CN109598422A CN201811385839.6A CN201811385839A CN109598422A CN 109598422 A CN109598422 A CN 109598422A CN 201811385839 A CN201811385839 A CN 201811385839A CN 109598422 A CN109598422 A CN 109598422A
Authority
CN
China
Prior art keywords
enterprise
production
safety index
production safety
regional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811385839.6A
Other languages
Chinese (zh)
Inventor
李睿智
陈耀涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Baizhuo Network Technology Co Ltd
Tongding Interconnection Information Co Ltd
Original Assignee
Suzhou Baizhuo Network Technology Co Ltd
Tongding Interconnection Information Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Baizhuo Network Technology Co Ltd, Tongding Interconnection Information Co Ltd filed Critical Suzhou Baizhuo Network Technology Co Ltd
Priority to CN201811385839.6A priority Critical patent/CN109598422A/en
Priority to CN201910275643.XA priority patent/CN109816281A/en
Publication of CN109598422A publication Critical patent/CN109598422A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Computer Security & Cryptography (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses the calculation method of regional production safety index and devices, the calculating of regional production safety index is realized based on enterprise's production safety index and weight proportion, i.e. regional production safety index is based on enterprise's production safety index in region, using business risk grade as weight proportion, it is calculated with the mode of weighted average;And enterprise's production safety index is realized with the principle deducted points, full marks 100, which divide, deducts the score that correlative factor is lost, i.e. enterprise's production safety index is to divide four key factors for subtracting and influencing enterprise safety operation with full marks 100, including Internet of Things monitoring, hidden danger management, Incident Management, security information, the score deducted.The present invention realizes the accurate assessment of regional production safety index, comprehensively reflects the safe condition of regional production;Accurately illustrate the developing state of regional production safety index: the period calculates regional production safety index, is analyzed and processed, the developing state of reflecting regional safety in production.

Description

The calculation method and device of regional production safety index
Technical field
The present invention relates to the calculation method of the technical field of production safety index more particularly to regional production safety index and Device.
Background technique
With the attention that country supervises enterprise safety operation, more and more assessment index of keeping the safety in production are applied to peace In full supervision, and safety in production index system is constituted, but most of indexs in index system can only all reflect safe life Safe shape state in terms of some in production lacks the synthesis evaluation index to regional production safe condition.
Regional production safety index is a kind of relative indicatrix that activity safety is produced in region, the characteristic evidences information content Theoretical and statistical method is realized, is a kind of creative development carried out to the index system of production safety.
Summary of the invention
For overcome the deficiencies in the prior art, the purpose of the present invention is to provide the calculation methods of regional production safety index And device, it is intended to solve existing safety in production index system to the support Shortcomings of regional production safe condition index, lack The problem of to the synthesis evaluation index of regional production safe condition.
The purpose of the present invention is implemented with the following technical solutions:
A kind of calculation method of regional production safety index, comprising:
Initial step:
The production safety index of each enterprise in zoning;
The risk class of each enterprise in zoning, from high to low include level-one, second level ..., K grades;
The enterprise that risk class is level-one~K grades weight shared in regional production safety is set, W is used1~WKIt indicates;
Statistic procedure:
The number of the enterprise that statistical risk grade is level-one~K grades, uses N1~NKIt indicates;
Calculate step:
The production safety index for the enterprise that risk class is level-one is denoted asIt is the enterprise of second level by risk class The production safety index of industry is denoted asProduction safety index by risk class for K grades of enterprise is denoted as
Zoning production safety index are as follows:
On the basis of the above embodiments, it is preferred that in the initial step, the calculating of the production safety index S of enterprise Formula are as follows:
S=100-DInternet of Things monitoring-DHidden danger management-DIncident Management-DEnterprise security information
Wherein, DInternet of Things monitoringInternet of Things for the production of influence enterprise monitors the score because being subtracted out in prime implicant, DHidden danger managementFor shadow The hidden danger management of enterprise's production is rung because of the score that is subtracted out in prime implicant, DIncident ManagementFor the Incident Management factor for influencing enterprise's production The score being subtracted out in, DEnterprise security informationThe score being subtracted out in enterprise security information factor item to influence enterprise's production.
On the basis of the above embodiments, it is preferred that the risk class of each enterprise in the zoning, specifically:
The production risk index of each enterprise in zoning;
According to the configuration relation between the production risk index of enterprise each in region and the risk class of enterprise, area is determined The risk class of each enterprise in domain.
On the basis of the above embodiments, it is preferred that
Wherein, accident degree is provided with level-one~level Four, d from low to highiIt is the score that every i grades of accident deducts, niIt is i grades of things Therefore quantity;I is positive integer;
DEnterprise security information=DSecurity Officer's configuration+DSafe qualification+DOccupational health construction+DEmergency preplan+DSafety in production system;Wherein, Security Officer configures normally DSecurity Officer's configuration=0, off-specification DSecurity Officer's configuration=2;The complete then D of safe qualificationSafe qualification=0, incomplete then DSafe qualification=2;Occupation is defended The raw sound then D of constructionOccupational health construction=0, unsound then DOccupational health construction=2;Emergency preplan establishes then DEmergency preplan=0, it does not establish then DEmergency preplan=2;Keep the safety in production the then D that has regular systemSafety in production system=0, unsound then DSafety in production system=2.
On the basis of the above embodiments, it is preferred that K=4, and W1=100, W2=20, W3=5, W4=1;
d1=10, d2=20, d3=30, d4=50.
A kind of computing device of regional production safety index, comprising:
Initial module is used for:
The production safety index of each enterprise in zoning;
The risk class of each enterprise in zoning, from high to low include level-one, second level ..., K grades;
The enterprise that risk class is level-one~K grades weight shared in regional production safety is set, W is used1~WKIt indicates;
Statistical module is used for:
The number of the enterprise that statistical risk grade is level-one~K grades, uses N1~NKIt indicates;
Computing module is used for:
The production safety index for the enterprise that risk class is level-one is denoted asIt is the enterprise of second level by risk class The production safety index of industry is denoted asProduction safety index by risk class for K grades of enterprise is denoted as
Zoning production safety index are as follows:
On the basis of the above embodiments, it is preferred that the initial module is used to calculate the production safety index S's of enterprise Formula are as follows:
S=100-DInternet of Things monitoring-DHidden danger management-DIncident Management-DEnterprise security information
Wherein, DInternet of Things monitoringInternet of Things for the production of influence enterprise monitors the score because being subtracted out in prime implicant, DHidden danger managementFor shadow The hidden danger management of enterprise's production is rung because of the score that is subtracted out in prime implicant, DIncident ManagementFor the Incident Management factor for influencing enterprise's production The score being subtracted out in, DEnterprise security informationThe score being subtracted out in enterprise security information factor item to influence enterprise's production.
On the basis of the above embodiments, it is preferred that the risk class of each enterprise in the zoning, specifically:
The production risk index of each enterprise in zoning;
According to the configuration relation between the production risk index of enterprise each in region and the risk class of enterprise, area is determined The risk class of each enterprise in domain.
On the basis of the above embodiments, it is preferred that
Wherein, accident degree is provided with level-one~level Four, d from low to highiIt is the score that every i grades of accident deducts, niIt is i grades of things Therefore quantity;I is positive integer;
DEnterprise security information=DSecurity Officer's configuration+DSafe qualification+DOccupational health construction+DEmergency preplan+DSafety in production system;Wherein, Security Officer configures normally DSecurity Officer's configuration=0, off-specification DSecurity Officer's configuration=2;The complete then D of safe qualificationSafe qualification=0, incomplete then DSafe qualification=2;Occupation is defended The raw sound then D of constructionOccupational health construction=0, unsound then DOccupational health construction=2;Emergency preplan establishes then DEmergency preplan=0, it does not establish then DEmergency preplan=2;Keep the safety in production the then D that has regular systemSafety in production system=0, unsound then DSafety in production system=2.
On the basis of the above embodiments, it is preferred that K=4, and W1=100, W2=20, W3=5, W4=1;
d1=10, d2=20, d3=30, d4=50.
Compared with prior art, the beneficial effects of the present invention are:
The invention discloses the calculation method of regional production safety index and devices, are based on enterprise's production safety index and power Weight ratio realizes the calculating of regional production safety index, i.e., regional production safety index is with enterprise's production safety index in region Based on, using business risk grade as weight proportion, it is calculated with the mode of weighted average;And enterprise's production safety index It is realized with the principle of deduction of points, full marks 100 divide, and deduct the score that correlative factor is lost, i.e. enterprise's production safety index is to use full marks 100 points subtract four key factors for influencing enterprise safety operation, including Internet of Things monitoring, hidden danger management, Incident Management, safety Information, the score deducted.
The present invention realizes the accurate assessment of regional production safety index, comprehensively reflects the safe shape of regional production State: covering many factors of regional production safety in a manner of various dimensions, embodies different enterprises in a manner of weight proportion Influence of the production safety state to regional production safe condition, accurately evaluated the production safety state in region;Accurately Ground illustrates the developing state of regional production safety index: the period calculates regional production safety index, then to these indexs It is analyzed and processed, obtains the developing state of regional production safety index, and then reflect the developing state of region security production.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 shows a kind of process signal of the calculation method of regional production safety index provided in an embodiment of the present invention Figure;
Fig. 2 shows a kind of structural representations of the computing device of regional production safety index provided in an embodiment of the present invention Figure.
Specific embodiment
In the following, being described further in conjunction with attached drawing and specific embodiment to the present invention, it should be noted that not Under the premise of conflicting, new implementation can be formed between various embodiments described below or between each technical characteristic in any combination Example.
Specific embodiment one
As shown in Figure 1, the embodiment of the invention provides a kind of calculation methods of regional production safety index, comprising:
Initial step S101:
The production safety index of each enterprise in zoning;
The risk class of each enterprise in zoning, from high to low include level-one, second level ..., K grades;
The enterprise that risk class is level-one~K grades weight shared in regional production safety is set, W is used1~WKIt indicates;
Statistic procedure S102:
The number of the enterprise that statistical risk grade is level-one~K grades, uses N1~NKIt indicates;
Calculate step S103:
The production safety index for the enterprise that risk class is level-one is denoted asIt is the enterprise of second level by risk class The production safety index of industry is denoted asProduction safety index by risk class for K grades of enterprise is denoted as
Zoning production safety index are as follows:
Enterprise's production safety index realizes that full marks 100 divide with the principle deducted points, and deducts the score that correlative factor is lost.It is excellent Choosing, in the initial step S101, the calculation formula of the production safety index S of enterprise can be with are as follows:
S=100-DInternet of Things monitoring-DHidden danger management-DIncident Management-DEnterprise security information
Wherein, DInternet of Things monitoringInternet of Things for the production of influence enterprise monitors the score because being subtracted out in prime implicant, DHidden danger managementFor shadow The hidden danger management of enterprise's production is rung because of the score that is subtracted out in prime implicant, DIncident ManagementFor the Incident Management factor for influencing enterprise's production The score being subtracted out in, DEnterprise security informationThe score being subtracted out in enterprise security information factor item to influence enterprise's production. The advantage of doing so is that giving the production safety index of each enterprise and the different relationships because between prime implicant.
For example, the particularly relevant factor of the production safety index of enterprise and the score value accounting of each factor can be as shown in table 1:
The correlative factor of the production safety index of 1 enterprise of table and the score value accounting of each factor
Internet of Things monitoring deduction of points includes that sensor early warning deduction of points and camera early warning are deducted points.The standard of sensor early warning deduction of points It is to be obtained with " number of enterprise's current year overdue response sensor early warning " divided by " total degree of enterprise's current year all the sensors early warning " Percentage out, every 1% one point of button;This deduction of points at most 10 points of button.The standard of camera early warning deduction of points is with " enterprise images current year Head early warning number " obtains percentage, every 1% one point of button divided by " number of days that current date had already passed through current year ";This deduction of points At most 10 points of button.Preferably, the calculation formula of Internet of Things monitoring deduction of points is as follows:
Hidden danger management deduction of points includes hidden troubles removing deduction of points and hidden danger processing deduction of points.Hidden troubles removing deduction of points standard be with " when The percentage that the hidden danger number that year is checked out " is obtained divided by " current year hidden troubles removing number ", every 2% 1 point of button;This deduction of points is most 5 points of button.Hidden danger handles standard of deducting point with " enterprise's current year overdue untreated hidden danger number " divided by " enterprise excludes current year The total number of hidden danger " obtains to obtain percentage, every 1% one point of button;This deduction of points at most 15 points of button.Preferably, hidden danger management is deducted points Calculation formula it is as follows:
Incident Management deduction of points is deduction of points caused by all accidents occurred cumulative enterprise's current year, i.e.,
Wherein, accident degree is provided with level-one~level Four, d from low to highiIt is the score that every i grades of accident deducts, niIt is i grades of things Therefore quantity;I is positive integer.The embodiment of the present invention to deduction score corresponding to incident classification without limitation, it is preferred that d1= 10, d2=20, d3=30, d4=50.This deduction of points at most 50 points of button, the deduction of points rule of different brackets accident can be such as 2 institute of table Show:
2 incident classification of table deducts the corresponding relationship of score with every accident
The deduction of points of enterprise security information is mainly to the relevant deduction of points of enterprise security information management, including five contents: safety Whether personnel depaly closes rule, whether safe qualification is complete, whether sound, emergency preplan is established, is safe for occupational health construction Whether production system perfects.Each full marks 2 divides, and inspection result then detains 2 points, otherwise do not deduct points if it is "No", specific to calculate public affairs Formula is as follows:
DEnterprise security information=DSecurity Officer's configuration+DSafe qualification+DOccupational health construction+DEmergency preplan+DSafety in production system;Wherein, Security Officer configures normally DSecurity Officer's configuration=0, off-specification DSecurity Officer's configuration=2;The complete then D of safe qualificationSafe qualification=0, incomplete then DSafe qualification=2;Occupation is defended The raw sound then D of constructionOccupational health construction=0, unsound then DOccupational health construction=2;Emergency preplan establishes then DEmergency preplan=0, it does not establish then DEmergency preplan=2;Keep the safety in production the then D that has regular systemSafety in production system=0, unsound then DSafety in production system=2.
The embodiment of the present invention is realized based on regional production safety index by enterprise's production safety index and weight proportion It calculates, i.e., regional production safety index is based on enterprise's production safety index in region, using business risk grade as weight proportion, It is calculated with the mode of weighted average;And enterprise's production safety index is realized with the principle deducted points, full marks 100 divide, and deduct The score that correlative factor is lost, i.e. enterprise's production safety index are to be divided to subtract four that influence enterprise safety operation with full marks 100 Key factor, including Internet of Things monitoring, hidden danger management, Incident Management, security information, the score deducted.
Preferably, in the zoning each enterprise risk class, can be with specifically: each enterprise in zoning Production risk index;According to the configuration relation between the production safety index S of enterprise and the risk class of enterprise, enterprise is determined Risk class.
In the embodiment of the present invention, the calculation of the production risk index of each enterprise can be in region are as follows:
The grade of enterprises major hazard source is set, from high to low includes level-one major hazard source, second level substantial risk Source ..., P grades of major hazard sources;The major hazard source that grade is level-one~P grades power shared in enterprise's production risk is set Weight, uses WW1~WWPIt indicates;Weight can be configured according to the demand in practical application;
The grade of enterprises risk source is set, from high to low include Q grades of risk sources, Q-1 grades of risk sources ..., level-one Risk source;The grade weight shared in enterprise's production risk for the risk source of Q grades~level-one is set, W is usedFQ~WF1It indicates;Power Weight can be configured according to the demand in practical application;
Obtain the value-at-risk and its grade of each major hazard source of enterprises;
Obtain the value-at-risk and its grade of each risk source of enterprises;
The major hazard source quantity that grade is level-one~P grades is counted, N is usedW1~NWPIt indicates;
The risk source quantity that grade is Q grades~level-one is counted, N is usedFQ~NF1It indicates;
The value-at-risk for the major hazard source that grade is level-one is denoted asIt is the substantial risk of second level by grade The value-at-risk in source is denoted asValue-at-risk by grade for P grades of major hazard source is denoted as In practical applications, it is calculated to be further simplified, reduces calculation amount, it can be by the value-at-risk of the identical major hazard source of grade It is set as identical value, such as some empirical mean value;
Value-at-risk by grade for Q grades of risk source is denoted asBy the risk for the risk source that grade is Q-1 grades Value is denoted asThe value-at-risk for the risk source that grade is level-one is denoted asIn reality It in the application of border, is calculated to be further simplified, reduces calculation amount, the value-at-risk of the identical risk source of grade can be set as phase Same value, such as some empirical mean value;
Calculate the production risk index of enterprise are as follows:
Enterprise's production risk index is based on the value-at-risk of enterprises major hazard source and risk source, with substantial risk The grade of source and risk source is weight proportion, is calculated with the mode of weighted average.
Preferably, in the zoning each enterprise risk class, can be with specifically: according to enterprise each in region Production risk index R and enterprise risk class between configuration relation, determine the risk class of each enterprise in region.Example Such as, R < 20, corresponding level Four risk (priming the pump grade);20≤R < 40, corresponding tertiary risk;40≤R < 60, corresponding light breeze Danger;R > 60, corresponding prime risk (highest risk class).
The embodiment of the present invention to the weight of the setting of business risk grade and each risk class without limitation, risk etc. Grade can be divided into level Four, it is preferred that K=4, and W1=100, W2=20, W3=5, W4=1.At this point, the risk class packet of enterprise It includes: prime risk, second level risk, tertiary risk, level Four risk.In practical applications, user can be according to the item of specific environment Part and self-demand select suitable weight, for evaluating the significance level that each risk class is affected.
Preferably, P=4, and WW1=100, WW2=80, WW3=60, WW4=40;At this point, level-one major hazard source represents spy Big danger source, second level major hazard source represent major hazard source, and three-level major hazard source represents larger danger source, the great danger of level Four Dangerous source represents general danger source;
Q=5, and WF5=30, WF4=20, WF3=10, WF2=5, WF1=1.
Preferably,Value be 100,Value be 80,Value be 60,Value be 50;
Value be 40,Value be 30,Value be 20,Value be 10,Value be 1.
The embodiment of the present invention realizes the accurate assessment of regional production safety index, comprehensively reflects the peace of regional production Total state: covering many factors of regional production safety in a manner of various dimensions, embodies difference in a manner of weight proportion Influence of the production safety state of enterprise to regional production safe condition, has accurately evaluated the production safety state in region; Accurately illustrate the developing state of regional production safety index: the period calculates regional production safety index, then to these Index is analyzed and processed, and obtains the developing state of regional production safety index, and then reflects the development of region security production Situation.
In above-mentioned specific embodiment one, the calculation method of regional production safety index is provided, it is corresponding, The application also provides the computing device of regional production safety index.Since Installation practice is substantially similar to embodiment of the method, institute To describe fairly simple, the relevent part can refer to the partial explaination of embodiments of method.Installation practice described below is only It is only illustrative.
Specific embodiment two
As shown in Fig. 2, the embodiment of the invention provides a kind of computing devices of regional production safety index, comprising:
Initial module 201, is used for:
The production safety index of each enterprise in zoning;
The risk class of each enterprise in zoning, from high to low include level-one, second level ..., K grades;
The enterprise that risk class is level-one~K grades weight shared in regional production safety is set, W is used1~WKIt indicates;
Statistical module 202, is used for:
The number of the enterprise that statistical risk grade is level-one~K grades, uses N1~NKIt indicates;
Computing module 203, is used for:
The production safety index for the enterprise that risk class is level-one is denoted asIt is the enterprise of second level by risk class The production safety index of industry is denoted asProduction safety index by risk class for K grades of enterprise is denoted as
Zoning production safety index are as follows:
Preferably, K=4, and W1=100, W2=20, W3=5, W4=1.
Preferably, the formula that the initial module 201 is used to calculate the production safety index S of enterprise can be with are as follows:
S=100-DInternet of Things monitoring-DHidden danger management-DIncident Management-DEnterprise security information
Wherein, DInternet of Things monitoringInternet of Things for the production of influence enterprise monitors the score because being subtracted out in prime implicant, DHidden danger managementFor shadow The hidden danger management of enterprise's production is rung because of the score that is subtracted out in prime implicant, DIncident ManagementFor the Incident Management factor for influencing enterprise's production The score being subtracted out in, DEnterprise security informationThe score being subtracted out in enterprise security information factor item to influence enterprise's production.
Preferably, in the zoning each enterprise risk class, can be with specifically:
The production risk index of each enterprise in zoning;
According to the configuration relation between the production risk index of enterprise each in region and the risk class of enterprise, area is determined The risk class of each enterprise in domain.
Preferably,
Wherein, accident degree is provided with level-one~level Four, d from low to highiIt is the score that every i grades of accident deducts, niIt is i grades of things Therefore quantity;I is positive integer;
DEnterprise security information=DSecurity Officer's configuration+DSafe qualification+DOccupational health construction+DEmergency preplan+DSafety in production system;Wherein, Security Officer configures normally DSecurity Officer's configuration=0, off-specification DSecurity Officer's configuration=2;The complete then D of safe qualificationSafe qualification=0, incomplete then DSafe qualification=2;Occupation is defended The raw sound then D of constructionOccupational health construction=0, unsound then DOccupational health construction=2;Emergency preplan establishes then DEmergency preplan=0, it does not establish then DEmergency preplan=2;Keep the safety in production the then D that has regular systemSafety in production system=0, unsound then DSafety in production system=2.
Preferably, d1=10, d2=20, d3=30, d4=50.
The embodiment of the present invention is realized based on regional production safety index by enterprise's production safety index and weight proportion It calculates, i.e., regional production safety index is based on enterprise's production safety index in region, using business risk grade as weight proportion, It is calculated with the mode of weighted average;And enterprise's production safety index is realized with the principle deducted points, full marks 100 divide, and deduct The score that correlative factor is lost, i.e. enterprise's production safety index are to be divided to subtract four that influence enterprise safety operation with full marks 100 Key factor, including Internet of Things monitoring, hidden danger management, Incident Management, security information, the score deducted.
The embodiment of the present invention realizes the accurate assessment of regional production safety index, comprehensively reflects the peace of regional production Total state: covering many factors of regional production safety in a manner of various dimensions, embodies difference in a manner of weight proportion Influence of the production safety state of enterprise to regional production safe condition, has accurately evaluated the production safety state in region; Accurately illustrate the developing state of regional production safety index: the period calculates regional production safety index, then to these Index is analyzed and processed, and obtains the developing state of regional production safety index, and then reflects the development of region security production Situation.
The present invention is from using in purpose, and in efficiency, the viewpoints such as progressive and novelty are illustrated, the practical progress having Property, oneself meets the function that Patent Law is emphasized and promotes and use important document, and more than the present invention explanation and attached drawing are only of the invention Preferred embodiment and oneself, the present invention is not limited to this, therefore, it is all constructed with the present invention, device, wait the approximations, thunder such as levy With, i.e., all according to equivalent replacement made by present patent application range or modification etc., the patent application that should all belong to of the invention is protected Within the scope of shield.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.Although present invention has been a degree of descriptions, it will be apparent that, in the item for not departing from the spirit and scope of the present invention Under part, the appropriate variation of each condition can be carried out.It is appreciated that the present invention is not limited to the embodiments, and it is attributed to right and wants The range asked comprising the equivalent replacement of each factor.It will be apparent to those skilled in the art that can as described above Various other corresponding changes and deformation are made in technical solution and design, and all these change and deformation is all answered Within this is belonged to the protection scope of the claims of the invention.

Claims (10)

1. a kind of calculation method of regional production safety index characterized by comprising
Initial step:
The production safety index of each enterprise in zoning;
The risk class of each enterprise in zoning, from high to low include level-one, second level ..., K grades;
The enterprise that risk class is level-one~K grades weight shared in regional production safety is set, W is used1~WKIt indicates;
Statistic procedure:
The number of the enterprise that statistical risk grade is level-one~K grades, uses N1~NKIt indicates;
Calculate step:
The production safety index for the enterprise that risk class is level-one is denoted asIt is the enterprise of second level by risk class Production safety index is denoted asProduction safety index by risk class for K grades of enterprise is denoted as
Zoning production safety index are as follows:
2. the calculation method of regional production safety index according to claim 1, which is characterized in that the initial step In, the calculation formula of the production safety index S of enterprise are as follows:
S=100-DInternet of Things monitoring-DHidden danger management-DIncident Management-DEnterprise security information
Wherein, DInternet of Things monitoringInternet of Things for the production of influence enterprise monitors the score because being subtracted out in prime implicant, DHidden danger managementTo influence enterprise The hidden danger management of industry production is because of the score that is subtracted out in prime implicant, DIncident ManagementTo influence the Incident Management of enterprise's production because in prime implicant The score being subtracted out, DEnterprise security informationThe score being subtracted out in enterprise security information factor item to influence enterprise's production.
3. the calculation method of regional production safety index according to claim 2, which is characterized in that in the zoning The risk class of each enterprise, specifically:
The production risk index of each enterprise in zoning;
According to the configuration relation between the production risk index of enterprise each in region and the risk class of enterprise, determine in region The risk class of each enterprise.
4. the calculation method of regional production safety index according to claim 3, which is characterized in that
Wherein, accident degree is provided with level-one~level Four, d from low to highiIt is the score that every i grades of accident deducts, niIt is i grades of things Therefore quantity;I is positive integer;
DEnterprise security information=DSecurity Officer's configuration+DSafe qualification+DOccupational health construction+DEmergency preplan+DSafety in production system;Wherein, Security Officer configures normally DSecurity Officer's configuration=0, off-specification DSecurity Officer's configuration=2;The complete then D of safe qualificationSafe qualification=0, incomplete then DSafe qualification=2;Occupation is defended The raw sound then D of constructionOccupational health construction=0, unsound then DOccupational health construction=2;Emergency preplan establishes then DEmergency preplan=0, it does not establish then DEmergency preplan=2;Keep the safety in production the then D that has regular systemSafety in production system=0, unsound then DSafety in production system=2.
5. the calculation method of regional production safety index according to claim 4, which is characterized in that K=4, and W1=100, W2=20, W3=5, W4=1;
d1=10, d2=20, d3=30, d4=50.
6. a kind of computing device of regional production safety index characterized by comprising
Initial module is used for:
The production safety index of each enterprise in zoning;
The risk class of each enterprise in zoning, from high to low include level-one, second level ..., K grades;
The enterprise that risk class is level-one~K grades weight shared in regional production safety is set, W is used1~WKIt indicates;
Statistical module is used for:
The number of the enterprise that statistical risk grade is level-one~K grades, uses N1~NKIt indicates;
Computing module is used for:
The production safety index for the enterprise that risk class is level-one is denoted asIt is the enterprise of second level by risk class Production safety index is denoted asProduction safety index by risk class for K grades of enterprise is denoted as
Zoning production safety index are as follows:
7. the computing device of regional production safety index according to claim 6, which is characterized in that the initial module is used In the formula for the production safety index S for calculating enterprise are as follows:
S=100-DInternet of Things monitoring-DHidden danger management-DIncident Management-DEnterprise security information
Wherein, DInternet of Things monitoringInternet of Things for the production of influence enterprise monitors the score because being subtracted out in prime implicant, DHidden danger managementTo influence enterprise The hidden danger management of industry production is because of the score that is subtracted out in prime implicant, DIncident ManagementTo influence the Incident Management of enterprise's production because in prime implicant The score being subtracted out, DEnterprise security informationThe score being subtracted out in enterprise security information factor item to influence enterprise's production.
8. the computing device of regional production safety index according to claim 7, which is characterized in that in the zoning The risk class of each enterprise, specifically:
The production risk index of each enterprise in zoning;
According to the configuration relation between the production risk index of enterprise each in region and the risk class of enterprise, determine in region The risk class of each enterprise.
9. the computing device of regional production safety index according to claim 8, which is characterized in that
Wherein, accident degree is provided with level-one~level Four, d from low to highiIt is the score that every i grades of accident deducts, niIt is i grades of things Therefore quantity;I is positive integer;
DEnterprise security information=DSecurity Officer's configuration+DSafe qualification+DOccupational health construction+DEmergency preplan+DSafety in production system;Wherein, Security Officer configures normally DSecurity Officer's configuration=0, off-specification DSecurity Officer's configuration=2;The complete then D of safe qualificationSafe qualification=0, incomplete then DSafe qualification=2;Occupation is defended The raw sound then D of constructionOccupational health construction=0, unsound then DOccupational health construction=2;Emergency preplan establishes then DEmergency preplan=0, it does not establish then DEmergency preplan=2;Keep the safety in production the then D that has regular systemSafety in production system=0, unsound then DSafety in production system=2.
10. the computing device of regional production safety index according to claim 9, which is characterized in that K=4, and W1= 100, W2=20, W3=5, W4=1;
d1=10, d2=20, d3=30, d4=50.
CN201811385839.6A 2018-11-20 2018-11-20 The calculation method and device of regional production safety index Pending CN109598422A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201811385839.6A CN109598422A (en) 2018-11-20 2018-11-20 The calculation method and device of regional production safety index
CN201910275643.XA CN109816281A (en) 2018-11-20 2019-04-08 The calculation method and device of regional production safety index

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811385839.6A CN109598422A (en) 2018-11-20 2018-11-20 The calculation method and device of regional production safety index

Publications (1)

Publication Number Publication Date
CN109598422A true CN109598422A (en) 2019-04-09

Family

ID=65959167

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201811385839.6A Pending CN109598422A (en) 2018-11-20 2018-11-20 The calculation method and device of regional production safety index
CN201910275643.XA Pending CN109816281A (en) 2018-11-20 2019-04-08 The calculation method and device of regional production safety index

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201910275643.XA Pending CN109816281A (en) 2018-11-20 2019-04-08 The calculation method and device of regional production safety index

Country Status (1)

Country Link
CN (2) CN109598422A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112783100A (en) * 2019-11-06 2021-05-11 中国石油化工股份有限公司 Memory, chemical enterprise safety production risk early warning method, equipment and device
CN114331112A (en) * 2021-12-28 2022-04-12 天地(常州)自动化股份有限公司 Enterprise safety condition real-time evaluation management system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114358552A (en) * 2021-12-28 2022-04-15 天地(常州)自动化股份有限公司 Enterprise safety condition evaluation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112783100A (en) * 2019-11-06 2021-05-11 中国石油化工股份有限公司 Memory, chemical enterprise safety production risk early warning method, equipment and device
CN114331112A (en) * 2021-12-28 2022-04-12 天地(常州)自动化股份有限公司 Enterprise safety condition real-time evaluation management system

Also Published As

Publication number Publication date
CN109816281A (en) 2019-05-28

Similar Documents

Publication Publication Date Title
CN109816281A (en) The calculation method and device of regional production safety index
CN105516130B (en) Data processing method and device
Dumrak et al. Factors associated with the severity of construction accidents: The case of South Australia
Kumar et al. Policies to reduce influenza in the workplace: impact assessments using an agent-based model
CN109816282A (en) The calculation method and device of regional production risk index
Zhou et al. Assessment of provincial social vulnerability to natural disasters in China
Alizadeh et al. Analysis of occupational accident fatalities and injuries among male group in Iran between 2008 and 2012
Choudhury et al. Food security and human mobility during the covid-19 lockdown
Lipscomb et al. How well are we controlling falls from height in construction? Experiences of union carpenters in Washington State, 1989–2008
Hutter An inspector calls: the importance of proactive enforcement in the regulatory context
CN113947279A (en) Risk classification management and control method based on engineering management and control platform
Nadpara et al. An empirical examination of the effect of corruption on health outcomes
Santana et al. Incidence of severe work-related injuries among young adult workers in Brazil: analysis of compensation data
Queste et al. User needs: why we need indicators
KR101423307B1 (en) Information-security ability management system
McCarrey et al. Landscape office attitudes: Reflections of perceived degree of control over transactions with the environment.
Hashem et al. The factors affecting the implementation of safety and health practices in the Libyan Construction Sites
Lipscomb et al. Twenty years of workers' compensation costs due to falls from height among union carpenters, Washington State
Soltanian et al. Assessment of mask-wearing adherence and social distancing compliance in public passengers in Hamadan, Iran, during the COVID-19 pandemic
Wang et al. Spatio-temporal evolution and trend prediction of the incidence of Class B notifiable infectious diseases in China: a sample of statistical data from 2007 to 2020
CN112016777A (en) Railway construction engineering quality safety management system and method
Georgantzi Elder abuse and neglect in the European Union
Richter et al. Poverty in old age in times of COVID-19—Empirical results from Austria
Crampton et al. Using infoveillance to identify community concerns/literacy, reduce risk, and improve response in pollution and health emergencies
Guldvik et al. Rapid intervention vehicles' impact on fire departments' response time

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190409