constituted according to the frame structure acquisition of information;
According to each first on the Hardware fitting layout information and each profile monomer of the first size acquisition of information First shape information, first size information and the first location information of Hardware fitting installing mechanism.
4. window production process management method according to claim 1, which is characterized in that second parameter information includes Each second Hardware fitting installation on second dimension information of each glass plate monomer and the second shape information, glass plate monomer The second shape information, the second dimension information and the second location information of mechanism.
5. window production process management method according to claim 4, which is characterized in that described according to the first size Information, the glass plate layout information and the Hardware fitting layout information obtain each glass being set on the frame The step of second parameter information of monomer includes:
According to the first size information and the glass plate layout information obtain the glass plate the second dimension information and Second shape information;
Glass is set to according to second dimension information and the second shape information and Hardware fitting layout information acquisition The second shape information, the second dimension information and the second confidence of each second Hardware fitting installing mechanism on plate monomer Breath.
6. window production process management method according to claim 1, which is characterized in that described according to first parameter Information and second parameter information generate the step of production process process for producing the window and include:
By first parameter information and second parameter information inquiry presetting database to obtain the production window Production process process, prestore in the presetting database respectively with first parameter information and second parameter information Form multiple production process processes of mapping relations.
7. a kind of window production process management device characterized by comprising
First obtains module, and for obtaining the order information of window to be processed, the order information carries the window Frame structure information, glass plate layout information and Hardware fitting layout information;
Second obtains module, for being obtained described in composition according to the frame structure information and the Hardware fitting layout information First parameter information of each profile monomer of frame structure;
Third obtains module, for being set to according to the glass plate layout information and Hardware fitting layout information acquisition Second parameter information of each glass monolith in the frame structure;
Generation module, for generating the life for producing the window according to first parameter information and second parameter information Process flow is produced, the production process process includes multiple production processes successively to sort.
8. window production process management device according to claim 7, which is characterized in that first parameter information includes The first shape of each first Hardware fitting installing mechanism on the dimension information of each profile monomer and each profile monomer Information, first size information and first location information;The second acquisition module according to the frame structure information for obtaining Take the first size information for constituting each profile monomer of frame structure;According to the Hardware fitting layout information and described One dimension information obtains the first shape information of each first Hardware fitting installing mechanism on each profile monomer, first size Information and first location information.
9. a kind of storage medium, which is characterized in that computer program is stored in the storage medium, when the computer program When running on computers, so that the computer perform claim requires 1 to 6 described in any item methods.
10. a kind of terminal device, which is characterized in that including processor and memory, computer journey is stored in the memory Sequence, the processor require 1 to 6 by calling the computer program stored in the memory, for perform claim Method described in one.
CN201811571954.2A 2018-12-21 2018-12-21 Window production process management method and device, storage medium and terminal equipment Active CN109636662B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811571954.2A CN109636662B (en) 2018-12-21 2018-12-21 Window production process management method and device, storage medium and terminal equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811571954.2A CN109636662B (en) 2018-12-21 2018-12-21 Window production process management method and device, storage medium and terminal equipment

Publications (2)

Publication Number Publication Date
CN109636662A true CN109636662A (en) 2019-04-16
CN109636662B CN109636662B (en) 2021-02-02

Family

ID=66076360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811571954.2A Active CN109636662B (en) 2018-12-21 2018-12-21 Window production process management method and device, storage medium and terminal equipment

Country Status (1)

Country Link
CN (1) CN109636662B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117102890A (en) * 2023-10-19 2023-11-24 济南天辰智能装备股份有限公司 Frame fan processing method and processing system, window processing method and processing system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150040091A1 (en) * 2013-07-31 2015-02-05 GlobalFoundries, Inc. Methods for modifying an integrated circuit layout design
US20150091138A1 (en) * 2013-04-18 2015-04-02 Spansion Llc Die Seal Layout for VFTL Dual Damascene in a Semiconductor Device
CN106709121A (en) * 2016-06-27 2017-05-24 陈思思 Data processing method and device for computer-aid design
CN107443556A (en) * 2017-08-01 2017-12-08 贺州学院 Automatic blending method and device
CN108710749A (en) * 2018-05-17 2018-10-26 成都仁仁爱家窗饰有限公司 A kind of curtain information intelligent management system
US20180348641A1 (en) * 2017-06-02 2018-12-06 Samsung Electronics Co., Ltd. Method, a non-transitory computer-readable medium, and/or an apparatus for determining whether to order a mask structure
CN108975666A (en) * 2018-08-02 2018-12-11 朱盛菁 A kind of production method of releasing type pattern glass

