CN109633341A - A kind of comprehensive Simulated System of electric operator - Google Patents

A kind of comprehensive Simulated System of electric operator Download PDF

Info

Publication number
CN109633341A
CN109633341A CN201910049023.4A CN201910049023A CN109633341A CN 109633341 A CN109633341 A CN 109633341A CN 201910049023 A CN201910049023 A CN 201910049023A CN 109633341 A CN109633341 A CN 109633341A
Authority
CN
China
Prior art keywords
valve
electric operator
water pipe
water
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910049023.4A
Other languages
Chinese (zh)
Other versions
CN109633341B (en
Inventor
张宇
徐文才
印光耀
罗兆荣
马振兴
郭庆
燕琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Co Ltd Of Yangzhou Electric Power Equipment Repair & Manufacture Factory
Original Assignee
Co Ltd Of Yangzhou Electric Power Equipment Repair & Manufacture Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ltd Of Yangzhou Electric Power Equipment Repair & Manufacture Factory filed Critical Co Ltd Of Yangzhou Electric Power Equipment Repair & Manufacture Factory
Priority to CN201910049023.4A priority Critical patent/CN109633341B/en
Publication of CN109633341A publication Critical patent/CN109633341A/en
Application granted granted Critical
Publication of CN109633341B publication Critical patent/CN109633341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/003Environmental or reliability tests

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

A kind of comprehensive Simulated System of electric operator, the present invention relates to electric operator test macro more particularly to the test devices of electric operator.It proposes that a kind of structure is simple, feasible, can detecte the synthesis Simulated System of reliability under electric operator operation situation in site.The pipeline pressure generating assembly includes water tank, water pump, frequency converter, valve one and electric operator one, the import of the water pump is connected with water tank by water inlet pipe and by water pump described in Frequency Converter Control, and the outlet of the water pump is connected by water pipe one with valve one;The present invention can simulate possessed high temperature under the operating condition of electric operator scene, low temperature, high humidity, high electromagnetic radiation, the synthesis operating condition for drenching with rain and vibrating, to effectively detect the reliability under electric operator operation situation in site by simulation system.Have many advantages, such as that delicate structure, stability is good, long service life on the whole.

Description

A kind of comprehensive Simulated System of electric operator
Technical field
The present invention relates to electric operator test macro more particularly to the test devices of electric operator.
Background technique
Electric device for valve is that commonly a kind of electromechanical integration executes equipment to industrial process automation control field, it with Electric energy can be widely used in electric power, change as power according to the opening and closing of preparatory sets requirement control valve and air door etc. The valve in the fields such as work, metallurgy and petroleum controls.Transmission with the continuous improvement that various controls require, to electric device for valve It is required that also higher and higher.
Electric operator can pass through delivery test, type approval test in process of production, exist in this three tests Certain deficiency.Delivery test is tested the performance of electric operator, and type approval test is to electric operator Electromagnetic interference and protective performance are tested, every test process be it is relatively independent, electric operator can not be simulated and existed Performance and stability under work on the spot environment.
Summary of the invention
The present invention can detecte electric operator at the scene in view of the above problems, to propose a kind of structure simple, feasible The synthesis Simulated System of reliability under operating condition.
The technical solution of the present invention is as follows: including pipeline pressure generating assembly, adverse circumstances trial zone and vibration spraying test Area;
The pipeline pressure generating assembly includes water tank, water pump, frequency converter, valve one and electric operator one, the water pump Import be connected with water tank by water inlet pipe and by water pump described in Frequency Converter Control, the outlet of the water pump passes through water pipe One is connected with valve one and controls the valve one, the side of the valve one far from water pump by electric operator one It is connected to by isocon with water tank;
The adverse circumstances trial zone include isolation room, high/low temperature high humidity generating device, electromagnetic radiation generating device, valve two, Electric operator two, valve three and electric operator three, the high/low temperature high humidity generating device, electromagnetic radiation fill Set, valve two, electric operator two, valve three and electric operator three are each provided in isolation room, the one of the valve two Side, which is connected with water pipe one by water pipe two and passes through electric operator two, controls the valve two, and the one of the valve three Side is connected far from the side of water pump with valve two by water pipe three and controls the valve three by electric operator three;
The vibration spraying trial zone includes damping device one, valve four, electric operator four, valve five, electronic execution machine Structure five, damping device two, vibration machine and a pair of of spray equipment, one end of the damping device one pass through water pipe six and valve Three sides far from valve two are connected, and the side of the valve four passes through one of water pipe four and damping device one far from valve three Side is connected and by four control valve four of electric performance device, and the side of the valve five is remote by water pipe five and valve four Side from damping device one is connected and by five control valve five of electric performance device, and the vibration machine is connected to On water pipe five and for generating vibration on water pipe five, a pair of spray equipment is respectively arranged on electric operator four and electricity Move the top of executing agency five and for being sprayed to electric operator four and electric operator five;The damping dress Two side is set to be connected with valve five far from the side of valve four by water pipe seven and the other side of damping device two passes through back Water pipe and water tank are connected.
The simulation system further includes central processing unit, is all connected with pressure sensor on the water pipe two, water pipe six, institute State electric operator one, electric operator two, electric operator three, electric operator four, electric operator five, Frequency converter, high/low temperature high humidity generating device, electromagnetic radiation generating device, vibration machine, a pair of of spray equipment and a pair of of pressure Sensor is all connected on central processing unit;
The valve one, valve three, valve four, is designed with torque in valve five and tries monitoring device in real time valve two, described in five Torque real-time monitoring device is all connected on central processing unit.
It states electric operator one, electric operator two, electric operator three, electric operator four, electronic hold Row mechanism five is small rotary inertia electric operator.
The present invention can simulate possessed high temperature, low temperature, high humidity, high electromagnetism under the operating condition of electric operator scene The synthesis operating condition for radiating, drenching with rain and vibrating, to effectively detect that electric operator is transported at the scene by simulation system Reliability in row situation.Have many advantages, such as that delicate structure, stability is good, long service life on the whole.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of this case.
Specific embodiment
The present invention is as shown in Figure 1, include pipeline pressure generating assembly, adverse circumstances trial zone and vibration spraying trial zone;
The pipeline pressure generating assembly includes water tank, water pump, frequency converter, valve one and electric operator one, the water pump Import be connected with water tank by water inlet pipe and by water pump described in Frequency Converter Control, the outlet of the water pump passes through water pipe One is connected with valve one and controls the valve one, the side of the valve one far from water pump by electric operator one It is connected to by isocon with water tank;To provide the torque of valve opening and closing using water pump, at the same it is defeated using Frequency Converter Control water pump Pressure out, to generate different switching torques for electric operator;
The adverse circumstances trial zone include isolation room, high/low temperature high humidity generating device, electromagnetic radiation generating device, valve two, Electric operator two, valve three and electric operator three, the high/low temperature high humidity generating device, electromagnetic radiation fill Set, valve two, electric operator two, valve three and electric operator three are each provided in isolation room, the one of the valve two Side, which is connected with water pipe one by water pipe two and passes through electric operator two, controls the valve two, and the one of the valve three Side is connected far from the side of water pump with valve two by water pipe three and controls the valve three by electric operator three;
The vibration spraying trial zone includes damping device one, valve four, electric operator four, valve five, electronic execution machine Structure five, damping device two, vibration machine and a pair of of spray equipment, one end of the damping device one pass through water pipe six and valve Three sides far from valve two are connected, and the side of the valve four passes through one of water pipe four and damping device one far from valve three Side is connected and by four control valve four of electric performance device, and the side of the valve five is remote by water pipe five and valve four Side from damping device one is connected and by five control valve five of electric performance device, and the vibration machine is connected to On water pipe five and for generating vibration on water pipe five, central processing unit passes through the vibrational energy of control vibrator, to control The vibration frequency output area of vibrator;A pair of spray equipment is respectively arranged on electric operator four and electric operator Five top and for being sprayed to electric operator four and electric operator five, which can be electronic It is sprayed in the multiple directions of executing agency;The side of the damping device two is by water pipe seven and valve five far from valve four Side be connected and the other side of damping device two is connected by return pipe with water tank.To by damping device one, subtract Influence of the isolation vibration of device two to other component in simulation system is shaken, the actual life of simulation system is extended.
In this way, sequentially connected water inlet pipe, water pump, part water pipe one, water pipe two, valve two, water pipe three, valve can be passed through Door three, water pipe six, damping device one, water pipe four, valve four, water pipe five, valve five, water pipe seven, damping device two, return water are tubular At main waterway, and pressure is formed by water pipe one, valve one and isocon and controls water route, to control water route by changing pressure In pressure adjust the pressure of main waterway, to realize the simulation to pressure locating for valve, to determined needed for each valve indirectly Switch torque.
At the same time, this case is also provided with high/low temperature high humidity generating device and electromagnetic radiation generating device in isolation room, To provide the simulation of high/low temperature high humidity environment state, by electromagnetic radiation by high/low temperature high humidity generating device in closed area Generating device provides the simulation of high electromagnetic radiation environment;And vibration machine and a pair are provided in vibration spraying trial zone Spray equipment, to provide the simulation of rain working condition by spray equipment in open-air atmosphere, provide pipe Vibration by vibration machine The simulation for condition of starting building.
In conclusion this case can simulate possessed high temperature, low temperature, height under the operating condition of electric operator scene Wet, high electromagnetic radiation, the synthesis operating condition for drenching with rain and vibrating, to effectively detect electric operator by simulation system Reliability under operation situation in site.Have many advantages, such as that delicate structure, stability is good, long service life on the whole.
The simulation system further includes central processing unit, is all connected with pressure sensor on the water pipe two, water pipe six, institute State electric operator one, electric operator two, electric operator three, electric operator four, electric operator five, Frequency converter, high/low temperature high humidity generating device, electromagnetic radiation generating device, vibration machine, a pair of of spray equipment and a pair of of pressure Sensor is all connected on central processing unit;To remotely carry out unified high efficiency regulatory by central processing unit.
The valve one, valve three, valve four, torque is designed in valve five tries monitoring device in real time valve two, and five The torque real-time monitoring device is all connected on central processing unit.To remotely easily got by central processing unit The working condition of the implementation of valve one, valve two, valve three, valve four, valve five, in order to subsequent data statistics.Using Switch torque generation device of the valve as electric operator is avoided to greatest extent used in the electronic execution machine industry of tradition The big disadvantage of magnetic powder debugger rotary inertia, restore the field working conditions of electric operator to the greatest extent.
It states electric operator one, electric operator two, electric operator three, electric operator four, electronic hold Row mechanism five is small rotary inertia electric operator.Thus with the switching torque the way of production as electric operator Valve cooperation avoids the big disadvantage of magnetic powder debugger rotary inertia used in the electronic execution machine industry of tradition to greatest extent, The field working conditions of electric operator are restored to the greatest extent.

Claims (3)

1. a kind of comprehensive Simulated System of electric operator, which is characterized in that including pipeline pressure generating assembly, severe ring Border trial zone and vibration spraying trial zone;
The pipeline pressure generating assembly includes water tank, water pump, frequency converter, valve one and electric operator one, the water pump Import be connected with water tank by water inlet pipe and by water pump described in Frequency Converter Control, the outlet of the water pump passes through water pipe One is connected with valve one and controls the valve one, the side of the valve one far from water pump by electric operator one It is connected to by isocon with water tank;
The adverse circumstances trial zone include isolation room, high/low temperature high humidity generating device, electromagnetic radiation generating device, valve two, Electric operator two, valve three and electric operator three, the high/low temperature high humidity generating device, electromagnetic radiation fill Set, valve two, electric operator two, valve three and electric operator three are each provided in isolation room, the one of the valve two Side, which is connected with water pipe one by water pipe two and passes through electric operator two, controls the valve two, and the one of the valve three Side is connected far from the side of water pump with valve two by water pipe three and controls the valve three by electric operator three;
The vibration spraying trial zone includes damping device one, valve four, electric operator four, valve five, electronic execution machine Structure five, damping device two, vibration machine and a pair of of spray equipment, one end of the damping device one pass through water pipe six and valve Three sides far from valve two are connected, and the side of the valve four passes through one of water pipe four and damping device one far from valve three Side is connected and by four control valve four of electric performance device, and the side of the valve five is remote by water pipe five and valve four Side from damping device one is connected and by five control valve five of electric performance device, and the vibration machine is connected to On water pipe five and for generating vibration on water pipe five, a pair of spray equipment is respectively arranged on electric operator four and electricity Move the top of executing agency five and for being sprayed to electric operator four and electric operator five;The damping dress Two side is set to be connected with valve five far from the side of valve four by water pipe seven and the other side of damping device two passes through back Water pipe and water tank are connected.
2. the comprehensive Simulated System of a kind of electric operator according to claim 1, which is characterized in that the simulation System further includes central processing unit, and pressure sensor, the electric operator are all connected on the water pipe two, water pipe six One, electric operator two, electric operator three, electric operator four, electric operator five, frequency converter, high/low temperature High humidity generating device, electromagnetic radiation generating device, vibration machine, a pair of of spray equipment and a pair of of pressure sensor are all connected to On central processing unit;
The valve one, valve three, valve four, is designed with torque in valve five and tries monitoring device in real time valve two, described in five Torque real-time monitoring device is all connected on central processing unit.
3. the comprehensive Simulated System of a kind of electric operator according to claim 1, which is characterized in that state electronic hold Row mechanism one, electric operator two, electric operator three, electric operator four, electric operator five are small turn Dynamic inertia electric operator.
CN201910049023.4A 2019-01-18 2019-01-18 Comprehensive working condition simulation system of electric actuating mechanism Active CN109633341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910049023.4A CN109633341B (en) 2019-01-18 2019-01-18 Comprehensive working condition simulation system of electric actuating mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910049023.4A CN109633341B (en) 2019-01-18 2019-01-18 Comprehensive working condition simulation system of electric actuating mechanism

