CN109634653A - A kind of resource allocation method and device based on component based architecture - Google Patents

A kind of resource allocation method and device based on component based architecture Download PDF

Info

Publication number
CN109634653A
CN109634653A CN201811459778.3A CN201811459778A CN109634653A CN 109634653 A CN109634653 A CN 109634653A CN 201811459778 A CN201811459778 A CN 201811459778A CN 109634653 A CN109634653 A CN 109634653A
Authority
CN
China
Prior art keywords
configuration file
project
business
replacement
business module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811459778.3A
Other languages
Chinese (zh)
Other versions
CN109634653B (en
Inventor
谭家祥
康昆彬
张艳菊
卢亦斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Lang Run Innovation Intellectual Property Operation Co ltd
Original Assignee
Chain Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chain Technology Co Ltd filed Critical Chain Technology Co Ltd
Priority to CN201811459778.3A priority Critical patent/CN109634653B/en
Publication of CN109634653A publication Critical patent/CN109634653A/en
Application granted granted Critical
Publication of CN109634653B publication Critical patent/CN109634653B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/70Software maintenance or management
    • G06F8/71Version control; Configuration management

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of resource allocation method and device based on component based architecture, should resource allocation method based on component based architecture include: to be identified project basic framework and each business module according to project demands, and establish replacement configuration file library;Project configuration model is constructed according to project demands;By project configuration model according to project demands, each original configuration file established in item base frame and each business module and the priority relationship that configuration file is respectively replaced in replacement configuration file library;Acquisition business changes demand, and changes the current configuration file that demand and priority relationship are identified project in basic framework and each business module according to business;Original configuration file is replaced using current configuration file.By applying the present invention, realizing under componentialized framework, the modification to single business module or basic framework content, the flexible replacement to configuration file is realized, complex source Code Design is avoided, increases the extending space of source code.

Description

A kind of resource allocation method and device based on component based architecture
Technical field
The present invention relates to computer software technical fields, and in particular to a kind of resource allocation method based on component based architecture And device.
Background technique
When software engineering project uses componentialized framework at present, need item dividing to be several relatively independent business moulds Block and a basic framework module, business module depend on some small technology modules, and project once combines completion, single industry Business module or the content of basic framework will be unable to directly change or be difficult in the project to modify or there are problems, causes component The problem of change project frame can not change.For example, after the completion of writing as some component A, need tagged, possesses fixed Version, when using component A in another some project B, it is necessary to download component A, because it is specified with version, The code of component A cannot be modified after the completion of downloading.Therefore the scalability of component how is improved to the item based on component based architecture Mesh great significance for design.
Summary of the invention
Componentialized framework is used in software engineering project in the prior art the technical problem to be solved in the present invention is that overcoming When combination project, the content modification of basic framework and business module is difficult, the defect of component flexibility and poor expandability, thus It is proposed a kind of resource allocation method and device based on component based architecture.
The embodiment of the invention provides a kind of resource allocation methods based on component based architecture, comprising: according to project demands It identifies project basic framework and each business module, and establishes replacement configuration file library;Project is constructed according to the project demands to match Set model;By the project configuration model according to the project demands, the item base frame and each business module are established In each original configuration file and the replacement configuration file library in respectively replace the priority relationship of configuration file;Acquisition business becomes Dynamic demand, and the item base frame and each business module are determined according to business variation demand and the priority relationship In current configuration file;The original configuration file is replaced using the current configuration file.
Optionally, the project configuration model includes: basic framework allocation models and business module allocation models, wherein The basic framework allocation models is for establishing each original configuration file and replacement configuration text in the item base frame The priority relationship of configuration file is respectively replaced in part library, and institute is determined according to business variation demand and the priority relationship State the current configuration file in item base frame;The business module allocation models is for establishing each original in the business module The priority relationship of configuration file is respectively replaced in beginning configuration file and the replacement configuration file library, and is changed according to the business Demand and the priority relationship determine the current configuration file in the business module.
Optionally, it is described according to the business change demand and the priority relationship determine the item base frame and Current configuration file in each business module, comprising: demand is changed according to the business and obtains the priority relationship;Judgement is It is no that there are the replacement configuration files that priority is higher than the original configuration file;When there are priority to be higher than described original match When setting the replacement configuration file of file, the replacement configuration file of highest priority is determined as the current-configuration text Part.
Optionally, the resource allocation method based on component based architecture, further includes: described in being higher than there is no priority When the replacement configuration file of original configuration file, original configuration file is determined as the current configuration file.
Optionally, the basic framework allocation models is multiple.
Optionally, the business module allocation models is multiple.
The embodiment of the invention also provides a kind of device for allocating resources based on component based architecture, comprising: replacement configuration text Module is established in part library, for identifying project basic framework and each business module according to project demands, and establishes replacement configuration file Library;Project configuration model constructs module, for constructing project configuration model according to the project demands;Priority relationship establishes mould Block, for, according to the project demands, establishing the item base frame and each business module by the project configuration model In each original configuration file and the replacement configuration file library in respectively replace the priority relationship of configuration file;It is currently configured text Part determining module changes demand for obtaining business, and determines institute according to business variation demand and the priority relationship State the current configuration file in item base frame and each business module;Configuration file replacement module, for using described current Configuration file replaces the original configuration file.
Optionally, the project configuration model includes: basic framework allocation models and business module allocation models.
The embodiment of the invention also provides a kind of non-transient computer readable storage mediums to store computer instruction, institute Computer instruction is stated for making the computer execute the above-mentioned resource allocation method based on component based architecture.
The embodiment of the invention also provides a kind of computer equipments, comprising: at least one processor;And with it is described at least Wherein, the memory is stored with the finger that can be executed by least one described processor to the memory of one processor communication connection Enable, described instruction executed by least one described processor so that at least one described processor execute it is above-mentioned based on component Change the resource allocation method of framework.
Technical solution of the present invention has the advantages that
Resource allocation method provided in an embodiment of the present invention based on component based architecture, by determining item according to project demands Mesh basic framework and each business module, establish alternate file library, and construct project configuration model, are then become according to corresponding business Original configuration file and replacement configuration in dynamic demand and the item base frame and each business module that are determined in advance according to the model The priority relationship that configuration file is respectively replaced in library determines current configuration file, is finally replaced using current configuration file former Beginning configuration file.By the building of replacement configuration file library and allocation models, to can also be replaced after the completion of projects combo Configuration file realizes pair to realize under componentialized framework, the modification to single business module or basic framework content The flexible replacement of configuration file, avoids complex source Code Design, increases the extending space of source code.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the flow chart of the resource allocation method based on component based architecture in the embodiment of the present invention;
Fig. 2 is to change demand and priority relationship according to business in the embodiment of the present invention to identify project basic framework and each industry The specific flow chart of current configuration file in module of being engaged in;
Fig. 3 is the structural schematic diagram of the device for allocating resources based on component based architecture in the embodiment of the present invention;
Fig. 4 is the structural schematic diagram of computer equipment in the embodiment of the present invention.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
As long as in addition, the non-structure each other of technical characteristic involved in invention described below different embodiments It can be combined with each other at conflict.
Embodiment 1
The embodiment of the invention provides a kind of resource allocation methods based on component based architecture, as shown in Figure 1, above-mentioned base Include: in the resource allocation method of component based architecture
Step S1: identifying project basic framework and each business module according to project demands, and establishes replacement configuration file library. In practical applications, corresponding item base frame and each business module, these item base frames are downloaded according to project demands Frame and business module are existing component, and configuration file corresponding in existing component is stored in the replacement configuration file library Alternate file.
Step S2: project configuration model is constructed according to project demands.Specifically, which includes: that basic framework is matched Set model and business module allocation models.
Step S3: it by project configuration model according to project demands, establishes in item base frame and each business module The priority relationship of configuration file is respectively replaced in each original configuration file and replacement configuration file library.In practical applications, each The configuration file of component load can be the former configuration file in component, be also possible to replace corresponding replacement in configuration file library Configuration file determines the priority relationship between them by above-mentioned allocation models.
Step S4: the business that obtains changes demand, and changes demand and priority relationship according to business and identify project basic frame Current configuration file in frame and each business module.It is a in practical applications, it is needed in building project to certain groups in project When part is changed, demand can be changed according to business and priority relationship determines current configuration file.
Step S5: original configuration file is replaced using current configuration file.Specifically, by replacing current configuration file Original configuration file then realizes the flexible modification of items component by the modification to configuration file.
S1 to step S5 through the above steps, the resource allocation method based on component based architecture of the embodiment of the present invention are real Show under componentialized framework, the modification to single business module or basic framework content is realized to the flexible of configuration file Replacement, avoids complex source Code Design, increases the extending space of source code.
Below with reference to concrete application example, to the embodiment of the present invention based on the resource allocation method of component based architecture into Row detailed description.
Specifically, in one embodiment, above-mentioned step S1 identifies project basic framework and each business according to project demands Module, and establish replacement configuration file library.In practical applications, it when software engineering project uses componentialized framework, needs first It identifies project each business module required for basic framework and project, by by item base frame and each business module group Altogether, it is stored with corresponding configuration file in finished item frame and each business module, such as: background color, Background Case, background music etc..The corresponding replacement configuration text of each configuration file is stored in above-mentioned replacement configuration file library Part, such as: the first wife in item base frame sets background document color as white, is stored with color in replacement configuration file library Configuration file is replaced for black, yellow etc..
In a preferred embodiment, above-mentioned step S2 constructs project configuration model according to project demands, and constructed matches It sets model to specifically include: basic framework allocation models and business module allocation models.
Specifically, in one embodiment, above-mentioned step S3 establishes item by project configuration model according to project demands The excellent of configuration file is respectively replaced in each original configuration file and replacement configuration file library in mesh basic framework and each business module First grade relationship.Specifically, above-mentioned basic framework allocation models for establish in item base frame each original configuration file with The priority relationship of configuration file is respectively replaced in replacement configuration file library, and is determined according to business variation demand and priority relationship Current configuration file in item base frame;Business module allocation models is for establishing each original configuration file in business module With the priority relationship of configuration file is respectively replaced in replacement configuration file library, and demand is changed according to business and priority relationship is true Determine the current configuration file in business module.
In practical applications, it after identify project basic framework and each business module, needs for item base frame Basic framework allocation models is established, and establishes business module allocation models, the number of above two allocation models for business module It can be set as one or more according to the needs of project, the effect of each allocation models is for the item base corresponding to it The priority of configuration file is arranged according to preset priority set-up mode in frame or business module, such as: it can be according to background The size setting original configuration file of image and the priority for replacing each replacement background image stored in configuration file library, on The format for the configuration file stated can be json file, plist file etc., and the present invention is not limited thereto.
In a preferred embodiment, as shown in Fig. 2, above-mentioned step S4, changes demand and priority relationship according to business The current configuration file identified project in basic framework and each business module, specifically includes:
Step S41: demand is changed according to business and obtains priority relationship.In practical applications, such as: business change demand For replace project interface background image when, then need to obtain the priority relationship of the configuration file about background image.
Step S42: the replacement configuration file that priority is higher than original configuration file is judged whether there is.In practical application In, such as: when above-mentioned original configuration file background image be blue background pattern, replacement configuration file library in it is corresponding When replacement configuration file is respectively as follows: white background picture, yellow background image, if above-mentioned priority relationship are as follows: yellow background Picture priority is greater than white background picture priority, and white background picture priority is greater than blue background image, then explanation is deposited It is higher than the replacement configuration file of original configuration file in above-mentioned priority, executes step S33;If above-mentioned priority relationship is Blue background picture priority is greater than white background picture priority, and white background picture priority is greater than yellow background image, Then explanation executes step S34 there is no the replacement configuration file that above-mentioned priority is higher than original configuration file.
Step S43: when there are the replacement configuration file that priority is higher than original configuration file, by replacing for highest priority It changes configuration file and is determined as current configuration file.In practical applications, if above-mentioned priority relationship are as follows: yellow background image is excellent First grade is greater than white background picture priority, and white background picture priority is greater than blue background image, then current configuration file For replacement configuration file corresponding to yellow accessory image.