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150091138A1 (en) * 2013-04-18 2015-04-02 Spansion Llc Die Seal Layout for VFTL Dual Damascene in a Semiconductor Device
US20150040091A1 (en) * 2013-07-31 2015-02-05 GlobalFoundries, Inc. Methods for modifying an integrated circuit layout design
CN106709121A (en) * 2016-06-27 2017-05-24 陈思思 Data processing method and device for computer-aid design
US20180348641A1 (en) * 2017-06-02 2018-12-06 Samsung Electronics Co., Ltd. Method, a non-transitory computer-readable medium, and/or an apparatus for determining whether to order a mask structure
CN107443556A (en) * 2017-08-01 2017-12-08 贺州学院 Automatic blending method and device
CN108710749A (en) * 2018-05-17 2018-10-26 成都仁仁爱家窗饰有限公司 A kind of curtain information intelligent management system
CN108975666A (en) * 2018-08-02 2018-12-11 朱盛菁 A kind of production method of releasing type pattern glass

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
T. P. CHU.ETC: ""Robust design window determination for metal capacitors upon plasma damage"", 《2014 IEEE INTERNATIONAL INTEGRATED RELIABILITY WORKSHOP FINAL REPORT (IIRW)》 *
李中秋: ""木塑窗的结构设计与制作工艺"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》 *
胡深等: ""关于居住建筑遮阳优化设计的探讨"", 《建筑科学》 *
马晓平: ""新型木窗的研究与设计"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117102890A (en) * 2023-10-19 2023-11-24 济南天辰智能装备股份有限公司 Frame fan processing method and processing system, window processing method and processing system
CN117102890B (en) * 2023-10-19 2024-01-26 济南天辰智能装备股份有限公司 Frame fan processing method and processing system, window processing method and processing system

Also Published As

Publication number Publication date
CN109636662B (en) 2021-02-02

Similar Documents

Publication Publication Date Title
CN105261366B (en) Audio recognition method, speech engine and terminal
US10462010B2 (en) Detecting and managing recurring patterns in device and service configuration data
CN109086182A (en) The method and terminal device of database auto-alarming
CN102946415B (en) A kind of implementation method of mobile terminal this locality application and device
CN109816114A (en) A kind of generation method of machine learning model, device
CN109360579A (en) Charging pile phonetic controller and system
CN104991849A (en) Method for monitoring system resource occupation of Linux process through zabbix
CN112235389A (en) Intelligent terminal data processing method and device based on Internet of things
CN104698374A (en) Method for improving testing efficiency and accuracy of automatic relay protecting tester
CN109963288A (en) The appraisal procedure and device of base station
CN109636662A (en) Window production process management method, apparatus, storage medium and terminal device
CN115794641A (en) Method, device and equipment for making number based on business process and storage medium
CN108509236A (en) Subject replacement method and device, face identification system subject replacement method and device
CN114203176A (en) Control method and device of intelligent equipment, storage medium and electronic device
CN109685364A (en) Workshop Operation Sequencing method, apparatus, storage medium and terminal device
CN205809674U (en) A kind of HMI system supporting to operate man machine interface in mobile device remote
CN110083685B (en) Data configuration method and device for intention recognition
US20170160892A1 (en) Individual customization system and method
CN109636540A (en) Price list generation method, device, storage medium and the terminal customized for window
CN107977419A (en) A kind of nuclear power station DCS O&Ms support file identification method and system
CN102026144A (en) Roaming performance test method, equipment and system thereof
CN103631854A (en) ICD and SCD consistency calibration method based on model objectification semantics
CN116703114A (en) Classified storage method, system, device and medium for power dispatching data
CN110969359A (en) Power distribution network parallel topology analysis method and device, computer equipment and storage medium
CN104834567A (en) Partition and application time window conformance detection system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant