CN109611366A - Test device and fan test mechanism - Google Patents

Test device and fan test mechanism Download PDF

Info

Publication number
CN109611366A
CN109611366A CN201811424544.5A CN201811424544A CN109611366A CN 109611366 A CN109611366 A CN 109611366A CN 201811424544 A CN201811424544 A CN 201811424544A CN 109611366 A CN109611366 A CN 109611366A
Authority
CN
China
Prior art keywords
anemometer
loading plate
driving member
blower
testboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811424544.5A
Other languages
Chinese (zh)
Inventor
苏萌
刘斌辉
黄璇
胡坚耀
陈玉明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electronic Product Reliability and Environmental Testing Research Institute
Original Assignee
China Electronic Product Reliability and Environmental Testing Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electronic Product Reliability and Environmental Testing Research Institute filed Critical China Electronic Product Reliability and Environmental Testing Research Institute
Priority to CN201811424544.5A priority Critical patent/CN109611366A/en
Publication of CN109611366A publication Critical patent/CN109611366A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D27/00Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
    • F04D27/001Testing thereof; Determination or simulation of flow characteristics; Stall or surge detection, e.g. condition monitoring

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention discloses a kind of test device and fan test mechanism, fan test mechanism includes: testboard, anemometer and evolution component.The testboard is for installing blower, the evolution component is installed on the testboard, the anemometer is installed on the evolution component, the receiving end of the anemometer is towards the outlet air end of the blower, and the anemometer passes through the evolution component and the testboard generates relative movement.Anemometer is placed on evolution component, at this point, adjusting position conversion assembly is until the receiving end of anemometer is corresponding with the outlet air end of blower according to the position of blower outlet air end.Therefore, above-mentioned fan test mechanism can carry out corresponding evolution processing to anemometer according to the blower of different model, i.e. after anemometer is installed on evolution component, without being dismantled to anemometer, both it can realize and be aligned with the blower of different model, to simplify the wind-force testing process of blower.

Description

Test device and fan test mechanism
Technical field
The present invention relates to the technical fields of fan test, more particularly to a kind of test device and fan test mechanism.
Background technique
Traditionally, in order to guarantee the using effect of blower, wind-force test can be carried out to blower first before blower uses.It passes The test mode of system is then manually adjusted anemometer and is allowed to outlet air with blower by the way that blower to be placed on fan test platform Mouth is corresponding, then the mounting hole that fixing bolt passes through anemometer is fixed with fan test platform.But due to different model Blower sizes can change, and therefore, it is necessary to again take out fixing bolt, then relocate again to anemometer, to make The testing process for obtaining blower is very complicated.
Summary of the invention
Based on this, it is necessary to provide a kind of test device and fan test mechanism, the wind-force test stream of blower can be simplified Journey.
Its technical solution is as follows:
A kind of fan test mechanism, comprising: testboard, anemometer and evolution component, the testboard is for installing Blower, the evolution component are installed on the testboard, and the anemometer is installed on the evolution component, institute The receiving end of anemometer is stated towards the outlet air end of the blower, the anemometer passes through the evolution component and the test Platform generates relative movement.
Blower when in use, is placed on testboard by above-mentioned fan test mechanism first.Then, anemometer is placed on On evolution component, at this point, according to the position of blower outlet air end, adjusting position conversion assembly until the receiving end of anemometer with The outlet air end of blower is corresponding.Therefore, above-mentioned fan test mechanism can carry out phase to anemometer according to the blower of different model The evolution processing answered, i.e.,, both can be real without dismantling to anemometer after anemometer is installed on evolution component It is now aligned with the blower of different model, to simplify the wind-force testing process of blower.
Below with reference to above scheme, the present invention is further described:
The evolution component includes the first loading plate, the second loading plate, the first driving member and the first actuator, described First loading plate is located above second loading plate, and first driving member is connected with first actuator, and described first Driving member is rotationally installed on first loading plate, and the anemometer and first driving member are sequentially connected, described First driving member drives the anemometer to move along first direction.
The anemometer further includes connecting plate, and the connecting plate is installed in the anemometer, and the connecting plate is removable Ground is installed on first loading plate, and the connecting plate and first driving member are sequentially connected.
The evolution component further includes the second driving member and the second actuator, second driving member and described second Actuator be connected, second driving member is rotationally installed on second loading plate, first loading plate with it is described The transmission connection of second driving member, second driving member drive first loading plate to move in a second direction.
The evolution component further includes third loading plate, lifters and third actuator, one end of the lifters It is connected with second loading plate, the other end of the lifters is connected with the third loading plate, the third actuator set It is located in the lifters, the third loading plate and second loading plate interval are arranged, and the third loading plate is installed in On the testboard.
The evolution component further includes more guide rods, and the more guide rods are along the circumferentially-spaced of the lifters It is arranged on second loading plate, is additionally provided on the third loading plate and the guide rod multiple lockings correspondingly Part.
The locking member includes mounting base and contradicts bar, and the mounting base is set in the outside of the guide rod, described to support Feeler lever is movably installed in the mounting base, and the conflict bar is used to limit with the guide rod and contradict.
A kind of test device, including the fan test mechanism and controller, the controller and the fan test machine Structure is electrically connected.
When in use, blower to be measured and anemometer are installed in fan test mechanism for above-mentioned test device.At this point, to The outlet air end for surveying blower is corresponding with the receiving end of anemometer.The correlative measurement of anemometer can be directly acquired finally by controller Try numerical value.Therefore, above-mentioned test device is more convenient when carrying out wind-force test to blower to be measured.
Test device further includes noise test instrument, and the noise test instrument is installed on the testboard, and the noise Tester and the controller are electrically connected.
Test device further includes electric parameter tester, and the electric parameter tester is installed on the testboard, and described Electric parameter tester and the controller are electrically connected.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of test device described in one embodiment of the invention and fan test mechanism;
Fig. 2 is the structural schematic diagram of fan test mechanism described in one embodiment of the invention;
Fig. 3 is the structural schematic diagram of test device described in another embodiment of the present invention and fan test mechanism.
Description of symbols:
100, testboard, 110, erection support, 111, mounting hole, 200, anemometer, 210, connecting plate, 300, evolution Component, the 310, first loading plate, the 320, second loading plate, 321, guide rod, the 330, first driving member, the 340, first actuator, 350, the second driving member, the 360, second actuator, 370, third loading plate, 371, locking member, 3711, mounting base, 3712, conflict Bar, 372, tight locking button, 380, lifters, 390, third actuator, 400, blower, 500, controller, 510, industrial PC, 520, Programmable controller, 600, noise test instrument, 700, electric parameter tester.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, below in conjunction with attached drawing and specific embodiment party Formula, the present invention is further described in detail.It should be understood that the specific embodiments described herein are only to solve The present invention is released, and the scope of protection of the present invention is not limited.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", " right side " and similar statement for illustrative purposes only, are not meant to be the only embodiment.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more Any and all combinations of relevant listed item.
Heretofore described " first ", " second " do not represent specific quantity and sequence, are only used for the differentiation of title.
As depicted in figs. 1 and 2, in one embodiment, a kind of fan test mechanism, comprising: testboard 100, anemometer 200 are used to install blower 400 with evolution component 300, the testboard 100, and the evolution component 300 is installed in institute It states on testboard 100, the anemometer 200 is installed on the evolution component 300, the receiving end of the anemometer 200 Towards the outlet air end of the blower 400, the anemometer 200 is produced by the evolution component 300 with the testboard 100 Raw relative movement.
Blower 400 when in use, is placed on testboard 100 by above-mentioned fan test mechanism first.Then, by anemometer 200 are placed on evolution component 300, at this point, adjusting position conversion assembly 300 is straight according to the position of 400 outlet air end of blower It is corresponding with the outlet air end of blower 400 to the receiving end of anemometer 200.Therefore, above-mentioned fan test mechanism can be according to difference The blower 400 of model carries out corresponding evolution processing to anemometer 200, i.e., when anemometer 200 is installed in evolution group After on part 300, without being dismantled to anemometer 200, it can both realize and aligned with the blower 400 of different model, thus simple The testing process of blower 400 is changed.
Specifically, in the present embodiment, erection support 110 is also provided on the testboard 100.The erection support 110 for installing blower 400 to be measured, and the surface of the erection support 110 offers multiple mounting holes 111, the mounting hole 111 For corresponding with the mounting hole 111 on blower 400 to be measured.Due to different model 400 external dimensions of blower or shape not yet It is identical, therefore, multiple mounting holes 111 are opened up on the erection support 110, multiple mounting holes 111 are convenient for and blower 400 to be measured It is aligned, so that the blower 400 of different model is more convenient during installation.Further, to blower 400 to be measured into When row test, in order to reduce the test error between anemometer 200 and blower to be measured 400, the outlet air end of blower 400 to be measured and survey The receiving end of bearing 200 is in same level.
In one embodiment, the evolution component 300 includes the first loading plate 310, the second loading plate 320, the One driving member 330 and the first actuator 340.First loading plate 310 is located at second loading plate, 320 top, and described the One driving member 330 is connected with first actuator 340, and first driving member 330 is rotationally installed in described first and holds On support plate 310, the anemometer 200 is sequentially connected with first driving member 330, and first driving member 330 drives described Anemometer 200 is moved along first direction.Specifically, in the present embodiment, first driving member 330 is screw rod or ball wire Bar.Screw rod be convert rotary motion to linear motion, or by transform linear motion be rotary motion rod piece.Described first drives Moving part 340 is handle or rolled round.The first driving member 330 is driven by handle or rolled round, so that the rotation of driving member is more Add conveniently.More specifically, in order to guarantee that the first driving member 330 can accurately drive anemometer 200 to be moved along first direction, Sliding rail or sliding slot are equipped on first loading plate 310, anemometer 200 can be under the drive of the first driving member 330 at this time It is moved along sliding rail or sliding slot, that is, realizes anemometer 200 and moved along preset first direction.
It, will after blower 400 to be measured is installed on testboard 100 first when carrying out wind-force test to blower 400 to be measured Anemometer 200 and the first driving member 330 are sequentially connected.At this point, the rotation of the first driving member 330 is driven by the first actuator 340, First driving member 330 has driven anemometer 200 to be moved relative to testboard 100 during rotation.Further, when to Survey after blower 400 and anemometer 200 be in same plane, by rotate the first driving member 330 can be realized anemometer 200 to Survey blower 400 close to or far from.Therefore, above embodiment is not necessarily to carry out removing and installing again to anemometer 200, i.e., The mutual adjusting of anemometer 200 with blower 400 to be measured can be achieved.
In one embodiment, the anemometer 200 further includes connecting plate 210, and the connecting plate 210 is installed in the survey In bearing 200, the connecting plate 210 is movably installed on first loading plate 310, and the connecting plate 210 and institute State the transmission connection of the first driving member 330.Specifically, in the present embodiment, it is contemplated that the exterior contour or shape of anemometer 200 are not Rule.Therefore, connecting plate 210 is added in anemometer 200.First loading plate 310 is protruded into one end of the connecting plate 210 It is internal to cooperate with first driving member 330 transmission.Above embodiment increases anemometer 200 and the first driving member 330 Contact area, so that anemometer 200 is more stable when being moved with the first driving member 330.This is only wherein one A embodiment, for example, it is also possible to add first motor on first loading plate 310, the first motor and described the One driving member 330 is connected, and by controlling the open and close of first motor, realizes that anemometer 200 follows the first driving member 330 Mobile and stopping.
In one embodiment, the evolution component 300 further includes the second driving member 350 and the second actuator 360. Second driving member 350 is connected with second actuator 360, and second driving member 350 is rotationally installed in described On second loading plate 320, first loading plate 310 is sequentially connected with second driving member 350, second driving member 350 drive first loading plate 310 to move in a second direction.Specifically, in the present embodiment, second driving member 350 For screw rod or ball screw.Second actuator 360 is handle or rolled round.Blower 400 to be measured is installed on testboard 100 Afterwards, anemometer 200 and the first driving member 330 being sequentially connected, the first actuator 340 drives the first driving member 330 to rotate, and first Driving member 330 has driven anemometer 200 to be moved relative to testboard 100 during rotation.Further, first is held Support plate 310 and the second driving member 350 are sequentially connected, at this point, the direction and the direction of the second driving member 350 of the first driving member 330 It is mutually perpendicular to (i.e. first direction and second direction is mutually perpendicular to), and the energy when following the first driving member 330 mobile of anemometer 200 Enough any parts in the first driving member 330 stop or re-move, and the first loading plate 310 is following the shifting of the second driving member 350 It can stop or re-move in any part of the second driving member 350 when dynamic.Therefore, anemometer 200 is in the first driving member 330 It can be realized moving freely in one plane under drive with the second driving member 350, i.e., anemometer 200 is realized in two dimension The movement in space, to improve the scope of activities of anemometer 200.
In one embodiment, the evolution component 300 further includes third loading plate 370, lifters 380 and third Actuator 390.One end of the lifters 380 is connected with second loading plate 320, the other end of the lifters 380 with The third loading plate 370 is connected, and the third actuator 390 is set in the lifters 380, the third loading plate 370 are arranged with second loading plate 320 interval, and the third loading plate 370 is installed on the testboard 100.Specifically, In the present embodiment, the lifters 380 are screw rod or ball screw.The third actuator 390 is runner or rolled round.It will survey Bearing 200 and the first driving member 330 are sequentially connected.At this point, the rotation of the first driving member 330 is driven by the first actuator 340, the One driving member 330 has driven anemometer 200 to be moved relative to testboard 100 during rotation.Further, by first Loading plate 310 and the second driving member 350 are sequentially connected.Finally, being added between the second loading plate 320 and third loading plate 370 Lifters 380 drive lifters 380 to rotate by third actuator 390, at this point, the second loading plate 320 can be in lifters 380 Under the action of along testboard 100 axial direction carry out lifting moving.Therefore, anemometer 200 first the first driving member 330 with Moving freely in one plane is realized under the drive of second driving member 350, i.e., anemometer 200 is realized in two-dimensional space It is mobile.Then, anemometer 200 can be realized the lifting moving relative to testboard 100 by lifters 380.Above-mentioned embodiment party Formula realizes anemometer 200 without disassembly, and the three-dimensional activity on testboard 100 can be realized.
In one embodiment, the evolution component 300 further includes more guide rods 321.The more guide rods 321 being provided at circumferentially spaced on second loading plate 320 along the lifters 380, also set on the third loading plate 370 It is equipped with and the one-to-one multiple locking members 371 of the guide rod 321.The locking member 371 includes mounting base 3711 and contradicts Bar 3712.The mounting base 3711 is set in the outside of the guide rod 321, and the conflict bar 3712 is movably installed in institute It states in mounting base 3711, and the conflict bar 3712 is used to limit with the guide rod 321 and contradict.Specifically, in the present embodiment In, after the both ends of the lifters 380 are connected with the second loading plate 320 with third loading plate 370 respectively, at this point, being installed in Guide rod 321 on second loading plate 320 is movably inserted into mounting base 3711.More specifically, when needing to pass through lifters When 380 the second loading plates 320 of drive carry out lifting moving, guide rod 321 can follow the second loading plate 320 relative to mounting base 3711 are moved.When the second loading plate 320 is moved to predeterminated position, turns conflict bar 3712 and be allowed to and 321 phase of guide rod It mutually contradicts, the limit of guide rod 321 is fixed to realize.Meanwhile tight locking button 372 is additionally provided on third loading plate 370, institute It states tight locking button 372 to cooperate for locking with third actuator 390, third actuator 390 is avoided unintentional rotation occur.Therefore above-mentioned Embodiment, which avoids between the second loading plate 320 and third loading plate 370, there is lifting error.
As shown in Figure 1, in one embodiment, a kind of test device, including blower described in above-mentioned any one embodiment Mechanism for testing includes controller 500.The controller 500 is electrically connected with the fan test mechanism.
Above-mentioned test device is installed in fan test mechanism with anemometer 200 when in use, by blower 400 to be measured. At this point, the outlet air end of blower 400 to be measured is corresponding with the receiving end of anemometer 200.It can directly be obtained finally by controller 500 Take the dependence test numerical value of anemometer 200.Therefore, above-mentioned test device to blower 400 to be measured carry out wind-force test when more It is convenient.
As shown in figure 3, in one embodiment, test device further includes noise test instrument 600.The noise test instrument 600 are installed on the testboard 100, and the noise test instrument 600 and the controller 500 are electrically connected.Specifically, exist In the present embodiment, the noise test instrument 600 is used to carry out noise test to the blower 400 for being in outlet air state.Then, noise Acquired sound signal is passed to controller 500 by tester 600.
In one embodiment, test device further includes electric parameter tester 700.The electric parameter tester 700 is installed On the testboard 100, and the electric parameter tester 700 and the controller 500 are electrically connected.Specifically, in this reality It applies in example, the electric parameter tester 700 is used to test the parameters of electric power (such as voltage, electric current, electrical power) of blower 400.Cause This, above-mentioned test device can carry out wind-force test, electric performance test and noise test to blower 400 to be measured, so that Test device can more comprehensively test blower 400 to be measured, improve test device and the test of blower 400 is imitated Fruit.
Further, the controller 500 includes industrial PC 510 and programmable controller 520.I.e. anemometer 200, make an uproar Sound tester 600 and electric parameter tester 700 are electrically connected by programmable controller 520 and the industrial PC 510, most The transmitting and processing of test signal are realized eventually.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of fan test mechanism characterized by comprising testboard, anemometer and evolution component, the testboard For installing blower, the evolution component is installed on the testboard, and the anemometer is installed in the evolution On component, towards the outlet air end of the blower, the anemometer passes through the evolution component for the receiving end of the anemometer Relative movement is generated with the testboard.
2. fan test mechanism according to claim 1, which is characterized in that the evolution component includes the first carrying Plate, the second loading plate, the first driving member and the first actuator, first loading plate are located above second loading plate, institute It states the first driving member to be connected with first actuator, first driving member is rotationally installed in first loading plate On, the anemometer and first driving member are sequentially connected, and first driving member drives the anemometer along first direction It is mobile.
3. fan test mechanism according to claim 2, which is characterized in that the anemometer further includes connecting plate, described Connecting plate is installed in the anemometer, and the connecting plate is movably installed on first loading plate, and the connection Plate and first driving member are sequentially connected.
4. fan test mechanism according to claim 2, which is characterized in that the evolution component further includes the second biography Moving part and the second actuator, second driving member are connected with second actuator, and second driving member rotationally fills It is located on second loading plate, first loading plate and second driving member are sequentially connected, the second driving member band First loading plate is moved to move in a second direction.
5. fan test mechanism according to claim 4, which is characterized in that the evolution component further includes that third is held Support plate, lifters and third actuator, one end of the lifters are connected with second loading plate, the lifters it is another End be connected with the third loading plate, the third actuator is set in the lifters, the third loading plate with it is described The setting of second loading plate interval, the third loading plate are installed on the testboard.
6. fan test mechanism according to claim 4, which is characterized in that the evolution component, which further includes more, leads To bar, the more guide rods are provided at circumferentially spaced on second loading plate along the lifters, the third carrying It is additionally provided on plate and the guide rod multiple locking members correspondingly.
7. fan test mechanism according to claim 6, which is characterized in that the locking member includes mounting base and contradicts Bar, the mounting base are set in the outside of the guide rod, and the conflict bar is movably installed in the mounting base, and institute State contradict bar be used for and the guide rod limit contradict.
8. a kind of test device, including fan test mechanism described in claim 1 to 7 any one, which is characterized in that also wrap Controller is included, the controller and the fan test mechanism are electrically connected.
9. test device according to claim 8, which is characterized in that it further include noise test instrument, the noise test instrument It is installed on the testboard, and the noise test instrument and the controller are electrically connected.
10. test device according to claim 8, which is characterized in that further include electric parameter tester, the electrical parameter is surveyed Examination instrument is installed on the testboard, and the electric parameter tester and the controller are electrically connected.
CN201811424544.5A 2018-11-27 2018-11-27 Test device and fan test mechanism Pending CN109611366A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811424544.5A CN109611366A (en) 2018-11-27 2018-11-27 Test device and fan test mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811424544.5A CN109611366A (en) 2018-11-27 2018-11-27 Test device and fan test mechanism

Publications (1)

Publication Number Publication Date
CN109611366A true CN109611366A (en) 2019-04-12

Family

ID=66005181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811424544.5A Pending CN109611366A (en) 2018-11-27 2018-11-27 Test device and fan test mechanism

Country Status (1)

Country Link
CN (1) CN109611366A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173768A (en) * 2020-02-27 2020-05-19 浙江上风高科专风实业有限公司 Novel fault detection device of axial flow fan
CN113958530A (en) * 2021-10-14 2022-01-21 浙江工业大学 Be used for large-scale axial fan export wind speed test fixture

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1988005870A1 (en) * 1987-02-05 1988-08-11 Al-Ko Polar Gmbh Maschinenfabrik Ventilator part and method for its functional control
CN202646105U (en) * 2012-05-29 2013-01-02 东莞市海德试验仪器有限公司 Performance detection device of alternate current and direct current fans
CN203185855U (en) * 2013-04-16 2013-09-11 浙江一铭机车部件有限公司 Bearing bush three-dimensional positioning bracket for laser marking machine
CN205779846U (en) * 2016-06-28 2016-12-07 广东金莱特电器股份有限公司 A kind of novel wind-speed test platform
CN207261289U (en) * 2017-09-06 2018-04-20 洛森通风设备(上海)有限公司 Wind turbine dispatches from the factory test table
CN207866992U (en) * 2018-01-30 2018-09-14 佛山赛宝信息产业技术研究院有限公司 Motor reliability tests system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1988005870A1 (en) * 1987-02-05 1988-08-11 Al-Ko Polar Gmbh Maschinenfabrik Ventilator part and method for its functional control
CN202646105U (en) * 2012-05-29 2013-01-02 东莞市海德试验仪器有限公司 Performance detection device of alternate current and direct current fans
CN203185855U (en) * 2013-04-16 2013-09-11 浙江一铭机车部件有限公司 Bearing bush three-dimensional positioning bracket for laser marking machine
CN205779846U (en) * 2016-06-28 2016-12-07 广东金莱特电器股份有限公司 A kind of novel wind-speed test platform
CN207261289U (en) * 2017-09-06 2018-04-20 洛森通风设备(上海)有限公司 Wind turbine dispatches from the factory test table
CN207866992U (en) * 2018-01-30 2018-09-14 佛山赛宝信息产业技术研究院有限公司 Motor reliability tests system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173768A (en) * 2020-02-27 2020-05-19 浙江上风高科专风实业有限公司 Novel fault detection device of axial flow fan
CN111173768B (en) * 2020-02-27 2021-08-13 浙江上风高科专风实业有限公司 Novel fault detection device of axial flow fan
CN113958530A (en) * 2021-10-14 2022-01-21 浙江工业大学 Be used for large-scale axial fan export wind speed test fixture

Similar Documents

Publication Publication Date Title
CN103998925B (en) Adaptability Electromagnetic Coupling System
CN109611366A (en) Test device and fan test mechanism
JP6767746B2 (en) A cross member unit of a printed circuit board test device and a test device having the cross member unit.
CN104569642B (en) electrostatic discharge immunity testing device
CN110780242B (en) Automatic control device and method for full-automatic small-gap magnetic field measurement of cyclotron
CN103364755A (en) Full-automatic scanning testing device, full-automatic scanning testing system and full-automatic scanning testing method for electric energy meter power frequency magnetic field
CN110068294A (en) Wound-rotor type noninductive resistor detection device and detection method
CN204515121U (en) Electric energy meter AC magnetic field test unit
CN109708860B (en) Steering engine testing device and method
RU175581U1 (en) COMBINED DYNAMIC MODELING STAND
CN206068846U (en) A kind of drive apparatus for the two-sided detection of circuit board
CN106603788B (en) For detecting the detection device of mobile phone charging hole and earpiece holes
CN103449252A (en) Winding device capable of automatically adjusting winding angle
KR20090044170A (en) Gauss scanner
CN203486657U (en) Winding device capable of automatically adjusting winding angle
KR100840154B1 (en) Gauss scanner and method using the same
CN203772989U (en) Subway-mounted signal beacon reading and testing device
CN206788326U (en) A kind of rotor test machine
CN210376488U (en) Measure accurate alternating current-direct current digital leakage current sensor
Schnizer et al. A mole for measuring pulsed superconducting magnets
CN207280329U (en) Heart device and its component are asked in a kind of radio remote control
WO2016169299A1 (en) Cock assembling device for interlocking assembly
CN106357066B (en) It is a kind of for assembling the assembly equipment of MW class generator permanent magnet body
CN202582532U (en) Full-automatic laser contact network detector
CN207478627U (en) A kind of antistatic physical experiment table

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 511300 No.78, west of Zhucun Avenue, Zhucun street, Zengcheng District, Guangzhou City, Guangdong Province

Applicant after: CHINA ELECTRONIC PRODUCT RELIABILITY AND ENVIRONMENTAL TESTING RESEARCH INSTITUTE ((THE FIFTH ELECTRONIC RESEARCH INSTITUTE OF MIIT)(CEPREI LABORATORY))

Address before: 510610 No. 110 Zhuang Road, Tianhe District, Guangdong, Guangzhou, Dongguan

Applicant before: CHINA ELECTRONIC PRODUCT RELIABILITY AND ENVIRONMENTAL TESTING RESEARCH INSTITUTE ((THE FIFTH ELECTRONIC RESEARCH INSTITUTE OF MIIT)(CEPREI LABORATORY))

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190412

RJ01 Rejection of invention patent application after publication