CN109629384A - A kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation - Google Patents

A kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation Download PDF

Info

Publication number
CN109629384A
CN109629384A CN201811488172.2A CN201811488172A CN109629384A CN 109629384 A CN109629384 A CN 109629384A CN 201811488172 A CN201811488172 A CN 201811488172A CN 109629384 A CN109629384 A CN 109629384A
Authority
CN
China
Prior art keywords
pitch
repairing
push rod
base
asphalt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811488172.2A
Other languages
Chinese (zh)
Inventor
李九梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811488172.2A priority Critical patent/CN109629384A/en
Publication of CN109629384A publication Critical patent/CN109629384A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/096Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for forming, opening-out, cleaning, drying or heating and filling
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving

Abstract

The invention discloses a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation, belong to asphalt pavement repairing field, a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation, the method being laid with by three layers, for the function different pitches layer choosing pitch of different types, it may be implemented to repair bituminous pavement using industrial solid wastes and construction and demolition wastes, while saving a large amount of pitch resource, excessive influence will not be caused to the intensity of bituminous pavement, the difference of function and loading demand for different bitumen layers, the pitch of different qualities can be selected, the cost of asphalt pavement repairing is saved to the full extent, the intensity of bituminous pavement is greatly enhanced by being reasonably laid with means, bituminous pavement after making repairing is not easy be damaged premature because of sole mass reason, reduce staff's repairing Frequency reduces because of the problem of bituminous pavement quality influencing caused by traffic.

Description

A kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation
Technical field
The present invention relates to asphalt pavement repairing fields, more specifically to a kind of bituminous pavement based on urban transportation Crack method for repairing and mending.
Background technique
Bituminous pavement refers to various types of road surfaces that bitumen for road use material making is mixed in mineral material.Pitch combines Material, which improves to pave the way, resists the ability of driving and the damage of natural cause road pavement with pellet, and evenness of road surface is made to lack dirt, waterproof, warp Durable long, therefore, bituminous pavement is a kind of high class pavement being the most widely used in road construction, and bituminous pavement is as a kind of soft Property road surface, compared to cement pavement, the ability of the anti-rigid shock of bituminous pavement is preferable, and have certain elasticity, in weight Original shape can be replied after rolling faster, is not susceptible to damage, therefore its wide usage is higher than cement pavement.
As cement pavement, when overloading wagon and road surfacing not enough standardize all be damage of bituminous pavement maximum it is former Cause, however as a kind of amorphous material, although the fusing point that pitch is not fixed, the temperature of asphalt melting is lower, works as pitch Road surface is under the condition of high temperature for a long time when working, and bituminous pavement easily melts, when vehicle inside the pitch of thawing upper traveling When relatively clear track can be left on bituminous pavement, when bituminous pavement temperature reduce, after pitch solidifies again, track also after It is continuous to stay on bituminous pavement, it also will affect the use of bituminous pavement, need to repair bituminous pavement.
When being repaired for bituminous pavement, the methods using primary concreting most of at this stage, even if some Using the method that segmentation pours, but the asphalt component being segmented in casting process matches most one to pitch made of laying The bituminous pavement intensity difference of road surface and primary concreting is little, and intensity is far below the bituminous pavement being originally laid with, and is using one It after holding the time, is easily damaged again, needs to be repaired again, great waste is caused to pitch resource, expend many More manpowers and money, and also need to close a road to traffic during pavement patching, the traffic of bituminous pavement is seriously affected, the people are given The trip of the masses causes to seriously affect.
Summary of the invention
1. technical problems to be solved
Aiming at the problems existing in the prior art, the purpose of the present invention is to provide a kind of asphalt roads based on urban transportation Crack method for repairing and mending in face, it may be implemented to repair bituminous pavement using industrial solid wastes and construction and demolition wastes It mends, while saving a large amount of pitch resource, excessive influence will not be caused to the intensity of bituminous pavement, while by reasonable Laying means greatly enhance the intensity of bituminous pavement, the bituminous pavement after making repairing is not easy premature because of sole mass reason It is damaged, reduces the frequency of staff's repairing, reduce because of the problem of bituminous pavement quality influencing caused by traffic.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
A kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation, comprising the following steps:
S1, road surface cleaning, staff clean out the sundries on road surface.
S2, take damaged pitch, pitch at Damages of Asphalt Road Surface is taken out together together with a neighbouring fritter asphalt blocks Come, form repairing hole, and repair hole to keep rule as far as possible, can be rectangle.
After being cleared up the bed course of script bituminous pavement, construction waste brick is added into repairing hole in S3, setting cushion Bed course is used as with sandstone etc..
S4, underlayment are laid with, and are poured base pitch into repairing hole, after being added to base pitch, are used asphalt compaction Base asphalt compaction is being stood a period of time, is allowing base bitumen solidification, during base bitumen solidification, need to be arranged by machine Protective device sets waterproofing membrane on base pitch upper berth, when the temperature of the surroundings is low, also needs separately to set up warm-keeping device.
S5, base are laid with, then pour base's pitch into repairing hole, after being added to base's pitch, use asphalt compaction Base's asphalt compaction is being stood a period of time, is allowing base's bitumen solidification, during base's bitumen solidification, need to be arranged by machine Protective device sets waterproofing membrane on base's pitch upper berth, when the temperature of the surroundings is low, also needs separately to set up warm-keeping device.
S6, topping laying finally pour surface layer pitch into repairing hole, after being added to surface layer pitch, with pitch pressure Surface layer asphalt compaction is being stood a period of time, is allowing surface layer bitumen solidification, during surface layer bitumen solidification, need to set by real machine Protective device is set, waterproofing membrane is set on surface layer pitch upper berth, when the temperature of the surroundings is low, also needs separately to set up warm-keeping device.
S7, patch work ending, after the completion of the last layer surface layer bitumen solidification, can will be built up on surface layer pitch Protective device removes, and carries out finishing cutting to surface layer pitch, and surface layer pitch is made more to adapt to former road surface.
It may be implemented to repair bituminous pavement using industrial solid wastes and construction and demolition wastes, it is big saving While the pitch resource of amount, excessive influence will not be caused to the intensity of bituminous pavement, while by being reasonably laid with means The intensity for greatly enhancing bituminous pavement, make repairing after bituminous pavement be not easy it is premature because of sole mass reason be damaged, The frequency of staff's repairing is reduced, is reduced because of the problem of bituminous pavement quality influencing caused by traffic.
Further, in the S3 setting cushion and construction waste brick and sandstone etc. need to be into before repairing hole is added The thick stirring of row, keeps the distribution of the construction waste of the biggish construction waste of volume and small volume more uniform, keeps bed course Higher intensity, and be not easy to influence the water penetration of bed course.
Further, a small amount of industrial solid wastes coal can be mixed in the base pitch in the S4 underlayment laying Slag, and cinder need to be crushed first, the intensity requirement of underlayment is lower, a small amount of cinder can be mixed, in not excessive influence Under the premise of underlayment pitch intensity, pitch resource can be saved.
Further, base's pitch in the S5 base laying should not mix sundries, and need to select the drip of maximum intensity Blueness increases the load-bearing capacity of base's pitch, extends the service life of repairing pitch.
Further, in the surface layer pitch of the S6 topping laying, a small amount of solid small particles waste can be mixed, it can be with It is the scrap iron for doing pulverization process and Passivation Treatment, the scrap iron particle being passivated on a small quantity is inserted into pitch can significantly promote face The wear-resisting property of layer pitch, reduces the abrasion of surface layer pitch.
Further, the S4 underlayment is laid with, S5 base is laid with and S6 topping laying in the attemperator that refers to can be with It is straw mat, cost is relatively low for straw mat, and to the less pollution of nature, and heat insulation effect is preferable.
Further, the S2 takes in damaged pitch, and the asphalt waste for taking out can temporarily be stored with the storage box Get up, for recycling in the future, can production section pitch articles, such as rubber can save a large amount of pitch resource.
Further, the asphalt compaction machine packet that the S4 underlayment is laid with, refers in the laying of S5 base and S6 topping laying Include and determine push rod, it is described determine to dig in push rod have push rod slot, it is described determine to dig on push rod have push rod rotation slot, and move push rod Slot is communicated with the outside world by dynamic push rod rotation slot, and dynamic push rod, and one end position of dynamic push rod are plugged in the dynamic push rod slot In in dynamic push rod slot, the other end of the dynamic push rod is located in dynamic push rod slot, and the dynamic push rod is located in dynamic push rod slot One end be connected with rotating ball, be connected with telescopic rod in the trough floor of the dynamic push rod slot, the telescopic rod is far from dynamic push rod One end of the trough floor of slot is connected with push plate, is connected with compressed spring between the push plate and the trough floor of dynamic push rod slot, And compressed spring is socketed in the outside of telescopic rod, when staff carries out asphalt compaction machine, passes through telescopic rod, push plate, compression Spring and dynamic push rod move back and forth, and reduce impact of the vibration generated when the work of asphalt compaction machine to staff, subtract The feeling of fatigue of small staff makes push rod be not easy to be detached from from staff's hand, is not easy to cause safety accident.
Further, the push plate is connected with resilient rubbber cushion far from one end of telescopic rod, opens in the resilient rubbber cushion It is carved with cavity, is filled with multiple elastic balls in the cavity, the presence of push plate can make the contact between rotating ball and push plate more Add steadily, the power for making rotating ball be transmitted to push plate is more balanced, makes push plate be not easy to turn on one's side because of discontinuity, while push plate Presence the power on push plate conductor rotors ball can also be made more balanced, when staff being made to hold dynamic push rod, be not easily susceptible to The relatively thump that asphalt compaction machine is transmitted to, is not easy to damage staff.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
(1) this programme may be implemented to repair bituminous pavement using industrial solid wastes and construction and demolition wastes It mends, while saving a large amount of pitch resource, excessive influence will not be caused to the intensity of bituminous pavement, while by reasonable Laying means greatly enhance the intensity of bituminous pavement, the bituminous pavement after making repairing is not easy premature because of sole mass reason It is damaged, reduces the frequency of staff's repairing, reduce because of the problem of bituminous pavement quality influencing caused by traffic.
(2) in S3 setting cushion and construction waste brick and sandstone etc. need slightly to be stirred before repairing hole is added, Keep the distribution of the construction waste of the biggish construction waste of volume and small volume more uniform, bed course is allow to keep higher strong Degree, and be not easy to influence the water penetration of bed course.
(3) a small amount of industrial solid wastes cinder can be mixed in the base pitch in the laying of S4 underlayment, and cinder needs It is first crushed, the intensity requirement of underlayment is lower, can mix a small amount of cinder, strong in not excessive influence underlayment pitch Under the premise of degree, pitch resource can be saved.
(4) base's pitch in the laying of S5 base should not mix sundries, and need to select the pitch of maximum intensity, increase base The load-bearing capacity of pitch extends the service life of repairing pitch.
(5) in the surface layer pitch of S6 topping laying, a small amount of solid small particles waste can be mixed, can be and did crushing The scrap iron of processing and Passivation Treatment, the scrap iron particle being passivated on a small quantity is inserted into pitch can significantly promote the resistance to of surface layer pitch Performance is ground, the abrasion of surface layer pitch is reduced.
(6) attemperator referred in the laying of S4 underlayment, the laying of S5 base and S6 topping laying can be straw mat, straw mat Cost is relatively low, and to the less pollution of nature, and heat insulation effect is preferable.
(7) S2 takes in damaged pitch, and the asphalt waste for taking out can temporarily be stored with the storage box, in the future Recycle, can production section pitch articles, such as rubber can save a large amount of pitch resource.
(8) the asphalt compaction machine referred in the laying of S4 underlayment, the laying of S5 base and S6 topping laying includes determining push rod, fixed Digging in push rod has push rod slot, and determining to dig on push rod has push rod rotation slot, and dynamic push rod slot passes through dynamic push rod rotation Slot communicates with the outside world, and dynamic push rod is plugged in dynamic push rod slot, and one end of dynamic push rod is located in dynamic push rod slot, moves push rod The other end is located in dynamic push rod slot, and one end that dynamic push rod is located in dynamic push rod slot is connected with rotating ball, moves push rod slot Telescopic rod is connected in trough floor, one end of trough floor of the telescopic rod far from dynamic push rod slot is connected with push plate, and push plate is pushed away with dynamic It is connected with compressed spring between the trough floor of bar slot, and compressed spring is socketed in the outside of telescopic rod, carries out in staff When asphalt compaction machine, by moving back and forth for telescopic rod, push plate, compressed spring and dynamic push rod, reduce asphalt compaction machine work As when impact to staff of the vibration that generates, reduce the feeling of fatigue of staff, be not easy push rod from staff's hand Middle disengaging is not easy to cause safety accident.
(9) push plate is connected with resilient rubbber cushion far from one end of telescopic rod, and digging in resilient rubbber cushion has cavity, in cavity Filled with multiple elastic balls, the presence of push plate can make the contact between rotating ball and push plate more steady, conduct rotating ball Power to push plate is more balanced, makes push plate be not easy to turn on one's side because of discontinuity, while the presence of push plate can also make push plate Power on conductor rotors ball is more balanced, when staff being made to hold dynamic push rod, has been not easily susceptible to asphalt compaction machine and has been transmitted to Relatively thump, be not easy to damage staff.
Detailed description of the invention
Fig. 1 is Asphalt Pavement Cracking method for repairing and mending of the invention with flow chart;
Fig. 2 is the side view of existing asphalt compaction machine;
Side sectional view when Fig. 3 is asphalt compaction machine push rod work of the invention;
Fig. 4 is the structural schematic diagram in Fig. 3 at A;
Fig. 5 is side sectional view when asphalt compaction machine push rod of the invention is idle;
Fig. 6 is the top view at the place of asphalt compaction machine push rod of the invention.
Figure label explanation:
1 loading plate, 2 squeeze boards, 3 motor, 4 power supplys, 5 external frames, 6 jarring machines, 7 dust block boards, 8 determine push rod, 9 dynamic push away Bar, 10 dynamic push rod slots, 11 dynamic push rod rotation slots, 12 telescopic rods, 13 push plates, 14 compressed springs, 15 resilient rubbber cushions, 16 rotations Ball.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention;Technical solution in the embodiment of the present invention carries out clear, complete Site preparation description;Obviously;Described embodiments are only a part of the embodiments of the present invention;Instead of all the embodiments, it is based on Embodiment in the present invention;It is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment;It shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the instruction such as term " on ", "lower", "inner", "outside", " top/bottom end " Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.In addition, term " first ", " second " are used for description purposes only, and cannot understand For indication or suggestion relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " is set Be equipped with ", " be arranged/connect ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to removable Connection is unloaded, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be specific Situation understands the concrete meaning of above-mentioned term in the present invention.
Embodiment 1:
Referring to Fig. 1, a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation, comprising the following steps:
S1, road surface cleaning, staff clean out the sundries on road surface, and S2 is made to take the drip recycled in damaged pitch It is not easy in green block containing excessive sundries.
S2, take damaged pitch, pitch at Damages of Asphalt Road Surface is taken out together together with a neighbouring fritter asphalt blocks Come, form repairing hole, and repair hole to keep rule as far as possible, can be rectangle.
After being cleared up the bed course of script bituminous pavement, construction waste brick is added into repairing hole in S3, setting cushion Bed course is used as with sandstone etc..
S4, underlayment are laid with, and are poured base pitch into repairing hole, after being added to base pitch, are used asphalt compaction Base asphalt compaction is being stood a period of time, is allowing base bitumen solidification, during base bitumen solidification, need to be arranged by machine Protective device sets waterproofing membrane on base pitch upper berth, when the temperature of the surroundings is low, also needs separately to set up warm-keeping device.
S5, base are laid with, then pour base's pitch into repairing hole, after being added to base's pitch, use asphalt compaction Base's asphalt compaction is being stood a period of time, is allowing base's bitumen solidification, during base's bitumen solidification, need to be arranged by machine Protective device sets waterproofing membrane on base's pitch upper berth, when the temperature of the surroundings is low, also needs separately to set up warm-keeping device.
S6, topping laying finally pour surface layer pitch into repairing hole, after being added to surface layer pitch, with pitch pressure Surface layer asphalt compaction is being stood a period of time, is allowing surface layer bitumen solidification, during surface layer bitumen solidification, need to set by real machine Protective device is set, waterproofing membrane is set on surface layer pitch upper berth, when the temperature of the surroundings is low, also needs separately to set up warm-keeping device.
S7, patch work ending, after the completion of the last layer surface layer bitumen solidification, can will be built up on surface layer pitch Protective device removes, and carries out finishing cutting to surface layer pitch, and surface layer pitch is made more to adapt to former road surface.
In S3 setting cushion and construction waste brick and sandstone etc. need slightly to be stirred before repairing hole is added, make body The construction waste distribution of the biggish construction waste of product and small volume is more uniform, and bed course is allow to keep higher intensity, and It is not easy to influence the water penetration of bed course, a small amount of industrial solid wastes coal can be mixed in the base pitch in the laying of S4 underlayment Slag, and cinder need to be crushed first, the intensity requirement of underlayment is lower, a small amount of cinder can be mixed, in not excessive influence Under the premise of underlayment pitch intensity, pitch resource can be saved, base's pitch in the laying of S5 base should not mix sundries, And the pitch of maximum intensity need to be selected, increase the load-bearing capacity of base's pitch, extends the service life of repairing pitch, S6 surface layer paving If surface layer pitch in, a small amount of solid small particles waste can be mixed, can be and did the useless of pulverization process and Passivation Treatment Iron, the scrap iron particle being passivated on a small quantity is inserted into pitch can significantly promote the wear-resisting property of surface layer pitch, reduce surface layer drip Green abrasion, S4 underlayment is laid with, S5 base is laid with and S6 topping laying in the attemperator that refers to can be straw mat, straw mat Cost is relatively low, and to the less pollution of nature, and heat insulation effect is preferable, and S2 takes in damaged pitch, and the pitch for taking out is useless Material can temporarily be stored with the storage box, for recycling in the future, can production section pitch articles, such as rubber, Ke Yijie Save a large amount of pitch resource.
Please refer to Fig. 2, Fig. 3, Fig. 4 and Fig. 5, the drip that S4 underlayment is laid with, refers in the laying of S5 base and S6 topping laying Green compacting machine includes determining push rod 8, and determining to dig in push rod 8 has push rod slot 10, and determining to dig on push rod 8 has push rod rotation slot 11, and dynamic push rod slot 10 is communicated with the outside world by dynamic push rod rotation slot 11, is plugged with dynamic push rod 9 in dynamic push rod slot 10, and One end of dynamic push rod 9 is located in dynamic push rod slot 10, and the other end for moving push rod 9 is located in dynamic push rod slot 10, and dynamic push rod 9 is located at One end in dynamic push rod slot 10 is connected with rotating ball 16, is connected with telescopic rod 12 in the trough floor of dynamic push rod slot 10, stretches One end of trough floor of the bar 12 far from dynamic push rod slot 10 is connected with push plate 13, the trough floor of push plate 13 and dynamic push rod slot 10 it Between be connected with compressed spring 14, and compressed spring 14 is socketed in the outside of telescopic rod 12, carries out asphalt compaction machine in staff When, by moving back and forth for telescopic rod 12, push plate 13, compressed spring 14 and dynamic push rod 9, when reducing the work of asphalt compaction machine Impact of the vibration of generation to staff, reduces the feeling of fatigue of staff, and push rod 9 is made to be not easy to take off from staff's hand From being not easy to cause safety accident, push plate 13 is connected with resilient rubbber cushion 15 far from one end of telescopic rod 12, in resilient rubbber cushion 15 Cutting has cavity, is filled with multiple elastic balls in cavity, the presence of push plate 13 can make connecing between rotating ball 16 and push plate 13 Touching is more steady, and the power for making rotating ball 16 be transmitted to push plate 13 is more balanced, and push plate 13 is made to be not easy that side occurs because of discontinuity It turns over, while the presence of push plate 13 can also make the power on 13 conductor rotors ball 16 of push plate more balanced, holds staff dynamic When push rod 9, it is not easily susceptible to the relatively thump that asphalt compaction machine is transmitted to, is not easy to damage staff.
When staff carries out asphalt compaction machine, in order to play the role of compacting, under the action of shaking device 6, drip Green compacting machine integrally can the higher vibration of occurrence frequency, and high-frequency vibration can be along determining push rod 8 and dynamic push rod 9 is transmitted to work people On hand, and in order to more smoothly push asphalt compaction machine, staff needs to use biggish strength to push to member Asphalt compaction machine, and under the action of high-frequency vibration, the arm of staff is easily numb, and staff is easy fatigue, this In invention, by moving back and forth for telescopic rod 12, push plate 13, compressed spring 14 and dynamic push rod 9, reduce asphalt compaction machine work As when impact to staff of the vibration that generates, reduce the feeling of fatigue of staff, be not easy push rod 9 from staff's hand Middle disengaging is not easy to cause safety accident.
It may be implemented to repair bituminous pavement using industrial solid wastes and construction and demolition wastes, it is big saving While the pitch resource of amount, excessive influence will not be caused to the intensity of bituminous pavement, while by being reasonably laid with means The intensity for greatly enhancing bituminous pavement, make repairing after bituminous pavement be not easy it is premature because of sole mass reason be damaged, The frequency of staff's repairing is reduced, reduction influences caused by road pavement traffic because of the problem of bituminous pavement quality.
It is described above;It is merely preferred embodiments of the present invention;But scope of protection of the present invention is not limited thereto; Anyone skilled in the art is in the technical scope disclosed by the present invention;According to the technique and scheme of the present invention and its It improves design and is subject to equivalent substitution or change;It should be covered by the scope of protection of the present invention.

Claims (9)

1. a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation, it is characterised in that: the following steps are included:
S1, road surface cleaning, staff clean out the sundries on road surface.
S2, take damaged pitch, pitch at Damages of Asphalt Road Surface is taken out together together with a neighbouring fritter asphalt blocks, shape It is cheated at repairing, and repair hole to keep rule as far as possible, can be rectangle.
After being cleared up the bed course of script bituminous pavement, construction waste brick and sand is added into repairing hole in S3, setting cushion Stone etc. is used as bed course.
S4, underlayment are laid with, and pour base pitch into repairing hole, will with asphalt compaction machine after being added to base pitch Base asphalt compaction is standing a period of time, is allowing base bitumen solidification, during base bitumen solidification, protection need to be arranged Device sets waterproofing membrane on base pitch upper berth, when the temperature of the surroundings is low, also needs separately to set up warm-keeping device.
S5, base are laid with, then pour base's pitch into repairing hole, will with asphalt compaction machine after being added to base's pitch Base's asphalt compaction is standing a period of time, is allowing base's bitumen solidification, during base's bitumen solidification, protection need to be arranged Device sets waterproofing membrane on base's pitch upper berth, when the temperature of the surroundings is low, also needs separately to set up warm-keeping device.
S6, topping laying finally pour surface layer pitch into repairing hole, after being added to surface layer pitch, with asphalt compaction machine By surface layer asphalt compaction, a period of time is being stood, is allowing surface layer bitumen solidification, during surface layer bitumen solidification, guarantor need to be set Protection unit sets waterproofing membrane on surface layer pitch upper berth, when the temperature of the surroundings is low, also needs separately to set up warm-keeping device.
S7, patch work ending, after the completion of the last layer surface layer bitumen solidification, can will be built up in the protection on surface layer pitch Device removes, and carries out finishing cutting to surface layer pitch, and surface layer pitch is made more to adapt to former road surface.
2. a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation according to claim 1, it is characterised in that: institute State in S3 setting cushion and construction waste brick and sandstone etc. need slightly to be stirred before repairing hole is added, keep volume larger Construction waste and small volume construction waste distribution it is more uniform.
3. a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation according to claim 1, it is characterised in that: institute A small amount of industrial solid wastes cinder can be mixed by stating in the base pitch in the laying of S4 underlayment, and cinder need to be crushed first Processing.
4. a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation according to claim 1, it is characterised in that: institute The base's pitch stated in the laying of S5 base should not mix sundries, and need to select the pitch of maximum intensity.
5. a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation according to claim 1, it is characterised in that: institute It states in the surface layer pitch of S6 topping laying, a small amount of solid small particles waste can be mixed, can be and did pulverization process and blunt Change the scrap iron of processing.
6. a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation according to claim 1, it is characterised in that: institute Stating the attemperator referred in the laying of S4 underlayment, the laying of S5 base and S6 topping laying can be straw mat.
7. a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation according to claim 1, it is characterised in that: institute It states S2 to take in damaged pitch, the asphalt waste for taking out can temporarily be stored with the storage box, for recycling in the future.
8. a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation according to claim 1, it is characterised in that: institute Stating the asphalt compaction machine referred in the laying of S4 underlayment, the laying of S5 base and S6 topping laying includes determining push rod (8), described to push away surely Digging in bar (8) has push rod slot (10), it is described determine to dig on push rod (8) have push rod rotation slot (11), and dynamic push rod is slotting Slot (10) is communicated with the outside world by dynamic push rod rotation slot (11), is plugged with dynamic push rod (9) in the dynamic push rod slot (10), and dynamic One end of push rod (9) is located in dynamic push rod slot (10), and the other end of the dynamic push rod (9) is located in dynamic push rod slot (10), One end that the dynamic push rod (9) is located in dynamic push rod slot (10) is connected with rotating ball (16), the dynamic push rod slot (10) It is connected in trough floor telescopic rod (12), one end of trough floor of the telescopic rod (12) far from dynamic push rod slot (10) is connected with Push plate (13) is connected with compressed spring (14) between the push plate (13) and the trough floor of dynamic push rod slot (10), and compresses bullet Spring (14) is socketed in the outside of telescopic rod (12).
9. a kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation according to claim 8, it is characterised in that: institute It states push plate (13) to be connected with resilient rubbber cushion (15) far from the one end of telescopic rod (12), digging in the resilient rubbber cushion (15) has Cavity, the cavity is interior to be filled with multiple elastic balls.
CN201811488172.2A 2018-12-06 2018-12-06 A kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation Withdrawn CN109629384A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811488172.2A CN109629384A (en) 2018-12-06 2018-12-06 A kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811488172.2A CN109629384A (en) 2018-12-06 2018-12-06 A kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation

Publications (1)

Publication Number Publication Date
CN109629384A true CN109629384A (en) 2019-04-16

Family

ID=66071739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811488172.2A Withdrawn CN109629384A (en) 2018-12-06 2018-12-06 A kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation

Country Status (1)

Country Link
CN (1) CN109629384A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111041927A (en) * 2019-11-21 2020-04-21 江苏永联精筑建设集团有限公司 Method for repairing damaged asphalt concrete pavement
CN110409272B (en) * 2019-07-25 2021-05-11 杭州南岳建设工程有限公司 Method for repairing pits on asphalt pavement and repairing material used by same
CN113462177A (en) * 2021-07-08 2021-10-01 江苏聚科特新材料科技有限公司 Polymer composite modified asphalt and highway pavement structure thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1286336A (en) * 1999-08-26 2001-03-07 蓝派冲击压实技术开发(北京)有限公司 Method for maintaining asphalt pavement
CN2431311Y (en) * 2000-04-03 2001-05-23 周鼎 Electric stamper driven forward-backward
CN206512547U (en) * 2017-02-06 2017-09-22 南京优品盛源工程技术有限公司 A kind of repairing type bituminous paving
CN207552872U (en) * 2017-09-21 2018-06-29 泉州市永茂电子科技有限公司 The hand steered road roller of buffer-type
CN207672358U (en) * 2017-11-14 2018-07-31 唐华国 A kind of environment protection pavement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1286336A (en) * 1999-08-26 2001-03-07 蓝派冲击压实技术开发(北京)有限公司 Method for maintaining asphalt pavement
CN2431311Y (en) * 2000-04-03 2001-05-23 周鼎 Electric stamper driven forward-backward
CN206512547U (en) * 2017-02-06 2017-09-22 南京优品盛源工程技术有限公司 A kind of repairing type bituminous paving
CN207552872U (en) * 2017-09-21 2018-06-29 泉州市永茂电子科技有限公司 The hand steered road roller of buffer-type
CN207672358U (en) * 2017-11-14 2018-07-31 唐华国 A kind of environment protection pavement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409272B (en) * 2019-07-25 2021-05-11 杭州南岳建设工程有限公司 Method for repairing pits on asphalt pavement and repairing material used by same
CN111041927A (en) * 2019-11-21 2020-04-21 江苏永联精筑建设集团有限公司 Method for repairing damaged asphalt concrete pavement
CN113462177A (en) * 2021-07-08 2021-10-01 江苏聚科特新材料科技有限公司 Polymer composite modified asphalt and highway pavement structure thereof

Similar Documents

Publication Publication Date Title
CN109629384A (en) A kind of Asphalt Pavement Cracking method for repairing and mending based on urban transportation
CN101768914B (en) Pavement structure for structure transfer and performance recovery of semi-rigid base asphalt pavement
CN101691736A (en) Construction method for reconstructing old concrete pavement by paving asphalt-concrete surface layer
CN201538972U (en) Urban road inspection well resisting settlement and fragmentation
CN110878503A (en) Damaged asphalt pavement repairing method
CN204753293U (en) Main line cement concrete pavement " bai jiahei " regeneration structure is economized by state
KR100869651B1 (en) Road surface repairing method using the rubafalt
CN106966639A (en) A kind of poor asphalt macadam transition zone compound and semi-rigid asphalt pavement
CN213625024U (en) Cold regeneration road surface structure of emulsified asphalt
CN110205895A (en) A kind of green low-carbon environment-friendly type road structure using regrown material
CN204780555U (en) Structure that repaired in bituminous paving hole groove
CN214143150U (en) Concrete bridge asphalt pavement layer structure in high-temperature rainy area
KR101962474B1 (en) Crack Repairing Method
CN104746402B (en) The restorative procedure of well lid periphery damaged road surface
CN209854521U (en) Quick maintenance device of bituminous paving
CN113250031A (en) On-site rapid regeneration and repair method for semi-rigid base disease of asphalt pavement
CN209923714U (en) Emulsified asphalt cold-recycling pavement
CN106930167A (en) A kind of concrete debris regenerated aggregate warm-mixed asphalt thin overlay structure and its construction method
CN113882211A (en) Environment-friendly water-preserving type pavement structure and construction method
CN113756148A (en) Construction method of pouring type composite pavement
CN207210923U (en) A kind of express highway pavement repairing compacting apparatus for leveling
CN112411305A (en) Road solid waste mobile crushing and in-situ cold recycling construction method
CN105603856A (en) Method for rapidly maintaining BRT station heavy traffic road segment
CN206359846U (en) Cement concrete pavement regeneration pavement structure
CN110106760A (en) A kind of urban road restorative procedure controlling settlement of foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190416

WW01 Invention patent application withdrawn after publication