CN109595584A - Gas baffle mechanism in waste heat boiler - Google Patents

Gas baffle mechanism in waste heat boiler Download PDF

Info

Publication number
CN109595584A
CN109595584A CN201811608073.3A CN201811608073A CN109595584A CN 109595584 A CN109595584 A CN 109595584A CN 201811608073 A CN201811608073 A CN 201811608073A CN 109595584 A CN109595584 A CN 109595584A
Authority
CN
China
Prior art keywords
heat exchanger
exchanger tube
gas baffle
support frame
suspension hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811608073.3A
Other languages
Chinese (zh)
Inventor
蒋东
陶春红
朱建云
朱丹萍
许科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Hailu Heavy Industry Co Ltd
Original Assignee
Suzhou Hailu Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Hailu Heavy Industry Co Ltd filed Critical Suzhou Hailu Heavy Industry Co Ltd
Priority to CN201811608073.3A priority Critical patent/CN109595584A/en
Publication of CN109595584A publication Critical patent/CN109595584A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23MCASINGS, LININGS, WALLS OR DOORS SPECIALLY ADAPTED FOR COMBUSTION CHAMBERS, e.g. FIREBRIDGES; DEVICES FOR DEFLECTING AIR, FLAMES OR COMBUSTION PRODUCTS IN COMBUSTION CHAMBERS; SAFETY ARRANGEMENTS SPECIALLY ADAPTED FOR COMBUSTION APPARATUS; DETAILS OF COMBUSTION CHAMBERS, NOT OTHERWISE PROVIDED FOR
    • F23M9/00Baffles or deflectors for air or combustion products; Flame shields
    • F23M9/10Baffles or deflectors formed as tubes, e.g. in water-tube boilers

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Combustion Of Fluid Fuel (AREA)

Abstract

The invention discloses the gas baffle mechanisms in a kind of waste heat boiler, it include: to be arranged to form gas baffle by several spaced heat exchanger tubes, it is connected by top elbow between the top of adjacent heat exchange tubes in each heat exchanger tube row, it is connected by bottom elbow between the bottom of adjacent heat exchange tubes in each heat exchanger tube row, heat exchanger tube is arranged in pairs, the upper end of two adjacent heat exchanger tubes of each group of two heat exchanger tubes row end is connected by bridge piece, and burner hearth is stretched out in the upper end of all heat exchanger tube rows;Support frame is provided with above gas baffle, several sunpenders are provided on support frame, the lower end of every sunpender is threaded with adjusting nut, and suspension hook is fixedly installed on each adjusting nut, and each suspension hook hangs a top elbow to hang on the support frame gas baffle.The present invention has the advantages that the connection structure between gas baffle and support frame is simplified, the service life of the erecting by overhang of gas baffle effectively extends.

Description

Gas baffle mechanism in waste heat boiler
Technical field
The present invention relates to boiler technology fields, and in particular to the gas baffle mechanism in waste heat boiler.
Background technique
Gas baffle is arranged in water-cooling wall radiation chamber or water-cooling wall convection cell, and its role is to upset flow of flue gas side To degree of filling of the raising flue gas in entire burner hearth, to effectively improve heat transfer effect.
Gas baffle is fixedly connected on the support frame, and a large amount of dust stratifications are had after working long hours, on gas baffle, in order to Dust stratification on gas baffle is removed, the principle of low frequency oscillation usually can be all taken, is made on gas baffle by rapping Dust is fallen.But current due to being fixedly connected between gas baffle and support frame, gas baffle under the action of rapping power Connection between support frame is easily damaged.
Summary of the invention
The technical problem to be solved in the invention is: providing the cigarette in a kind of waste heat boiler that can effectively prolong the service life Gas baffle mechanism.
To solve the above problems, the technical solution adopted by the present invention is that: the gas baffle mechanism in waste heat boiler, comprising: Gas baffle in burner hearth is set, and the gas baffle is arranged by several spaced heat exchanger tubes and formed, adjacent heat exchange Heat exchanger tube row between pipe row and positioned at both ends and there are the gap current for flue gas, Mei Gehuan between the inner wall of burner hearth It is connected by top elbow between the top of adjacent heat exchange tubes in heat pipe row, the bottom of adjacent heat exchange tubes in each heat exchanger tube row It is connected by bottom elbow between portion, heat exchanger tube is arranged in pairs, and each group of two heat exchanger tubes arrange adjacent two in end The upper end of root heat exchanger tube is connected by bridge piece, and burner hearth is stretched out in the upper end of all heat exchanger tube rows;Gas baffle it is upper Side is provided with support frame, several sunpenders is provided on support frame, the lower end of every sunpender is threaded with adjusting nut, each Suspension hook is fixedly installed on adjusting nut, each suspension hook hangs a top elbow to prop up gas baffle hanging On support.
Further, the gas baffle mechanism in waste heat boiler above-mentioned, wherein stretch out on the gas baffle of burner hearth and be arranged There is rapping beam, the rapping beam is arranged perpendicular to each heat exchanger tube and is welded and fixed between each heat exchanger tube row.
Further, the gas baffle mechanism in waste heat boiler above-mentioned, wherein the suspension hook is U-shaped suspension hook, U The both ends of shape suspension hook are weldingly fixed on nut.
Further, the gas baffle mechanism in waste heat boiler above-mentioned, wherein the installation knot between sunpender and support frame Structure includes: that installation through-hole is offered on support frame, and the upper end of sunpender is stretched out from installation through-hole, on the sunpender above installation through-hole It is provided with washer and is threaded with locking nut, washer is pressed on the support frame at the top of installation through-hole by locking nut.
Further, the gas baffle mechanism in waste heat boiler above-mentioned, wherein all heat exchanger tubes row's of gas baffle Top is provided with import header and outlet header, and two heat exchanger tubes of each group of two exclusive ends of heat exchanger tube are respectively that import is changed Heat pipe and outlet heat exchanger tube, the upper end of every import heat exchanger tube is connected with import header, and every outlet heat exchanger tube and goes out Mouth header is connected.
The invention has the advantages that one, using heat exchanger tube arrange to form gas baffle, in this way can not only be in burner hearth inner barrier cigarette Gas improves degree of filling of the flue gas in burner hearth, moreover it is possible to heat exchange is carried out, to make full use of the heat of high-temperature flue gas.Two, it is formed The heat exchanger tube row of gas baffle is hung on suspension hook by top elbow, and this not only simplifies between gas baffle and support frame Connection structure, it is thus also avoided that rigid connection is formed between gas baffle and support frame, it is clear when being carried out by the way of impact vibration When ash work, the situation that can effectively avoid the erecting by overhang for hanging entire gas baffle impaired because of rapping power occurs, thus The service life of erecting by overhang can effectively be extended.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the gas baffle mechanism in waste heat boiler of the present invention.
Fig. 2 is structural schematic diagram shown in Fig. 1 left view direction.
Fig. 3 is the attachment structure schematic diagram between the middle and upper part Fig. 1 elbow and sunpender.
Fig. 4 is Fig. 3 left view direction structural schematic diagram.
Specific embodiment
The following further describes the present invention in detail with reference to the accompanying drawings and preferred embodiments.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, the gas baffle mechanism in waste heat boiler, comprising: the cigarette in burner hearth 1 is set Gas baffle 20.The gas baffle 20 is formed by several spaced heat exchanger tubes rows 2, adjacent heat exchanger tube arranges between 2, with And there are the gaps 21 current for flue gas between the heat exchanger tube row 2 at both ends and the inner wall of burner hearth 1.Each heat exchanger tube row 2 It is connected by top elbow 22 between the top of middle adjacent heat exchange tubes, the bottom of adjacent heat exchange tubes in each heat exchanger tube row 2 Between be connected by bottom elbow 23.In pairs, it is adjacent that each group of two heat exchanger tubes arrange 2 ends to heat exchanger tube row 2 The upper end of two heat exchanger tubes is connected by bridge piece 24, and burner hearth 1 is stretched out in the upper end of all heat exchanger tube rows 2.The present embodiment In, the top of gas baffle 20 is provided with import header 9 and outlet header 10, and each group of two heat exchanger tube arranges the two of 2 outer ends Root heat exchanger tube be respectively import heat exchanger tube 25 and outlet heat exchanger tube 26, the upper end of every import heat exchanger tube 25 with import header 9 It is connected, every outlet heat exchanger tube 26 is connected with outlet header 10.
The top of gas baffle 20 is provided with support frame 4, is provided with several sunpenders 5 on support frame 4, under every sunpender 5 End is threaded with adjusting nut 6, and suspension hook 7, suspension hook described in the present embodiment are fixedly installed on each adjusting nut 6 7 be U-shaped suspension hook, and the both ends of U-shaped suspension hook are weldingly fixed on the outer wall of adjusting nut 6.Adjusting nut 6 is adjustable in sunpender 5 On position, thus to adjust the height of hanging.In the present embodiment, the mounting structure between every sunpender 5 and support frame 4 is wrapped It includes: offering installation through-hole 41 on support frame 4, the upper end of sunpender 5 is stretched out from installation through-hole 41, and 41 top of installation through-hole is hung It is provided with washer 42 on bar 4 and is threaded with locking nut 8, locking nut 8 is by the pressure of washer 42 gear at 41 top of installation through-hole Support frame 4 on.
Each suspension hook 7 is hung with a top elbow 22, thus by the hanging of entire gas baffle 20 on support frame 4. The quantity of sunpender 5 can need to be arranged according to practical hanging, as long as ensuring that entire gas baffle 20 can lift i.e. with surely leaning on It can.
In the present embodiment, stretch out on the gas baffle 20 of burner hearth 1 and be provided with rapping beam 11, the rapping beam 11 perpendicular to Each heat exchanger tube is arranged 2 and is welded and fixed between each heat exchanger tube row 2.It is arranged after rapping beam 11, can periodically passes through vibration Rapping beam 11 is beaten, so that the dust on the gas baffle 20 being located in burner hearth 1 be made to fall.Gas baffle 20 passes through 7 activity of suspension hook Hanging is on support frame 4, and the rapping power being handed on sunpender 5 in this way will effectively reduce, so as to protect the hangings such as sunpender 5 entire The erecting by overhang of gas baffle 20.
The present invention has the advantages that one, using heat exchanger tube row 2 formed gas baffles 20, in this way can not only be in 1 internal resistance of burner hearth Flue gas is kept off, improves degree of filling of the flue gas in burner hearth, moreover it is possible to heat exchange is carried out, to make full use of the heat of high-temperature flue gas.Two, Formed gas baffle 20 heat exchanger tube row 2 by top elbow 22 hang on suspension hook 7, this not only simplifies gas baffle 20 with Connection structure between support frame 4, it is thus also avoided that rigid connection is formed between gas baffle 20 and support frame 4, when using impact When the mode of vibration carries out deashing work, can effectively avoid the erecting by overhang for hanging entire gas baffle 20 due to rapping power by The case where damage, occurs, so as to effectively extend the service life of erecting by overhang.

Claims (5)

1. the gas baffle mechanism in waste heat boiler, comprising: the gas baffle in burner hearth is arranged in, it is characterised in that: described Gas baffle is arranged by several spaced heat exchanger tubes and is formed, between adjacent heat exchanger tube row and the heat exchanger tube positioned at both ends Arrange between the inner wall of burner hearth there are the gap current for flue gas, in each heat exchanger tube row between the top of adjacent heat exchange tubes It is connected by top elbow, is connected by bottom elbow between the bottom of adjacent heat exchange tubes in each heat exchanger tube row, is changed Heat pipe is arranged in pairs, and the upper end of two adjacent heat exchanger tubes of each group of two heat exchanger tubes row end passes through bridge piece phase Burner hearth is stretched out in the upper end of connection, all heat exchanger tube rows;Support frame is provided with above gas baffle, if being provided on support frame Dry sunpender, the lower end of every sunpender are threaded with adjusting nut, suspension hook are fixedly installed on each adjusting nut, each Suspension hook hangs a top elbow to hang on the support frame gas baffle.
2. the gas baffle mechanism in waste heat boiler according to claim 1, it is characterised in that: stretch out the flue gas gear of burner hearth Rapping beam is provided on plate, the rapping beam is arranged perpendicular to each heat exchanger tube and welded between each heat exchanger tube row solid It is fixed.
3. the gas baffle mechanism in waste heat boiler according to claim 2, it is characterised in that: the suspension hook is U-shaped The both ends of suspension hook, U-shaped suspension hook are weldingly fixed on nut.
4. the gas baffle mechanism in waste heat boiler according to claim 1 or 2 or 3, it is characterised in that: sunpender and support Mounting structure between frame includes: that installation through-hole is offered on support frame, and the upper end of sunpender is stretched out from installation through-hole, and installation is logical It is provided with washer on sunpender above hole and is threaded with locking nut, washer is pressed on installation through-hole top by locking nut On the support frame in portion.
5. the gas baffle mechanism in waste heat boiler according to claim 1 or 2 or 3, it is characterised in that: gas baffle The top of all heat exchanger tube rows is provided with import header and outlet header, two heat exchange of each group of two exclusive ends of heat exchanger tube Pipe is respectively import heat exchanger tube and outlet heat exchanger tube, and the upper end of every import heat exchanger tube is connected with import header, and every goes out Mouth heat exchanger tube is connected with outlet header.
CN201811608073.3A 2018-12-27 2018-12-27 Gas baffle mechanism in waste heat boiler Pending CN109595584A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811608073.3A CN109595584A (en) 2018-12-27 2018-12-27 Gas baffle mechanism in waste heat boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811608073.3A CN109595584A (en) 2018-12-27 2018-12-27 Gas baffle mechanism in waste heat boiler

Publications (1)

Publication Number Publication Date
CN109595584A true CN109595584A (en) 2019-04-09

Family

ID=65964492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811608073.3A Pending CN109595584A (en) 2018-12-27 2018-12-27 Gas baffle mechanism in waste heat boiler

Country Status (1)

Country Link
CN (1) CN109595584A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA342412A (en) * 1934-06-19 Kooistra Lambert Boiler tube support
RU2171960C2 (en) * 1999-11-09 2001-08-10 Открытое акционерное общество "Череповецкий сталепрокатный завод" Furnace for thermal and chemical treatment of metalware in controlled atmosphere and method of its heating
CN201955005U (en) * 2010-12-02 2011-08-31 上海久升节能工程有限公司 Fixing and guiding device for heat exchange tube group in waste heat boiler for submerged arc furnace
CN104121587A (en) * 2014-08-06 2014-10-29 无锡华光锅炉股份有限公司 Smoke baffle structure of garbage incineration furnace
CN207907720U (en) * 2018-01-30 2018-09-25 天津华能北方热力设备有限公司 A kind of electric-furnace exhaust heat boiler with Z-type heat exchanger tube
CN209893454U (en) * 2018-12-27 2020-01-03 苏州海陆重工股份有限公司 Smoke baffle mechanism in waste heat boiler

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA342412A (en) * 1934-06-19 Kooistra Lambert Boiler tube support
RU2171960C2 (en) * 1999-11-09 2001-08-10 Открытое акционерное общество "Череповецкий сталепрокатный завод" Furnace for thermal and chemical treatment of metalware in controlled atmosphere and method of its heating
CN201955005U (en) * 2010-12-02 2011-08-31 上海久升节能工程有限公司 Fixing and guiding device for heat exchange tube group in waste heat boiler for submerged arc furnace
CN104121587A (en) * 2014-08-06 2014-10-29 无锡华光锅炉股份有限公司 Smoke baffle structure of garbage incineration furnace
CN207907720U (en) * 2018-01-30 2018-09-25 天津华能北方热力设备有限公司 A kind of electric-furnace exhaust heat boiler with Z-type heat exchanger tube
CN209893454U (en) * 2018-12-27 2020-01-03 苏州海陆重工股份有限公司 Smoke baffle mechanism in waste heat boiler

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱大林等: "《起重机械设计》", vol. 1, 31 December 2014, 武汉:华中科技大学出版社 , pages: 79 *

Similar Documents

Publication Publication Date Title
CN106247361B (en) A kind of special deashing device of horizontal mineral hot furnace waste heat boiler
CN217844901U (en) Anti-condensation self-ash-cleaning evaporator of waste heat boiler
CN209893454U (en) Smoke baffle mechanism in waste heat boiler
CN109595584A (en) Gas baffle mechanism in waste heat boiler
CN203857445U (en) Waste heat boiler adaptive to high temperature semi-coke solid particle waste heat recovery and utilization
CN210891594U (en) Positive pressure vertical water pipe waste heat boiler
CN209801441U (en) Dry-back horizontal type marine fuel oil boiler
CN205388305U (en) Novel low temperature second grade economizer
CN109099412B (en) Mounting structure of high-temperature high-pressure back flue economizer of power station
CN108006659A (en) The combined type deashing arrangement and method for arranging of a kind of garbage burning boiler
CN209840066U (en) Self-ash-cleaning anti-blocking fly ash separation structure
CN217109526U (en) Comb-shaped plate structure of superheater tube
CN207230919U (en) A kind of chain grate hot-water boiler with boiler tail afterheat energy-saving environmental protecting device
CN206803134U (en) CFBB superheater support structure
CN215597313U (en) Hot water heater structure for boiler equipment
CN219955653U (en) Novel biomass-fired hot water boiler
CN109708097A (en) One kind is from the anti-blocking flying dust separated structure of deashing
CN111174224A (en) Boiler convection heating surface rapping dust removal device and rapping method
CN212869740U (en) Hanging structure of horizontal garbage boiler superheater
CN212901465U (en) Boiler platen superheater for large power station
CN216244397U (en) Evaporator structure of waste incineration boiler
CN218459802U (en) Dust collecting pole system and electric dust collector comprising same
CN219775695U (en) Flue gas waste heat boiler of Conscodi electric furnace of steel mill with horizontal water-cooled wall structure
CN214223087U (en) Device for preventing refractory material at bottom of CFB boiler hanging screen from falling off
CN217604076U (en) Adjustable arch structure for double-drum transverse reciprocating grate boiler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination