CN109631588A - A kind of method for maintaining of all-electric melting kiln - Google Patents

A kind of method for maintaining of all-electric melting kiln Download PDF

Info

Publication number
CN109631588A
CN109631588A CN201910100403.6A CN201910100403A CN109631588A CN 109631588 A CN109631588 A CN 109631588A CN 201910100403 A CN201910100403 A CN 201910100403A CN 109631588 A CN109631588 A CN 109631588A
Authority
CN
China
Prior art keywords
pool wall
electric melting
electrode
brick
melting kiln
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910100403.6A
Other languages
Chinese (zh)
Other versions
CN109631588B (en
Inventor
王贵江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910100403.6A priority Critical patent/CN109631588B/en
Publication of CN109631588A publication Critical patent/CN109631588A/en
Application granted granted Critical
Publication of CN109631588B publication Critical patent/CN109631588B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D1/00Casings; Linings; Walls; Roofs
    • F27D1/16Making or repairing linings increasing the durability of linings or breaking away linings
    • F27D1/1621Making linings by using shaped elements, e.g. bricks
    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B5/00Melting in furnaces; Furnaces so far as specially adapted for glass manufacture
    • C03B5/02Melting in furnaces; Furnaces so far as specially adapted for glass manufacture in electric furnaces, e.g. by dielectric heating
    • C03B5/027Melting in furnaces; Furnaces so far as specially adapted for glass manufacture in electric furnaces, e.g. by dielectric heating by passing an electric current between electrodes immersed in the glass bath, i.e. by direct resistance heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27MINDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
    • F27M2001/00Composition, conformation or state of the charge
    • F27M2001/07Glass

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The present invention discloses a kind of method for maintaining of all-electric melting kiln, including hot repair and cold repair, hot repair is the main electrode load that (1) first shuts down all-electric melting kiln, and the state that electrode and dog-hole are adjusted to heat preservation will be started, when the temperature of upper pool wall is down to 95-105 DEG C, local route repair is carried out to impaired tank block or transitional brick;(2) length for observing and measuring molybdenum electrode in all-electric melting kiln, is replaced or continues to according to the extent of damage of molybdenum electrode to make it have preferable working condition;(3) main electrode load is adjusted to high pressure gear until the temperature in upper storage reservoir rises to 850-900 DEG C, addition main molten polarizing electrode does further power-up heating, until daily production status demand.Present invention can ensure that can restore as new, this method slows down corrosion of the glass metal to corundum brick significantly relatively, extends kiln service life, effectively reduces production cost, safety and environmental protection, energy-saving consumption-reducing when all-electric melting kiln end-of-life without all shifting onto.

Description

A kind of method for maintaining of all-electric melting kiln
Technical field
The present invention relates to minerals fusion apparatus technical field more particularly to a kind of method for maintaining of all-electric melting kiln.
Background technique
All Electric Melting Furnace is one kind of glass electric melting, and after it is found that high temp glass can be conductive, electric energy can make heat source Glass is melted, i.e., melts glass with electric melting furnace.And it is all by electricity that All Electric Melting Furnace, which is exactly all normal work furnace fuels, Power.The cardinal principle of All Electric Melting Furnace is generally added in kiln thorax side wall plug flat horizontal plug-in type, transitional brick oblique cutting using electric energy as heat source Bottom straight cutting is top-insertion type what angle-inserting type, top were inserted into, is all to carry out indirect resistance radiant heating.Tank furnace is directly used in kiln Glass for electrode liquid makees heating resistor, and glass metal is made to generate heat, and controls temperature schedule by adjusting electrical power.It is national in recent years right The control pay attention to day by day of environmental pollution, the full battery kiln thermal efficiency is high, up to 85%, saves the energy, does not pollute, eliminates public hazards, have Effect improves working condition, and its melted glass metal ingredient out is uniform, and product quality is high, is easy to implement automatically in production process Change operation.Therefore, electric glass melting has at home and abroad obtained rapid popularization.
But the tank block of domestic traditional all-electric melting kiln generally will be because connecing with high-temperature glass liquid at 3 years or so for a long time It touches and is etched, so that material qualitative change is poor, and then increases energy consumption, just mean that the glass furnace service life expires, traditional solution Often blowing out power-off cooling discharging is removed kiln and is rebuild, corundum brick, electrode structure and other thermal insulation materials more renewed. After kiln is removed, more intact tank block, bottom of pond Zhuan, Xuan brick etc. will be scrapped in kiln, considerably increase production cost, repair It is long to manage the period.
Application No. is the Chinese invention patents of CN201310158180.1 to disclose modular repair All Electric Melting Furnace oven process, the invention The design being segmented using pool wall on melting tank overcomes glass by optimizing the material of rationally setting each position refractory brick of melting furnaces The liquid problem short to kiln seriously corroded, furnace service life extends kiln service life.
Summary of the invention
It is an object of the invention to overcome defect described in the prior art, to provide a kind of maintenance of all-electric melting kiln Method, the method for maintaining can guarantee when all-electric melting kiln end-of-life without all shifting onto, it is only necessary to which part maintenance can be extensive Multiple such as new, this method slows down corrosion of the glass metal to corundum brick significantly relatively, extends kiln service life, effectively reduces life Produce cost, safety and environmental protection, energy-saving consumption-reducing.
To achieve the goals above, the invention provides the following technical scheme:
A kind of method for maintaining of all-electric melting kiln, including hot repair and cold repair, the hot repair the following steps are included:
(1) it shuts down the main electrode load of all-electric melting kiln, and electrode will be started and dog-hole is adjusted to the state of heat preservation, When the temperature of upper pool wall is down to 95-105 DEG C, start to carry out local route repair to impaired tank block or transitional brick;
(2) observe and measure the length of molybdenum electrode in the all-electric melting kiln, according to the extent of damage of the molybdenum electrode into Row replacement is continued to make it have preferable working condition;
(3) after the completion of molybdenum electrode maintenance, the main electrode load is adjusted to high pressure gear up to the temperature in upper storage reservoir Degree rises to 850-900 DEG C, and main molten polarizing electrode is then added and does further power-up heating, until daily production status demand.
Preferably: the all-electric melting kiln includes Xuan Ding and furnace body, and the Xuan Ding is separably set to the top of the furnace body Portion;The furnace body includes upper pool wall, lower pool wall and the transitional brick between the upper pool wall and the lower pool wall, it is described on Pool wall is made of pool wall on the pool wall on upper first and second under, and the end of pool wall is located at the full electricity on described first The lower section of molten silicate liquid level in melting furnace.
Further: the height ratio of pool wall is greater than 7:9, preferably 5:3 on pool wall and described second on described first.
Further: the local route repair of the impaired tank block is to carry out the corundum brick on described first on pool wall more Repair is mended.
Preferably: the time of heat preservation described in step (1) is 6-8 days.
Preferably: in step (2), being headed into when the length of the molybdenum electrode is less than 58cm, when the molybdenum electrode Length is maintained the statusquo when being equal to 60cm.
2, preferably: in step (3) when the temperature in the upper storage reservoir rises to 940-960 DEG C, first keeping the temperature 16-18h, and infuse The swelling that meaning observation occurs, adjusts force-bearing situation using jackscrew in time;Until expansion terminates holding out against jackscrew, do further Power-up heating, until daily production status demand.
Preferably: the cold repair the following steps are included:
S1, the main electrode load for shutting down all-electric melting kiln will be described after the glass metal cooling in the all-electric melting kiln Glass metal is cleared up at away from the position the main electrode 5-10cm, carries out part to impaired tank block, transitional brick or leakage hole brick It repairs;
S2, after the completion of local route repair, firing up is carried out as the heating energy using liquefied gas or natural gas, works as liter Transformer is adjusted to high pressure gear during heat preservation to 16-18h is kept the temperature after 940-960 DEG C by temperature, attempts power-up heating, Ke Yijia The heating energy is shut down after electricity, is heated up using power-up, until daily production status demand, is adjusted to suitable gear.
Preferably: local route repair described in step (1) and S1 is to be replaced impaired corundum brick, and in new corundum brick Between insulating brick preset clearance with fill schmigel carry out it is be bonded.
Further: the distance in the gap is 5-10cm, preferably 5-6cm.
Compared with prior art, the invention has the following advantages:
All-electric melting kiln method for maintaining provided by the invention includes hot repair and cold repair, and specific hot repair and cold repair are according to full electricity The trouble location of melting furnace and real operating condition carry out, and the present inventor is by research for many years and according to the electricity inside full shop kiln It flows away to proposing to scientific rationality practicable all-electric melting kiln method for maintaining, the method for maintaining either hot repair or cold It repairs and is not required to all-electric melting kiln carrying out dismounting reconstruction, only need to carry out local route repair and can restore under low consumption situation as new, In addition, can go directly damaged part using method for maintaining of the present invention, maintenance efficiency is substantially increased.Specifically, this hair It is bright when carrying out hot repair, although having shut down the main electrode load of all-electric melting kiln, still keeping the temperature of upper pool wall is 95- 105 DEG C, 950 DEG C of temperature of state under pond, the state can not only guarantee that maintenance personal repaired, but also can make complete after maintenance Electric melting furnace is rapidly heated to daily production status demand, avoids the cooling of all-electric melting kiln whole or needs 20 after pushing over reconstruction Build furnace and economic loss caused by the heating-up time within several days, in addition hot repair method provided by the present invention can solve 95% it is complete Electric melting furnace fault state because, it is measuring according to the present invention it is demonstrated experimentally that in all-electric melting kiln receive glass metal corrode it is more serious Position be successively tank block, transitional brick, dog-hole, furnace bottom, increased channel and material path, wherein tank block is especially located at pool wall Silicate formation at tank block corrode the most serious, be secondly transitional brick and dog-hole, but small pool wall, furnace bottom and rising The erosion in road can be ignored, and in addition the present inventor extrapolates the average life span of AZS corundum brick according to the actual conditions of erosion It is 7 years or so, thus according to method for maintaining of the invention, directlys adopt hot repair replacement impaired tank block or transitional brick, Record the length of molybdenum electrode in all-electric melting kiln simultaneously, be replaced or continue to according to the extent of damage of molybdenum electrode so that its With preferable working condition, restore the all-electric melting kiln repaired as new, the all-electric melting kiln after maintenance is directly by main electricity Pole isolating transformer be adjusted to high pressure gear until upper storage reservoir in temperature rise to 850-900 DEG C, then be added main molten polarizing electrode do into One step power-up heating, until daily production status demand, is adjusted to suitable gear and accomplishes that Quick-return produces.
It is in addition of the invention that upper tank block can be changed to traditional monolith tiling method when repairing upper pool wall, But the upper tank block of monolith is divided on arranged up and down first tank block on tank block and second, several pool walls on first Brick forms pool wall on first, several on second tank block form pool wall on second, and on first the end of pool wall be located at it is described The lower section of molten silicate liquid in all-electric melting kiln, with this in maintenance next time, it is only necessary to replace tank block on impaired first , maintenance cost is again reduced, maintenance efficiency is improved;
Under normal circumstances, 95% damaged part is located on tank block and transitional brick in all-electric melting kiln, and the two It is repaired using hot repair, efficiency is higher, certainly when damaged part is located at leakage hole brick, furnace bottom, especially leakage hole brick, then It needs to remove when needing to clear up glass metal at away from the position main electrode 8-12cm using the method for cold repair, the cold repair method Dog-hole changes the step of brick is repaired, and can so aoxidize to avoid molybdenum electrode, whens preventing from repairing leakage hole brick etc., damages molybdenum electrode, After the completion of reparation, the present invention then uses liquefied gas or natural gas to carry out firing up as the heating energy, then using power-up Heating is taken over to daily production status demand.Can so be rapidly heated all-electric melting kiln, and improve efficiency.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the furnace structure schematic diagram for cooperating Xuan Ding in one embodiment of the invention;
Fig. 2 is the furnace structure schematic diagram of unmated Xuan Ding in Fig. 1.
Description of symbols:
1, furnace body;11, upper pool wall;111, pool wall on first;112, pool wall on second;12, transitional brick;13, lower pool wall; 14, furnace bottom;15, dog-hole;16, increased channel;2, corundum brick;3, insulating brick;4, Xuan Ding;5, iron is held in the palm;6, jackscrew.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
As long as in addition, the non-structure each other of technical characteristic involved in invention described below different embodiments It can be combined with each other at conflict.
It should be noted that upper pool wall, lower pool wall, dog-hole, increased channel have corundum brick and are wrapped in invention Insulating brick composition on the outside of corundum brick.
Embodiment 1
The present invention provides the method for maintaining of pool wall upper in a kind of pair of all-electric melting kiln, comprising the following steps:
(1) as shown in Fig. 1 to 2, first on column plus iron 5 is held in the palm, a surname top 4 is separated with furnace body 1, furnace body 1 can torn open When maintenance without put into again production a surname top 4 expense, accomplish once put into repeatedly be benefited, save the time, manpower and material resources and Financial resources, wherein furnace body includes upper pool wall 11, lower pool wall 13 and the transitional brick 12 between upper pool wall 11 and lower pool wall 13, on Pool wall 11 is made of pool wall 112 on the pool wall 111 on upper first and second under, and the end of pool wall 111 is located on first The lower section of molten silicate liquid level in the all-electric melting kiln, the height ratio of pool wall 112 is not small on pool wall 111 and second on first In 7:9, the preferred 5:3 of this embodiment;
(2) it shuts down the main electrode load of all-electric melting kiln, and electrode will be started and dog-hole 15 is adjusted to the shape of heat preservation State keeps the temperature 7 days, and when the temperature of upper pool wall 11 is down to 100 DEG C, starts to carry out local route repair to impaired tank block, specifically For the corundum brick 2 on first on pool wall 111 is carried out replacement repairing, while being reserved between new corundum brick 2 and insulating brick 3 The gap of 5cm is bonded with filling schmigel;
(3) length for observing and measuring molybdenum electrode in all-electric melting kiln is pushed up when the length of molybdenum electrode is less than 58cm Enter, maintains the statusquo when the length of molybdenum electrode is equal to 60cm, to make it have preferable working condition;
(4) after the completion of molybdenum electrode maintenance, main electrode load is adjusted to high pressure gear until the temperature in upper storage reservoir rises to 900 DEG C, when the temperature in upper storage reservoir rises to 950 DEG C, 16h is first kept the temperature, and pay attention to observing kiln tank block, if it expands phenomenon, Force-bearing situation is adjusted using jackscrew 6 in time;Until expansion terminates holding out against jackscrew 6, further power-up heating is done, until daily production Duty requirements.
Embodiment 2
The present invention provides the method for maintaining of transitional brick 12 in a kind of pair of all-electric melting kiln, comprising the following steps:
(1) add support iron 5 first on column, a surname top 4 is separated with furnace body 1, it can be when tearing furnace body 1 open and repairing without again The expense on investment production a surname top 4, accomplishes once to put into and repeatedly be benefited, save time, manpower and material resources and financial resources;
(2) it shuts down the main electrode load of all-electric melting kiln, and electrode will be started and dog-hole is adjusted to the state of heat preservation, Heat preservation 6 days, and when the temperature of upper pool wall 11 is down to 95 DEG C, start to be replaced impaired upper tank block 11, transitional brick 12, And between new corundum brick 2 and insulating brick 3 reserve 5cm gap with fill schmigel carry out it is be bonded;
(2) electrode water jacket and cleaning and maintenance of impaired transitional brick 12 are removed, wherein the water jacket or molybdenum electrode that damage need more Renew, the water jacket safeguarded is put into transitional brick 12 and pre-buried good molybdenum electrode as required, it is desirable that molybdenum electrode maintains an equal level in transition 12 upper end of brick, and cullet are covered, cullet can melt to play the role of vacuum insulating oxygen at high temperature, to realize Protect the effect of molybdenum electrode;
(3) after the completion of molybdenum electrode maintenance, main electrode load is adjusted to high pressure gear until the temperature in upper storage reservoir rises to 850 DEG C, when the temperature in upper storage reservoir rises to 940 DEG C, 16h is first kept the temperature, and pay attention to observing the swelling that kiln tank block occurs, and Shi Caiyong jackscrew 6 adjusts force-bearing situation, until expansion terminates holding out against jackscrew 6, when upper storage reservoir temperature rises to 1200 DEG C, main electricity Pole heads into 60cm and does further power-up heating main electrode is directly enabled after water jacket water flowing, until daily production status demand, ?.
Embodiment 3
The present invention provides the method for maintaining of pool wall 13 lower in a kind of pair of all-electric melting kiln, comprising the following steps:
(1) add support iron 5 first on column, a surname top 4 is separated with furnace body 1, it can be when tearing furnace body 1 open and repairing without again The expense on investment production a surname top 4, accomplishes once to put into and repeatedly be benefited, save time, manpower and material resources and financial resources;
(2) the whole electrode loads for shutting down the big furnace of all-electric melting kiln, after the glass metal cooling in all-electric melting kiln, by glass Glass liquid is cleared up at away from the position main electrode 8cm, starts to be replaced impaired lower tank block, and in new corundum brick 2 and is protected The gap that 5cm is reserved between warm brick 3 is bonded with filling schmigel;
(3) length for observing and measuring molybdenum electrode in all-electric melting kiln is pushed up when the length of molybdenum electrode is less than 58cm Enter, maintains the statusquo when the length of molybdenum electrode is equal to 60cm, to make it have preferable working condition;
(4) after the completion of molybdenum electrode maintenance, main electrode load is adjusted to high pressure gear, when the temperature in upper storage reservoir rises to 960 DEG C when, first keep the temperature 16h, and pay attention to observe kiln tank block, if it expands phenomenon, in time using jackscrew 6 adjust stress Then situation does further power-up heating, until daily production status demand.
Embodiment 4
The present invention provides the method for maintaining in leakage hole 15 in a kind of pair of all-electric melting kiln, comprising the following steps:
(1) the whole electrode loads for shutting down the big furnace of all-electric melting kiln, after the glass metal cooling in all-electric melting kiln, by glass Glass liquid is cleared up at away from the position main electrode 8cm, and carrying out local route repair to impaired 15 brick of leakage hole (specifically can be according to reality Depending on);Specially the corundum brick 2 being damaged in leakage hole 15 is replaced, and pre- between new corundum brick 2 and insulating brick 3 The gap of 5cm is stayed to be bonded to fill schmigel;
(2) after the completion of local route repair, firing up is carried out as the heating energy using liquefied gas, when being warming up to 950 DEG C After keep the temperature 16h, transformer is adjusted to high pressure gear during heat preservation, power-up heating is attempted, the heating energy is shut down after being powered on, It is heated up using power-up, until daily production status demand.
Embodiment 5
The present invention provides the method for maintaining of increased channel 16 in a kind of pair of all-electric melting kiln, comprising the following steps:
(1) it shuts down the main electrode load of all-electric melting kiln, and electrode will be started and dog-hole is adjusted to the state of heat preservation, Heat preservation 5 days, and when the temperature of increased channel 16 is down to 100 DEG C, start to carry out local route repair to impaired increased channel brick, specially The corundum brick 2 of increased channel 16 is subjected to replacement repairing, at the same between new corundum brick 2 and insulating brick 3 reserve 3cm gap with Filling schmigel is bonded;
(3) observe and measure the length of main molten molybdenum electrode in all-electric melting kiln, when the length of molybdenum electrode is less than 58cm into Row heads into, and maintains the statusquo when the length of molybdenum electrode is equal to 60cm, to make it have preferable working condition;
(4) after the completion of molybdenum electrode maintenance, main electrode load is adjusted to high pressure gear until the temperature in upper storage reservoir rises to 900 DEG C, when the temperature in upper storage reservoir rises to 950 DEG C, 16h is first kept the temperature, and pay attention to observing kiln tank block, if it expands phenomenon, Force-bearing situation is then adjusted using jackscrew 6 in time;After expansion, then jackscrew 6 is held out against, further power-up heating is done, until daily Production status demand.
Note: embodiment 1 and the plug flat the most suitable of embodiment 3 and top insertion electrode in the present invention, embodiment 2 are suitble to oblique cutting the most Electrode.
The foregoing is merely a specific embodiment of the invention, but scope of protection of the present invention is not limited thereto, any In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by those familiar with the art, all answers It is included within the scope of the present invention.Therefore, protection scope of the present invention should be with the scope of protection of the claims It is quasi-.

Claims (10)

1. a kind of method for maintaining of all-electric melting kiln, which is characterized in that including hot repair and cold repair, the hot repair includes following step It is rapid:
(1) it shuts down the main electrode load of all-electric melting kiln, and electrode will be started and dog-hole is adjusted to the state of heat preservation, to upper When the temperature of pool wall is down to 95-105 DEG C, start to carry out local route repair to impaired tank block or transitional brick;
(2) length for observing and measuring molybdenum electrode in the all-electric melting kiln, is replaced according to the extent of damage of the molybdenum electrode It changes or continues to make it have preferable working condition;
(3) after the completion of molybdenum electrode maintenance, the main electrode load is adjusted to high pressure gear up to the temperature liter in upper storage reservoir To 850-900 DEG C, main molten polarizing electrode is then added and does further power-up heating, until daily production status demand.
2. method for maintaining according to claim 1, which is characterized in that the all-electric melting kiln includes Xuan Ding and furnace body, institute State the top that Xuan Ding is separably set to the furnace body;The furnace body include upper pool wall, lower pool wall and be set to the upper pool wall Transitional brick between the lower pool wall, the upper pool wall are made of pool wall on the pool wall on upper first and second under, The end of pool wall is located at the lower section of molten silicate liquid level in the all-electric melting kiln on described first.
3. method for maintaining according to claim 2, which is characterized in that pool wall on pool wall and described second on described first Height is than being greater than 7:9.
4. method for maintaining according to claim 2, which is characterized in that the local route repair of the impaired tank block is by institute It states the corundum brick on first on pool wall and carries out replacement repairing.
5. method for maintaining according to claim 1, which is characterized in that the time of cooling described in step (1) is 6-8 days.
6. method for maintaining according to claim 1, which is characterized in that in step (2), when the length of the molybdenum electrode is less than It is promoted when 58cm, is maintained the statusquo when the length of the molybdenum electrode is equal to 60cm.
7. method for maintaining according to claim 1, which is characterized in that when the temperature in the upper storage reservoir rises in step (3) At 940-960 DEG C, 16-18h is first kept the temperature, and pays attention to observing the swelling that kiln tank block occurs, is adjusted in time using jackscrew Force-bearing situation;Until expansion terminates holding out against jackscrew, further power-up heating is done, until daily production status demand.
8. method for maintaining according to claim 1, which is characterized in that the cold repair the following steps are included:
S1, the whole electrodes and corresponding electric heating system for shutting down all-electric melting kiln, with the glass metal in the all-electric melting kiln After cooling, the glass metal is cleared up at away from the position the main electrode 5-10cm, to impaired tank block, transitional brick or leakage Hole brick carries out local route repair;
S2, after the completion of local route repair, firing up is carried out as the heating energy using liquefied gas or natural gas, when being warming up to 16-18h is kept the temperature after 940-960 DEG C, transformer is adjusted to high pressure gear during heat preservation, power-up heating is attempted, after being powered on The heating energy is shut down, is heated up using power-up, until daily production status demand.
9. method for maintaining according to claim 1, which is characterized in that local route repair described in step (1) and S1 is will be by The corundum brick of damage is replaced, and between new corundum brick and insulating brick preset clearance with fill schmigel carry out it is be bonded.
10. method for maintaining according to claim 9, which is characterized in that the distance in the gap is 5-10cm, preferably 5- 6cm。
CN201910100403.6A 2019-01-31 2019-01-31 A kind of method for maintaining of all-electric melting kiln Active CN109631588B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910100403.6A CN109631588B (en) 2019-01-31 2019-01-31 A kind of method for maintaining of all-electric melting kiln

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910100403.6A CN109631588B (en) 2019-01-31 2019-01-31 A kind of method for maintaining of all-electric melting kiln

Publications (2)

Publication Number Publication Date
CN109631588A true CN109631588A (en) 2019-04-16
CN109631588B CN109631588B (en) 2019-12-03

Family

ID=66064751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910100403.6A Active CN109631588B (en) 2019-01-31 2019-01-31 A kind of method for maintaining of all-electric melting kiln

Country Status (1)

Country Link
CN (1) CN109631588B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111253047A (en) * 2020-04-07 2020-06-09 江苏亚太光学有限公司 All-electric melting platinum-free gold crucible optical glass kiln
CN112815712A (en) * 2021-02-07 2021-05-18 江西铜业集团(贵溪)冶金化工工程有限公司 Local maintenance method for flash furnace bottom arch foot brick
CN112923731A (en) * 2021-02-06 2021-06-08 江西铜业集团(贵溪)冶金化工工程有限公司 Local maintenance method for flash furnace bottom bricks
CN113108607A (en) * 2021-04-15 2021-07-13 嘉峪关宏电铁合金有限责任公司 Quick repairing process for lining of silicomanganese ore heating furnace with super furnace age
CN115010346A (en) * 2022-07-19 2022-09-06 中国建材国际工程集团有限公司 Cold repair method and structure of main crown of glass melting furnace

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0770617A (en) * 1993-09-03 1995-03-14 Nisshin Steel Co Ltd Method for repairing furnace bottom part in blast furnace
CN1609023A (en) * 2004-11-05 2005-04-27 河南安彩高科股份有限公司 Method of repairing dog-hole lap brick of glass tank furnace in on-stream state
CN101907298A (en) * 2010-07-31 2010-12-08 中国洛阳浮法玻璃集团有限责任公司 Hot repair method of port tongue arch of coal-burning glass furnace
CN101941790A (en) * 2010-07-27 2011-01-12 河北东旭投资集团有限公司 Method for prolonging service life of PDP float glass furnace arch
CN102092919A (en) * 2010-12-16 2011-06-15 武汉力诺太阳能集团股份有限公司 Top-mounted electrode type all-electric melting furnace
CN104529134A (en) * 2014-12-10 2015-04-22 河南安彩高科股份有限公司 Hot repair method of glass kiln crown

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0770617A (en) * 1993-09-03 1995-03-14 Nisshin Steel Co Ltd Method for repairing furnace bottom part in blast furnace
CN1609023A (en) * 2004-11-05 2005-04-27 河南安彩高科股份有限公司 Method of repairing dog-hole lap brick of glass tank furnace in on-stream state
CN101941790A (en) * 2010-07-27 2011-01-12 河北东旭投资集团有限公司 Method for prolonging service life of PDP float glass furnace arch
CN101907298A (en) * 2010-07-31 2010-12-08 中国洛阳浮法玻璃集团有限责任公司 Hot repair method of port tongue arch of coal-burning glass furnace
CN102092919A (en) * 2010-12-16 2011-06-15 武汉力诺太阳能集团股份有限公司 Top-mounted electrode type all-electric melting furnace
CN104529134A (en) * 2014-12-10 2015-04-22 河南安彩高科股份有限公司 Hot repair method of glass kiln crown

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵开芝: "玻璃熔窑的热修", 《建材工业信息> *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111253047A (en) * 2020-04-07 2020-06-09 江苏亚太光学有限公司 All-electric melting platinum-free gold crucible optical glass kiln
CN112923731A (en) * 2021-02-06 2021-06-08 江西铜业集团(贵溪)冶金化工工程有限公司 Local maintenance method for flash furnace bottom bricks
CN112815712A (en) * 2021-02-07 2021-05-18 江西铜业集团(贵溪)冶金化工工程有限公司 Local maintenance method for flash furnace bottom arch foot brick
CN113108607A (en) * 2021-04-15 2021-07-13 嘉峪关宏电铁合金有限责任公司 Quick repairing process for lining of silicomanganese ore heating furnace with super furnace age
CN115010346A (en) * 2022-07-19 2022-09-06 中国建材国际工程集团有限公司 Cold repair method and structure of main crown of glass melting furnace
CN115010346B (en) * 2022-07-19 2023-10-03 中国建材国际工程集团有限公司 Cold repair method and structure for glass melting furnace crown

Also Published As

Publication number Publication date
CN109631588B (en) 2019-12-03

Similar Documents

Publication Publication Date Title
CN109631588B (en) A kind of method for maintaining of all-electric melting kiln
DK2858955T3 (en) INSTALLATION AND METHOD OF GLASS MOLDING
CN109336366B (en) High-temperature deformation resistant platinum channel structure
KR20120094875A (en) Preheating method and preheating apparatus of steel making ladle
CN109987823A (en) A kind of electronical display glass substrate furnace discharge mouth heating device
CN202849234U (en) Device for prolonging service life of electric melting furnace
CN214299853U (en) Reinforcing structure for propelling support of electrode brick of liquid crystal glass kiln
CN102494538B (en) Process for overhauling of calcining furnace and starting of baking oven
CN1205139C (en) Cooling mode for prolonging service life of glass pool furnace and reducing glass defect
CN111763000A (en) Large arch structure of large-scale total oxygen combustion glass kiln
CN202610092U (en) On-line tank wall brick cutting device for cold repair transformation process of glass smelting kiln
CN213865903U (en) Water-cooling combined device for replacing wall of glass melting furnace
CN110981164B (en) Melting apparatus and melting method
CN103925792B (en) One is drawn the post-rift processing method of channel in smelting furnace
CN202936296U (en) Heating electrode and alkali-free aluminoborosilicate glass melting furnace with heating electrodes
EP0739861B1 (en) Method for repairing glass-melting furnaces
EP0157767B1 (en) Electrical melting of solidified glass in melting units
CN104891802B (en) Electrode bar mounting structure
CN114853317B (en) Platinum channel non-heating area thermal state maintenance method
CN102910799B (en) Heating electrode and there are the silicate glass containing boron and aluminium without alkali melting furnaces of this heating electrode
CN101338975B (en) Electric stove EBT steel-tapping hole hot repairing dedicated device and repairing method
CN113666614A (en) Online replacement method for wall of glass melting furnace
CN201250171Y (en) Lead-free low-smelting glass furnace
CN219585970U (en) Adjustable high-temperature-resistant insulation supporting device for hot repair of glass melting furnace
CN220837919U (en) Tundish immersion nozzle baking and heat preserving device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant