CN109625596A - Prefabricated stacking floor stores pallet and its mating suspender - Google Patents
Prefabricated stacking floor stores pallet and its mating suspender Download PDFInfo
- Publication number
- CN109625596A CN109625596A CN201910093319.6A CN201910093319A CN109625596A CN 109625596 A CN109625596 A CN 109625596A CN 201910093319 A CN201910093319 A CN 201910093319A CN 109625596 A CN109625596 A CN 109625596A
- Authority
- CN
- China
- Prior art keywords
- pallet
- suspender
- stacking floor
- upright bar
- prefabricated stacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D61/00—External frames or supports adapted to be assembled around, or applied to, articles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D85/00—Containers, packaging elements or packages, specially adapted for particular articles or materials
- B65D85/30—Containers, packaging elements or packages, specially adapted for particular articles or materials for articles particularly sensitive to damage by shock or pressure
- B65D85/46—Containers, packaging elements or packages, specially adapted for particular articles or materials for articles particularly sensitive to damage by shock or pressure for bricks, tiles or building blocks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Pallets (AREA)
Abstract
The invention discloses a kind of Prefabricated stacking floor storage pallet and its mating suspenders, wherein, storing pallet includes: chassis and Duo Gen upright bar, more upright bars are vertically fixedly connected on the both ends of chassis, upright bar is hollow structure, the bottom of upright bar be provided with above and below multiple storage pallets be superimposed place when, make top storage pallet be plugged on lower section storage pallet column inner cavity in plug division, upright bar be equipped with for lift store pallet the first hole for hoist.The stockyard area occupied of Prefabricated stacking floor is greatly saved in Prefabricated stacking floor storage pallet, convenient for disassembly and assembly;Cooperation special hanger is lifted, and is improved hoisting transportation efficiency, is reduced hoisting process to the damage probability of Prefabricated stacking floor.
Description
Technical field
The present invention relates to assembly concrete building prefabrication concrete component production and transport technical fields, specifically,
It is related to a kind of Prefabricated stacking floor storage pallet and its mating suspender.
Background technique
Currently, the concrete prefabricated usual pile of laminated floor slab, in the heap field areas of factory, not only the area in stockyard utilizes
Rate is low, and needs for Prefabricated stacking floor block-by-block to be hoisted on transport vehicle when dismounting handling, and it is very inconvenient to operate, not only efficiency
Lowly, and unprotect measure, it is easy to damage Prefabricated stacking floor.
The mode for being connected by screw bolts or welding mostly between existing storage rack connects, and dismounting is inconvenient, while also causing
The hoisting transportation inefficiency of Prefabricated stacking floor.
Therefore, it is necessary to a kind of novel Prefabricated stacking floor storage pallet be developed, to save stockyard space, conveniently hang
Dress and transport Prefabricated stacking floor.
Summary of the invention
The main purpose of the present invention is to provide a kind of Prefabricated stacking floor storage pallet and its mating suspenders, to solve
Prefabricated stacking floor location mode in the prior art occupies the problem that storage space is big, hoisting transportation is inconvenient.
To achieve the goals above, the present invention provides a kind of Prefabricated stacking floors to store pallet, the storage pallet
It include: chassis;More upright bars, more upright bars are vertically fixedly connected on the both ends of chassis, and upright bar is hollow structure, the bottom of upright bar
When being provided with the superposition placement above and below multiple storage pallets, so that top storage pallet is plugged on lower section and store standing for pallet
Plug division in column inner cavity, upright bar are equipped with the first hole for hoist for lifting storage pallet.
Further, plug division is in inversed taper platform shape.
Further, the top full-size of plug division is 3mm-4mm smaller than the internal diameter of column.
Further, the bottom of column is equipped with flange in the upper of plug division at.
Further, chassis includes: more cross bars, and more cross bars are arranged in parallel, and cross bar is for placing Prefabricated stacking floor;
Two vertical poles, two vertical poles are respectively fixedly connected at the both ends of cross bar, and upright bar is fixedly connected on the both ends of vertical pole.
Further, it is connected between two upright bars at the both ends of same root vertical pole and is provided with a connecting rod, connecting rod
Both ends are fixedly connected with the top of two upright bars respectively.
Further, arranged in a crossed manner in the region surrounded jointly by a vertical pole, a connecting rod and two upright bars to have
More hounds.
Further, it is respectively provided on the downside of vertical pole and the two sides up and down of upright bar junction and connecting rod and upright bar junction
There is frame body stiffener.