Publications (2)

Publication Number Publication Date
CN109633341A true CN109633341A (en) 2019-04-16
CN109633341B CN109633341B (en) 2021-04-16

Family

ID=66061317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910049023.4A Active CN109633341B (en) 2019-01-18 2019-01-18 Comprehensive working condition simulation system of electric actuating mechanism

Country Status (1)

Country Link
CN (1) CN109633341B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09105768A (en) * 1995-10-12 1997-04-22 Sony Corp Hygrothermal tester
EP1418438A2 (en) * 2002-11-08 2004-05-12 Spillecke Ralf Environmental test chamber
CN102109361A (en) * 2010-12-15 2011-06-29 天津埃柯特阀门控制设备有限公司 Position detection device for electric executing mechanism
CN201926532U (en) * 2010-12-15 2011-08-10 天津埃柯特阀门控制设备有限公司 Torque testing device for angular travel electric execution mechanism
CN103901308A (en) * 2014-04-22 2014-07-02 扬州电力设备修造厂 Electro-hydraulic brake intelligent test bench of electric actuating mechanism and test method thereof
CN205301473U (en) * 2016-01-18 2016-06-08 天津德昌工控科技有限公司 A simulation experiment appearance for electric actuator

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09105768A (en) * 1995-10-12 1997-04-22 Sony Corp Hygrothermal tester
EP1418438A2 (en) * 2002-11-08 2004-05-12 Spillecke Ralf Environmental test chamber
CN102109361A (en) * 2010-12-15 2011-06-29 天津埃柯特阀门控制设备有限公司 Position detection device for electric executing mechanism
CN201926532U (en) * 2010-12-15 2011-08-10 天津埃柯特阀门控制设备有限公司 Torque testing device for angular travel electric execution mechanism
CN103901308A (en) * 2014-04-22 2014-07-02 扬州电力设备修造厂 Electro-hydraulic brake intelligent test bench of electric actuating mechanism and test method thereof
CN205301473U (en) * 2016-01-18 2016-06-08 天津德昌工控科技有限公司 A simulation experiment appearance for electric actuator

Also Published As

Publication number Publication date
CN109633341B (en) 2021-04-16

Similar Documents

Publication Publication Date Title
CN106959685B (en) A kind of system and method for the steam turbine DEH control system loophole test based on RT-LAB technology
CN103528429B (en) Cleaning head device and on-line cleaning robot of condenser
CN109633341A (en) A kind of comprehensive Simulated System of electric operator
Yame et al. An online controller redesign based fault-tolerant strategy for thermal comfort in a multi-zone building
CN105464722B (en) A kind of Emergency Trip System of Steam Turbines and its method suitable for unit APS controls
CN201030369Y (en) Digital ion high-low-voltage live-wire cleaning machine
Huey et al. Trends in the stability properties of CLSS controllers: a root-locus analysis
CN107017666A (en) Small-sized single-phase synchronous generator paired running system FEM model method for building up
CN110953690A (en) On-site debugging system and method for central air conditioner
CN207148559U (en) A kind of dynamic simulation experiment of electric power system stage apparatus
CN107702496A (en) A kind of convenient textile machinery drying unit dried
CN204027773U (en) Tightness test frock
CN106844944A (en) A kind of integrated energy system real-time simulation apparatus
CN105666495A (en) Network robot man-machine interaction system based on smart phone
CN102494161B (en) Multifunctional combined test valve for gas moisture and decomposer tests of transformer substation
Nistah et al. Intelligent monitoring interfaces for coal fired power plant boiler trips: A review
CA3135036A1 (en) System for generating electrical energy
Horváth et al. Restoration and PLC control of a material handling MP-9S industrial manipulator platform
CN217470574U (en) Stepless air volume adjusting control cabinet capable of realizing visual operation
Drozdov et al. Formal verification of protection functions for power distribution networks
Zhang et al. A study on the control of a sensorless pneumatic joint using predictive control method
Alboteanu Automatic System for Handling Fragile Objects
CN205516962U (en) Sack cleaner pulse valve multidimension matrix control system
CN219625881U (en) Semi-physical simulation experiment platform for simulating operation condition of steam turbine generator
Muaffaq et al. Portable wireless supervisory control and data acquisition system based on online laboratories

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant