CN109607403A - A kind of wind-power tower integral erection construction method - Google Patents

A kind of wind-power tower integral erection construction method Download PDF

Info

Publication number
CN109607403A
CN109607403A CN201910107707.5A CN201910107707A CN109607403A CN 109607403 A CN109607403 A CN 109607403A CN 201910107707 A CN201910107707 A CN 201910107707A CN 109607403 A CN109607403 A CN 109607403A
Authority
CN
China
Prior art keywords
tower
hoist engine
group
hauling block
moulding bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910107707.5A
Other languages
Chinese (zh)
Inventor
周绪红
王宇航
曹昀琦
华建民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201910107707.5A priority Critical patent/CN109607403A/en
Publication of CN109607403A publication Critical patent/CN109607403A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/28Other constructional details
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a kind of wind-power tower integral erection construction methods, are related to technical field of wind power generation.The work progress is made of six steps: step 1, tower is placed horizontally on the sleeper of ground, moulding bed and universal hinge support are installed inside tower, tower is connect with two groups of hauling block groups (or hoist engine) and balance pulley blocks (or hoist engine);Step 2 is drawn tower to the position about at 45 ° with horizontal plane with first group of hauling block group (or hoist engine) by the steering of the pulling force and auxiliary gin pole of hoist engine;Step 3 uses second group of hauling block group (or hoist engine) instead and continues to draw tower to vertical position, keeps stablizing using equalizer pulley group (or hoist engine) in the process;Vertical jack is arranged under moulding bed and integrally jacks up tower for step 4;Tower is placed in basic top surface by step 5, the top surface absolute altitude for reducing jack;Tower inner flange is attached by step 6 with basis, completes tower installation.Process of the present invention is simple and convenient to operate, speed of application is fast, and is not necessarily to Large-scale Hoisting equipment, economic benefits.

Description

A kind of wind-power tower integral erection construction method
Technical field
The present invention relates to technical field of wind power generation, more particularly to a kind of wind-power tower integral erection construction method.
Background technique
The wind-powered electricity generation energy is a kind of pollution-free, reproducible clean energy resource.Wind power plant generated energy is high, fan operation is stable, system Technology maturation is made, is come into operation extensively in recent years.
Wind power generating set is mainly made of tower, cabin, wheel hub and blade etc., and wherein tower is wind power generating set master The load-carrying members wanted, weight is maximum, difficulty of construction highest.The form of construction work of overwhelming majority wind-power tower is segmental hoisting at present, Work progress is related to a large amount of Large-scale Hoisting equipment and high altitude operation, high to the configuration requirement of equipment, while construction organization difficulty is big, It is long in time limit, it is time-consuming and laborious.
Therefore, it is necessary to the wind-power tower integral erection construction method that R and D are novel, to reduce difficulty, save at This.
Summary of the invention
The technical problem to be solved by the present invention is to current wind-power tower erection method, there are long in time limit, at high cost to ask Topic
The present invention solves scheme used by its technical problem: a kind of wind-power tower integral erection construction method is provided, Including following steps:
Tower (1) is placed horizontally on ground sleeper (2) by step 1, installs moulding bed (3) inside tower (1), moulding bed (3) universal hinge support (4) are connected under, tower (1) and first group of hauling block group (or hoist engine) (5), second group of traction are slided Wheel group (or hoist engine) (6) and balance pulley blocks (or hoist engine) (7) connection;
Step 2, by the steering of the pulling force of hoist engine (8) and auxiliary gin pole (9), with first group of hauling block group (or volume Raise machine) tower (1) traction to the position about at 45 ° with horizontal plane, uses equalizer pulley group (or hoist engine) in the process by (5) (7) it keeps stablizing;
Step 3 uses second group of hauling block group (or hoist engine) (6) instead and continues to draw tower (1) to vertical position, mistake It keeps stablizing using equalizer pulley group (or hoist engine) (7) in journey, removes gin pole (9) and first group of hauling block group (or elevator Machine) (5);
Vertical jack (10) is arranged under tower (1) bottom moulding bed (3) and integrally jacks up tower (1), removes for step 4 Universal hinge support (4), second group of hauling block group (or hoist engine) (6) and balance pulley blocks (or hoist engine) (7);
Tower (1) is placed in basic (11) top surface by step 5, the top surface absolute altitude for reducing jack (10);
Step 6 removes jack (10), moulding bed (3), and tower (1) inner flange and basic (11) are attached, and completes Tower (1) installation.
In the above scheme, moulding bed (3) is mounted on above tower inner flange (12) in said step 1;The universal hinge Support (4) setting can be freely rotated in vertical direction and horizontal plane at basic (11) center, make tower inner flange (12) and base Bolt hole alignment on plinth (11).
In the above scheme, moulding bed (3) is the detachable space truss of assembled, passes through high-strength spiral shell with the inner wall of tower (1) It tethers and connects.
In the above scheme, in the step two and step 3, first group of hauling block group (or hoist engine) (5), Second group of hauling block group (or hoist engine) (6) and gin pole (9) are arranged in tower (1) the same side, with two sides equalizer pulley group (or Hoist engine) (7) formation stable triangle, guarantee the balance of tower (1) in erection process.
The present invention has the advantages that compared with the existing technology
The present invention realizes the integral hoisting to tower, and this method process is simple and convenient to operate, speed of application is fast, saves Rent the expense of large-scale lifting appliance, economic benefits.
Detailed description of the invention
Fig. 1 is the side structure schematic view of the device of the invention installation process;
Fig. 2 is the positive structure diagram of the device of the invention installation process;
Fig. 3 is the side structure schematic view of first group of hauling block group (or hoist engine) distraction procedure of the invention;
Fig. 4 is the positive structure diagram of first group of hauling block group (or hoist engine) distraction procedure of the invention;
Fig. 5 is the side structure schematic view of second group of hauling block group (or hoist engine) distraction procedure of the invention;
Fig. 6 is the structural schematic diagram of jack stand process of the invention;
Fig. 7 is the structural schematic diagram of tower decentralization process of the invention;
Fig. 8 is installed structural schematic diagram for of the invention;
Fig. 9 is jig structure schematic diagram of the invention.
In figure: 1- tower, 2- sleeper, 3- moulding bed, 4- universal hinge support, first group of hauling block group (or hoist engine) of 5-, Second group of hauling block group (or hoist engine) of 6-, 7- equalizer pulley group (or hoist engine), 8- hoist engine, 9- gin pole, 10- are very heavy Top, the basis 11-, 12- tower inner flange.
Specific embodiment
The present invention is described in detail with Figure of description combined with specific embodiments below.
As shown in FIG. 1 to FIG. 9, the present invention provides a kind of wind-power tower integral erection construction method, Specific construction processes It is as follows:
As depicted in figs. 1 and 2, tower (1) is placed horizontally on ground sleeper (2), moulding bed is installed inside tower (3), universal hinge support (4) are connected under moulding bed (3), by tower (1) and first group of hauling block group (or hoist engine) (5), second Group hauling block group (or hoist engine) (6) and balance pulley blocks (or hoist engine) (7) connection;
As shown in Figure 3 and Figure 4, sliding with first group of traction by the steering of the pulling force of hoist engine (8) and auxiliary gin pole (9) Wheel group (or hoist engine) (5) by tower (1) traction to the position about at 45 ° with horizontal plane, in the process using equalizer pulley group (or Hoist engine) (7) holding stabilization;
As shown in figure 5, using second group of hauling block group (or hoist engine) (6) instead continues to draw tower (1) to vertical position, It keeps stablizing using equalizer pulley group (or hoist engine) (7) in the process, removes gin pole (9) and first group of hauling block group and (or roll up Raise machine) (5);
Tower (1) is integrally jacked up as shown in fig. 6, vertical jack (10) is arranged under tower (1) bottom moulding bed (3), Remove universal hinge support (4), second group of hauling block group (or hoist engine) and balance pulley blocks (or hoist engine) (7);
As shown in fig. 7, tower (1) is placed in basic (11) top surface by the top surface absolute altitude for reducing jack (10);
As shown in figure 8, removing jack (10), moulding bed (3), tower inner flange (12) and basic (11) are attached, Complete tower (1) installation.
As shown in figure 9, moulding bed (3) is the detachable space truss of assembled, connected with the inner wall of tower (1) by high-strength bolt It connects.
The present invention realizes the integral hoisting to tower, and this method process is simple and convenient to operate, speed of application is fast, and saves But the expense of large-scale lifting appliance, economic benefits are rented.
The above is only the preferred embodiments of the invention, but the invention is not limited to above-mentioned specific implementations Scheme.One skilled in the relevant art without departing from the principle of the present invention, can also make several modifications, supplement Or use similar fashion substitution instead, these should also be regarded as protection scope of the present invention.
Although being used more herein: first group of 1- tower, 2- sleeper, 3- moulding bed, 4- universal hinge support, 5- traction are sliding Wheel group (or hoist engine), second group of hauling block group (or hoist engine) of 6-, 7- equalizer pulley group (or hoist engine), 8- hoist engine, The terms such as 9- gin pole, 10- jack, the basis 11-, 12- tower inner flange, but a possibility that be not precluded using other terms. The use of these items is only for being more convenient to describe and explain essence of the invention, it is construed as any additional Limitation be all to be disagreed with spirit of the invention.

Claims (4)

1. a kind of wind-power tower integral erection construction method, which is characterized in that tower erection work progress is made of six steps:
Tower (1) is placed horizontally on ground sleeper (2) by step 1, installs moulding bed (3) inside tower (1), moulding bed (3) Lower connection universal hinge support (4), by tower (1) and first group of hauling block group (or hoist engine) (5), second group of hauling block group (or hoist engine) (6) and balance pulley blocks (or hoist engine) (7) connection;
Step 2, by the steering of the pulling force of hoist engine (8) and auxiliary gin pole (9), with first group of hauling block group (or elevator Machine) tower (1) traction to the position about at 45 ° with horizontal plane, uses equalizer pulley group (or hoist engine) (7) in the process by (5) It keeps stablizing;
Step 3 uses second group of hauling block group (or hoist engine) (6) instead and continues to draw tower (1) to vertical position, in the process It keeps stablizing using equalizer pulley group (or hoist engine) (7), removes gin pole (9) and first group of hauling block group (or hoist engine) (5);
Vertical jack (10) is arranged under tower (1) bottom moulding bed (3) and integrally jacks up tower (1), removes universal for step 4 Hinged-support (4), second group of hauling block group (or hoist engine) (6) and balance pulley blocks (or hoist engine) (7);
Tower (1) is placed in basic (11) top surface by step 5, the top surface absolute altitude for reducing jack (10);
Step 6 removes jack (10), moulding bed (3), by tower inner flange (12) and basic (11) using high-strength bolt or in advance Stress screw rod is attached, and completes tower (1) installation.
2. a kind of wind-power tower integral erection construction method according to claim 1, it is characterised in that: the step one In, moulding bed (3) is mounted on above tower inner flange (12);Universal hinge support (4) setting, can be perpendicular at basic (11) center Histogram to be freely rotated in horizontal plane, be aligned tower inner flange (12) with the bolt hole on basic (11).
3. a kind of wind-power tower integral erection construction method according to claim 1, it is characterised in that: moulding bed (3) is dress With the detachable space truss of formula, it is connect with the inner wall of tower (1) by high-strength bolt.
4. a kind of wind-power tower integral erection construction method according to claim 1, it is characterised in that: the step two In step 3, first group of hauling block group (or hoist engine) (5), second group of hauling block group (or hoist engine) (6) and gin pole (9) setting forms stable triangle with two sides equalizer pulley group (or hoist engine) (7), guarantee was set up in tower (1) the same side The balance of tower (1) in journey.
CN201910107707.5A 2019-01-31 2019-01-31 A kind of wind-power tower integral erection construction method Pending CN109607403A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910107707.5A CN109607403A (en) 2019-01-31 2019-01-31 A kind of wind-power tower integral erection construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910107707.5A CN109607403A (en) 2019-01-31 2019-01-31 A kind of wind-power tower integral erection construction method

Publications (1)

Publication Number Publication Date
CN109607403A true CN109607403A (en) 2019-04-12

Family

ID=66021869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910107707.5A Pending CN109607403A (en) 2019-01-31 2019-01-31 A kind of wind-power tower integral erection construction method

Country Status (1)

Country Link
CN (1) CN109607403A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114962160A (en) * 2022-05-24 2022-08-30 中国长江三峡集团有限公司 Efficient installation device and method for high tower drum equipment
CN116537555A (en) * 2023-05-22 2023-08-04 中建八局第四建设有限公司 Net frame assembling method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4027441A (en) * 1975-10-02 1977-06-07 Grigory Vasilievich Pitelyaev Arrangement for erecting and dismounting an elongate object having one end articulated to a foundation
US20020095878A1 (en) * 2000-12-05 2002-07-25 Henderson Allan P. Tilt-up and telescopic support tower for large structures
CN1944920A (en) * 2006-10-25 2007-04-11 唐山开滦建设(集团)有限责任公司 Method for setting up large box type steel structure permanent headframe during well drilling period
CN201232387Y (en) * 2008-07-11 2009-05-06 江苏省电力公司建湖县供电公司 Special hinge for integral vertical tower
CN101513974A (en) * 2009-02-20 2009-08-26 中国石油化工集团公司 Turning hoisting method for vertical type apparatus
CN102359303A (en) * 2011-10-31 2012-02-22 湖北省输变电工程公司 Extra-high voltage common circuit iron tower assembling method
CN205275095U (en) * 2016-01-19 2016-06-01 国网浙江永康市供电公司 Cross bridge type gin pole device
CN206502579U (en) * 2017-03-03 2017-09-19 吕家辰 Power pole hoisting device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4027441A (en) * 1975-10-02 1977-06-07 Grigory Vasilievich Pitelyaev Arrangement for erecting and dismounting an elongate object having one end articulated to a foundation
US20020095878A1 (en) * 2000-12-05 2002-07-25 Henderson Allan P. Tilt-up and telescopic support tower for large structures
CN1944920A (en) * 2006-10-25 2007-04-11 唐山开滦建设(集团)有限责任公司 Method for setting up large box type steel structure permanent headframe during well drilling period
CN201232387Y (en) * 2008-07-11 2009-05-06 江苏省电力公司建湖县供电公司 Special hinge for integral vertical tower
CN101513974A (en) * 2009-02-20 2009-08-26 中国石油化工集团公司 Turning hoisting method for vertical type apparatus
CN102359303A (en) * 2011-10-31 2012-02-22 湖北省输变电工程公司 Extra-high voltage common circuit iron tower assembling method
CN205275095U (en) * 2016-01-19 2016-06-01 国网浙江永康市供电公司 Cross bridge type gin pole device
CN206502579U (en) * 2017-03-03 2017-09-19 吕家辰 Power pole hoisting device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114962160A (en) * 2022-05-24 2022-08-30 中国长江三峡集团有限公司 Efficient installation device and method for high tower drum equipment
CN114962160B (en) * 2022-05-24 2024-05-28 中国长江三峡集团有限公司 High-efficiency installation device and method for high-tower drum equipment
CN116537555A (en) * 2023-05-22 2023-08-04 中建八局第四建设有限公司 Net frame assembling method

Similar Documents

Publication Publication Date Title
CN204441801U (en) A kind of Multifunctional special vehicle for electric wire construction
CN202245820U (en) Small-sized electric sling cart
CN102701083B (en) Method for replacing wind driven generator component by using special equipment
CN102198914B (en) Working platform for installing wind generating set
CN109607403A (en) A kind of wind-power tower integral erection construction method
CN203128000U (en) Hoisting device for direct-driven wind power generator set
CN106088609A (en) A kind of integral lifting method of large span steel structure vestibule
CN203865931U (en) Hoisting combination tool of distribution transformer
CN205349623U (en) A device that is used for changing fan gear box in air
CN206985567U (en) A kind of construction site construction crane
CN204921267U (en) Fan pillar hoist and mount platform structure
CN203306970U (en) Jacking tool used for jacking heavy part in narrow space
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN211676260U (en) Ferris wheel emergency rescue device
CN202011709U (en) Installation work platform for wind turbine generator set
CN210457249U (en) Electric pole holding structure with self-jacking machine body
CN205257816U (en) Be used for lifting machine in wind generating set cabin
CN204714390U (en) A kind of suspender installed for annex in tower cylinder
CN206288045U (en) A kind of frock carrier
CN202657821U (en) Impeller assembly-disassembly lifting device of no-split centrifugal compressor
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN204675783U (en) A kind of substation simple multifunctional tool car
CN206084920U (en) Device is changed to fan rotor bearing
CN204057793U (en) A kind of voltage transformer lifting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190412

WD01 Invention patent application deemed withdrawn after publication