According to another aspect of the present invention, a kind of suspender is provided, the suspender and above-mentioned Prefabricated stacking floor are stored and transported
Defeated frame is mating, and suspender includes suspender frame, and suspender frame is equipped with the more booms to match respectively with more upright bars, opens up on boom
There is the second hole for hoist to match with the first hole for hoist, a U-shaped company is removably worn in the first hole for hoist and the second hole for hoist
Fitting.
Further, boom can be inserted into the inner cavity of upright bar;A lifting lug is equipped at the top of every boom;Boom and suspender
Frame junction is provided with suspender stiffener.
It applies the technical scheme of the present invention, the superposition of muti-piece Prefabricated stacking floor is placed on chassis when use, it is adjacent
It is separated between Prefabricated stacking floor by chock;Since the top of storage pallet is uncovered structure, facilitates and place prefabricated overlapping
Floor;Upright bar uses hollow structure, and plug division is arranged in the bottom of upright bar, and plug division is plugged in upright bar, can will be more
A storage pallet is superimposed placement up and down, and the stockyard area occupied of Prefabricated stacking floor is greatly saved;Multiple storage pallets
It is connected using spigot-and-socket (plug division connection), it is more convenient that multiple storages are transported compared to the mode for being bolted or welding
Frame is dismounted;Cooperate special hanger by the first hole for hoist being set on column, it is convenient that entirety is carried out to Prefabricated stacking floor
Hoisting transportation improves hoisting transportation efficiency without lifting to Prefabricated stacking floor block-by-block.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present invention, and of the invention shows
Examples and descriptions thereof are used to explain the present invention for meaning property, does not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the schematic perspective view of the storage pallet of the embodiment of the present invention.
Fig. 2 is the schematic view of the front view of the storage pallet of the embodiment of the present invention.
Fig. 3 is the side structure schematic view of the storage pallet of the embodiment of the present invention.
Fig. 4 is the overlooking structure diagram of the storage pallet of the embodiment of the present invention.
Fig. 5 is the structural schematic diagram of the suspender of the embodiment of the present invention.
Structural schematic diagram when Fig. 6 is the suspender lifting storage pallet of the embodiment of the present invention.
Structural schematic diagram when Fig. 7 is the storage pallet multiple superpositions of the embodiment of the present invention.
Fig. 8 is the structural schematic diagram of storage pallet in top when the suspender of the embodiment of the present invention lifts superposition.
Wherein, the above drawings include the following reference numerals:
10, chassis;11, cross bar;12, vertical pole;20, upright bar;21, plug division;22, the first hole for hoist;23, flange;30, even
Extension bar;40, hound;50, frame body stiffener;60, suspender;61, suspender frame;62, boom;63, the second hole for hoist;64, U-shaped company
Fitting;65, lifting lug;66, suspender stiffener.
Specific embodiment
To facilitate the understanding of the present invention, the present invention is made below in conjunction with Figure of description and preferred embodiment more complete
Face meticulously describes, but the protection scope of the present invention is not limited to the following specific embodiments.It should be noted that not rushing
In the case where prominent, the feature in embodiment and embodiment in the present invention be can be combined with each other.
Unless otherwise defined, all technical terms used hereinafter and the normally understood meaning of those skilled in the art
It is identical." first ", " second " used in present patent application specification and claims and similar word are simultaneously
Any sequence, quantity or importance are not indicated, and are intended merely to facilitate and corresponding components are distinguished.Equally, " one
It is a " or the similar word such as " one " do not indicate that quantity limits, but indicate that there are at least one.The classes such as " connection " or " connected "
As word be not limited to physics or mechanical connection, but may include electrical connection, either it is direct also
It is indirect."upper", "lower", "left", "right" etc. are only used for indicating relative positional relationship, when the absolute position for being described object changes
After change, then the relative positional relationship also correspondingly changes.
Referring to Fig. 1 to Fig. 4 and Fig. 6 to Fig. 8, a kind of Prefabricated stacking floor storage pallet of the embodiment of the present invention, this is deposited
Putting pallet mainly includes chassis 10 and Duo Gen upright bar 20.Wherein, chassis 10 is for storing Prefabricated stacking floor;More upright bars 20
Vertically it is fixedly connected on the both ends of chassis 10.Upright bar 20 is hollow structure.The bottom of upright bar 20 is provided with plug division 21.When multiple
When storing pallet or more superposition placement, the storage pallet being located above is plugged on underlying deposit by the plug division 21
It puts in 20 inner cavity of column of pallet.The first hole for hoist 22 for lifting storage pallet is additionally provided in upright bar 20.
Above-mentioned Prefabricated stacking floor storage pallet is in use, be placed on chassis 10 for the superposition of muti-piece Prefabricated stacking floor
On, it is separated between adjacent Prefabricated stacking floor by chock;Since the top of storage pallet is uncovered structure, facilitate placement
Prefabricated stacking floor;Upright bar 20 uses hollow structure, and plug division 21 is arranged in the bottom of upright bar 20, and plug division 21 is plugged on
In upright bar 20, multiple storage pallets can be superimposed placement up and down, the stockyard that Prefabricated stacking floor is greatly saved occupies face
Product;Multiple storage pallets are connected using spigot-and-socket (connection of plug division 21), compared to the mode for being bolted or welding, more
It is convenient that multiple storage pallets are dismounted;Cooperate special hanger by the first hole for hoist 22 being set on column 20, it is convenient
Integral hoisting transport is carried out to Prefabricated stacking floor, without lifting to Prefabricated stacking floor block-by-block, improves hoisting transportation efficiency.
In the present embodiment, the shape of plug division 21 is inversed taper platform shape, and more convenient storage pallet by top is under
The storage pallet of side is docked.When multiple storage pallets to be superimposed to placement up and down, only pallet bottom need to be stored in top
The inversed taper platform shape plug division 21 in portion is aligned in the inner cavity for being inserted in the column 20 of lower section storage pallet, and operation is very easy.
Further, in the present embodiment, the top full-size of plug division 21 is 3mm-4mm smaller than the internal diameter of column 20.
In this way, make plug division 21 be inserted in lower section storage pallet 20 inner cavity of column in after, the top peripheral of plug division 21 with
There are lesser gaps between the inner wall of column 20;The not only storage pallet of more convenient socket and dismounting superposition, Er Qieke
To ensure that there is enough stability after multiple storage pallets are superimposed up and down.If 21 top peripheral of plug division and 20 inner wall of column
Between gap it is excessive, then be unfavorable for store pallet superposition when stabilization.
When in order to be superimposed multiple storage pallets up and down, 20 uniform force of column of upper and lower level is stood in the present embodiment
The bottom of column 20 is in being provided with flange 23 along place on plug division 21.It is inserted in lower box type column in the plug division 21 of top storage pallet
After in 20, lower box type column 20 is resisted by the flange 23, it is ensured that 20 uniform force of column of upper and lower level further improves multiple
Store stability when pallet is superimposed up and down.
Specifically, in the present embodiment, chassis 10 includes more cross bars 11 and two vertical poles 12, wherein more cross bars
11 are arranged in parallel, and the cross bar 11 is for placing Prefabricated stacking floor.Two vertical poles 12 are respectively fixedly connected at the both ends of cross bar 11.
Upright bar 20 is fixedly connected on the both ends of vertical pole 12.When carrying out structure design to storage pallet, need to consider to store pallet
The rigidity of structure and intensity.The rigidity of structure and intensity of storing pallet should be able to meet the requirement of long-time service, if structure
Rigidity, which is unsatisfactory for requirement, so that component is easily consumed, and component strength is unsatisfactory for requirement may recurring structure malicious event.This implementation
In example, in such a way that top storage pallet load is born in upright bar 20, cross bar 11 is not directly connected with upright bar 20, avoids down
The case where 11 compressive deformation of cross bar of Fang Cunfang pallet, improves the structural strength and rigidity of frame body.
In order to further increase the structural strength and rigidity of frame body, in the present embodiment, it is connected to same root vertical pole 12
It is provided with a connecting rod 30 between two upright bars 20 at both ends, the both ends of the connecting rod 30 top with two upright bars 20 respectively
It is fixedly connected.Also, it is arranged in a crossed manner in the region surrounded jointly by 12, connecting rods 30 of a vertical pole and two upright bars 20
There are more hounds 40;Under the two sides up and down of vertical pole 12 Yu 20 junction of upright bar and connecting rod 30 and 20 junction of upright bar
Side is provided with frame body stiffener 50.Pass through connecting rod 30, more hounds 40 and 50 column 20 of muti-piece stiffener and chassis
It is reinforced at 10 structural weak, effectively increases the structural strength and rigidity of frame body.
Referring to Fig. 5, Fig. 6 and Fig. 8, a kind of suspender 60 of the embodiment of the present invention, the suspender 60 and prefabricated overlapping of the invention
Floor storage pallet match, the suspender 60 include suspender frame 61, be provided on suspender frame 61 more respectively with more
The boom 62 that upright bar 20 matches offers and 22 phase of the first hole for hoist on the column 20 of storage pallet on boom 62
Removably wear a single u-shaped connector 64 in the second hole for hoist 63 matched, the first hole for hoist 22 and the second hole for hoist 63, every
The top of boom 62 is provided with a lifting lug 65.
It, only need to be right with more upright bars 20 respectively by multiple booms 62 on suspender frame 61 when needing to lift storage pallet
It connects, keeps the second hole for hoist 63 on boom 62 corresponding with 22 position of the first hole for hoist on column 20, then by U-shaped connector 64
It penetrates in the first hole for hoist 22 and the second hole for hoist 63 and is attached suspender 60 and storage pallet, then pass through crane for suspender
60 sling together with storage pallet.
Specifically, in the present embodiment, the outer diameter of boom 62 is more smaller than the intracavity diameter of upright bar 20, and boom 62 can be inserted into
In the inner cavity of upright bar 20, boom 62 and 61 junction of suspender frame are provided with suspender stiffener 66.In this way, not only facilitating will hang
Arm 62 is docked with upright bar 20, reduces torque arm length, and the suspender frame 61 of suspender 60 and storage pallet form an entirety, increase
Add the end of upright bar 20 to constrain, causes upright bar 20 to deform excessive the case where causing frame body to consume so as to avoid lifting.
Storage pallet of the invention can with used aloned, can also multiple superpositions use, it is equal on each storage pallet
Muti-piece Prefabricated stacking floor can be stored.Compared to existing location mode, storage pallet of the invention can be substantially reduced stockyard
Area occupied.When the storage pallet lifts, mating suspender 60 of the invention need to be used to be lifted.Hoisting transportation is convenient, nothing
The hoisting prefabricated laminated floor slab of block-by-block is needed, lifting working efficiency is not only increased, and reduces the several of Prefabricated stacking floor damage
Rate.
In general, only need a Si Suo work that hanging piece can be completed when storage pallet of the invention and its suspender lift
Installation;Using storage pallet of the invention and its suspender, six pieces of superimposed sheets can be once lifted by crane, lifting efficiency is hung than traditional veneer
Fortune improves 6 times;Storage pallet of the invention can safely may be used using stack design using a storage pallet as unit
It is superimposed layer 2-3 by ground, 40%-60% storage space can be saved;Laminated floor slab heap can be reduced using storage pallet of the invention
The internal stress that moment generates when folded, and a large amount of operations may be significant to drop because of component damage, cracking caused by abnormal activity
The low probability that construction management accident, production accident, quality accident occurs.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of Prefabricated stacking floor stores pallet, which is characterized in that the storage pallet includes:
Chassis (10);
More upright bars (20), the more upright bars (20) are vertically fixedly connected on the both ends of the chassis (10), the upright bar
It (20) is that hollow structure makes top when the bottom of the upright bar (20) is provided with the superposition placement above and below multiple storage pallets
Storage pallet is plugged on the plug division (21) in column (20) inner cavity of lower section storage pallet, and the upright bar (20) is equipped with
For lifting the first hole for hoist (22) of storage pallet.
2. Prefabricated stacking floor according to claim 1 stores pallet, which is characterized in that the plug division (21) is in
Taper type.
3. Prefabricated stacking floor according to claim 2 stores pallet, which is characterized in that the top of the plug division (21)
Portion's full-size is 3mm-4mm smaller than the internal diameter of the column (20).
4. Prefabricated stacking floor according to claim 2 stores pallet, which is characterized in that the bottom of the column (20)
Upper in the plug division (21) is equipped with flange (23) at.
5. Prefabricated stacking floor according to claim 1 stores pallet, which is characterized in that the chassis (10) includes:
More cross bars (11), the more cross bars (11) are arranged in parallel, and the cross bar (11) is for placing the prefabricated overlapping building
Plate;
Two vertical poles (12), two vertical poles (12) are respectively fixedly connected in the both ends of the cross bar (11), the upright bar
(20) both ends of the vertical pole (12) are fixedly connected on.
6. Prefabricated stacking floor according to claim 5 stores pallet, which is characterized in that be connected to described in same root and indulge
It is provided with a connecting rod (30) between the upright bar (20) of two of the both ends of bar (12), the both ends difference of the connecting rod (30)
It is fixedly connected with the top of two upright bars (20).
7. Prefabricated stacking floor according to claim 6 stores pallet, which is characterized in that by a vertical pole
(12), arranged in a crossed manner in the region that a connecting rod (30) and two upright bars (20) surround jointly to have more hounds
(40)。
8. Prefabricated stacking floor according to claim 6 stores pallet, which is characterized in that the vertical pole (12) with it is described
It is provided on the downside of the two sides up and down of upright bar (20) junction and the connecting rod (30) and the upright bar (20) junction
Frame body stiffener (50).
9. a kind of suspender (60), which is characterized in that the suspender (60) and prefabricated overlapping of any of claims 1-8
Floor store pallet it is mating, the suspender (60) includes suspender frame (61), the suspender frame (61) be equipped with more respectively with
The boom (62) that the more upright bars (20) match offers and the first hole for hoist (22) phase on the boom (62)
It is U-shaped that one is removably worn in the second hole for hoist (63) matched, first hole for hoist (22) and second hole for hoist (63)
Connector (64).
10. suspender (60) according to claim 9, which is characterized in that the boom (62) can be inserted into the upright bar (20)
Inner cavity in;A lifting lug (65) are equipped at the top of the every boom (62);The boom (62) and the suspender frame (61)
Junction is provided with suspender stiffener (66).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910093319.6A CN109625596A (en) | 2019-01-30 | 2019-01-30 | Prefabricated stacking floor stores pallet and its mating suspender |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910093319.6A CN109625596A (en) | 2019-01-30 | 2019-01-30 | Prefabricated stacking floor stores pallet and its mating suspender |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109625596A true CN109625596A (en) | 2019-04-16 |
Family
ID=66064323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910093319.6A Pending CN109625596A (en) | 2019-01-30 | 2019-01-30 | Prefabricated stacking floor stores pallet and its mating suspender |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109625596A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110255363A (en) * | 2019-05-25 | 2019-09-20 | 金阳(安徽)环保科技股份有限公司 | A kind of floor hoisting appliance |
CN111674684A (en) * | 2020-06-28 | 2020-09-18 | 青岛腾远设计事务所有限公司 | Device for transporting and stacking prefabricated floor slab components and using method thereof |
CN112761364A (en) * | 2021-01-14 | 2021-05-07 | 中铁建设集团有限公司 | Transportation support body of wall body component with location and multiple monitoring function |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3529741A (en) * | 1967-11-17 | 1970-09-22 | Vickers Ltd | Container having collapsible side walls |
CN202987916U (en) * | 2012-12-14 | 2013-06-12 | 南车株洲电机有限公司 | Transformer storage and transfer frame |
CN204078272U (en) * | 2014-08-25 | 2015-01-07 | 中国海洋石油总公司 | Combined hanging framework |
CN204660255U (en) * | 2015-05-26 | 2015-09-23 | 袁亚斌 | A kind of Novel assembled Turnover Box |
CN205873664U (en) * | 2016-08-17 | 2017-01-11 | 安徽江淮汽车股份有限公司 | Lift by crane auxiliary device |
CN106428921A (en) * | 2016-07-27 | 2017-02-22 | 中车四方车辆有限公司 | Cylindrical workpiece storage and transportation device |
CN206665947U (en) * | 2017-04-17 | 2017-11-24 | 浙江农业商贸职业学院 | A kind of hoisting device for train container |
CN207141662U (en) * | 2017-09-08 | 2018-03-27 | 中国二十二冶集团有限公司 | Prefabricated superimposed sheet lifts storage rack |
CN107973215A (en) * | 2017-12-22 | 2018-05-01 | 瓦房店轴承集团国家轴承工程技术研究中心有限公司 | Wind power bearing suspender without hole for hoist |
CN108408583A (en) * | 2018-04-05 | 2018-08-17 | 南京高传机电自动控制设备有限公司 | A kind of hoisting sling of wind-driven generator end cap |
CN207877086U (en) * | 2018-01-19 | 2018-09-18 | 山东创新金属科技有限公司 | A kind of novel container boom hoisting |
CN108706208A (en) * | 2018-08-07 | 2018-10-26 | 锦萧建筑科技有限公司 | Stand for piling up for concrete prefabricated board class component |
CN208412443U (en) * | 2018-06-05 | 2019-01-22 | 湖南三茵生态农业发展有限公司 | Fermented feed stores barrow |
-
2019
- 2019-01-30 CN CN201910093319.6A patent/CN109625596A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3529741A (en) * | 1967-11-17 | 1970-09-22 | Vickers Ltd | Container having collapsible side walls |
CN202987916U (en) * | 2012-12-14 | 2013-06-12 | 南车株洲电机有限公司 | Transformer storage and transfer frame |
CN204078272U (en) * | 2014-08-25 | 2015-01-07 | 中国海洋石油总公司 | Combined hanging framework |
CN204660255U (en) * | 2015-05-26 | 2015-09-23 | 袁亚斌 | A kind of Novel assembled Turnover Box |
CN106428921A (en) * | 2016-07-27 | 2017-02-22 | 中车四方车辆有限公司 | Cylindrical workpiece storage and transportation device |
CN205873664U (en) * | 2016-08-17 | 2017-01-11 | 安徽江淮汽车股份有限公司 | Lift by crane auxiliary device |
CN206665947U (en) * | 2017-04-17 | 2017-11-24 | 浙江农业商贸职业学院 | A kind of hoisting device for train container |
CN207141662U (en) * | 2017-09-08 | 2018-03-27 | 中国二十二冶集团有限公司 | Prefabricated superimposed sheet lifts storage rack |
CN107973215A (en) * | 2017-12-22 | 2018-05-01 | 瓦房店轴承集团国家轴承工程技术研究中心有限公司 | Wind power bearing suspender without hole for hoist |
CN207877086U (en) * | 2018-01-19 | 2018-09-18 | 山东创新金属科技有限公司 | A kind of novel container boom hoisting |
CN108408583A (en) * | 2018-04-05 | 2018-08-17 | 南京高传机电自动控制设备有限公司 | A kind of hoisting sling of wind-driven generator end cap |
CN208412443U (en) * | 2018-06-05 | 2019-01-22 | 湖南三茵生态农业发展有限公司 | Fermented feed stores barrow |
CN108706208A (en) * | 2018-08-07 | 2018-10-26 | 锦萧建筑科技有限公司 | Stand for piling up for concrete prefabricated board class component |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110255363A (en) * | 2019-05-25 | 2019-09-20 | 金阳(安徽)环保科技股份有限公司 | A kind of floor hoisting appliance |
CN111674684A (en) * | 2020-06-28 | 2020-09-18 | 青岛腾远设计事务所有限公司 | Device for transporting and stacking prefabricated floor slab components and using method thereof |
CN111674684B (en) * | 2020-06-28 | 2021-04-16 | 青岛腾远设计事务所有限公司 | Device for transporting and stacking prefabricated floor slab components and using method thereof |
CN112761364A (en) * | 2021-01-14 | 2021-05-07 | 中铁建设集团有限公司 | Transportation support body of wall body component with location and multiple monitoring function |
CN112761364B (en) * | 2021-01-14 | 2021-12-28 | 中铁建设集团有限公司 | Transportation support body of wall body component with location and multiple monitoring function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109625596A (en) | Prefabricated stacking floor stores pallet and its mating suspender | |
US9308922B2 (en) | Cambered frame system for intermodal rail cars | |
CN203667798U (en) | Light-weight high-strength cross beam lifting appliance | |
CN101559903A (en) | Cargo sling special for flabellum | |
CN204675558U (en) | Be easy to the baggage elevator loading and unloading loading | |
CN111017695A (en) | Process for hoisting large ship block by matching crawler crane with hoisting system | |
CN211687913U (en) | Full-machine hanger | |
CN210885075U (en) | Equipment secondary transportation and hoist and mount frame of taking one's place | |
CN210558917U (en) | Detachable oiling machine hoisting frame | |
CN206266175U (en) | A kind of forklift has bad luck suspension hook frame | |
CN103434720B (en) | Foldable object turnover box capable of being divided and positioned | |
CN221140821U (en) | Hanging bracket | |
CN206626402U (en) | Gas cylinder carriage | |
CN206599263U (en) | A kind of assembling glass pallet structure | |
CN215326417U (en) | Adjustable lifting appliance for lifting laminated plate bracket | |
CN217397421U (en) | Transport case | |
CN217555732U (en) | Suspension arm | |
CN220810162U (en) | Integral carrying device for heavy goods shelf | |
CN207659018U (en) | A kind of hoisting bracket of transformer and its shell | |
CN105691820A (en) | Detachable storage rack | |
CN220703136U (en) | Auxiliary hanging device for forklift hoisting | |
CN218619802U (en) | Splicing type frame hanging beam and mast crane | |
CN205023715U (en) | A pier loading and unloading multipurpose thick stick | |
CN216710352U (en) | Container fixing device for truck | |
CN218143280U (en) | Superimposed sheet transportation frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190416 |
|
RJ01 | Rejection of invention patent application after publication |