CN109610845A - A kind of device being pre-positioned constructional column reinforcement location and its construction method - Google Patents

A kind of device being pre-positioned constructional column reinforcement location and its construction method Download PDF

Info

Publication number
CN109610845A
CN109610845A CN201811544080.1A CN201811544080A CN109610845A CN 109610845 A CN109610845 A CN 109610845A CN 201811544080 A CN201811544080 A CN 201811544080A CN 109610845 A CN109610845 A CN 109610845A
Authority
CN
China
Prior art keywords
steel pipe
constructional column
coating steel
reinforcing bar
reinforcement location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811544080.1A
Other languages
Chinese (zh)
Inventor
方昌伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201811544080.1A priority Critical patent/CN109610845A/en
Publication of CN109610845A publication Critical patent/CN109610845A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Abstract

The invention discloses a kind of device for being pre-positioned constructional column reinforcement location and its construction methods, it is related to building field, a kind of provided device for being pre-positioned constructional column reinforcement location, including beams of concrete, the first coating steel pipe of multiple groups model same vertical is fixedly installed on the beams of concrete, reinforcing bar clips are wound on first coating steel pipe, the second coating steel pipe is socketed in the middle part of first coating steel pipe, it is fixedly connected between the reinforcing bar clips by tied silk, first coating steel pipe bottom end is embedded with constructional column reinforcing bar.Using the concrete one-pass molding of constructional column of the invention, it is closely knit to ensure that constructional column upper end is connect with beam bottom, effectively improves the construction quality of constructional column.

Description

A kind of device being pre-positioned constructional column reinforcement location and its construction method
Technical field
The invention belongs to building fields, more particularly, to a kind of device for being pre-positioned constructional column reinforcement location and its construction Method.
Background technique
In building construction process, the bar planting of constructional column is not only taken time and effort, and the testing cost of bar planting is also one big Expenditure;And constructional column is primarily not to undertake vertical load, but resist shearing, what how antidetonation etc. laterally carried.When construction, construction Leakiness is often poured on column, and the anti seismic efficiency of constructional column greatly reduces.
Summary of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind to be pre-positioned construction The device and its construction method of column reinforcement location.
To achieve the goals above, the technical scheme adopted by the invention is as follows: provided one kind is pre-positioned constructional column steel The device of muscle position: including beams of concrete, first that multiple groups model same vertical is fixedly installed on the beams of concrete is zinc-plated Steel pipe is wound with reinforcing bar clips on first coating steel pipe, and it is zinc-plated to be socketed with second in the middle part of first coating steel pipe Steel pipe is fixedly connected between the reinforcing bar clips by tied silk, and first coating steel pipe bottom end is embedded with constructional column reinforcing bar.
Preferably, the diameter of first coating steel pipe isThe diameter of second coating steel pipe is
Preferably, the beams of concrete and the first coating steel pipe are contour, and the first coating steel pipe top is close with adhesive tape closure It is real.
Preferably, the constructional column steel-bar arrangement at each angle of the beams of concrete has four.
Preferably, the tied silk is horizontal in the first coating steel pipe outer ring and interval is arranged.
Preferably, the constructional column reinforcing bar is spiral.
A kind of construction method being pre-positioned constructional column reinforcement location, it is characterised in that: the steps include:
Step 1: the position of construction beam steel is accurately positioned on beams of concrete surface;
Step 2: after release agent is brushed on the first coating steel pipe surface, pre-buried the is carried out according to the position of construction beam steel The work of one coating steel pipe, and the upper end is closely knit with adhesive plaster closure;
Step 3: reinforcing bar clips are installed on the upper layer of the first coating steel pipe, and solid by tied silk between reinforcing bar clips Fixed connection;
Step 4: after beams of concrete constructs completion and initial set, the second reinforcing bar galvanized steel is tapped with hammer, takes out the first plating Zinc steel pipe;
Step 5: constructional column reinforcing bar is placed into the first coating steel pipe position, and longitudinally fixed using tied silk progress.
Beneficial effects of the present invention:
1, the integrality of beam is protected, is avoided by shifting to an earlier date pre-buried constructional column reinforcing bar compared to traditional rear bar planting method Destruction of the bar planting to beam afterwards.
2, it is closely knit to ensure that constructional column upper end is connect with beam bottom, effectively improves for the concrete one-pass molding of constructional column The construction quality of constructional column.
3, fixation is attached by steel wire between coating steel pipe, that is, the constructional column reinforcing bar positioning accuracy that can guarantee, andIt is socketed outside coating steel pipeConvenient for the later period pairCoating steel pipe is removed, and can be repeatedly used, that is, is guaranteed Quality saves material again.
4, material all in work progress is conventional steel pipe, and materials are easy, and at low cost, manufacturing process is simple, is suitble to Promote construction.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is top view of the invention;
Fig. 2 is A-A sectional view of the invention.
Wherein, 1, beams of concrete, the 2, first coating steel pipe, the 3, second coating steel pipe, 4, constructional column, 5, constructional column reinforcing bar, 6, tied silk, 7, reinforcing bar clips.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.
Referring to shown in Fig. 1-2, a kind of device being pre-positioned constructional column reinforcement location, including beams of concrete 1, the coagulation It is fixedly installed with the first coating steel pipe 2 of multiple groups model same vertical on native beam 1, is wound with steel on first coating steel pipe 2 Muscle clips 7, the middle part of first coating steel pipe 2 are socketed with the second coating steel pipe 3, pass through between the reinforcing bar clips 7 Tied silk 6 is fixedly connected, and 2 bottom end of the first coating steel pipe is embedded with constructional column reinforcing bar 5.
Wherein: the diameter of first coating steel pipe 2 isThe diameter of second coating steel pipe 3 isInstitute It states beams of concrete 1 and the first coating steel pipe 2 is contour, and 2 top of the first coating steel pipe is closely knit with adhesive tape closure;The beams of concrete Constructional column reinforcing bar 5 at 1 each angle is provided with four;The tied silk 6 is horizontal in 2 outer ring of the first coating steel pipe and interval is arranged; The constructional column reinforcing bar 5 is spiral.
A kind of construction method being pre-positioned constructional column reinforcement location, the steps include:
Step 1: the position of construction beam steel 5 is accurately positioned on 1 surface of beams of concrete;
Step 2: it after release agent is brushed on 2 surface of the first coating steel pipe, is carried out according to the position of construction beam steel 5 pre-buried The work of first coating steel pipe 2, and the upper end is closely knit with adhesive plaster closure;
Step 3: reinforcing bar clips 7 are installed on the upper layer of the first coating steel pipe 2, and pass through tied silk between reinforcing bar clips 7 6 are fixedly connected;
Step 4: after beams of concrete constructs completion and initial set, the second reinforcing bar galvanized steel 3 is tapped with hammer, takes out first Coating steel pipe 2;
Step 5: constructional column reinforcing bar 5 is placed into 2 position of the first coating steel pipe, and longitudinally fixed using tied silk progress.
The present embodiment is by brushing release agent on 2 surface of the first coating steel pipe and being socketed on 2 surface of the first coating steel pipe Second coating steel pipe, 3 method effectively improves and removes difficult defect, while also accurately defining the position of constructional column reinforcing bar It sets, all materials of the device are the conventional steel pipe in work progress, and materials are easy, and at low cost, manufacturing process is simple, are suitble to Promote construction.
Obviously present invention specific implementation is not subject to the restrictions described above, as long as using method concept and skill of the invention The improvement for the various unsubstantialities that art scheme carries out, or not improved the conception and technical scheme of the invention are directly applied to it Its occasion, it is within the scope of the present invention.

Claims (7)

1. a kind of device for being pre-positioned constructional column reinforcement location, including beams of concrete (1), it is characterised in that: the concrete It is fixedly installed with the first coating steel pipe (2) of multiple groups model same vertical on beam (1), is wound on first coating steel pipe (2) Have reinforcing bar clips (7), is socketed with the second coating steel pipe (3) in the middle part of first coating steel pipe (2), the reinforcing bar clips (7) it is fixedly connected between by tied silk (6), the first coating steel pipe (2) bottom end is embedded with constructional column reinforcing bar (5).
2. a kind of device for being pre-positioned constructional column reinforcement location according to claim 1, it is characterised in that: described first The diameter of coating steel pipe (2) isThe diameter of second coating steel pipe (3) is
3. a kind of device for being pre-positioned constructional column reinforcement location according to claim 1, it is characterised in that: the coagulation Tu Liang (1) and the first coating steel pipe (2) are contour, and the first coating steel pipe (2) top is closely knit with adhesive tape closure.
4. a kind of device for being pre-positioned constructional column reinforcement location according to claim 1, it is characterised in that: the coagulation Constructional column reinforcing bar (5) at Tu Liang (1) each angle is provided with four.
5. a kind of device for being pre-positioned constructional column reinforcement location according to claim 1, it is characterised in that: the tied silk (6) horizontal in the first coating steel pipe (2) outer ring and interval setting.
6. a kind of device for being pre-positioned constructional column reinforcement location, feature described in -5 any one exist according to claim 1 In: the constructional column reinforcing bar (5) is spiral.
7. a kind of construction method for being pre-positioned constructional column reinforcement location, it is characterised in that: the steps include:
Step 1: the position of construction beam steel (5) is accurately positioned on beams of concrete (1) surface;
Step 2: it after release agent is brushed on the first coating steel pipe (2) surface, is carried out according to the position of construction beam steel (5) pre-buried First coating steel pipe (2) work, and the upper end is closely knit with adhesive plaster closure;
Step 3: reinforcing bar clips (7) are installed on the upper layer of the first coating steel pipe (2), and pass through bundle between reinforcing bar clips (7) Silk (6) is fixedly connected;
Step 4: after beams of concrete constructs completion and initial set, the second reinforcing bar galvanized steel (3) is tapped with hammer, takes out the first plating Zinc steel pipe (2);
Step 5: constructional column reinforcing bar (5) are placed into the first coating steel pipe (2) position, and longitudinally fixed using tied silk progress.
CN201811544080.1A 2018-12-17 2018-12-17 A kind of device being pre-positioned constructional column reinforcement location and its construction method Pending CN109610845A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811544080.1A CN109610845A (en) 2018-12-17 2018-12-17 A kind of device being pre-positioned constructional column reinforcement location and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811544080.1A CN109610845A (en) 2018-12-17 2018-12-17 A kind of device being pre-positioned constructional column reinforcement location and its construction method

Publications (1)

Publication Number Publication Date
CN109610845A true CN109610845A (en) 2019-04-12

Family

ID=66010393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811544080.1A Pending CN109610845A (en) 2018-12-17 2018-12-17 A kind of device being pre-positioned constructional column reinforcement location and its construction method

Country Status (1)

Country Link
CN (1) CN109610845A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116771119A (en) * 2023-08-22 2023-09-19 江苏省华建建设股份有限公司 Connection construction method for embedded straight thread sleeve assembly of tie bar of concrete constructional column

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2723605A1 (en) * 1994-08-09 1996-02-16 Martinez Andre Raymond Concrete floor coffering frame
CN203879017U (en) * 2014-05-23 2014-10-15 舜元建设(集团)有限公司 Tool-type column-top bar embedding device for structural columns
CN106884541A (en) * 2017-03-15 2017-06-23 上海建工四建集团有限公司 The positioning component of reserved joint bar, positioner and localization method in shear wall
CN108385986A (en) * 2018-03-26 2018-08-10 中国十七冶集团有限公司 A kind of device and method ensureing constructional column reinforcement location
CN208168157U (en) * 2018-03-30 2018-11-30 陕西建工新型建设有限公司 A kind of assembled leads wall reserved steel bar positioning cage plate

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2723605A1 (en) * 1994-08-09 1996-02-16 Martinez Andre Raymond Concrete floor coffering frame
CN203879017U (en) * 2014-05-23 2014-10-15 舜元建设(集团)有限公司 Tool-type column-top bar embedding device for structural columns
CN106884541A (en) * 2017-03-15 2017-06-23 上海建工四建集团有限公司 The positioning component of reserved joint bar, positioner and localization method in shear wall
CN108385986A (en) * 2018-03-26 2018-08-10 中国十七冶集团有限公司 A kind of device and method ensureing constructional column reinforcement location
CN208168157U (en) * 2018-03-30 2018-11-30 陕西建工新型建设有限公司 A kind of assembled leads wall reserved steel bar positioning cage plate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116771119A (en) * 2023-08-22 2023-09-19 江苏省华建建设股份有限公司 Connection construction method for embedded straight thread sleeve assembly of tie bar of concrete constructional column

Similar Documents

Publication Publication Date Title
CN209308282U (en) The positioning device of reinforcing bar is planted after a kind of constructional column
CN206233596U (en) Building block exterior wall constructional column concrete casting device
CN109610845A (en) A kind of device being pre-positioned constructional column reinforcement location and its construction method
CN106182364A (en) A kind of detachable steel core and the method making pre-stressed concrete hollow beam
CN106400783B (en) The construction method of bored concrete pile is made of expansion steel reinforcement cage
CN208502075U (en) A kind of constructional column upper reinforcement connection pre-embedded device
US20110302880A1 (en) Rebar Sleeve Unit
JP4237173B2 (en) Hole closing jig and hole closing method using the hole closing jig
CN109296138A (en) The positioning device and construction method of reinforcing bar are planted after a kind of constructional column
CN208899525U (en) The fixed structure of pre-buried channel flow
CN104563103A (en) Composite-reinforcement partially-prestressed concrete solid square pile and production method thereof
CN108824191B (en) Construction process of group nail connecting device with corrugated sleeve
CN207003670U (en) A kind of new prefabricated overhanging component
CN105735487A (en) Wall tied reinforcement component
CN209429531U (en) A kind of tightening formula concrete floor hole reservation device
CN201381587Y (en) Dual-purpose ejector rod for controlling cast-in-place concrete bean cross section and reinforced steel bar
CN104005340B (en) Continuous beam elongated prestressing tendon lashing construction method
CN207405498U (en) A kind of high ferro box beam portable awning portal support device
CN204531184U (en) For fixing the locator card of steel plastic compount anti-crack net in reinforced concrete wallboard
JP2001012080A (en) Hoop bar locking tool
CN208586761U (en) A kind of steel core concrete column ring beam joint
CN208965741U (en) A kind of wall tie bar fastener inserts
CN108547447B (en) Side die fixing device
CN201818047U (en) Concrete floor pipeline opening reserving tool
CN105649340B (en) The combing locator and its construction method of presstressed reinforcing steel lashing in built-in pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190412

RJ01 Rejection of invention patent application after publication