Step S44: when there is no the replacement configuration file that priority is higher than original configuration file, by original configuration file It is determined as current configuration file.In practical applications, if above-mentioned priority relationship is blue background picture priority greater than white Color background image priority, white background picture priority are greater than yellow background image, then current configuration file is blue background Original configuration file corresponding to image.
Specifically, in one embodiment, above-mentioned step S5 replaces original configuration file using current configuration file.? In practical application, by the way that current configuration file replacement original configuration file is then realized project by the modification to configuration file The flexible modification of component.
S1 to step S5 through the above steps, the resource distribution side provided in an embodiment of the present invention based on component based architecture Method realizes under componentialized framework, and the modification to single business module or basic framework content is realized to configuration file Flexibly replacement, avoids complex source Code Design, increases the extending space of source code.
Embodiment 2
The embodiment of the invention provides a kind of device for allocating resources based on component based architecture, as shown in figure 3, group should be based on The device for allocating resources of part framework includes:
Module 1 is established in replacement configuration file library, for being identified project basic framework and each business module according to project demands, And establish replacement configuration file library.Detailed content referring to step S1 in embodiment 1 associated description.
Project configuration model constructs module 2, for constructing project configuration model according to project demands.Detailed content is referring to reality Apply the associated description of step S2 in example 1.
Priority relationship establishes module 3, for, according to project demands, establishing item base frame by project configuration model And the priority relationship of configuration file is respectively replaced in each original configuration file in each business module and replacement configuration file library.In detail Thin content referring to step S3 in embodiment 1 associated description.
Current configuration file determining module 4 changes demand for obtaining business, and changes demand and priority according to business Relationship is identified project the current configuration file in basic framework and each business module.Detailed content is referring to step S4 in embodiment 1 Associated description.
Configuration file replacement module 5, for replacing original configuration file using current configuration file.Detailed content is referring to reality Apply the associated description of step S5 in example 1.
By the cooperative cooperating of above-mentioned each component part, the resource provided in an embodiment of the present invention based on component based architecture Configuration device realizes under componentialized framework, and the modification to single business module or basic framework content is realized to configuration The flexible replacement of file, avoids complex source Code Design, increases the extending space of source code.
Embodiment 3
The embodiment of the present invention provides a kind of non-transient computer storage medium, which is stored with computer The resource based on component based architecture in above-mentioned any means embodiment can be performed in executable instruction, the computer executable instructions Configuration method, wherein above-mentioned storage medium can for magnetic disk, CD, read-only memory (Read-Only Memory, ROM), Random access memory (Random Access Memory, RAM), flash memory (Flash Memory), hard disk (Hard Disk Drive, abbreviation: HDD) or solid state hard disk (Solid-State Drive, SSD) etc.;The storage medium can also include The combination of the memory of mentioned kind.
It is that can lead to it will be understood by those skilled in the art that realizing all or part of the process in above-described embodiment method Computer program is crossed to instruct relevant hardware come what is completed, program can be stored in a computer-readable storage medium, should Program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, storage medium can for magnetic disk, CD, only Read storage memory (ROM) or random access memory (RAM) etc..
Embodiment 4
The embodiment of the present invention provides a kind of computer equipment, and structural schematic diagram is as shown in figure 4, the computer equipment packet It includes: one or more processors 410 and memory 420, in Fig. 4 by taking a processor 410 as an example.
Above-mentioned computer equipment can also include: input unit 430 and output device 440.
Processor 410, memory 420, input unit 430 and output device 440 can pass through bus or other modes It connects, in Fig. 4 for being connected by bus.
Processor 410 can be central processing unit (Central Processing Unit, CPU).Processor 410 may be used also Think other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), field programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, The combination of the chips such as discrete hardware components or above-mentioned all kinds of chips.General processor can be microprocessor or the processing Device is also possible to any conventional processor etc..
Memory 420 is used as a kind of non-transient computer readable storage medium, can be used for storing non-transient software program, non- Transient computer executable program and module, such as the resource allocation method pair based on component based architecture in the embodiment of the present application Program instruction/the module answered, processor 410 by operation be stored in memory 420 non-transient software program, instruction and Module, thereby executing the various function application and data processing of server, i.e., realization above method embodiment based on component Change the resource allocation method of framework.
Memory 420 may include storing program area and storage data area, wherein storing program area can store operation system Application program required for system, at least one function;Storage data area can be stored according to the resource distribution based on component based architecture The processing unit of method uses created data etc..In addition, memory 420 may include high-speed random access memory, It can also include non-transient memory, a for example, at least disk memory, flush memory device or other non-transient solid-state storages Device.In some embodiments, it includes the memory remotely located relative to processor 410 that memory 420 is optional, these are long-range Memory can pass through network connection to the device for allocating resources based on component based architecture.The example of above-mentioned network includes but unlimited In internet, intranet, local area network, mobile radio communication and combinations thereof.
Input unit 430 can receive the number or character information of input, and generate and the resource based on component based architecture Configure the related user setting of processing unit and the related key signals input of function control of operation.Output device 440 can wrap It includes display screen etc. and shows equipment.
One or more module is stored in memory 420, when being executed by one or more processor 410, is held Row method as shown in Figure 1 or 2.
Method provided by the embodiment of the present invention can be performed in the said goods, has the corresponding functional module of execution method and has Beneficial effect.The not technical detail of detailed description in embodiments of the present invention, for details, reference can be made to embodiments as shown in Figure 1 or 2 In associated description.
Obviously, the above embodiments are merely examples for clarifying the description, and does not limit the embodiments.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or It changes.There is no necessity and possibility to exhaust all the enbodiments.And it is extended from this it is obvious variation or It changes still within the protection scope of the invention.

