CN109597017A - 一种智能电能表起动和潜动的快速检测方法 - Google Patents
一种智能电能表起动和潜动的快速检测方法 Download PDFInfo
- Publication number
- CN109597017A CN109597017A CN201811600418.0A CN201811600418A CN109597017A CN 109597017 A CN109597017 A CN 109597017A CN 201811600418 A CN201811600418 A CN 201811600418A CN 109597017 A CN109597017 A CN 109597017A
- Authority
- CN
- China
- Prior art keywords
- starting
- electric energy
- energy meter
- test
- theoretical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Measurement Of Current Or Voltage (AREA)
Abstract
本发明提供一种智能电能表起动和潜动的快速检测方法,包括以下步骤:步骤1,预先设置预设起动电流Ix和预设时间阈值A;步骤2,根据电能表标称参数,计算电能表起动试验检测的理论起动时限tQ和潜动试验检测的理论潜动时限Δt;步骤3:起动试验检测或潜动试验检测开始后,在所述理论起动时限tQ或所述潜动试验检测的理论潜动时限Δt的前A*tQ或A*Δt内施加所述预设起动电流Ix,在所述理论起动时限tQ或所述潜动试验检测的理论潜动时限Δt的后(1‑A)*Tx或(1‑A)*Δt内施加理论起动电流IQ;步骤4:所述理论起动时限tQ或所述理论潜动时限Δt结束后,根据电能表实际脉冲的变化,并结合起动试验检测标准或潜动试验检测标准判定起动试验或潜动试验的检测结果。
Description
技术领域
本发明涉及智能电能表检测领域,具体的说,涉及了一种智能电能表起动和潜动的快速检测方法。
背景技术
现有不同等级的智能电能表按照国网要求进行电能表的起动试验和潜动试验检测时,时间很长,往往需要几十分钟才能完成。起动试验和潜动试验检测时施加的起动电流IQ要求如下:
【起动电流IQ】
国家计量检定规程JJG 596-2012中规定,单相或三相电能表的起动电流IQ如表1所示:
【起动试验检测】
在电压线路加参比电压Un和功率因数的条件下,电流线路的电流升到表1规定的起动电流IQ后,电能表在起动时限tQ内应能起动并连续记录。
起动时限按下面公式(1)确定:
式中:IQ为电能表最大电流,单位为A;Un为参比电压,单位为V;
C=电能表输出单元发出的脉冲数,单位为imp/kWh或imp/kvarh;m为系数,单相电能表为m=1,三相四线电能表为m=3,三相三线电能表为
【潜动试验检测】
试验时,电流线路不加电流,电压线路施加电压为参比电压的115%和功率因数的条件下,测试输出单元所发脉冲不能多于1个。
潜动时限按下面公式(2)确定:
0.2S级表:
0.5S级、1级表:
2级表:
式中:Imax为电能表最大电流,单位为A;Un为参比电压,单位为V;
C=电能表输出单元发出的脉冲数,单位为imp/kWh或imp/kvarh;m为系数,单相电能表为m=1,三相四线电能表为m=3,三相三线电能表为
以单相有功、经互感器接入的电能表常数1200imp/kWh、电流10(60)A举例说明,根据以上公式计算可得,起动试验时间需要5.5分钟,潜动试验时间需要30.3分钟,两个试验总共需要36分钟左右才能完成。
目前国内的电能表生产企业和电能表检定部门,在对电能表起动试验、潜动试验这两项指标考核时,往往需要花费很长时间,而生产电能表检定装置的企业在这方面也没有太多的研究,只是按部就班的按照国网要求去检测,这样就大大降低了相关部门的生产效率。
为了解决以上存在的问题,人们一直在寻求一种理想的技术解决方案。
发明内容
本发明的目的是针对现有技术的不足,从而提供了一种智能电能表起动和潜动的快速检测方法,在不影响检测结果的前提下能够极大提高检测效率。
为了实现上述目的,本发明所采用的技术方案是:一种智能电能表起动和潜动的快速检测方法,该快速检测方法包括以下步骤:
步骤1,预先设置预设起动电流Ix和预设时间阈值A,所述预设时间阈值A为起动试验检验或潜动试验检验时施加预设起动电流Ix的时间占起动试验检测周期或潜动试验检测周期的百分比;
步骤2,根据电能表标称参数,计算电能表起动试验检测的理论起动时限tQ和潜动试验检测的理论潜动时限Δt;
步骤3:起动试验检测或潜动试验检测开始后,在所述理论起动时限tQ或所述潜动试验检测的理论潜动时限Δt的前A*tQ或A*Δt内施加所述预设起动电流Ix,在所述理论起动时限tQ或所述潜动试验检测的理论潜动时限Δt的后(1-A)*Tx或(1-A)*Δt内施加理论起动电流IQ;
步骤4:所述理论起动时限tQ或所述理论潜动时限Δt结束后,根据电能表实际脉冲的变化,并结合起动试验检测标准或潜动试验检测标准判定起动试验或潜动试验的检测结果。
基于上述,所述预设起动电流的计算过程为:预设电能表在设定时间Tx内输出一个脉冲信号,根据所述设定时间Tx计算电能表需要施加的预设起动电流Ix:
其中,W为电能表的额定电功,单位为kWh;C为电能表输出单元发出的脉冲数,单位为imp/kWh;m为系数,单相电能表为1,三相四线电能表为3,三相三线电能表为Un为参比电压,单位为V。
本发明相对现有技术具有突出的实质性特点和显著的进步,具体的说,本发明通过将电能表起动试验检测的理论起动时限tQ或潜动试验检测的理论潜动时限Δt分成两个阶段,在不同的阶段内施加不同的起动电流,以此改变起动试验和潜动试验检测周期内某个时段内负载的变化,促使这两项试验检测的快速完成,而不影响最终的检测结果,达到加速起动试验检测和潜动试验检测的目的。
具体实施方式
下面通过具体实施方式,对本发明的技术方案做进一步的详细描述。
本发明提供一种智能电能表起动和潜动的快速检测方法,包括以下步骤:
步骤1,预先设置预设起动电流Ix和预设时间阈值A,所述预设时间阈值A为起动试验检验或潜动试验检验时施加预设起动电流Ix的时间占起动试验检测周期或潜动试验检测周期的百分比,优选的,所述预设时间阈值为80%;
所述预设起动电流的计算过程为:预设电能表在设定时间Tx内输出一个脉冲信号,优选的,所述设定时间Tx为1min,根据所述设定时间Tx计算电能表需要施加的预设起动电流Ix:
其中,W为电能表的额定电功,单位为kWh;C为电能表输出单元发出的脉冲数,单位为imp/kWh;m为系数,单相电能表为1,三相四线电能表为3,三相三线电能表为Un为参比电压,单位为V;
步骤2,根据电能表标称参数,计算电能表起动试验检测的理论起动时限tQ和潜动试验检测的理论潜动时限Δt;
步骤3:起动试验检测或潜动试验检测开始后,在所述理论起动时限tQ或所述潜动试验检测的理论潜动时限Δt的前A*tQ或A*Δt内施加所述预设起动电流Ix,在所述理论起动时限tQ或所述潜动试验检测的理论潜动时限Δt的后(1-A)*Tx或(1-A)*Δt内施加理论起动电流IQ;
步骤4:所述理论起动时限tQ或所述理论潜动时限Δt结束后,根据电能表实际脉冲的变化,并结合起动试验检测标准或潜动试验检测标准判定起动试验或潜动试验的检测结果。
以一个单相2级有功的电能表为例,该电能表的标称参数为:电能表常数1200imp/kW*h、电流为5(60)A、参比电压为220V、额定电功为1kWh、接线方式为单相、等级为2级,根据上述标称参数可得,C=1200imp/kW*h,m=1,W=1kW*h=60*1000(W*min),Un=220V,Ib=5A,Imax=60A,IQ=0.005Ib=0.025A,参照背景技术里面的公式(1)计算电能表起动试验检测的理论起动时限tQ,
参照背景技术里面的公式(2)计算电能表潜动试验检测的理论潜动时限Δt,
两个试验检测完成原来需要41.2min左右。
按照本发明的技术方案对上述参数的电能表进行起动试验和潜动试验检测前,首先选取所述设定时间Tx为1min,根据公式(3)计算预设起动电流Ix,可得:
选取所述时间阈值A为80%,即相当于把电能表起动试验检测或潜动试验检测的检测周期分成两个阶段:前80%*tQ或80%*Δt,和后20%*TQ或20%*Δt。
按照本发明的技术方案对上述参数的电能表进行起动试验和潜动试验检测时,在前80%*tQ或80%*Δt内,施加所述预设起动电流Ix,由于该预设起动电流Ix=0.227A,远远大于表1中要求的理论起动电流IQ,从而使得电能表快速起动而不使电能表的脉冲信号发生变化。
在后20%*TQ或20%*Δt内,施加表1要求的理论起动电流IQ,IQ=0.025A,按该时间段内电能表脉冲的实际变化来判断起动试验和潜动试验的检测结果,其中,进行起动试验检测时,如果在后20%*TQ或20%*Δt内电能表发出脉冲信号,则判断该项试验检测合格,否则不合格;进行潜动试验检测时,如果在后20%*TQ或20%*Δt内电能表发出脉冲信号,则判断该项试验不合格,否则合格。
由于在前80%*TQ或80%*Δt施加预设起动电流只是为了使电能表快速起动并不会改变电能表脉冲信号的发生,且两项试验检测的结果最终是由后20%*TQ或20%*Δt施加的理论起动电流决定的,故最终起动试验检测时间仅为20%*TQ,即20%*10.9min;最终潜动试验检测时间仅20%*Δt,即20%*30.3min;两个试验检时间加起来为20%*TQ+20%*Δt=8.24min;与现有的起动试验检测和潜动试验检测相比,按照本发明的技术方案对上述参数的电能表进行起动试验和潜动试验检测时,检测结果并不会受到影响,而检测时间却减少了80%*TQ+80%*Δt=32.96min,大大挺高了检测效率。
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制;尽管参照较佳实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者对部分技术特征进行等同替换;而不脱离本发明技术方案的精神,其均应涵盖在本发明请求保护的技术方案范围当中。
Claims (4)
1.一种智能电能表起动和潜动的快速检测方法,其特征在于,包括以下步骤:
步骤1,预先设置预设起动电流Ix和预设时间阈值A,所述预设时间阈值A为起动试验检验或潜动试验检验时施加预设起动电流Ix的时间占起动试验检测周期或潜动试验检测周期的百分比;
步骤2,根据电能表标称参数,计算电能表起动试验检测的理论起动时限tQ和潜动试验检测的理论潜动时限Δt;
步骤,3:起动试验检测或潜动试验检测开始后,在所述理论起动时限tQ或所述潜动试验检测的理论潜动时限Δt的前A*tQ或A*Δt内施加所述预设起动电流Ix,在所述理论起动时限tQ或所述潜动试验检测的理论潜动时限Δt的后(1-A)*Tx或(1-A)*Δt内施加理论起动电流IQ;
步骤4:所述理论起动时限tQ或所述理论潜动时限Δt结束后,根据电能表实际脉冲的变化,并结合起动试验检测标准或潜动试验检测标准判定起动试验或潜动试验的检测结果。
2.根据权利要求1所述的智能电能表起动和潜动的快速检测方法,其特征在于,所述预设起动电流Ix的计算过程为:预设电能表在设定时间Tx内输出一个脉冲信号,根据所述设定时间Tx计算电能表需要施加的预设起动电流Ix:
其中,W为电能表的额定电功,单位为kWh;C为电能表输出单元发出的脉冲数,单位为imp/kWh;m为系数,单相电能表为1,三相四线电能表为3,三相三线电能表为;Un为参比电压,单位为V。
3.根据权利要求2所述的智能电能表起动和潜动的快速检测方法,其特征在于:所述设定时间为60s。
4.根据权利要求1所述的智能电能表起动和潜动的快速检测方法,其特征在于:所述时间阈值A为80%。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811600418.0A CN109597017A (zh) | 2018-12-26 | 2018-12-26 | 一种智能电能表起动和潜动的快速检测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811600418.0A CN109597017A (zh) | 2018-12-26 | 2018-12-26 | 一种智能电能表起动和潜动的快速检测方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109597017A true CN109597017A (zh) | 2019-04-09 |
Family
ID=65962825
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811600418.0A Pending CN109597017A (zh) | 2018-12-26 | 2018-12-26 | 一种智能电能表起动和潜动的快速检测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109597017A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111413661A (zh) * | 2020-05-06 | 2020-07-14 | 郑州万特电气股份有限公司 | 一种采用标准表法进行仪表常数试验的检测方法 |
CN111896909A (zh) * | 2020-07-16 | 2020-11-06 | 河南省计量科学研究院 | 一种电能表误差修正方法及装置 |
CN111965586A (zh) * | 2020-08-25 | 2020-11-20 | 安徽南瑞中天电力电子有限公司 | 预累计电能快速电能表起动和潜动的试验方法及其装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104808168A (zh) * | 2015-03-25 | 2015-07-29 | 广州市格宁电气有限公司 | 一种基于分段电流技术的电能表快速校验方法 |
CN105954703A (zh) * | 2016-05-27 | 2016-09-21 | 国网天津市电力公司 | 一种大规模快速批量兼容单、电能表自动化检定系统与方法 |
CN106054107A (zh) * | 2016-05-27 | 2016-10-26 | 国网天津市电力公司 | 快速批量电能表潜动试验装置脉冲对齐控制模块 |
CN106093831A (zh) * | 2016-05-27 | 2016-11-09 | 国网天津市电力公司 | 快速批量电能表潜动试验方法 |
CN107085196A (zh) * | 2017-04-19 | 2017-08-22 | 国网上海市电力公司 | 一种电子式交流电能表的检定方法 |
-
2018
- 2018-12-26 CN CN201811600418.0A patent/CN109597017A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104808168A (zh) * | 2015-03-25 | 2015-07-29 | 广州市格宁电气有限公司 | 一种基于分段电流技术的电能表快速校验方法 |
CN105954703A (zh) * | 2016-05-27 | 2016-09-21 | 国网天津市电力公司 | 一种大规模快速批量兼容单、电能表自动化检定系统与方法 |
CN106054107A (zh) * | 2016-05-27 | 2016-10-26 | 国网天津市电力公司 | 快速批量电能表潜动试验装置脉冲对齐控制模块 |
CN106093831A (zh) * | 2016-05-27 | 2016-11-09 | 国网天津市电力公司 | 快速批量电能表潜动试验方法 |
CN107085196A (zh) * | 2017-04-19 | 2017-08-22 | 国网上海市电力公司 | 一种电子式交流电能表的检定方法 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111413661A (zh) * | 2020-05-06 | 2020-07-14 | 郑州万特电气股份有限公司 | 一种采用标准表法进行仪表常数试验的检测方法 |
CN111413661B (zh) * | 2020-05-06 | 2022-03-29 | 郑州万特电气股份有限公司 | 一种采用标准表法进行仪表常数试验的检测方法 |
CN111896909A (zh) * | 2020-07-16 | 2020-11-06 | 河南省计量科学研究院 | 一种电能表误差修正方法及装置 |
CN111896909B (zh) * | 2020-07-16 | 2023-07-25 | 河南省计量科学研究院 | 一种电能表误差修正方法及装置 |
CN111965586A (zh) * | 2020-08-25 | 2020-11-20 | 安徽南瑞中天电力电子有限公司 | 预累计电能快速电能表起动和潜动的试验方法及其装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109597017A (zh) | 一种智能电能表起动和潜动的快速检测方法 | |
CN105182126B (zh) | 一种改进型配电变压器能效计量检测方法 | |
CN109901039A (zh) | 一种换流阀晶闸管均压元件测试装置及方法 | |
CN110146777A (zh) | 一种发电机/调相机转子匝间短路故障检测方法 | |
CN104316894A (zh) | 一种电能表实际运行环境的仿真校验方法 | |
CN102508055A (zh) | 一种风能发电并网系统检测装置及方法 | |
CN108169540A (zh) | 一种风力发电机组电压闪变的测量方法 | |
Yuan et al. | Experimental study on short-circuit current characteristics of a photovoltaic system with low voltage ride through capability under a symmetrical fault | |
CN105301391B (zh) | 基于有源滤波及谐波补偿的孤岛检测装置和方法 | |
CN103543317A (zh) | 用于测量iec标准电压闪变的方法 | |
WO2015192273A1 (zh) | 一种三相交流电弧炉自适应建模装置及其仿真算法 | |
CN105974272B (zh) | 一种被动式孤岛检测方法 | |
Rogalla et al. | Determination of the frequency dependent thévenin equivalent of inverters using differential impedance spectroscopy | |
CN107797017A (zh) | 一种电力变压器带电检测损耗特征参数的方法 | |
CN109839540A (zh) | 基于rpwm的在线单相并网逆变器弱网阻抗测量方法 | |
CN116087623A (zh) | 一种新能源并网系统整体阻抗测量方法及装置 | |
CN205786930U (zh) | 一种电子电力变压器电能质量检测装置 | |
CN211505780U (zh) | 一种集成式10kV氧化锌避雷器试验系统 | |
Górecki et al. | The power quality in low-power solar off-grid system | |
CN107561380A (zh) | 一种探究配电变压器绕组交流电阻与谐波次数关系的实验装置和实验方法 | |
CN113054747A (zh) | 一种配电台区非线性负荷的非侵入式检测方法 | |
CN207623427U (zh) | 中间继电器感应电压屏蔽—rc速选测试箱 | |
CN105223452A (zh) | 实现电能质量监测及污染源定位的电能质量监测仪和方法 | |
CN1019621B (zh) | 磁控管阴极与阳极同心度调整技术 | |
CN112557788B (zh) | 一种考虑电网强度的并联型有源电力滤波器性能检测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190409 |
|
RJ01 | Rejection of invention patent application after publication |