CN109583778A - Big 4th area management method and system - Google Patents

Big 4th area management method and system Download PDF

Info

Publication number
CN109583778A
CN109583778A CN201811483404.5A CN201811483404A CN109583778A CN 109583778 A CN109583778 A CN 109583778A CN 201811483404 A CN201811483404 A CN 201811483404A CN 109583778 A CN109583778 A CN 109583778A
Authority
CN
China
Prior art keywords
distribution network
area
network data
data
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811483404.5A
Other languages
Chinese (zh)
Inventor
陈立新
姚旭
秦锋蕴
张博伦
安光辉
赵超阳
朱毅然
梁珺
韩烨锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Network Xinjiang Electric Power Co Ltd
Beijing Kedong Electric Power Control System Co Ltd
State Grid Xinjiang Electric Power Co Ltd
Original Assignee
National Network Xinjiang Electric Power Co Ltd
Beijing Kedong Electric Power Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Network Xinjiang Electric Power Co Ltd, Beijing Kedong Electric Power Control System Co Ltd filed Critical National Network Xinjiang Electric Power Co Ltd
Priority to CN201811483404.5A priority Critical patent/CN109583778A/en
Publication of CN109583778A publication Critical patent/CN109583778A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention provides one kind big 4th area management method and system, is related to dispatching of power netwoks fortune inspection technical field.The management method is based on an area and 4th area, comprising: obtains the distribution network data in an area and/or 4th area, the power distribution network data include the power distribution network artwork data in an area and/or the power distribution network business datum in 4th area;According to the default level of organization by the corresponding organization of the power distribution network data correlation;Zone of responsibility and the administration authority of the distribution network data are configured to the default level owning user.The management method can at least manage all power grid organizations of a provincial company, according to level locating for power grid organization, owning user for different power grid organizations distributes different administration authorities, strengthens the management function to each power grid organization;Secondly, the owning user for different power grid organizations distributes certain zone of responsibility, the safety of electric network data is strengthened.

Description

Big 4th area management method and system
Technical field
The present invention relates to dispatchings of power netwoks to transport inspection technical field, in particular to a kind of big 4th area management method and system.
Background technique
One sound zone system is generally deployed in an area, for the dispatching management information system that distribution scheduling personnel use, four sound zone systems 4th area are deployed in, the fortune used for power grid fortune inspection personnel examines management system.
Big four sound zone system is exactly the scheduling business of a sound zone system to be passed through as far as possible the completion of four sound zone systems, so that big four fauna System is provided simultaneously with the function of scheduling and fortune inspection.
What a current area or four sound zone systems was built both for each districts and cities, none can be with statistical management and monitoring The system of the whole province's distribution operating condition, and for the main station system in the city, main station system, that is, scheduling system, main station system is in group Loom structure management aspect, there is no the functions of information department management, lack a specific distinguishing hierarchy;In data management side Face, the data that user is browsed to substantially are all whole network datas, and data between each districts and cities as it can be seen that there are data safeties Hidden danger;In terms of permission, the permission that user obtains also compare it is more, each districts and cities can not systematization safeguard the user and angle of this districts and cities Color, coupling is excessive between prefectures and cities, easy to operate by mistake to lead to the case where deleting other districts and cities user appearance.
Summary of the invention
It is an object of the present invention in view of the deficiency of the prior art, provide one kind big 4th area management method and be System, this method can be used for statistical management and monitoring the whole province's distribution operating condition.
To achieve the above object, technical solution used in the embodiment of the present invention is as follows:
In a first aspect, the embodiment of the present invention provides a kind of big 4th area management method, tetra- area's management method of Gai great is based on an area With 4th area, comprising:
The distribution network data in an area and/or 4th area is obtained, the power distribution network data include the power distribution network artwork data in an area And/or four area power distribution network business datum;
According to the default level of organization by the corresponding organization of the power distribution network data correlation;
Zone of responsibility and the administration authority of the distribution network data are configured to the default level owning user.
Further, the distribution network data in an area further includes remote-control data, and the distribution network data in 4th area also wraps It includes: the remote signalling and telemetry, short circuit of the remote signalling data of a distant terminal, the remote signalling of two distant terminals and telemetry, three distant terminals Failure and ground fault data.
Further, the default level according to organization is by the corresponding organization of the power distribution network data correlation Before, comprising: if default level level not corresponding with the organization, increase in the default level with it is described The corresponding level of organization.
Further, zone of responsibility and the administrative power that the distribution network data is configured to the default level owning user Limit, comprising:
Corresponding administrator is established to each default level, and establishes the user of the affiliated level of the administrator, to every The corresponding zone of responsibility of the distribution network data and administration authority in a affiliated level of user configuration.
Further, zone of responsibility and the administrative power that the distribution network data is configured to the default level owning user Limit, further includes:
The corresponding zone of responsibility of the distribution network data and administration authority according to the default level owning user configuration, mistake Filter the distribution network data being not belonging in the zone of responsibility and administration authority.
Further, the method also includes: the operation number of the power distribution network of each default level is counted according to predetermined period According to the power distribution network operation data includes at least one of the data of static rack, terminal coverage rate, online rate.
Further, the operation data of the power distribution network of each default level after the statistics is based on GIS-Geographic Information System figure Graphic data is shown.
Further, the method also includes the distribution network datas in monitoring one area and/or 4th area, if monitoring institute The distribution network data for stating an area and/or 4th area breaks down, and the failure is sent to user belonging to the default level.
Second aspect, the embodiment of the present invention also provide a kind of big 4th area management system, and the system comprises a sound zone systems, four Sound zone system and big four sound zone system, big four sound zone system include:
Module is obtained, for obtaining the distribution network data in an area and/or 4th area, the power distribution network data include matching for an area Power grid artwork data and/or the power distribution network business datum in 4th area;
Relating module, for the default level according to organization by corresponding group of loom of the power distribution network data correlation Structure;
Configuration module, for configuring zone of responsibility and the administrative power of the distribution network data to the default level owning user Limit.
It optionally, further include measuring terminals, the measuring terminals are for obtaining distribution network data, and by the distribution netting index According to being sent to big four sound zone system, wherein the measuring terminals include a distant terminal, two distant terminals, three distant terminals and short circuit With Earth Fault Detection terminal.
The third aspect, the embodiment of the present invention also provide a kind of computer readable storage medium, are stored thereon with computer journey Sequence, when the computer program is executed by processor, realize big 4th areas management method described above the step of.
The beneficial effects of the present invention are:
The embodiment of the present invention provides a kind of big 4th area management method and system, management method described above, based on an area and 4th area, big four sound zone system obtain the distribution network data in an area and/or 4th area, and all electricity of provincial company can at least be managed by having The function of mechanism, reticular tissue can be managed collectively all power grid organizations of the provincial company;In addition, according to power grid group Level locating for loom structure is distributed different administration authorities for the owning user of different power grid organizations, is strengthened to each The management function of a power grid organization;Secondly, the owning user for different power grid organizations distributes certain zone of responsibility, Strengthen the safety of electric network data.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the flow diagram one of big 4th area management method provided in an embodiment of the present invention;
Fig. 2 is the flow diagram two of big 4th area management method provided in an embodiment of the present invention;
Fig. 3 is the flow diagram three of big 4th area management method provided in an embodiment of the present invention;
Fig. 4 is the flow diagram four of big 4th area management method provided in an embodiment of the present invention;
Fig. 5 is the flow diagram five of big 4th area management method provided in an embodiment of the present invention;
Fig. 6 is the flow diagram six of big 4th area management method provided in an embodiment of the present invention;
Fig. 7 is the schematic device of big 4th area management system provided in an embodiment of the present invention;
Fig. 8 is another schematic device of big 4th area management system provided in an embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the present embodiment, it should be noted that one area of the present embodiment refers to the electricity used for network operation personnel Net scheduling system, 4th area refer to the power grid used for network operation personnel transport check system, great Si Qu refer to by an area with 4th area are merged, and most of scheduling business in an area is transferred in 4th area, so that 4th area have management power grid fortune inspection simultaneously The function of business and dispatching of power netwoks business.
In the application, " multiple " refer to two or more."and/or" describes the incidence relation of affiliated partner, indicates There may be three kinds of relationships, for example, A and/or B, can indicate: individualism A, exist simultaneously A and B, individualism B these three Situation.Character "/" typicallys represent the relationship that forward-backward correlation object is a kind of "or".
First embodiment
The embodiment of the present invention provides a kind of big 4th area management method, and the big 4th area management method is based on an area and 4th area, As shown in Figure 1, comprising:
S101. the distribution network data in an area and/or 4th area is obtained, wherein the power distribution network data include the distribution in an area Net artwork data and/or the power distribution network business datum in 4th area.
Wherein, the distribution network data in an area and/or 4th area is obtained, comprising: obtain the distribution network data in an area, obtain 4th area Distribution network data and three kinds of situations of electric network data in an area and 4th area can be obtained simultaneously.
Wherein, the power distribution network artwork data in an area refers to graph data and model data in power distribution network scheduling business, Wherein, graph data refers to that grid graph data, model data refer to the device datas such as power network switch.The power distribution network in 4th area The related data that business datum includes but is not limited in power distribution network fortune inspection, also may include the dependency number in power distribution network scheduling process According to the application is defined not to this.
S102. according to the default level of organization by the corresponding organization of the power distribution network data correlation.
Wherein, organization refers to power grid organization, and the default level of organization includes provincial company layer, districts and cities Company's layer and feeder zone and substation's area level, but it is not limited only to this, it also may include other layers according to practical situations Grade.Wherein, provincial company level is higher than prefecture-level company's layer, and prefecture-level company's level is higher than feeder zone and substation's area level.Such as: XX provincial electric power company, then it should belong to provincial company layer;Utilities Electric Co., the county XX, then it should belong to prefecture-level company's layer.
The distribution network data in the area and/or 4th area that get, will be according to the default level of organization and corresponding group Knit associated therewith.Such as: the distribution network data of each prefecture-level company's layer is associated with each prefecture-level company, belongs to provincial company The distribution network data of multiple prefecture-level companies, multiple prefecture-level company is associated with the provincial company respectively.I.e. each prefecture-level company The distribution network data of corresponding each prefecture-level company, each provincial company correspond to the total power distribution network of prefecture-level company all under the provincial company Data.
S103. zone of responsibility and the administration authority of the distribution network data are configured to the default level owning user.
Wherein, administration authority is set according to the default level owning user, including highest administrator, highest Managing user has highest permission, and the owning user that level can be preset to highest carries out additions and deletions and changes the management looked into;Similarly, respectively The owning user of a default level can manage the owning user lower than its level.
Zone of responsibility is one kind of administration authority, i.e., according to the owning user for presetting level, user can manage duty belonging to it Appoint the data in area.Such as: rank locating for the user is prefecture-level company's layer, then the user may only manage the electricity in its whom specific duties area Network data, and the electric network data of other prefecture-level companies cannot be managed.
Wherein, management method described above can be to all power grid groups of at least one provincial company for big four sound zone system Loom structure is managed collectively, specifically, an area and/or four sound zone systems by each districts and cities in the provincial company, realization pair The unified management of the provincial company, the application are defined not to this, and when managing multiple provincial companies, the management method will be with this Similar, the application just repeats no more.
In conclusion management method described above, big four sound zone system obtains the distribution network data in an area and/or 4th area, tool There is the function that can at least manage all power grid organizations of a provincial company, it can be to all power grid group looms of the provincial company Structure is managed collectively;In addition, the level according to locating for power grid organization, is the owning user of different power grid organizations Different administration authorities is distributed, the management function to each power grid organization is strengthened;Secondly, being different power grid group looms The owning user of structure distributes certain zone of responsibility, strengthens the safety of electric network data.
Further, the distribution network data in an area further includes remote-control data, and the distribution network data in 4th area also wraps It includes: the remote signalling and telemetry, short circuit of the remote signalling data of a distant terminal, the remote signalling of two distant terminals and telemetry, three distant terminals Failure and ground fault data.
Herein, it should be noted that herein simply by the measurement classification of terminal, terminal is divided into a distant terminal, two distant Terminal and three distant terminals, but a distant terminal, the specific type of two distant terminals and three distant terminals are not limited, it can be feeder line end End equipment (Feeder Terminal Unit, FTU), distribution transformer terminals equipment (distribution Transformer Supervisory Terminal Unit, TTU) or switching station terminal equipment (Distribution Terminal Unit, DTU), the application is defined not to this.
Telemetry function remotely measures and transmits operating parameter, including various electrical quantity (voltage, electric current, function on route The magnitudes such as rate) and load uncertainty etc., from classification, measured amount is analog quantity;Remote signaling function, i.e. remote collection simultaneously transmit Various protections and switching value information;Distant control function remotely receives and performs remote control command, mainly divide-shut brake, to long-range Some switching control devices are remotely controlled.
In this application, remote-control data access an area scheduling system, remote signalling data, telemetry, short trouble data, Ground fault data access 4th area fortune check system, weaken the dependence to area scheduling system, strengthen 4th area fortune check system Function so that the data that must be passed to area scheduling system are passed to area scheduling system, remainder data is then sent to 4th area Check system is transported, big four sound zone system finally will acquire an area and/or the distribution network data in 4th area is managed collectively, and realize to the whole province The unified monitoring of distribution network data.
Further, the default level according to organization is by the corresponding organization of the power distribution network data correlation Before, as shown in Figure 2, comprising:
If S104. default level level not corresponding with the organization, increase in the default level with The corresponding level of the organization.
Herein, it should be noted that if the level of current organization mechanism can not be found in existing default level, need to increase Add level corresponding with the organization in the default level, convenient for managing layer by layer.For example, the organization belongs to feeder line And substation level, but do not include feeder line and substation level in default level, feeder line and power transformation are added at this time for the organization It stands layer, allows to finely divide different organizations, realize multiple stratification management.
Further, as shown in figure 3, the responsibility for configuring the distribution network data to the default level owning user Area and administration authority, comprising:
S105. corresponding administrator is established to each default level, and establishes the user of the affiliated level of the administrator, To the corresponding zone of responsibility of distribution network data described in the affiliated level of each user configuration and administration authority.
Wherein, administration authority is set according to the default level owning user, including highest administrator, highest Managing user has highest permission, and the owning user that level can be preset to highest is managed, but for lower than its rank Default level, it will establish corresponding administrator for the default level, the administrator of each level establishes affiliated level User, to the corresponding zone of responsibility of distribution network data described in the affiliated level of each user configuration and administration authority.
I.e. each default level has its corresponding administrator, and each administrator, which has, can establish its level user Permission, each user have check the level distribution network data zone of responsibility and administration authority.
Further, as shown in figure 4, the responsibility for configuring the distribution network data to the default level owning user After area and administration authority, further includes:
S106. the corresponding zone of responsibility of the distribution network data according to the default level owning user configuration and administrative power Limit, filters out the distribution network data being not belonging in the zone of responsibility and administration authority.
Wherein, it should be noted that Fig. 4 has been merely given as the flow diagram of S103, S105 and S106, does not provide other The flow diagram of step, other step relationships can refer to flow diagram described above, this flow diagram repeats no more.
Further, the above method, as shown in Figure 5, further includes:
S107. the operation data of the power distribution network of each default level is counted according to predetermined period, the power distribution network runs number According to the data for including static rack, at least one of terminal coverage rate, online rate.
Wherein, predetermined period can be acquisition in every 15 minutes once, and as needed, collection period can also be adjusted, Acquisition data include the data of static network frame, and terminal coverage rate, online rate are at least one, herein, it should be noted that terminal refers to Can be Feeder Terminal Unit (FTU), distribution transformer terminals equipment (TTU) or switching station terminal equipment (DTU), the application is not right This is defined.Therefore, the application, can be with periodic statistical districts and cities index by coverage rate, the online rate of the above-mentioned terminal of statistics Situation grasps distribution network construction situation for each districts and cities in time and provides data support.
Further, the operation data of the power distribution network of each default level after the statistics is based on GIS-Geographic Information System figure Graphic data is shown.
When being monitored based on operating condition of the GIS-Geographic Information System graph data to the power distribution network of each default level, save Grade organization can preferably grasp the distribution operating condition of each clamp mechanism.For example, during provincial organization can use Between be embedded in map, the mode that surrounding comparison is shown, react each districts and cities' distribution construction and operating condition, and can by map To jump in the homepage of districts and cities, details are checked, prefecture-level user can grasp comprehensive display and prison by districts and cities' homepage Districts and cities' distribution operating condition is controlled, integrated management visualization is higher.
Further, the above method, as shown in Figure 6, further includes:
S108. the distribution network data in an area and/or 4th area is monitored, if monitoring matching for an area and/or 4th area When electric network data occurs abnormal, the exception is sent to the owning user that 4th area presets level.
Wherein, since 4th area are fortune check systems, an area and/or 4th area can monitor always the power distribution network in corresponding system The exception is sent to 4th area if the distribution network data for monitoring an area and/or 4th area occurs abnormal by data The owning user of default level.
Second embodiment
The embodiment of the present invention provides a kind of big 4th area management system, and the system comprises a sound zone systems, four sound zone systems and big Four sound zone systems, as shown in fig. 7, big four sound zone system includes:
Module 201 is obtained, for obtaining the distribution network data in an area and/or 4th area, the power distribution network data include an area Power distribution network artwork data and/or 4th area power distribution network business datum;
Relating module 202, for the default level according to organization by the corresponding tissue of the power distribution network data correlation Mechanism;
Configuration module 203, for configuring zone of responsibility and the pipe of the distribution network data to the default level owning user Manage permission.
Further, above system includes: a sound zone system, four sound zone systems and big four sound zone system.
Wherein, a sound zone system can be the power network dispatching system of prefecture-level company, and four sound zone systems are that the power grid of prefecture-level company is transported It can be sent to big four sound zone system from the distribution network data that prefectures and cities obtain by check system, a sound zone system and four sound zone systems, greatly Four sound zone systems are the synthesis grid management systems of the corresponding provincial company of the prefecture-level company, i.e., may be implemented pair by big four sound zone system The unified management and monitoring of entire provincial company distribution network data.
It optionally, further include measuring terminals, the measuring terminals obtain distribution network data, and the distribution network data is sent out It send to big four sound zone system, wherein the measuring terminals include a distant terminal, two distant terminals, three distant terminals and short circuit and connect Earth fault detects terminal, wherein a distant terminal, two distant terminals, three distant terminals and short circuit and Earth Fault Detection terminal please refer to First embodiment, details are not described herein by the application.
Specifically, for the districts and cities region of not main station system, main station system described herein, that is, scheduling system or a fauna If desired system monitors the power distribution network scheduling and fortune inspection operating condition in the districts and cities region, without additional buying main station system, on the ground City region is arranged corresponding measuring terminals, and measuring terminals are used to obtain the distribution network data in the districts and cities region, and by distribution netting index According to big four sound zone system is sent to, the monitoring function to the operation of power networks state in the districts and cities region can be realized, convenient with building, The characteristics of save the cost.
Above-mentioned apparatus can be used for executing the method for above method embodiment offer, specific implementation and technical effect class Seemingly, which is not described herein again.
3rd embodiment
Third embodiment of the invention provides a kind of program product, such as computer readable storage medium, is stored thereon with meter Calculation machine program, the program is when being executed by processor for executing above method embodiment.Specific implementation and technical effect Similar, which is not described herein again.
Optionally, the present invention also provides a kind of big 4th area managing devices, as shown in figure 8, the device can integrate in terminal The chip of equipment or terminal device, the terminal can be the calculating equipment for having data processing function.
The device includes: memory 301, processor 302.
Memory 301 is for storing program, the program that processor 302 calls memory 301 to store, to execute the above method Embodiment.Specific implementation is similar with technical effect, and which is not described herein again.
In several embodiments provided by the present invention, it should be understood that disclosed device and method can pass through it Its mode is realized.For example, the apparatus embodiments described above are merely exemplary, for example, the division of the unit, only Only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components can be tied Another system is closed or is desirably integrated into, or some features can be ignored or not executed.Another point, it is shown or discussed Mutual coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or logical of device or unit Letter connection can be electrical property, mechanical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.It can select some or all of unit therein according to the actual needs to realize the mesh of this embodiment scheme 's.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of hardware adds SFU software functional unit.
The above-mentioned integrated unit being realized in the form of SFU software functional unit can store and computer-readable deposit at one In storage media.Above-mentioned SFU software functional unit is stored in a storage medium, including some instructions are used so that a computer Equipment (can be personal computer, server or the network equipment etc.) or processor (English: processor) execute this hair The part steps of bright each embodiment the method.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (English: Read-Only Memory, abbreviation: ROM), random access memory (English: Random Access Memory, letter Claim: RAM), the various media that can store program code such as magnetic or disk.

Claims (10)

1. a kind of big 4th area management method, which is characterized in that the big 4th area management method is based on an area and 4th area, comprising:
Obtain the distribution network data in an area and/or 4th area, the power distribution network data include an area power distribution network artwork data and/or The power distribution network business datum in 4th area;
According to the default level of organization by the corresponding organization of the power distribution network data correlation;
Zone of responsibility and the administration authority of the distribution network data are configured to the default level owning user.
2. the method according to claim 1, wherein the distribution network data in an area further includes remote-control data, The distribution network data in 4th area further include: the remote signalling data of a distant terminal, the remote signalling of two distant terminals and telemetry, three distant ends The remote signalling at end and telemetry, short trouble and ground fault data.
3. the method according to claim 1, wherein the default level according to organization is by the distribution Network data is associated with before corresponding organization, comprising: if default level level not corresponding with the organization, Increase level corresponding with the organization in the default level.
4. the method according to claim 1, wherein described match to described in the default level owning user configuration The zone of responsibility of electric network data and administration authority, comprising:
Corresponding administrator is established to each default level, and establishes the user of the affiliated level of the administrator, gives each use Family configure belonging to the corresponding zone of responsibility of the distribution network data and administration authority in level.
5. the method according to claim 1, wherein described match to described in the default level owning user configuration The zone of responsibility of electric network data and administration authority, further includes:
The corresponding zone of responsibility of the distribution network data and administration authority according to the default level owning user configuration, filter out The distribution network data being not belonging in the zone of responsibility and administration authority.
6. according to the method described in claim 2, it is characterized in that, the method also includes: according to predetermined period count it is each The operation data of the power distribution network of default level, the power distribution network operation data include the data of static rack, terminal coverage rate, At least one of line rate.
7. according to the method described in claim 6, it is characterized in that, the fortune of the power distribution network of each default level after the statistics Row data are based on GIS-Geographic Information System graph data and are shown.
8. the method according to claim 1, wherein the method also includes monitoring one area and/or 4th areas Distribution network data the failure is sent to institute if the distribution network data for monitoring an area and/or 4th area breaks down State user belonging to default level.
9. a kind of big 4th area management system, which is characterized in that the system comprises a sound zone system, four sound zone systems and big four faunas System, big four sound zone system include:
Module is obtained, for obtaining the distribution network data in an area and/or 4th area, the power distribution network data include the power distribution network in an area Artwork data and/or the power distribution network business datum in 4th area;
Relating module, for the default level according to organization by the corresponding organization of the power distribution network data correlation;
Configuration module, for configuring zone of responsibility and the administration authority of the distribution network data to the default level owning user.
10. system according to claim 9, which is characterized in that further include measuring terminals, the measuring terminals are for obtaining Distribution network data, and the distribution network data is sent to big four sound zone system, wherein the measuring terminals include a distant end End, two distant terminals, three distant terminals and short circuit and Earth Fault Detection terminal.
CN201811483404.5A 2018-12-05 2018-12-05 Big 4th area management method and system Pending CN109583778A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811483404.5A CN109583778A (en) 2018-12-05 2018-12-05 Big 4th area management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811483404.5A CN109583778A (en) 2018-12-05 2018-12-05 Big 4th area management method and system

Publications (1)

Publication Number Publication Date
CN109583778A true CN109583778A (en) 2019-04-05

Family

ID=65927219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811483404.5A Pending CN109583778A (en) 2018-12-05 2018-12-05 Big 4th area management method and system

Country Status (1)

Country Link
CN (1) CN109583778A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112182526A (en) * 2020-09-22 2021-01-05 中国建设银行股份有限公司 Community management method and device, electronic equipment and storage medium
CN117689500A (en) * 2024-02-01 2024-03-12 山东未来集团有限公司 Distributed computing network management system and method based on green energy support

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105303119A (en) * 2015-09-14 2016-02-03 浪潮集团有限公司 Multi-data center privilege management method and system
CN106789187A (en) * 2016-12-02 2017-05-31 国网北京市电力公司 The method and system of power distribution network alarm management

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105303119A (en) * 2015-09-14 2016-02-03 浪潮集团有限公司 Multi-data center privilege management method and system
CN106789187A (en) * 2016-12-02 2017-05-31 国网北京市电力公司 The method and system of power distribution network alarm management

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112182526A (en) * 2020-09-22 2021-01-05 中国建设银行股份有限公司 Community management method and device, electronic equipment and storage medium
CN117689500A (en) * 2024-02-01 2024-03-12 山东未来集团有限公司 Distributed computing network management system and method based on green energy support

Similar Documents

Publication Publication Date Title
US8280656B2 (en) System and method for providing power distribution system information
CN104134320B (en) Lightning protection online environment monitoring alarming network system
US9021431B2 (en) System and method for developing, deploying and implementing power system computer applications
US20100019575A1 (en) System and method for creating and controlling a virtual power distribution unit
CN111489091A (en) Comprehensive evaluation method for restoring force of power system
EP3008478A1 (en) Non-technical losses in a power distribution grid
DE202008009128U1 (en) Consumption and state meter
WO2016094297A1 (en) An integrated hazard risk management and mitigation system
CA2465941A1 (en) Interactive system for managing and remotely connecting customer utility loads
CN102687463A (en) Network system and method of controlling network system
CN104123134A (en) Intelligent electricity use data management method and system based on AMI and J2EE
CN109583778A (en) Big 4th area management method and system
CN209184628U (en) Construction site worker dormitory electricity utilization safety management system
CN107171438A (en) A kind of net level matches somebody with somebody electricity consumption monitoring and management system
CN108573342A (en) State evaluating method, device, computer equipment and the storage medium of power equipment
CN108256770A (en) Photo-voltaic power generation station O&M managing and control system based on mobile application
CN115842342A (en) Topology identification method and device for distributed power distribution network
Al-Kanj et al. A probability model for grid faults using incomplete information
CN106340963A (en) Electric power distribution room intelligent commission maintenance monitoring system
CN117856226A (en) Safety analysis method and device for power grid and electronic equipment
CN203151231U (en) Monitoring and analysis system for power grid running state of electrical power system
CN205594405U (en) Connecting bridge and bridge carry equipment remote monitoring device based on flight information
US20130219279A1 (en) Aggregating nodes for efficient network management system visualization and operations
CN103545805A (en) Modeling-based railway power supply arm monitoring method
CN114244864A (en) Cross-region interconnection detection method and device for power monitoring system and computer equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190405