Claims (10)

1. a kind of resource allocation method based on component based architecture characterized by comprising
It is identified project basic framework and each business module according to project demands, and establishes replacement configuration file library;
Project configuration model is constructed according to the project demands;
By the project configuration model according to the project demands, establish in the item base frame and each business module The priority relationship of configuration file is respectively replaced in each original configuration file and the replacement configuration file library;
Acquisition business changes demand, and determines the item base frame according to business variation demand and the priority relationship Current configuration file in frame and each business module;
The original configuration file is replaced using the current configuration file.
2. the resource allocation method according to claim 1 based on component based architecture, which is characterized in that the project configuration Model includes: basic framework allocation models and business module allocation models, wherein
The basic framework allocation models is used to establish each original configuration file in the item base frame and matches with the replacement The priority relationship that configuration file is respectively replaced in library is set, and true according to business variation demand and the priority relationship Current configuration file in the fixed item base frame;
The business module allocation models is for establishing each original configuration file and replacement configuration text in the business module The priority relationship of configuration file is respectively replaced in part library, and institute is determined according to business variation demand and the priority relationship State the current configuration file in business module.
3. the resource allocation method according to claim 1 based on component based architecture, which is characterized in that described according to Business changes demand and the priority relationship determines the current configuration file in the item base frame and each business module, Include:
Demand, which is changed, according to the business obtains the priority relationship;
Judge whether there is the replacement configuration file that priority is higher than the original configuration file;
When there are the replacement configuration file that priority is higher than the original configuration file, it will be replaced described in highest priority It changes configuration file and is determined as the current configuration file.
4. the resource allocation method according to claim 3 based on component based architecture, which is characterized in that further include:
When there is no the replacement configuration file that priority is higher than the original configuration file, original configuration file is determined For the current configuration file.
5. the resource allocation method according to claim 2 based on component based architecture, which is characterized in that the basic framework Allocation models is multiple.
6. the resource allocation method according to claim 2 based on component based architecture, which is characterized in that the business module Allocation models is multiple.
7. a kind of device for allocating resources based on component based architecture characterized by comprising
Module (1) is established in replacement configuration file library, for being identified project basic framework and each business module according to project demands, and Establish replacement configuration file library;
Project configuration model constructs module (2), for constructing project configuration model according to the project demands;
Priority relationship establishes module (3), for, according to the project demands, establishing the item by the project configuration model Configuration file is respectively replaced in each original configuration file and the replacement configuration file library in mesh basic framework and each business module Priority relationship;
Current configuration file determining module (4) changes demand for obtaining business, and changes demand and described according to the business Priority relationship determines the current configuration file in the item base frame and each business module;
Configuration file replacement module (5), for replacing the original configuration file using the current configuration file.
8. the device for allocating resources according to claim 7 based on component based architecture, which is characterized in that the project configuration Model includes: basic framework allocation models and business module allocation models.
9. a kind of non-transient computer readable storage medium, which is characterized in that the non-transient computer readable storage medium is deposited Computer instruction is stored up, the computer instruction is realized as claimed in any one of claims 1 to 6 based on group when being executed by processor The resource allocation method of part framework.
10. a kind of computer equipment characterized by comprising at least one processor (410);And with it is described at least one Processor (410) communication connection memory (420) wherein,
The memory (420) is stored with the instruction that can be executed by least one described processor (410), and described instruction is described At least one processor (410) executes, so that at least one described processor (410) is executed such as any one of claim 1-6 institute The resource allocation method based on component based architecture stated.
CN201811459778.3A 2018-11-30 2018-11-30 Resource allocation method and device based on componentized architecture Active CN109634653B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811459778.3A CN109634653B (en) 2018-11-30 2018-11-30 Resource allocation method and device based on componentized architecture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811459778.3A CN109634653B (en) 2018-11-30 2018-11-30 Resource allocation method and device based on componentized architecture

Publications (2)

Publication Number Publication Date
CN109634653A true CN109634653A (en) 2019-04-16
CN109634653B CN109634653B (en) 2023-08-01

Family

ID=66070545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811459778.3A Active CN109634653B (en) 2018-11-30 2018-11-30 Resource allocation method and device based on componentized architecture

Country Status (1)

Country Link
CN (1) CN109634653B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113448642A (en) * 2020-03-11 2021-09-28 成都鼎桥通信技术有限公司 System file access method and device and electronic equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090198742A1 (en) * 2008-02-01 2009-08-06 Lazar Borissov Method and System for Obtaining Files from a Set of Sources
CN102043653A (en) * 2010-12-23 2011-05-04 中国农业银行股份有限公司 Cache system and methods for modifying cache configuration and operating and querying cache data
CN105843638A (en) * 2016-03-18 2016-08-10 浪潮软件集团有限公司 Upgrading and reconstruction method for Spring old version framework
CN106802826A (en) * 2016-12-23 2017-06-06 中国银联股份有限公司 A kind of method for processing business and device based on thread pool
CN108279882A (en) * 2018-02-12 2018-07-13 百度在线网络技术(北京)有限公司 Skeleton generating method, device, equipment and computer-readable medium
CN108628632A (en) * 2018-03-20 2018-10-09 车音智能科技有限公司 A kind of packaging method and device
CN108829433A (en) * 2018-05-24 2018-11-16 努比亚技术有限公司 A kind of web system version dispositions method, equipment and storage medium
CN108829469A (en) * 2018-04-18 2018-11-16 北京奇艺世纪科技有限公司 A kind of application program page methods of exhibiting and device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090198742A1 (en) * 2008-02-01 2009-08-06 Lazar Borissov Method and System for Obtaining Files from a Set of Sources
CN102043653A (en) * 2010-12-23 2011-05-04 中国农业银行股份有限公司 Cache system and methods for modifying cache configuration and operating and querying cache data
CN105843638A (en) * 2016-03-18 2016-08-10 浪潮软件集团有限公司 Upgrading and reconstruction method for Spring old version framework
CN106802826A (en) * 2016-12-23 2017-06-06 中国银联股份有限公司 A kind of method for processing business and device based on thread pool
CN108279882A (en) * 2018-02-12 2018-07-13 百度在线网络技术(北京)有限公司 Skeleton generating method, device, equipment and computer-readable medium
CN108628632A (en) * 2018-03-20 2018-10-09 车音智能科技有限公司 A kind of packaging method and device
CN108829469A (en) * 2018-04-18 2018-11-16 北京奇艺世纪科技有限公司 A kind of application program page methods of exhibiting and device
CN108829433A (en) * 2018-05-24 2018-11-16 努比亚技术有限公司 A kind of web system version dispositions method, equipment and storage medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113448642A (en) * 2020-03-11 2021-09-28 成都鼎桥通信技术有限公司 System file access method and device and electronic equipment

Also Published As

Publication number Publication date
CN109634653B (en) 2023-08-01

Similar Documents

Publication Publication Date Title
US10949158B2 (en) Screenshot method and apparatus
CN108614726B (en) Virtual machine creation method and device
CN111324378B (en) Configuration method, device and equipment for video monitoring application software
CN114244717B (en) Configuration method and device of virtual network card resources, computer equipment and medium
CN108279882B (en) Framework generation method, device, equipment and computer readable medium
CN109344062A (en) The cross-domain method for jumping test of the page and terminal device
CN111796838A (en) MPP database automatic deployment method and device
CN114035879A (en) Page theme color changing method and device, electronic equipment and computer readable medium
CN110944067B (en) Load balancing method and server
US10387124B2 (en) System and method for creating domain specific language
CN113157345A (en) Automatic starting method and device for front-end engineering
CN114385164A (en) Page generation and rendering method and device, electronic equipment and storage medium
CN106020752A (en) Method and system for self-adaptation display
CN109634653A (en) A kind of resource allocation method and device based on component based architecture
CN113760301B (en) Micro-service application deployment method, device, equipment and storage medium
CN113810402B (en) Multi-protocol adaptation method and system, computer device, storage medium
CN113377652A (en) Test data generation method and device
CN110502296B (en) Method, equipment and storage medium for displaying firmware upgrading command
CN114936152A (en) Application testing method and device
US11487411B2 (en) Context-driven group pill in a user interface
CN111199519B (en) Method and device for generating special effect package
CN112286663B (en) Task scheduling method and device
CN111414232B (en) Virtual machine template data processing method and device
CN109976876B (en) Accelerator management method and device
CN112463212B (en) Environment building method and device supporting cross-system platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210122

Address after: 215163 No. 9 Xuesen Road, Science and Technology City, Suzhou High-tech Zone, Jiangsu Province

Applicant after: Suzhou Lang run innovation intellectual property operation Co.,Ltd.

Address before: 100034 4008, 4 floor, 9 building, 56 half moon street, Xicheng District, Beijing.

Applicant before: SINOCHAIN TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant