CN109607938A - A kind of integrated stabilization pond equipment and its treatment process handling distributed sewage - Google Patents

A kind of integrated stabilization pond equipment and its treatment process handling distributed sewage Download PDF

Info

Publication number
CN109607938A
CN109607938A CN201811486394.0A CN201811486394A CN109607938A CN 109607938 A CN109607938 A CN 109607938A CN 201811486394 A CN201811486394 A CN 201811486394A CN 109607938 A CN109607938 A CN 109607938A
Authority
CN
China
Prior art keywords
septic tank
area
zone
stabilization pond
river
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811486394.0A
Other languages
Chinese (zh)
Inventor
张发鹏
张纪增
曹爱新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southern Venture (tianjin) Technology Development Co Ltd
Original Assignee
Southern Venture (tianjin) Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southern Venture (tianjin) Technology Development Co Ltd filed Critical Southern Venture (tianjin) Technology Development Co Ltd
Priority to CN201811486394.0A priority Critical patent/CN109607938A/en
Publication of CN109607938A publication Critical patent/CN109607938A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/24Treatment of water, waste water, or sewage by flotation
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/46Treatment of water, waste water, or sewage by electrochemical methods
    • C02F1/461Treatment of water, waste water, or sewage by electrochemical methods by electrolysis
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F2001/007Processes including a sedimentation step
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/105Phosphorus compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/16Nitrogen compounds, e.g. ammonia
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/30Organic compounds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/30Aerobic and anaerobic processes

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Biological Treatment Of Waste Water (AREA)

Abstract

It is a kind of for handling the integrated stabilization pond equipment of distributed sewage, comprising: center inner barrel and outer barrel, wherein the center inner cylinder be septic tank react the area I;The outer cylinder is to be separated into differential responses area by different angle partition to be formed around center inner cylinder periphery;Outer cylinder differential responses area is followed successively by the septic tank reaction area II, septic tank the reaction area III, moving-bed biofilm reaction zone, settling zone clockwise;Integrated stabilization pond equipment is by scientific and reasonable design, it can be achieved that the processing up to standard of distributed sewage especially remote districts and rural urbanization sanitary sewage.The equipment and its process matched therewith can not only widely adapt to the fluctuation of water quality and water, also have the characteristics that Low investment, low energy consumption, unattended, the purpose of synchronous dephosphorization is realized while efficient stable removes pollutant, makes to be discharged stably reaching standard reuse.

Description

A kind of integrated stabilization pond equipment and its treatment process handling distributed sewage
Technical field
The invention belongs to sewage treatment field more particularly to a kind of integrated stabilization pond equipment for handling distributed sewage.
Background technique
With the continuous improvement of China's Living consumption, the discharge amount of sanitary sewage is also increasingly increasing.Urban life The processing of sewage uses centralized processing mode, i.e., is made of sewage collection system, centralized processing unit and disposal unit three parts: Sewage collection system needs to be equipped with corresponding collection conduit, closed conduit and necessary boost in pressure pump house so that sewage is collected to sewage Centralized processing unit in factory;And collect, expense caused by transportational process often account for cost of sewage disposal more than half. For rural area township, enterprises and institutions, scenic spot, mine and sewage network can not arrival area dispersion type domestic wastewater, by Restriction to geographical conditions and economic factor is difficult to adapt to centralized processing mode, leads to many point source sewage direct emissions, thus Cause great environmental problem and health risk.
The sanitary sewage of distributed sewage especially remote districts and rural urbanization, difference its water quality in the water period and water Amount fluctuation is larger.Traditional septic tank mode that the country continues to use always at present can only play the role of it pretreated, it is difficult to reach Increasingly strict national standard.Therefore, strong a kind of capacity of resisting impact load, Low investment, low energy consumption, unattended is researched and developed, and It is to achieve effective control the inevitable requirement of distributed sewage with stabilization, the decentralized type sewage processing equipment of efficient dephosphorization ability, It is also the key point for containing domestic water eutrophication trend.
Summary of the invention
In order to solve the above technical problem, the present invention provides a kind of integrated stabilization pond equipment for handling distributed sewage, Realize the processing up to standard of distributed sewage especially remote districts and rural urbanization sanitary sewage.
A kind of integrated stabilization pond equipment handling distributed sewage, comprising: two parts of equipment body and cover plate for manhole; Wherein: the equipment body includes center inner barrel and outer barrel;The center inner cylinder is that septic tank reacts Ith area, and water inlet pipe is in Intracardiac cylinder connection;The outer cylinder is separated into 5 reaction zones by different angle partition and is formed around center inner cylinder periphery;Described 5 Reaction zone is followed successively by septic tank clockwise and reacts IIth area, septic tank reaction IIIth area, anoxic zone, aerobic zone, settling zone;Septic tank is anti- The spacing board for answering the area I to react the area II with septic tank reacts the area II and reacts III with septic tank close to bottom there are the mouth of a river, septic tank is crossed There are crossing the mouth of a river, septic tank reacts the spacing board of the area III and anoxic zone close to bottom there are crossing the mouth of a river for the spacing board middle and upper part in area, The spacing board middle and upper part of anoxic zone and aerobic zone is there are the mouth of a river is crossed, and there are cross water for the spacing board middle and lower part of aerobic zone and settling zone Mouthful;The side wall of the manhole cover version reserves two 2 air inlets.
Further, the center inner barrel and outer barrel structure is circular barrel-like structure.
Further, a kind of integrated stabilization pond equipment handling distributed sewage, by the way of the water inlet of center, Water inlet pipe is linked with center inner cylinder, and water inlet pipe is connected with water dispensing apparatus.
Further, in the outer cylinder, the septic tank reaction area II volume accounts for the 10%-30% of entire outer cylinder volume, septic tank The reaction area III volume accounts for the 5%-20% of entire outer cylinder volume, and anoxic zone volume accounts for the 5%-20% of entire outer cylinder volume, and aerobic zone holds Product accounts for the 5%-25% of entire outer cylinder volume, and settling zone volume accounts for the 10%-20% of entire outer cylinder volume.
Further, described a kind of for handling the integrated stabilization pond equipment of distributed sewage, septic tank reacts III Area, anoxic zone, aerobic zone are equipped with bracket.
Further, described a kind of for handling the integrated stabilization pond equipment of distributed sewage, it is netted built in aerobic zone Electrode plate, bottom are equipped with aeration tube perhaps one of aeration plate or micro-hole aerator.
Further, the aerobic zone and settling zone partition, which are crossed at the mouth of a river, was arranged water baffle, crossed the installation of water baffle Angle is between 30 ° to 60 °.
Further, described a kind of for handling the integrated stabilization pond equipment of distributed sewage, there is air lift in settling zone Return pipe, exit are arranged perforated pipe, connect with outlet pipe, while top is equipped with overflow weir.
Further, one of the settable tube settling in the settling zone, sloping plate deposition are used for reinforced deposition effect.
A kind of integrated stabilization pond treatment process handling distributed sewage, comprising the following steps:
Step 1: sewage enters center inner cylinder by water inlet pipe, sufficiently reacts 6h in the septic tank reaction area I of inner cylinder, preliminary to remove Partial organic matter and nitrogen phosphorus;
Step 2: septic tank reaction the area I in water outlet through partition bottom cross the mouth of a river enter septic tank reaction the area II react 10h;
Step 3: water outlet, which through partition middle and upper part crosses the mouth of a river and enters septic tank, in the septic tank reaction area II reacts the area III, and septic tank is anti- Answer in the area III load the reaction zone dischargeable capacity 40% fixation bed fillers, reaction time 7h, for improve biofilm rate and Rate of contaminant degradation;
Step 4: the water outlet in the septic tank reaction area III crosses the mouth of a river through partition bottom and enters anoxic zone;When the hydraulic retention in the area Between be 7h, while the anoxic zone in load the reaction zone dischargeable capacity 50% fixation bed fillers, for improve pollutant removal imitate Fruit;
Step 5: anoxic zone water outlet crosses the mouth of a river through partition middle and upper part and enters aerobic zone, loads the reaction zone dischargeable capacity in aerobic zone 60% fixation bed fillers, hydraulic detention time 11h, while the removal through aeration reinforcing contaminant removal efficiency and phosphorus;
Step 6: being equipped with device for removing phosphorous by electrolysis in aerobic zone simultaneously, pole plate spacing is 1cm, and current density 30mA/cm2 is exposing Under gas air bearing and electric current double action, the mixed effect of sewage and pollutant can not only be reinforced, realize that the removal rate of phosphorus is 96%;
Step 7: aerobic zone water outlet through 45 ° cross water baffle effect removal excessive gas after by partition middle and upper part cross the mouth of a river enter sink Shallow lake area, the residence time is 6h in settling zone, and average surface load is 0.23m3/m2/h, so that effluent index reaches reuse standard.
The present invention provides a kind of integrated stabilization pond equipment for handling distributed sewage, research and develop to adaptation to local conditions and are suitble to divide The new equipment for dissipating type sewage treatment is to achieve effective control the inevitable requirement in the point-source pollutions source such as rural area, and contain domestic water The key point of body eutrophication trend.
Detailed description of the invention
Fig. 1 is device structure schematic diagram of the invention;
Fig. 2 is device structure top view of the invention
In figure: 1, water inlet;2, septic tank reacts the area I;3, septic tank reacts the area II;4, septic tank reacts the area III;5, anoxic Area;6, aerobic zone;7, settling zone;8, water hole;9, the water hole of aerobic zone and precipitating section;10, reflux pump;11, water outlet; 12, center inner cylinder;13, outer cylinder;14, stripping reflux pipe;15, cover plate for manhole.
Specific embodiment
Below in conjunction with attached drawing and preferred embodiment, to provide according to the present invention specific embodiment, structure, feature and its Effect, detailed description is as follows.
Embodiment 1
The present invention provides a kind of for handling the integrated stabilization pond equipment of distributed sewage, and device structure wraps as illustrated in fig. 1 and 2 Include two parts of equipment body and cover plate for manhole.Equipment body part includes center inner barrel and outer barrel, and shape is circle.Center Inner cylinder is that septic tank reacts the area I 2;Outer cylinder is that 5 reaction zones being separated by different angle partition surround center inner cylinder periphery shape At;5 reaction zones are followed successively by the septic tank reaction area II 3, the septic tank reaction area III 4, anoxic zone 5, good clockwise as shown in Figure 1 Oxygen area 6, settling zone 7.Cover plate for manhole has a diameter larger than the diameter of center inner cylinder as shown in Figure 2, and the side wall of the cover plate for manhole is pre- Stay 2 air inlets.By the way of integrated stabilization pond equipment is intake using center, water inlet pipe 1 as shown in Figure 1 and center inner cylinder excrement Pond is reacted the area I 2 and is connected, and sewage is directly entered the septic tank reaction area I 2;The area II 3 is reacted with septic tank in the septic tank reaction area I 2 Spacing board close to bottom there are cross the mouth of a river 8, sewage by septic tank reaction the area I 2 passed through the mouth of a river 8 enter septic tank react the area II 3;The septic tank reaction area II 3 reacts the spacing board middle and upper part in the area III 4 with septic tank there are the mouth of a river 8 is crossed, and sewage is reacted by septic tank The area II 3 passed through the mouth of a river 8 and enters the septic tank reaction area III 4;Septic tank reacts the spacing board of the area III 4 and anoxic zone 5 bottom of close to Portion passed through the mouth of a river 8 by the septic tank reaction area III 4 and enters anoxic zone 5 there are the mouth of a river, sewage is crossed;Anoxic zone 5 and aerobic zone 6 it Spacing board middle and upper part enters aerobic zone 6 by the mouth of a river 8 by anoxic zone 5 there are the mouth of a river 8, sewage is crossed;The installation electrolysis dephosphorization of aerobic zone 6 Device realizes synchronous phosphor-removing effect;The spacing board middle and lower part of aerobic zone 6 and settling zone 7 is there are the mouth of a river 9 is crossed, and sewage is by aerobic zone 6 Enter settling zone 7 by crossing the mouth of a river 9;There are outlet pipe 11 and overflow weirs for settling zone 7, are discharged the reuse after settling zone is clarified.
Further, described a kind of for handling the integrated stabilization pond equipment of distributed sewage, water inlet pipe 1 connects center Inner cylinder, using center water intake mode, water inlet pipe 1 is connected with water distributor, for optimizing water intake mode.
Further, described a kind of for handling the integrated stabilization pond equipment of distributed sewage, septic tank reacts the area II 3 Volume accounts for the 10%-30% of entire outer cylinder volume, and septic tank reaction 4 volume of the area III accounts for the 5%-20% of entire outer cylinder volume, anoxic zone 5 volumes account for the 5%-20% of entire outer cylinder volume, and 6 volume of aerobic zone accounts for the 5%-25% of entire outer cylinder volume, and 7 volume of settling zone accounts for whole The 10%-20% of a outer cylinder volume can be adjusted flexibly according to distributed sewage quality and water fluctuation.
Further, described a kind of for handling the integrated stabilization pond equipment of distributed sewage, septic tank reacts the area III 4, anoxic zone 5, aerobic zone 6 are equipped with bracket, install modification biological filler;
Further, described a kind of for handling the integrated stabilization pond equipment of distributed sewage, netted electricity built in aerobic zone 6 Pole plate, bottom are equipped with aeration tube perhaps one of aeration plate or micro-hole aerator;
Further, described a kind of for handling the integrated stabilization pond equipment of distributed sewage, aerobic zone 6 and settling zone 7 every Plate, which is crossed at the mouth of a river 9, was arranged water baffle, cross water baffle setting angle be 30 ° to 60 ° between, it is remaining for removing aerobic zone 6 Gas prevents from entering settling zone with sewage, influences the effect of sedimentation basin mud-water separation;
Further, described a kind of for handling the integrated stabilization pond equipment of distributed sewage, there is stripping reflux in settling zone 7 Pipe, exit are arranged perforated pipe, connect with outlet pipe 11, while top is equipped with overflow weir;
Further, one of the settable tube settling in the settling zone 7, sloping plate deposition are used for reinforced deposition effect;
Further, described a kind of for handling the integrated stabilization pond equipment of distributed sewage, it is set right above the inner cylinder of center There is a cover plate for manhole 15, there are 2 air inlets in cover sidewall, and it is all convenient for observation that the diameter of cover board is greater than the diameter of center inner cylinder The reactiveness and overhaul of the equipments of reaction zone.
Above-mentioned apparatus is described further combined with specific embodiments below.
Now by taking certain domestic sewage in rural areas as an example, using of the present invention a kind of for handling the integration of distributed sewage Stabilization pond equipment handles it, and water quality is as follows:
Index COD SS Ammonia nitrogen Total phosphorus
Concentration (mg/L) 300-500 100-200 20-40 3-10
The septic tank that sewage enters center inner cylinder through water inlet pipe 1 reacts the area I 2, and it is successively anti-by septic tank to pass through the mouth of a river 8 later Answer the area II 3, septic tank the reaction area III 4, anoxic zone 5, aerobic zone 6.Aerobic zone is equipped with device for removing phosphorous by electrolysis, and realization, which synchronizes, to remove Phosphorus effect.There are the mouth of a river 9 is crossed, sewage, which passed through the mouth of a river 9 by aerobic zone 6, to be passed through for the spacing board middle and lower part of aerobic zone and settling zone Enter settling zone 7 after the interception of 45 ° of mistake water baffles;There are outlet pipe 11 and overflow weir, water outlets to return behind settling zone for settling zone 7 With;Settling zone sludge realizes 75% reflux ratio through the effect of stripping tube gas.
Septic tank reaction 3 volume of the area II accounts for the 26% of entire outer cylinder volume, and septic tank reaction 4 volume of the area III accounts for entire outer cylinder The 16% of volume, 5 volume of anoxic zone account for the 16% of entire outer cylinder volume, and 6 volume of aerobic zone accounts for the 26% of entire outer cylinder volume, precipitating 7 volume of area accounts for the 16% of entire outer cylinder volume;Wherein the septic tank reaction area III 4, anoxic zone 5, aerobic zone 6 are equipped with bracket, pacify Fill modification biological filler.
(1) sewage enters center inner cylinder by water inlet pipe 1, sufficiently reacts 6h in the septic tank reaction area I 2 of inner cylinder, tentatively Remove the organic matter and nitrogen phosphorus of part;3
(2) it is discharged in the septic tank reaction area I 2 and crosses the mouth of a river 8 into the septic tank reaction area II reaction 10h through partition bottom;
(3) it is discharged in the septic tank reaction area II 3 and crosses the mouth of a river 8 into the septic tank reaction area III 4 through partition middle and upper part, septic tank is anti- Answer the fixation bed fillers that the reaction zone dischargeable capacity 40% is loaded in the area III 4, reaction time 7h, for improve biofilm rate and Rate of contaminant degradation;
(4) water outlet in the septic tank reaction area III 4 crosses the mouth of a river 8 into anoxic zone 5 through partition bottom;When the hydraulic retention in the area Between be 7h, while anoxic zone 5 in load the reaction zone dischargeable capacity 50% fixation bed fillers, for improve pollutant removal effect Fruit;
(5) water outlet of anoxic zone 5 crosses the mouth of a river 8 into aerobic zone 6 through partition middle and upper part, and the interior reaction zone that loads in aerobic zone 6 effectively holds The fixation bed fillers of product 60%, hydraulic detention time 11h, while the removal through aeration reinforcing contaminant removal efficiency and phosphorus;
(6) device for removing phosphorous by electrolysis is equipped in aerobic zone 6 simultaneously, pole plate spacing is 1cm, current density 30mA/cm2, it is being aerated Under air bearing and electric current double action, the mixed effect of sewage and pollutant can not only be reinforced, realize that the removal rate of phosphorus is 96%;
(7) aerobic zone 6 water outlet through 45 ° cross water baffle effect removal excessive gas after by partition middle and upper part cross the mouth of a river 9 enter sink Shallow lake area 7, the residence time is 6h in settling zone 7, and average surface load is 0.23m3/m2/ h, so that effluent index reaches reuse mark Standard, effluent quality index are as follows:
Index COD SS Ammonia nitrogen Total phosphorus
Concentration (mg/L) 30-40 < 5 < 5 0.2-0.4
One embodiment of the present invention has been described in detail above, but content is only the preferred embodiment of the present invention, It should not be considered as limiting the scope of the invention.Any changes and modifications in accordance with the scope of the present application, It should all fall within the scope of the patent of the present invention.
Of the invention is described in detail above by embodiment, but the content is only preferable implementation of the invention Example, should not be considered as limiting the scope of the invention.It is all according to all the changes and improvements made by the present patent application range Deng should still be within the scope of the patent of the present invention.

Claims (10)

1. a kind of integrated stabilization pond equipment for handling distributed sewage, comprising: two parts of equipment body and cover plate for manhole;Its In: the equipment body includes center inner barrel and outer barrel;The center inner cylinder is that septic tank reacts Ith area, water inlet pipe and center Inner cylinder connection;The outer cylinder is separated into 5 reaction zones by different angle partition and is formed around center inner cylinder periphery;Described 5 anti- It answers area to be followed successively by septic tank clockwise and reacts IIth area, septic tank reaction IIIth area, anoxic zone, aerobic zone, settling zone;Septic tank reaction The spacing board that the area II is reacted in the area I with septic tank reacts the area III with septic tank there are the mouth of a river, the septic tank reaction area II is crossed close to bottom Spacing board middle and upper part there are crossing the mouth of a river, septic tank reacts the spacing board of the area III and anoxic zone close to bottom there are the mouth of a river is crossed, and lacks The spacing board middle and upper part of oxygen area and aerobic zone is there are the mouth of a river is crossed, and there are cross the mouth of a river for the spacing board middle and lower part of aerobic zone and settling zone; The side wall of the manhole cover version reserves two 2 air inlets.
2. a kind of integrated stabilization pond equipment for handling distributed sewage according to claim 1, it is characterised in that: described Center inner barrel and outer barrel structure be circular barrel-like structure.
3. a kind of integrated stabilization pond equipment for handling distributed sewage according to claim 1, it is characterised in that: described A kind of integrated stabilization pond equipment handling distributed sewage, by the way of the water inlet of center, water inlet pipe is linked with center inner cylinder, Water inlet pipe is connected with water dispensing apparatus.
4. a kind of integrated stabilization pond equipment for handling distributed sewage according to claim 1, it is characterised in that: described In outer cylinder, the septic tank reaction area II volume accounts for the 10%-30% of entire outer cylinder volume, and the septic tank reaction area III volume accounts for entire outer The 5%-20% of cylinder volume, anoxic zone volume account for the 5%-20% of entire outer cylinder volume, and aerobic zone volume accounts for the 5%- of entire outer cylinder volume 25%, settling zone volume accounts for the 10%-20% of entire outer cylinder volume.
5. a kind of integrated stabilization pond equipment for handling distributed sewage according to claim 1, it is characterised in that: described It is a kind of for handling the integrated stabilization pond equipment of distributed sewage, the septic tank reaction area III, anoxic zone, aerobic zone are equipped with Bracket.
6. a kind of integrated stabilization pond equipment for handling distributed sewage according to claim 1, it is characterised in that: described It is a kind of for handling the integrated stabilization pond equipment of distributed sewage, mesh electrode plate built in aerobic zone, bottom is equipped with aeration tube Perhaps one of aeration plate or micro-hole aerator.
7. a kind of integrated stabilization pond equipment for handling distributed sewage according to claim 1, it is characterised in that: described Aerobic zone and settling zone partition cross at the mouth of a river water baffle be set, the setting angle for crossing water baffle is between 30 ° to 60 °.
8. a kind of integrated stabilization pond equipment for handling distributed sewage according to claim 1, it is characterised in that: described It is a kind of for handling the integrated stabilization pond equipment of distributed sewage, have stripping reflux pipe, exit setting perforation in settling zone Pipe, connect with outlet pipe, while top is equipped with overflow weir.
9. a kind of integrated stabilization pond equipment for handling distributed sewage according to claim 1, it is characterised in that: described One of the settable tube settling in settling zone, sloping plate deposition are used for reinforced deposition effect.
10. a kind of integrated stabilization pond treatment process for handling distributed sewage, it is characterised in that: the following steps are included:
Step 1: sewage enters center inner cylinder by water inlet pipe, sufficiently reacts 6h in the septic tank reaction area I of inner cylinder, preliminary to remove Partial organic matter and nitrogen phosphorus;
Step 2: septic tank reaction the area I in water outlet through partition bottom cross the mouth of a river enter septic tank reaction the area II react 10h;
Step 3: water outlet, which through partition middle and upper part crosses the mouth of a river and enters septic tank, in the septic tank reaction area II reacts the area III, and septic tank is anti- Answer in the area III load the reaction zone dischargeable capacity 40% fixation bed fillers, reaction time 7h, for improve biofilm rate and Rate of contaminant degradation;
Step 4: the water outlet in the septic tank reaction area III crosses the mouth of a river through partition bottom and enters anoxic zone;When the hydraulic retention in the area Between be 7h, while the anoxic zone in load the reaction zone dischargeable capacity 50% fixation bed fillers, for improve pollutant removal imitate Fruit;
Step 5: anoxic zone water outlet crosses the mouth of a river through partition middle and upper part and enters aerobic zone, loads the reaction zone dischargeable capacity in aerobic zone 60% fixation bed fillers, hydraulic detention time 11h, while the removal through aeration reinforcing contaminant removal efficiency and phosphorus;
Step 6: being equipped with device for removing phosphorous by electrolysis in aerobic zone simultaneously, pole plate spacing is 1cm, and current density 30mA/cm2 is exposing Under gas air bearing and electric current double action, the mixed effect of sewage and pollutant can not only be reinforced, realize that the removal rate of phosphorus is 96%;
Step 7: aerobic zone water outlet through 45 ° cross water baffle effect removal excessive gas after by partition middle and upper part cross the mouth of a river enter sink Shallow lake area, the residence time is 6h in settling zone, and average surface load is 0.23m3/m2/h, so that effluent index reaches reuse standard.
CN201811486394.0A 2018-12-06 2018-12-06 A kind of integrated stabilization pond equipment and its treatment process handling distributed sewage Pending CN109607938A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811486394.0A CN109607938A (en) 2018-12-06 2018-12-06 A kind of integrated stabilization pond equipment and its treatment process handling distributed sewage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811486394.0A CN109607938A (en) 2018-12-06 2018-12-06 A kind of integrated stabilization pond equipment and its treatment process handling distributed sewage

Publications (1)

Publication Number Publication Date
CN109607938A true CN109607938A (en) 2019-04-12

Family

ID=66006161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811486394.0A Pending CN109607938A (en) 2018-12-06 2018-12-06 A kind of integrated stabilization pond equipment and its treatment process handling distributed sewage

Country Status (1)

Country Link
CN (1) CN109607938A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110040918A (en) * 2019-06-06 2019-07-23 贵州圣觉环保设备有限公司 Integrated sewage treating apparatus
CN110104903A (en) * 2019-06-10 2019-08-09 南方创业(天津)科技发展有限公司 A kind of integration short distance nitration Anammox equipment and its treatment process
CN117049624A (en) * 2023-10-12 2023-11-14 河北中瀚水务有限公司 Medicine-adding simulation experiment device for water purification plant

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102531272A (en) * 2010-12-31 2012-07-04 苏州嘉净环保科技股份有限公司 Integrated device for treating decentralized domestic sewage
CN108298686A (en) * 2018-02-05 2018-07-20 北京化工大学 A kind of purifying processing device for high COD concentration domestic sewage in rural areas

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102531272A (en) * 2010-12-31 2012-07-04 苏州嘉净环保科技股份有限公司 Integrated device for treating decentralized domestic sewage
CN108298686A (en) * 2018-02-05 2018-07-20 北京化工大学 A kind of purifying processing device for high COD concentration domestic sewage in rural areas

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110040918A (en) * 2019-06-06 2019-07-23 贵州圣觉环保设备有限公司 Integrated sewage treating apparatus
CN110104903A (en) * 2019-06-10 2019-08-09 南方创业(天津)科技发展有限公司 A kind of integration short distance nitration Anammox equipment and its treatment process
CN117049624A (en) * 2023-10-12 2023-11-14 河北中瀚水务有限公司 Medicine-adding simulation experiment device for water purification plant
CN117049624B (en) * 2023-10-12 2024-01-02 河北中瀚水务有限公司 Medicine-adding simulation experiment device for water purification plant

Similar Documents

Publication Publication Date Title
CN102531298B (en) Sewage treatment device and method for enhanced denitrification A/A/O (Anodic Aluminum Oxide) and deoxygenation BAF (Biological Aerated Filter)
CN101774732B (en) Integral air-lift circumfluent suspended filler dispersed sewage biological treatment device
CN101708917B (en) Device and method for integrally processing garbage percolate
CN102775025A (en) Municipal life wastewater treatment system with high efficiency and low energy consumption
CN106116045A (en) A kind of efficiently villages and small towns waste water treating and reutilizing device and technique thereof
CN102897975A (en) Sewage treatment method of town blocks
CN109607938A (en) A kind of integrated stabilization pond equipment and its treatment process handling distributed sewage
CN108128986A (en) Integrated multistage AO decentralized sewage treatment devices and method
CN211644961U (en) Integrated sewage treatment equipment
CN210855718U (en) Novel rural sewage treatment system
CN202785899U (en) Sewage treatment device
CN2616530Y (en) Micro-power domestic sewage treatment integrating apparatus
CN211198754U (en) Integrated A2/O biochemical tower with embedded precipitation structure
CN210085200U (en) Solar energy integration sewage treatment device
CN209835881U (en) Distributed household type integrated sewage treatment device suitable for rural areas
CN109879522A (en) It is a kind of for handling the integrated stabilization pond equipment and its treatment process of distributed sewage
CN203904147U (en) Efficient low-energy-consumption sewage treatment device
CN215627425U (en) New rural domestic sewage treatment system based on MBR membrane reactor
CN202610070U (en) Integration sanitary sewage treatment device
CN201362612Y (en) Domestic sewage treatment and reusing device
CN209890436U (en) Integrated stabilization pond equipment for treating dispersive sewage
CN209537220U (en) A kind of integrated stabilization pond equipment handling distributed sewage
CN210393887U (en) Small-size sewage treatment integration equipment
CN204848574U (en) Rural sewage treatment plant of integration
CN211170301U (en) Ground-type domestic sewage treatment system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190412

WD01 Invention patent application deemed withdrawn after publication